HomeMy WebLinkAbout20080595 Ver 1_Application_20080401..s,.,n I ~~r `Y~/
.~ ' ~~
-v •• ..r-
4,~~~~q~
4 p~R~A ~Rei~
STATE of NORTH CAROLINA ""'~i~
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
Go~'ERr~'OR
SECRET.aR1"
March 28.2008
Mr. Rob Ridings
V1'ctlands/401 Unit
NC DENR Division of Water Qualih~
2321 Crabtree Blvd.
Ra]eigh, NC 27604-2260
(Seven Copies)
080595
Subject: Buffer Authorization Requesi, for the demolition and reconstruction of Bridge No. ]42, SR.
1315 over Unnamed Tributan~ to Little Fishing Crcck, Halifax Count.'. TIP No. B-4540
Dear Sirs:
Please find enclosed the Pre-Construction Notification for the above referenced project. The
existing bridge (~l-feet long) will be replaced with a new bridge of approximately l13 feet in
length on the existing alignment. Traffic will use an offsite detour during construction. There are
impacts to the buffers of waters of the U.S./State associated with this project. The new bridge
will completely span the creek and a much larger portion of floodplain. The bridge replacement
will result in a better hydraulic opening and provide for increased wildlife passage beneath the
future bridge. Little Fishing Creek is located in the Tar-Pamlico River Basin and is classified b_v
the Division of Water Quality at this bridge as C, NSW 28-79-25.
The bridge will be removed by sa~~ ing the deck and lifting it out in sections. VVe will excavate behind the
end bents and fold them back. then remove them without dropping am' components into the creek. Timber
piles from the existing bridge Zvi]] be cut off'at the mud line of the strum usuig a ]t~draulic shear er other
means that da;s not require construction equipment to get into the water. Best Management Practices for
the Protection of Surface Waters and for Bridge Demolition and Removal ~~~ip be strictl~~ adhered to
during the removal of the existing bridge.
(252) 237-6164 x 3532 ccoggins a~dot.state.nc.us
Post Office Box 3165, Wilson. North Carolina 27895-3165
FEDERALLY-PROTECTED SP>/C1ES AND CULTURAL RESOURCES
The Fish and \\'ildlifc Sen~ice (F\'VS) currentl~• list two fcderalh• protected species for Halifax Count~•
(Table 1).
Federal Habitat Biological
Common Name Scientific Name Status Present Conclusion
Red-cockaded Picoides borealis E N No Effect
woodpecker
Dwarf wedge mussel Alasmidonla helerodon E N 1\9ay Effect,
Not likely to
adversely affect
Tar spiny mussel Elliplio sleinsla~l.caj~a E N No Effect
A verbal concurrence eras recc;ived from Garv Jordan that conscn•ation measures arc not needed for the
Dwarf wedge mussel at this time. No clement occurrences are listed on the NHP database ~rithin one mile
of the bridge. I~'o pine trees suitable for RC\~j foraging or nesting are in, or adjacent to, the bridge. This
project is not likeh• to jeopardize the continued existence of any of the federally protected species listed in
Halifax County.
No sites eligible for listing on the National Register occur within the area of potential effect. This project
will not affect listed or eligible historic properties.
Regulatory Approvals
USAGE Section 404 Permit: This project has no \rl~aters of the US impacts.
NCD\\'Q Section 401 Certification: This project has no \~4'aters of the US impacts.
NCDW O Buffer Rules: As bridges are an allo~~~able use they require written authorization from the
Division of \\'ater Qualih•. Onl~~ Buffer Rule aopro~•al is sousht in ~~•ritina.
Please contact Chad Goggins at (252) 296-35 32 if you have an_v questions or need additional information.
Your time and effort arc appreciated.
Respectfulh~ Yours.
~% `.
' ~~~%'~-
i,
R.E. Greene, Jr., PE `. ~
Division Engineer -Division 4
(252) 237-6164 x 3532 ccoggins•aJdot.state.nc.us
Post Office Box 3165. Wilson, North Carolina 27895-3165
OlTlce USe Only: Form VernionMareh OS
USACE Action ID 11'0. DV1'Q No. 2 ~ ~ 8 ~ 5 9 5
(If an~~ particular item is not applicable to Uus project. please enter "Not Applicable" or "N/A".)
L Processing
Check all of the approval(s) requested for this project:
^ Section 404 Permit ® Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from D~~I'Q
^ 401 Water Quality Certification ^ Express 40l Water Quality Certification
2. I~Tationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because ~~'ritten approval for the 401 Certification
is not required, check here: ^
4. if payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
if your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
Owner/Applicant Information
Name: R. E. Greene -Division Engineer
Mailing Address: PO Box 3165
~'~~ilson. NC 27895-3 ] 65
Telephone Number: 252-237-6164x3 i0l Fax Number: 252-234-6174
E-mail Address: rgreenendot.state.nc.us
_'. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the ow~neriapplicant.)
Name: Jamie Guerrero Division 4 Em~ironmental Officer
Company Affiliation: Division 4 - NCDOT
Mailing Address: 509 Ward Blvd.
Wilson. NC 27895-3165
Telephone Number: 252 237-6164x3530 Fax Number: 252-234-6174
E-mail Address: j~uerrero(u~dot.state.nc.us
i'pdated 11.'1 '2005
Page 5 of 13
,,, ,
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan shov,~ing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DV~'Q may accept paperwork of any size. DVVQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Bride # 142 on SR 13 l 5 over Unnamed Tributary (UT~ to Little Fishing
Creek in Halifax County
2. T.I.P. Project Number or State Project Number (NCDOT Only): g -' L~.~ ~ D
3. Property Identification Number (Tax PIN):
4. Location
County: Halifax Co. (USGS Hollister (NC) Quadrangle)
Nearest Town: Brinkleyville
Subdivision name (include phase/lot number): N/A
Directionsto site (include road numbers/names, landmarks, etc.): This site is located about
2 miles west of NC 4 on SR 13 l 5 in Halifax County
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct w~aterbody.)
Decimal Degrees (6 digits minimum): 36.2984 °N • 77.9162__ °~~h
6. Property size (acres): N/A
7. Name of nearest receiving body of water: LiT' to Little Fishing Creek (DVl'Q ID: C. NSA'
28-79-251
8. River Basin: Tar River
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at h;~~__?_~o rr.r s_a~e ~:~ ~~'a. _ ~r •~~a^s .)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: rural area forested around stream with some farmland in the
area
i ~~a:~t~a i ~ ~ ~~oos
Page G of 13
10. Describe the overall project in detail, including the type of equipment to be used:
The project is to replace Halifax Count~Brids;e # l42 over UT to Little Fishins Creek between
SR 1317 and 1316 The existing_,bridge has a total length of 41 feet The replacement structure
will be a bride approximately 113 feet in length providin>? 28 feet of clear deck width. The
bridge will include t~~~o 11 foot lanes ~~-ith 3 foot offsets.
] l .Explain the purpose of the proposed work NCDOT bridee maintenance unit records indicate
Bridge # 25 has a sufficiency rating of 29 out of a possible 100 The structural aoyraisal is a
4 out of a possible 9 Based of FHWA standards this structure is structurally deficrent.
Based on the sufficiency ratin~of less than__50 and the structural appraisal, the bridee is
eligible for the FHWA's Highway Bride R~lacement and Rehabilitation Pror:ram.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and. or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, D«'Q Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along N~ith associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
constnrction schedules.
Bridge previouslxapproved ~ 33CFR 330 3
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this ~~~ork from the current application.
