Loading...
HomeMy WebLinkAbout20061138 Ver 1_Certification of Completion_20080331O~_ o~ WAT~RQG ?_ ~ ~~~" ~ _ ~ Y ~ - --, _--~~~ `__- `'-~ DWQ Project No.: Z o b 6 ~ ~'3 0 tiAichaet F. Easley, Governor WiAiam G. Ross Jr., Secretary North Carding Department of Environment and Natural Resources Alan W. ICBmek, P.E. Director Division of Water Quality County: ~ V / ~~ M ~P~N _ !y c, ~ o i ProjeetName: ,~".~,~Pnr~e,~,.~i-.y -~o S1i~ct~..reS c~xv¢-,,~4- yT 7~ C';~+(c t_i`c(c Clc ~~ S~- Date of I[ssaance of 401 Water Quality Certification: ~ ~ 7 ~ ~ 6 19 ~ 7 ' Certificate of Caaipletion Upon completion of all work approved within the 40l Water Quality Certification or applicable Buffer Rotes, and any subsequeait n~ fire applicant is requu+ed to rrdrrn this certificatie m the 401 Transportation Permitting Umt, North Carolina Division of Watra Qaality,1650 Marl Service.Ceater,Rgleigh, NC, 27699-1650. This form maybe rehirned m DWQ by the applicant, the agplicairt's authorized agent, or the project engineer. It is not . necessary to send certificates from all of tire. Appficant's Certification d.. i, J ..r , (~ o w M ~~ hereby state that, to the best of mry abilities, due care and diligence was used in lire observation of the construction such that the construction was observed to be built within substantial compliance and inisnt of 91~ 401 Water Quality Certification and Buffer Rules, the approved plaffi and specifications, ~ other supporting mat+cerials. Signature: Q _ ~ ~ •-. -- Date: 2-l J ,~>c9 $ Agent's Certification I, hereby state that, >b the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and iatentt of the 401 Wa1~ Qgality Ceatification and Hoffer Rules, the approved plans and specifications, a~ other supporting materials. Signature: Lngimeex's Certification Partial Final Dale: i, as a duly registers Frofessior~l Engineer in the Stave of North Carolina, having been authorized m observe (periodically, weekly, fall bare) the construction of the projectfor the Permittee hereby state that, ~ the best of my abrlr'ties, due care and diligence was used is the observation of the conshuction such that die c~stliiction was observed to be built within substa~al compliance a>td intent of the 401 Water Quality Certification and Buffer Rules, the approved glans and specifications, and otiicr supporting materials. Signature Registration No. Date Ot ``~> /~~ ~''/,lth, a " ~~ '1 sue,, ~ ~ V "~~'"~ `~~'3 Q,p~vk~ ~T~~, ~~~ '~Ac.. Trmspata~ P9 thit 1tib0 t~ Service Center, Ra~gir, North Caro&ra 27fi99-9650 2321 Crabtree Boulevard. Suite 250, Raleigh, NorBr Carot6ra 27604 ' t 919-733-1786 / FAX 919-73;i~61~3 J h0emet tttloJ/h2oerushite.nc.us/ncvveds ~ ~ CPPA A~ - 5076 Recyderyt(>96 ~ Consumer i'eper