Vl. Proposed Impacts to ~'~'aters of the United States/V1'aters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water; and stream channels associated ti'ith the project. Each impact must be
listed separately in the tables below (e.g., cul~°ert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
l'pdated 1 l: I '2005
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:. A number of timber piles will be
removed or cut off at the mud line of the stream using a hydraulic shear or other means that
does not require construction equipment in the stream No piles will be placed back in the
water. This bridge ~v~ill completely span the water.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and floodins?.
~~'etland Impact
Site Number
(indicate on map)
T~•pe of Impact T~~pe of R'etland
(e.g., forested, marsh,
herbaceous. bog. etc.) Located within
100-}car
Floodplain
(~•es,'no) Distance to
Nearest
Stream
(linear feet) Arca of
Impact
(acres)
Total ~~•'etland Lnpact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: NiA
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts; dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching; straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multit7ly ]math X ~~~idth, then divide by 43.560.
Stream Impact
Number
{indicate or, map)
Stream Name
~
Tti•pc of Impact
Perennial or
lntennittent? Average
Stream R'idth
Before Im act Impact
Length
!linear feat) Area of
Impact
iacres;l ~
Total Stream Impact (by length and acreage)
Updated 11.'1'005
Page S of 13
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Upen ~~-ater impacts include, but are not limited to
fall Pxcavatinn rlreduinQ fl~~ding drainaee_ bulkheads. etc.
Open V1'ater Impact
Site Number
(indicate on map) ,
1\ame of Waterbody
(if applicable)
Type of Impact Type of V1'aterbody
(lake, pond. estuan•, sound. ba~~.
ocean. etc.) Area of
Impact
(acres)
Total Open ~b'ater Impact (acres)
6. List the cumulative impact to all ~'~'aters of the U.S. resulting from the project: On1y
temporary impacts
Stream Impact (acres): 0
Wetland Impact (acres): 0
O en Water Impact (acres): 0
Total Impact to ~~'aters of the U. S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated ~~'aters
Do any isolated waters exist on the properly? ^ ~'es ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated ~~~etland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included ~~'ith this application.
Pond to be created in (check all that applyj: ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormvvater requirement, etc.): N/A
Current land use in the vicinity of the pond: N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
Updated 1 ];1.2005
Pagc 9 of 13
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. The bridge length will be
extended from 41 feet to 113 feet to span a lar>~erportion of the floodplain. A number of timber
piles will be removed from Little Fishing Creek with none being replaced in the stream resultin>;
in a net decrease in permanent stream impacts Strict enforcement of Best >\lana>;ement Practices
for sedimentation and erosion control and bridge demolition will be enforced during
construction No weep holes will be allowed in the bride deck which allow water to drain
directly into the stream Special sediment control fence (hardware cloth and stone) will be used
where appropriate throughout all phases of construction. Offsite detours will be used to avoid
temporary fill from an onsite detour.
VIII. Mitigation
DWQ - In accordance with l5A NCAC 2H .0500, mitigation may be required by the NC
Division of ~~l'ater Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January I5, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing i}le size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring; enhancing, or preser`~ing similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required !mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft. Technical Guide for Stream Work in North Carolina, available at
'~ !rn ,1 :., rr.~-ctciF p^ `te ~~4.et'r-~,'~'ct, '.`c. i•,tT,il
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
No mitigation is proposed. Buffer impacts less than 1/3 acre for bridges are an allowed
use per buffer rules.
Updated 11;1 2005
Pagc 10 of 13
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional in•formation regarding the application process for the NCEEP, check the NCEEP
website at htlx:_}I_e~.e~~r.sta*.e.~~;.us~~~~r;~ ince~,i:;::,. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of I`Ton-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
L~. Environmental Documentation (required by D«'Q)
1. Does the project involve an expenditure of public (federal/state local) funds or the use of
public (federal/state) land? Yes ® i~TO ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the I~Tational or North Carolina Environmental Policy Act (i\TEPA/SEPA)?
Note: 1f you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ®Meets Federal Categorical Exclusion criteria
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
?C. Proposed Impacts on Riparian and V1'atershed Buffers (required by D«'Q)
1t is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DVVQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), l5A NCAC 02B .0243 (Catawba) 15A NCAC
t~r,aa,za >>~~~zoos
Pagc l 1 of 13
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify Tar River )? ~'es ® I`TO ^
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multi>Jliers.
Zone* Impact Multiplier Required
(s uare feet) Mitigation
l 2338
2 1580
Total 3 918
` Zone 1 ealends out 30 feet perpendicular from the top of the near bark of channel; Zone 2 e~lends an
additiona120 feet from the edge of Z.une 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within I SA NCAC 2B .0242 or .0244, or .0260.
XI. Stormwater (required by DVVQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
Stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20°ro, please provide calculations
demonstrating total proposed impervious level.
All annrooriate best manaeement practices for sediment and erosion control will be
implemented
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastev~~ater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (l SA NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application? Yes ^ No
XIV. Cumulative impacts (required by DWQ)
t~T,aa,~a t t ~t ~2uus
Page 12 of 13
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
'--~-~ '~~~~ ~ - ~-:e ~~c ~s rc,~elas;~i~. If no, please provide a short narrative description:
1' .F' ..-y Clii~ ~'. _
XV.
Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
~' ~~'~~~
App~4fFa h gent's Signa
(Agent's signature is valid only if
r~c,d~,ea u-~~zous
Date
authorization letter from the applicant is provided.)
Pagc 13 of l3
•
~ ' ~
:a7/~1 "~s'2~G3 hNpt ~ a nele he •~ - t ~ ~ ~~
•
' ~ 1
+ r \
+ 'til ~ i ~~ - -.. ~, `' ~ .+ ~ ~~~`'` . ti`s-1~
.
~ i ~ _,y _ ~- _ i
+ _
~ <.
_
~
, - ~ -
! ; r _ _ _
+ ~
_ _ _
i-..
0 0.3 0.6 0.9 1.2 1.5 km
0 0.2 0.4 0.6 0.8 1 mi
36.2984°N, 77.9162°W (NAD83/WGS84)
USGS Hollister (NC) Quadrangle h'=-9. ~
Projection is UTM Zone 18 NAD83 Datum .. - _ . -
E
0
~'
V
W
O
See Sheef 1-A For Index of Sheets
See Stet 1-B For Con/entional Symbols
~"
N
r
1316
1.6
1315
PROJECT LOCATION
ti -_ s O
e
~~
- ry '
.~
I
~0
1315 ~ ~~ -~~ ~ " 56
1317 _ a
,- a 1~~
a c
~ 561 _ .~e~
VICINITY MAP
.rt--~--=- DETOUR
TO SR 1317
••
V GRAPHIC SCALES
25 12.5 r-10 25 50
o PLANS
25 12.5 0 25 50
O PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL) __..
END CONSTRUCTION
END TIP PROJECT B-4540
-L- STA. 18 + 60.75
END BRIDGE
-L- STA. 16+56.25
HALIFAX. COUNTY
LOCATION: BO ~~~~ 'FISHIKGSCREEKOBETWEENASR 317 AINDTARY
SR 1316
TYPE OF WORK: GRADING, PAVING, DRAINAGE, GUARDRAIL ~' SIGNING
END PAVING
STA. 17 + 35.00
SR 1315
Unnamed Tributary fo
Uttle Flshing Creek
BEGIN BRIDGE 1\~e
-L- STA. 15 + 43.75 ~'
I
BEGIN CONSTRUCTION
- BEGIN TIP PROJECT B-4540
-L- STA. 12 + 51.75
DESIGN DATA
ADT 2007 = 300
ADT 2030 = 600
DHV =
D = %
T = 3 %'
V = 55 MPH
' TTST 1% DUAL 2%
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT 8-4540 =
LENGTH STRUCTURES TIP PROJECT B-4540 =
TOTAL LENGTH TIP PROJECT B-4540 =
BIER
e R~]l 1eoRT epWH01 M
~. 8-4540 1
33755.1.1 BRZ-131517) PE
4
BEGIN PAVING
-L- STA. 14 + 65.00
NCDOT CONTACT: MIKE SUMMERS -BRIDGE MAINTENANCE UNIT
Preyarad 1n tle Oli1ce ol: H3URAULICS
LT~'~ HDR Engineering, Inc. ENGINEER
of the Carolinas
3773 Nollon°I Drire, Suite 207 Roleigh, NC 27612
496.5' FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
1006 STAA'DARD SPECIFlGTfONS
112.5' PE
S1GA'ANAE:
609' RIGHT OF N'AY DATE: mn7rxrc M. xAJa'RaucHT,P.E. ROADWAY DESIGN
PROJECT ENGINEER ENGINEER
LETTING DATE: RONYEll A. THIGPEN, P.E.
PROJECT DES1Gh' ENGINELA
or
TO SR 1316
INCOMPLETE PLANS
DD ~'M l'A P°N P%~ ntVl'ISITbn'
PRELIMINARY PLANS
ro sor r~ ro0 msarOCrnan
DII7SION OF HIGHN'A1'S
STATE OF NORTH CAROLINA
`° OON N
e
~i °~
,~-.~
w m~nuuuu
r I
o; .~~
~~~
a ,~~ ~ ~ ~1
~
~
~
~
!n
p
~•
J~
CATEGORICAL EXCLUSION ACTION CLASSIFICATIOIR.T FORI`1 ~kd T~~~, `UO~ ~
TIP Project No.
B-4540 ~~/.r;
~'''~.~"~.
State Project No. 8.2302001 °'
W.B.S. No. 33755.1.1
Federal Project No. BRZ-1315 (7)
OV ~ cJ~'
A. Project Description:
The purpose of this project is to replace Halifax County Bridge No. 142 on
SR 1315 over Little Fishing Creek. The existing structure has a total length of 41
feet. The replacement structure will be a bridge approximately 80 feet long
providing a minimum 28 feet clear deck width. The bridge will include two 11-
foot lanes and 3-foot offsets. The roadway grade of the new structure will be
approximately the same as the existing structure.
The approach roadway will extend approximately 360 feet from the west end of
the new bridge and 320 feet from the east end of the new bridge. The approaches
wiil be widened to include a 22-foot pavement width providing two 11-foot lanes.
Six-foot grass shoulders will be provided on each side (9-foot shoulders where
guardrail is included). The roadway will be designed as a Rural Local Route with
a 60 mile per hour design speed.
Traffic will be detoured off-site during construction (see Figure 1).
B. Purpose and Need:
NCDOT Bridge Maintenance Unit records indicate Bridge No. 142 has a
sufficiency rating of 29 out of a possible 100 for a new structure. The bridge is
considered structurally deficient due to substructure condition of 4 out of 9
according to Federal Highway Administration (F7FIWA) standards and therefore
eligible for FHWA's Highway Bridge Replacement and Rehabilitation Program.
Bridge No. 142 has aforty-four year old timber sub-structure with a typical life
expectancy between 40 to 50 years due to the natural deterioration rate of wood.
Prompt action was taken to temporarily repair end bent 2 that had decayed
completely through and broken, and five foot of scour around and in front of
bulkhead of end bent 2. The repair is considered temporary and replacement is
still warranted.
if
Rehabilitation of a timber structure is generally practical only when a few
members are damaged or prematurely deteriorated. However, past a certain
degree of deterioration, timber structures become impractical to maintain and
upon eligibility are programmed for replacement. Bridge No. 142 is approaching
the end of its useful life.
C. Proposed Improvements:
Circle one or more of the following Type II improvements which apply to the
project:
1. Modernization of a highway by resurfacing, restoration, rehabilitation,
reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking,
weaving, turning, climbing).
a. Restoring, Resurfacing, Rehabilitating, and Reconstructing
pavement (3R and 4R improvements)
b. Widening roadway and shoulders without adding through lanes
c. Modernizing gore treatments
d. Constructing lane improvements (merge, auxiliary, and turn lanes)
e. Adding shoulder dratns
f. Replacing and rehabilitating culverts, inlets, and drainage pipes,
including safety treatments
g. Providing driveway pipes
h. Performing minor bridge widening (less than one through lane)
i. Slide Stabilization
j. Structural BMP's for water quality improvement
2. Highway safety or traffic operations improvement projects including the
installation of ramp metering control devices and lighting.
a. Installing ramp metering devices
b. Installing lights
c. Adding or upgrading guardrail
d. Installing safety barriers including Jersey type barriers and pier
protection
e. Installing or replacing impact attenuators
f. Upgrading medians including adding or upgrading median barriers
g. Improving intersections including relocation and/or realignment
h. Making minor roadway realignment
i. Channelizing traffic
j. Performing clear zone safety improvements including removing
hazards and flattening slopes
k. Implementing traffic aid systems, signals, and motorist aid
1. Installing bridge safety hardware including bridge rail retrofit
3. Bridge rehabilitation, reconstruction, or replacement or the construction of
grade separation to replace existing at-grade railroad crossings.
a. Rehabilitating, reconstructing, or replac~g bridge approach slabs
b. Rehabilitating or replacing bridge decks
c. Rehabilitating bridges including painting (no red lead paint), scour
repair, fender systems, and minor structural improvements
O Replacing a bridge (structure and/or fill)
4. Transportation corridor fringe parking facilities. ,
_- 5. Construction of new truck weigh stations or rest areas.
2
6. Approvals for disposal of excess right-of--way or for joint or limited use of
right-of-way, where the proposed use does not have significant adverse
impacts.
7. Approvals for changes in access control.
8. Construction of new bus storage and maintenance facilities in areas used
predominantly for industrial or transportation purposes where such
construction is not inconsistent with existing zoning and located on or near
a street with adequate capacity to handle anticipated bus and support
vehicle traffic.
9. Rehabilitation or reconstruction of existing rail and bus buildings and
ancillazy facilities where only minor amounts of additional land are
required and there is not a substantial increase in the number of users.
10. Construction of bus transfer facilities (an open azea consisting of
passenger shelters, boarding azeas, kiosks and related street
improvements) when located in a commercial azea or other high activity
center in which there is adequate street capacity for projected bus traffic.
11. Construction of rail storage and maintenance facilities in azeas used
predominantly for industrial or transportation purposes where such
construction is not inconsistent with existing zoning and where there is no
significant noise impact on the surrounding community.
12. Acquisition of land for hardship or protective purposes, advance land
acquisition loans under section 3(b) of the LJMT Act. Hardship and
protective buying will be permitted only for a particular parcel or a limited
number of pazcels. These types of land acquisition qualify for a CE only
where the acquisition will not limit the evaluation of alternatives,
including shifts in alignment for planned construction projects, which may
be required in the NEPA process. No project development on such land
may proceed until the NEPA process has been completed.
13. Acquisition and construction of wetland, stream and endangered species
mitigation sites.
14. Remedial activities involving the removal, treatment or monitoring of soil
or groundwater contamination pursuant to state or federal remediation
guidelines.
3
D. Special Project Information:
Estimated Costs:
Total Construction : ; :. .. . $ 700,000
1Z~ht of Wav $ 36.000
Total $ 736,000
Estimated Traffic:
Current - 300 vpd
Year 2030 - 600 vpd
TTST - 1%
Dual - 2%
Accidents: Traffic Engineering has evaluated a recent three year period and
found two accidents occurring in the vicinity of the project. None were associated
with the geometry of the bridge or its approach roadways.
Design Exceptions: There are no anticipated design exceptions for this project.
Bridge Demolition: Bridge No. 142 is constructed entirely of timber and steel
and should be possible to remove with no resulting debris based on standard
demolition practices.
Alternatives Discussion:
No Build - No build would result in eventually closing the road which is
unacceptable given the volume of traffic served by SR 1315.
Rehabilitation -The bridge was constructed in 1962 and the timber
materials within the bridge are reaching the end of their useful life.
Rehabilitation would require replacing the timber components which
would constitute effectively replacing the bridge.
Offsite Detour -Bridge No. 142 will be replaced on the existing
alignment. Traffic will be detoured offsite (see Figure 1) during the
construction period. NCDOT Guidelines for Evaluation of Offsite
Detours for Bridge Replacement Projects consi rs multiple project
variables beginning with the additional time traded by the average road
user resulting from the offsite detour. The offsite detour for this project
would include SR 1317, and NC 4. The detour for the average road user
would result in 5.0 minutes additional travel time (4.1 miles additional
travel). Up to a seven-month duration of construction is expected on this
project. Based on the guidelines, the delay is acceptable. Halifax County
Emergency Services has indicated that an offsite detour is acceptable and
that services can be adequately re-routed during construction.
The condition of all roads and bridges on the offsite detour are acceptable
without improvement. Halifax County School Transportation has
indicated that rerouting buses around this project will not be a problem.
In view of the lower impacts to environment and property, project cost
savings and no major opposition, an offsite detour is recommended.
NCDOT Division 4 concurs in these recommendations.
Onsite Detour - An onsite detour was not evaluated due to the presence
of an acceptable offsite detour. _
New Alignment -Given that the alignment for SR 1315 is acceptable, a
new alignment was not considered as an alternative.
Other Agency Comments:
The N.C. Wildlife Resource Commission and U.S. Fish & Wildlife Service in
standardized letters provided a request that they prefer any replacement structure
to be a spanning structure and for NCDOT to conduct a mussel surrey.
Response: NCDOT has conducted a mussel survey and will abide by the request
for the replacement structure to be bridge.
The N.C. Division of Water Quality, the Army Corps of Engineers, and N.C.
Marine Fisheries had no special concerns for this project.
Public Involvement:
A letter was sent by the Location & Surveys Unit to all property owners affected
directly by this project. Property owners were invited to comment. No comments
have been received to date.
5
E. Threshold Criteria
The following evaluation of threshold criteria must be completed for Type II
actions
ECOLOGICAL YES NO
(1) Will the project have a substantial impact on any
unique or important natural resource? X
(2) Does the project involve habitat where federally
listed endangered or threatened species may occur? X
(3) Will the project affect anadromous fish?
X
(4) ff the project involves wetlands, is the amount of
permanent and/or temporary wetland taking less than
one-tenth (1/10) of an acre and have al] practicable measures ^
to avoid and minimize wetland takings been evaluated? X
(5) Will the project require the use of U. S. Forest Service lands? ^
X
(6) Will the quality of adjacent water resources be adversely
impacted by proposed construction activities? X
(7) Does the project involve waters classified as Outstanding Water
Resources (OWR) and/or High Quality Waters (HQW)? X
(8) Will the project require fill in waters of the United States
^
in any of the designated mountain trout counties? X
(9) Does the project involve any known underground storage
tanks (UST's) or hazardous materials sites? X
PERMITS AND COORDINATION YES NO
(10) If the project is located within a CAMA county, will the
project significantly affect the coastal zone and/or any
"Area of Environmental Concern" (AEC)? X
(11) Does the project involve Coastal Barrier Resources Act:;.
resources? X
(12) Will a U. S. Coast Guard permit be required?
X
(13) Will the project result in the modification of any existing
~ regulatory floodway? X
6
.~
r
(14) -Will the project require any stream relocations or channel
changes? ~-.
! SOCIAL, ECONOMIC, AND CULTURAL RESOURCES YES
(15) Will the project induce substantial impacts to planned
growth or land use for the area?
(16) Will the project require the relocation of any family or
business?
(17) Will the project have a disproportionately high and adverse
human health and environmental effect on any minority or ^
low-income population?
(18) If the project involves the acquisition of right of way, is the
amount of right of way acquisition considered minor? X
(19) Will the project involve any changes in access control? ^
(20) Will the project substantially alter the usefulness ^
and/or land use of adjacent property?
(21) Will the project have an adverse effect on permanent ^
local traffic patterns or community cohesiveness?
(22) Is the project included in an approved thoroughfare plan
and/or Transportation Improvement Program (and is,
therefore, in conformance with the Clean Air Act of 1990)? X
(23) Is the project anticipated to cause an increase in traffic
volumes?
(24) Will traffic be maintained during construction using existing
roads, staged construction, or on-site detours? X
(25) If the project is a bridge replacement project, will the bridge
be replaced at its existing location (along the existing facility)
and will all construction proposed in association with the
bridge replacement project be contained on the existing~acility? X
(26) Is there substantial controversy on social, economic, orb
environmental grounds concerning the project?
(27) Is the project consistent with all Federal, State, and local laws
relating to the environmental aspects of the project? X`
(28) Will the project have an "effect" on structures/properties
eligible for or listed on the National Register of Historic Places?
X
NO
X
X
X
X
X
X
X
X
X•
7
(29) Will the project affect any archaeological remains which are
important to 1-iistory or pre-history? }C
(30) Will the project require the use of Section 4(f) resources
(public parks, recreation lands, wildlife and waterfowl refuges,
historic sites, or historic bridges, as defined in Section 4(f)
of the U. S. Department of Transportation Act of 1966)? X
(31) Will the project result in any conversion of assisted public
recreation sites or facilities to non-recreation uses, as defined
by Section 6(f) of the Land and Water Conservation Act
of 1965, as amended? X
(32) Will the project involve construction in, across, or adjacent
to a river designated as a component of or proposed for
inclusion in the National System of Wild and Scenic Rivers? X
F. Additional Documentation Required for Unfavorable Responses in Part E
Response to Question 2: The dwarf wedge mussel was not found in the project area, a
new population of the dwarf wedge mussel was documented
approximately 2.5 miles upstream at SR 1621 in Warren
County. Therefore, the biological conclusion is "May
Affect-Not Likely to Adversely Affect". A verbal concurrence
was received from Gary Jordan, USFWS, that conservation
measures are not needed for the Dwarf wedge mussel at this
time.
Response to Question 28: There are no historic properties affected by this project but
there is a historic property in the vicinity. See project
commitments on greensheet.
G. CE Approval
TIP Project No, B-4540
State Project No. 8.2302001
W.B.S. No. 33755.1.1
Federal Project No. BRZ-1315 (17)
Project Description:
The purpose of this project is to replace Halifax County Bridge No. 142 on
SR 1315 over Little Fishing Creek. The existing structure has a total length of 41
feet. The replacement structure will be a bridge approximately 80 feet long ~
providing a minimum 28 feet clear deck width. The bridge will include two 11-
footlanes and 3-foot offsets. The roadway grade of the new structure will be
approximately the same as the existing structure.
The approach roadway will extend approximately 360 feet from the west end of
the new bridge and 320 feet from the east end of the new bridge. The approaches
will be widened to include a 22-foot pavement width providing two 11-foot lanes.
Six-foot grass shoulders will be provided on each side (9-foot shoulders where
guardrail is included). The roadway will be designed as a Rural Local. Route with
a 60 mile per hour design speed.
Traff c will be detoured off-site during construction (see Figure 1).
Categorical Exclusion Action Classification:
TYPE II(A)
X TYPE II(B )
Approved:
"~ -'^
Date
~-Z ~~L7~
Date
~ ~`yw-~
Project Planning Engineer
Project Development & Environmet Analysis Branch
For Type II (B) projects only:
^~/Z~ o~
Date
9
Project Development & Environmental Analysis Branch
Federal Highway Administration
x as*1' ° 4r r(iF ,~ ~ F s ,~•« ``~ ~', - ~ ` ~ °' :; a:'~ ~. 4v , a
.. , C 3 i - a r ,~ tf s: .~ 1~ t -~ h:~i1 i ~ i°~ i ~( f
t t-~ ~ ~ %• a ~ si'~'i 4.. yip :~La ,t ~ `e~ ~!~ ~ r" i It ~~~ f~-. ~:~~~ ~ ti-, t~+,~.+a.. < -
< -~ k . ~ h ±S• ~ kl
_ La'4r~ - 41 ~ ,J. ti. cal k ~~Si ~e`' ~ Y iF~` }5'° •~ 1 1•^. 3 l {f l• 4~ l] 1 ;~
d~f t g.a'#~ :~ , „ •r ' z a ., ~ Y a,,~, ~r+2 ~~t° ~"d S:~ ~ t ~' r a•s . i ~ ~ ~ +
. ~ ~ ',•PR®' CTCOMMY'~'MEN'1'S: ~ ~~ix t~ .1~
k; .l f r 'K ~ '.~ a ~ i a
_ ~';;{f~ `[rat y ~'
• ~" Bridge Na~142 ~ ,S~,t 1315 ~ ~ ~? .
~ Over~Little Fisl~fn ' ~~ ~ ~, ' • ~ ~'
r ~re~k
~ ~ fz }~ '
Federal Ad~Project NoaBl~'L~-1~3~15 (1'n , jt ~ 3 `~~ '
,State P~ojea NQ~; ,~, 2001 ~ ~, ~ a 3 ~ ~';
P ~'
t
~_ W.B.S. Na'3~7~~5~1.1 >, ~~
1
. ~ T.LP. No. B }4540 ' ~ 5
Off ce of Natural Environment -Bridge DemoLtion ~ ~;, .. ~ ~~
.. .~
The entire bridge is constructed of timber and steel. Therefore, it is unlikely that there
will be any temporary fill resulting from bridge~demolition~ •
Division Resident Engineer -Coordination -
NCDOT will notify Halifax County Schools and Emergency Management Services prior
to bridge closure. ~ •
All Design Groups/ Division Resident Engineer -Historic Property
There is a Historic Property west of Bridge No. 142. No staging will occur 300 fcet beyond begin
project station on the west-end of bridge. 1f the scope of the project changes or additional staging
at west~nd of bridge is required, or if alterations are required for detour route, additional
.-
coordination with SHPO is required.
r
.~
,. ~
7
t ~~
a `•,i
a
~M
~4
:~
r •, ~~
+,
)!
J
r
~~
J
1
^---19b
~~~TH NORTH CAROLINA DEPARTMENT OF
~~ ., TRANSPORTATION
j~ ~ DIVISION OF HIGHWAYS
'~* ~~~ PROJECT DE VELOPMENT &,
~% ENVIRONMENTAL ANALYSIS BRANCH
HALIFAX COUNTY
REPLACE BRIDGE NO. 142 ON SR 1315
OVER LITTLE FISHING CREEK
B-4540
Figure 1
1
~,
~J
„g
-,~ _
r. ~'.
~~~ 44
' F OG12
,,
1
>e
~'
~"
"~-, NORTH CAROLINA DEPARTMENT
`1 OF TRANSPORTATION
,~ ', ,i DIVISION OF HIGHWAYS
~,., ~ ~~' PROJECT DEVELOPMENT AND
`'~ ,r;%~ ENVIRONMENTAL ANALYSIS BRANCh
~~~ i
HALIFAX COUNTY
REPLACE BRIDGE N0.142 ON SR is
OVER LITTLE FISIiING CREEK
B-4540
FIGURE 2
~~ ~ ,
~. ti..,... .i=
~°"°"~ .AUG Z 9 2~Q4
~G?' ONlsiON OF ~
North Carolina Department of Cultural Resources A°.. ~ncHru~YS ~ a~
State H>;storic Preservation Office ~ ~S~
Michael F. Easley, Governor Peru ~ 5andbcrk• Adminrstraror ~°N F~~EL~~°S
Lisbeth C. Evans, Secrctarv A /1
OhFce of Archive, (story
Jeffrey J. Crow. Depury Secretary Division of Historical Resources
David Brook Director
c'lugust 12, 2004
MEI~IOR.-~NDLTd
TO: Gregory Thorpe, Ph.D., Director
Project Development and EmTironmental ~nalvsis Branch
NCDOT Division of Highways
FROM: Peter B. Sandbeck ~r ,~~P4.,~er '~C~
SL BJECT: 2004 Bridge Projects, including B-3492, B-4408, B-4409, B_4410, B-~-I-.~6,
B-4466, B~1=169, B-4518, B-45+5, B-45 ~3, B_4631, B--423; B-424; B-a-~54,'
B-4520; B-4538; B-4540; B-4548, B-~549 B_a
B-4665, B-4504, B-4560, B-=1587, B-4618, B-4644, B-4649, B--E6518, B--658
B-46 71, B-3624, B-3819, B- 39 J 1 B-4404, B-4552 '
B-3169, B-3606, B-3802, B-38u3, B-3804, B-4523, B-=1524, B X525, B- 526,
Multi-county, ER 04-1280-ER 04-1330
On July 28, 2004, Sarah ~icBnde, our preseryaaon specialist for transportation projects, met ~-ith the North
Carolina Department of Transportation (NCDO~ staff for a meeting of the minds concernin the abov
projects. We reported on our available information on historic architectural and archaeologicalgsurt-e~rs and
resources along a-ith our recommendations. NCDOT provided project descriptions, area phorographs, and
aerial photographs at the meeang.
Based on our review of the photographs and the information discussed at the meeting, we have included our
comments for each bridge project on a spreadsheet artached to this letter. These comments are pro~zded for
each project as proposed.
:fan archaeological survey is requested on the spreadsheet, a separate memorandum from the Office of State
.archaeology, e:tpLzining whether a general survey is required or if the s ~~
decour or new location, is attached. ~ '~, ~ preaicated upon an off-site
Having provided this inforTnation, we look forward to receipt of either a Categorical Exclusion or
Environmental l~ssessment which indicates h()\t; NCDO'I' addressed our comments.
The above comments are made pursuant to Section 1O(i r>f the National Historic Preservation ~lct and the
--1dv_isory Council (in Historic Preservation's Rcgulauons for Compliance with Section 106 codiried at 36 CFR
Part 8f}G).
11MINIyTttAllr)IV I.~Kahnn
Sq7 V Hloum 5ucc1. Ralclch N(' .~a7in~:\dd rcxs
)'~~rUItA'1'ION 11.17 \Aad 'fclephondFaa
`.I S N 131onm $1rce1, R:dcleb N(' Sc^''cc ~emer. Ralcleh N(' '7094JA1 i 191'117?~.J 7Gi/7
112V)_y g 1'L.\fVfVlfVi; 1017 Maul ticrv,cc [~•nrcr. Ralelch NC '70'P1.a017 ~}-K45i
`I S V Illuunl titrccl. R:,Ic1~11. Ni ~ 1'11'11%t i-0SJ7,'715-dR01
101" Vl:ul Scn~,cc Crwcr. Raiclch NC "0'1'1-J01',
' r119,r•1.~,cJSnls~xln
Thanl; you for your cooperation anti consideraao~is. It t-ou have :im- questions concerning the abo~-e
comment, please contact Renee Gledhill-EarletT, en~-iro~unental review coordinator, at 919/733--~7G.i. In all
future communication concerning this project, plcsse cite the abo~-e referenced tracking number.
PBS:w
ttachments
1 Spreadsheet
16 Memos
cc: Matt Wilkerson, NCDOT
Marv Pope Fua
l~
W
y
L
i
c
~I
~I
~.:
~~' ~ I B-3 :92 1 580050 I McDOVJEL_ 13 7 3bL ~ n3ncocx ! ~ t~ r.o
~ 8-4408 030265 ANSON 10 1961 !Hancock ! No i No
2 8-4409 030308 IANSON I 10 1922 I Hancock I No I No
~$
13or -4410
B~446 030307 ANSON i
100227 I BUNCOMBE 10
13 _
1931
1956 I Hancock
I Hancock Yes
No No
No
-~9r 8-4466
B-4469 210004
220219 (CLAY i
(CLEVELAND ~ 14
12 1952
~ 1952 Hancock
i Hancockk I No
No I No
Flo
a8
13~ I 8-4518
B-4545 1 350110
440072 GASTON
I HENDERSON ~ 12
14 1962
1963 I Hancock I
I Hancock I No i
No I No
No
13Gd 8-4573 1 540183 (LINCOLN 12 1965 ! Hancock I No No
1 8631 800526 IRUTHERFORD 13 1970 !Hancock ' No No
8-4423 1 060067 1 BEAUFORT 2 1965 1 Ca s No No
13~ SB~424 060068 I BEAUFORT 2 1966 Ca s No I No
8-4454 150043 ICARTERET I 2 ~ 1963 ! Ca s Na I No
8-4520 360032 I GATES i 1 1952 i Ca s Yes No
~8~8~538 1 410025 (HALIFAX ~ 4 1965 Ca s No I No
~$)B-4540 410142 (HALIFAX ~ 4 1962 I Ca s I Yes ! Yes
30 8-4548 450002 I HERTFORD ~ 1 ~ 1960 I Ca s I No I Yes
.~I B-4549 1 450042 I HERTFORD 1 ~ 1960 I Ca s Yes I Yes
1 8-4567 1 530069 ILENOIR I 2 1971 I Ca s i Yes Yes
8-4578 1 570008 (MARTIN ! 1 1974 ! Ca s ; No I No
13 X648 880017 ITYRRELL 1 1977 I Ca s i No No
1317 8-4664 1 920025 (WARREN ~ 5 1957 ! Ca s I Yes ! Yes
i r B~665 920036 i WARREN ~ 5 1955 Caps I No Yes
' -4504 1 320052 ! EDGECOMBE 4 1964 ?Johnson ! No Yes
t31 8-4560 500102 IJOHNSTON 4 1956 . Johnson I Yes Yes
-~9 8-4587 1 630082 INASH 4 1961 ! Johnson I No Yes
3 8618 i 770445 IROBESON 6 1955 i Johnson i Yes Na
(B~644 830057 I STANLY 10 1961 . Johnson I No No
i 32GI 8-4649 1 890377 UNION 10 1962 I Johnson ; No ~ No
:3 ~'8-4651 ; 890251 (UNION ! 10 1957 !Johnson ' No ~ No
3r -4658 ! 910345 (WAKE 5 1960 ~ Johnson No No
{ "B-4671 1950035 IWAYNE ~ 4 1961 ~ Johnson ~ No ~ Yes
j -3624 i 130190 ICALDWELL 11 1981 ! Pi kin ~ No No
-3819 130184 ! CALDW ELL 11 1962 ~ Pi kin i No i No
' ~ -3911 ~ 850038 ISURRY ~ 11 1923 ~ Pipkin I Yes I No
8-4404 ~ 000102 IALAMANCE 7 1968 Pi kin Yes i No
31d 6552 I 480100 i IREDELL ~ 12 1963 Pi kin ~ Yes ~ No
-4613 i 750415 IRANDOLPH 8 1959 Pi kin ~ No ~ Yes
i~ 8-4646 I 850132 ISURRY 11 1962 Pi kin I Yes No
t IB~i675 1960034 IWILKES ; 11 1960 Pi kin ~ No ~ No
~c9316-3169 ! 310158 ;DURHAM S 1960 Williams ! Yes ! No
f3o B-3606 i ~"1~'0~070 (ASHE 11 1963 Williams i Yes No
! a~8-3802 ! 040229 ;ASHE 11 1960 :Williams No No
r3cH;B-3803 ! 040334 'ASHE 11 1966 ~ Williams ~ Yes No
1ag~g-3804 i 040296 ;ASHE 11 1964 !Williams : Yes No
131 ,B-4523 I 380164 IGRANVILLE 5 1955 i Williams I No Yes
r3z;B-4524 ~ 380193 IGRANVILLE ~ 5 1956 ~ Williams i No Yes
~3~ 8-4525 i 380133 IGRANVILLE i 5 1960 ~ Williams I No " Yes
,3a~B-4526 ~ 380200 !GRANVILLE 5 1957 ~ Williams i No Yes
Federal Aid #: BR~1315('n TIP # : B-4540 County: Halifu
CONCURRENCE FORM FOR PROPERTIES NOT ELIGIBLE FOR
THE NATIONAL REGISTER OF ffiSTORIC PLACES
Project. Replace Bridge No. 142 on SR 1315 over Tributary of Little Fishing Creek, Halifaz County
On Apri119, 2005, representatives of the
® North Carolina Department of Transportation (NCDOT)
^ Federal Highway Administration (FHWA)
^ North Carolina State Historic Preservation Off ce (liPO)
^ other
Reviewed the subject project at
^ Scoping meeting
Historic architectural resources photograph review session/consultation
^ Other
All parties present agreed
^ There are no properties over fifty years old within the project's area of potential effects.
^ There are no properties less than fifty years old which are considered to meet Criteria Consideration G within the
project's area of potential effects.
^ There are properties over fifty years old within the project's Arta of Potential Effects (APE), but based on the
historical information available and the photographs of each property, the properties identified as (List below) are
considered not eligible for the National Register and no further evaluation of them are necessary.
^ There are no National Register-listed or Study Listed properties within the project's area of potential effects.
^ All properties greater than 50 years of age located in the APE have been considered at this constiltation, and based
upon the above concurrence, all compliance for historic architecture with Section 106 of the National Historic
Preservation Act and GS 121-12(a) has been completed for this project
There are no historic properties affected by this project (Attach any notes or documents as needed)
wit,.-~ ~~- ~1~~4-~~,.. ~ ~r k.,) ~., ~ ~ ~ ~ o r 6~ ~,1~.~,~..c .
Signed: CSC ~.~~ ~ ,,
~~~ '~- l a Q S
Representative, NCDOT Date
~~
FHWA, for the Division Administrator, or other Federal Agency "' Date
~/,
Representative, HPO ~ ~Y+~ ~,
~ . °~'~
/1 ~ i:/ ~ ~
1 y V~
Date
[f a survey report is pn:pared, a final copy of this form and the attached list will be included.
~ t n ~ G ,
r,1` rY.l ~ :'. 1~. 4 ~r~ dr try. "".~.r n .. ~. •' ~ I~.~~y ~ {
- ~~~~~~^ '47 Ir s, f t, fM ~ r.. ~ ,M 1 ~ ~~ Y" r v.':tr'~' y~r'~(p{~, ~
. ~'~~'` .- T • 1 r 1 ti ~ r YI,F . ~ 1 ~a+ ii'' ~ ~d+• : ~ID f5'~,t i r a'f'4
nt~ ~ , i.r,., ~,b "r /'-X' ~ 'Hr{ti~f ,!j .-; ~.. ~~I~pa 'Prj¢~ ~ R.
1 "• rw ~ % , 'fir ~1 .-`W L: t~•' ~~'l~/ N~ ~~^ ~ t:{~ ~l
~ :~ l µ~ ~4 1 f ' ~ ..-rx ,v*!n e ~ w ~ a u # // ) t'e'` '
~ te- Y ~r't,,n~ c,. .:~ ~ti N L (''r _~ ,.r V•r• ' K ~~ f
~~V~`.. ir~u...r~ 'f '' <"~~"at'kj~,. .> r ¢ .yk rtA 4kaa•M 4~ 41~
~ ~ ~ ! ~ ~~
r~4 } 1~.. ~T ~ ~~~; ~` !ar , I ~' '~} t ,~ c;:`~,~j ~'ibi+e~ ir~t 1c ~
..~.Irn~ +),a r t...[,~q rr ~"'~ fit. r~.31 ~ ~If -. 1,} ^* "'.. ^. s~t,~Pd yPr'm"~ 11^Xy 5p„' r~u t Z ' -
,~ d.. ` r x ._~ -r -.,,"~„r; r+l~~•R pr ~Z~il_ yfjy gr~4th s 1~'t ~~~ ~~ 1 ~ r~ ~ ~~~ ~~~~ ~
,~i` ~- ;j y,y 'r `_ °„~al, i j Y ",.ff '~ ~,. y ~ ~~~r ZI~ P. ,~ ~ ~j #f ~ ~y1~~ ,t ~:
r ... Cr~ >+ ~'~~'-.-~ r L ~'q,^~c 1~..~, .N'u ~1~ ~+~J~>' s.Ry~f r. Idy;.
+41 "'l ^ ~' +( fJM'. §- ~ ~~. K .Yarn+JLi,'-„~. 4~ a t . 'rn.l4 ~ K'~ ~ ~'Lh,V f4t~ f
r ~ A
1 ~ I
I' ~ ~ +' E ~~..~, ~ ~~ ';nn ,yL ~ `,
~ N
ti
~ ti
ti
~
~
!,
v
'
~r ~
1 `
R
t ~`qt. Wn, y~~
t .pk,.
µ t'
^ 1 + P
L ,'11~ 1- ~ ~.
l
,
' dr.,. ', ~~'..
b.
TY,~;~
J+
~I
+
'
=
w:. rr s
r
t
•
~IL'P
~n f
qq 1 ., 1 T.1
~ •~44 a; w,f +~
~~
. Air' ~ ~
.~,1
~
t
/1Y ~ (
. a
~'1
Yq^ Tw..k~4
c ~:41q
Ct--'1 ~:
~~ ~j}j
L
}
w i
tD
tb
I I
C
.-d
h nJ 'f'e7~'9j~- ~ ~ f ~ ,Y i yv w 1 1""i~'' - r~+tl9 ; y ~ ~~ ~;
:.7 DIYlr' ~ . ~ - JI `I I 1 ~ y~.Yr, .~y ~~ ~D.ti'
,: J I ~ and ~ "e-'y.
~ ~Ir~a ~w° ,t T~""~ ~ i~ i L'F. ~ 1" 1 ~. D +.l0~ f`ti0~"
,~ Jy ~'Y"~yl' ~' ~J N ~, ~~~+j r .,.E,~,. r.. X10 r % ~
ue .4 ~uy ~ ~ 1 ~i.f.F 1:~~y ' 1 .FYI ~~"~61,.,... '^w`rr''i4 ~``e'E~~' -
r IJr~L ~,~ 3~ ~~i1~ t ~~~~,xj~ L ~rK~,_ ~f~ h xT _. _ O_
Y' ~ ``Ft' r
y'°`;frl. - +::: .,~4e~d ~R • 111 1 ~~ r 4r ~ ~ yiAU4a Fh ~,e 3 Pip 1 D
}~, h ~~. ~ ~~G~.!, 4 ~ ~r ^v, i Irf ' ~+.rt.ae:al4~~e+.~ ~~ a 11~ ~ • a~r,~ I ~'
~ t,, ,. ..•~xf .{„mac- . . ~~1 ~,. ~("~ 1 ~~`~"!(~' .~, l ,yl~ s ". ~ , ~
r 'nr,~,~ 'yg .'t
~~'L7' xx h rf ! rr
"sM.,Y• ~ ' ~ r f' r^,•tY'~~ ~X~iL,LS, ~ a,w f 'p , ' ~' ~
o '~' f' t , t ~ ~ ._
Lr7r.x~•el 1^. t r L~~r Z,r„y F f~~ 1-,. J ~z `
~s'.- ,~,~ .'r6.. s wa~.. ~. ft~ ~~ ~.•~s4'4e~A*+r'1..,' ~LC„~Q•'K;1~- e
r• JC{•'°•`~ry dr 4. f 'p^i. M,f! 1J i •~ ,~F
S, ter, T "~ ~FW ~'~ h,, .M, t Y+ ....~'.` 1 .
A Ir ~ f ,, ~ ~~ f
~" U 1 `~k' ~ •y' tfeaf rvt~ R}~ ~ ' . 5+ ~NMr v,
5~ ub ,' 4 R, ~ J~, :ro b ,( ,~'• 4 a 9 r u r 1 h I n 1
rt ~~ ~"' 1 ~~ yt ~~a n e!4 r~~ ~Rt I! tk ~ 4' . '~,Jr. '~ ~~.. r .,~q~
t `v Yr, .'1F.. L 1~ 4.1.~~r ~ '~I~
ew+ ~ r j A 3 ~ ~ ~r'r+•~ v 4" 1)~~"V ' FI ~} ,t ,Jr'~~ s s".Yrv •av~'e I C' ! J!_~
~u*r~ ' i+M •+#1~,~~F "~~ „ 1. ~r~ )'~)R `~'(y {@''yfy~C41 !^' ?}I}N ~'9 ~f rv ~. ' t~, kv 'r+r. ~f • y
y~yry~~1-.. ~ r c NJ rol ,~ ` ~I L rlx ~ w la .. ~ i ^, a ' 1 r ' ~ ,
Y~ww'~ltht'' ~ ---'&3'~" Itry„yFa 1' etF1y 4D1+ ~^Y 'r.iali'~'~iM ) `t ~ r ~M~ ~ f 1
r 9~ l4Ni 1* a t A 1 • } 7Tr '~ S~. 7WV w. .r a -Sr }~ ' ^l s ,!" 1 ti 1 T' J,*+."~e1 I ~
}.nti '`Tl~d,~i mo't' ~ M ,~f"a 'i. ,fr ~j ~' '1,!~' , p ~ : r 1 1.- ~§,y„' 'I~M)'t' Y Y rrf. ' ~~1~ `~ `
~ ~ ~ r ~ . I M J j +t ~, rl J, u~. , it _ .".1.,•x 1 Jw x" ^ AS ~ ; r p 1~ i
~`t.+'f+C-"' C,~' r r. _.~t i'I~ ,ptL trxd 'frt' ~St~`N~ r i. 1 ~ V2 yf,~,(~~~~~
t~~ n4x 1 "~ r y. Y4 ~'' ~ 1~ ~~~ +~;~ 1 r P ~ r d/ <u"~r'1: iy.,y ~
,~~S,i~'^, _,L~~~~'q~''fj,~ I .V. x k~1,'.k eN~~ir-~"(U': x ~~t,~'~j f ~ r 7'~ ~1- i.1j~;T~w,~.~ r '~~5 ~y'Y~~ ~ r X51 ~y
n k ! .~.«a., a.c *Y1 : ' ~.. .~' , T. ~,+~t ~r~ yl'fi t,,~ ~ A w ~T ~,S' ?'/.!:Mln .p' r ,-1 , t '.! Mrt~'~ ~K( J r • ~r ~'r yl
t,. ,,,~ "'4~L i , X ~ ir~rF~;•~y~~y~l"" '. ' ~. ~ t y ~.{~L i ^~j~,r~i~~ ~ r~~~~Y~t -r - f7~'1 ne"',t' }r. [T r c ~I~A~~f 1 r ~ ,W~1 ~
t ~Y~.r h .rl~rtr '_ f r w ~,~ ~:r ~.y))M '.~(~~'- r~" ~Mi~ s ~ wY't 5y' 1 ~• t y
f ~ Z"lIa y:. ~~~ 1 ti,y"r r tLr. - '. W r4rr1 ncr .. d ~.µ. J ~w , ..t 1 i!',W rr Gf ~! A
wv • " ~Y „oL~t' "r. % ,, r,w r ~ ~ t ~ r „ H 1" r r / v 7 ~ ~{J~'r r ~Sr~M~~ 2 tI F~~ ~~
2l i. n r 1 n.. .- +. ~ t r,,,r,~., t1(' ~f~'~ ~'~" n 1 e f• 1 (>! •j ~~ y,1,1 i~ Tl.o~ 1aCr~k l
µ.t --.1 IF1 "L'/1!~ ~~TJhl~~l"frlrr(~MT / 1 .~I.~Iti r -,1C 4571
u z '.;, _ 1 ~i^~ r r~>,~,'t~~uy-~,llrl~~,, „r`?I'rw ° ~iV`" ~v~ 1 -"''t1 I 9 ;'1 ~ r nOV1r~ ~A~: ~~~7{'~xtl ;r r h~`!'SIr.1.7i1Y'9'+'r}~
yV r w ~' ~r .. "{ }+ ~' ,/rrty 1r1+. ~,~ '~' ~ r'7fi ~r~„y A '" Y+tti ' S ±~ ~ .~L..i , 7n .. ?fu1~ .t„ ~Q 9111'
rr a n e~}i L .µ Y F+1^^r , a. y rr 1 , 'P 4 y .A .~/.~'} ..
1 I! ~ I ~ ~ r •. .,.,.~ r~( r wTfM'rMw^ r~G _ Jr. ,~- b^.'., ny y, 1~ - ~' '.tV / It' 1 L r Y l~: ~7.p,~?I t(~4~ ~• ~jf(~~ `! ~..I{f ~. y~e' '
~ 7! . ,~ F tit a~(,1 t t~ r r. a
rL 9^' ku„ 'lr'y 'P ir. r 'Si ~ 17 }^~1,t; ~' l r t Al (! ~ 1
] ~ 1 ~IY~'..•L'M>t~ll i~ Llil'Y ,~ -}Jfi t f~~ 1 p t/~ 1,I, +y14~1~
M .''t y I VAr r 1..H~ .,r 1h I ar '~ F t •, ; ,~ L< ~n7+r ~.,r' NA L~ /ALrF/. ''~'~
r ~ ) ~ '~ r- 1 ay ~ - I r , t ~ ? It . h r !1 I 'K ~ 1V I' 1 Jy r~>I F. yv,
•- 1 r 4Y''w'~If ' l r 6.s 1 ~' I. 1 f fr ," L ~rryr ~'. ~ ! ~ '~ ~/ rn`r -y~~,r~,~rr.-t~,' r~ I''iu-t~G
! .' ,. ~
_, i + / ~ y
.. ,: _ 1 l s
~ .. _ I 1 1. , ,' 3
.,... M ~. rr .:.
i.. -!,
>, ~~~1
G - ~ _ -
O
.,
,~~~~
STATE OF NORTH CAROLINA
DEPARZ~I' OF TRANSPORTATION
MICHAEI. F. EASL.EY
GOVERNOR
May 3, 2005
Mr. Peter Saadbeck
Administrator and Deputy State Historic Preservation Officer
Historic Preservation Office
Dept of C>.Sltural Resources
4617 Mail Service Curter
Raleigh, North Carolina 27699-4617
Dear Mr. Sandbeck
/C'~
y:_~,.5-
LI'NDO T>PPETI'
SEC3tFfARY
Subject Design Changes for two Bridge Replacement Projects: Bridge No. 142 on SR 1315 over Tributa.-y
of Little Fishing Creek in Halifax County (ITP # B-4540, Federal Aid No. BRZ-1315~i~, WBS
No. 33755.1.1, ER-04-1281), and Bridge No. 69 ovC West Bear Creek on SR 1501 in Lenoir
County (I~' # 8567, Federal Aid No BRZ-1501(6), WBS No. 33755.1.1, ER-04-1299).
New design information regarding two bridge replacement projects (ITP #'s B-4540 [ER 04-1281], and B-
4567 [ER 04-1299]) has become available. Previously, multiple alternatives had been proposed for each
project, including the use temporary on-site detours, and/or relocation oa an adjacent location. Based on
these older proposed designs and environmental conditions favorable for past habitation, your office
recommended intensive archaeological surveys to identify and evaluate archaeological resources that may be
eligible for listing on the National Register of Historic Places in separate letters both dated August 12, 2004.
These are Federal-Aid projects, subject to compliance with Section 106 of the National Historic Preservation
Act and the guidelines issued by the Advisory Counal on Historic Preservation. -
Cuaendy, the only alternatives being considered for both bridge replacement projects are replace-in-oiace
designs on the emsting footprint of the bridges. Detailed, cuamt design plans and aerials have been
produced and studied Ground disturbance would be minimal and the Area of Potential Effects would not
expand beyond the azea that has been disturbed previously during bridge construction. It is unlikeiv that
these small-scale, replace-its-place projects would affect any significant archaeological sites eligible for the
National Register of Historic Places.
After reviewing the latest proposed plans, which involve only replace-in-place construction using offsite
detours, we believe that no archaeological survey is warranted for these projects. Please find the most recent
mapping for these projects for pour review and consideration.
Z'nank you for your assistance and cooperation with these projects. If you have any questions, contact Bra.,
Overton at (919) 715-1556.
t
Sincerely,
~~Y
Matt Wilkerson, eology Supervisor
Office of the Human Environment
cc Karen Capps, NCDOT PD&F_A
.w+luNC n~DRESS:
N(; DEPARTMEM OF TRANSPORTATION
.~F1CE OF MUMAN ENVIRONMENT
~y 1583 AAAIL SERVICE CENTER
_y RALEIGH NC 27699-1563
x
TELEPHONE: 919-715.1500
FAX: 919-715-1512
H/EBSIT~: 6VtM4~. NCDOT. ORG
LOCATION:
PARKER Lu+COLN BUILDING
TJZfi CAPITAL BOULEVARD, SURE 166
RALEIGH, NC 27604