HomeMy WebLinkAbout20050753 Ver 1_Certification of Completion_20080331OF,. W TF
A ..R
r~~~fi' T PoQ'Y
~_ ~ -,t
O y : ~Y. Y
DWQ Project No.s (~ S~ ~ S J
Applicant: _ ~- c9 ~ 1
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
County: ~~ w,k l~ ~I
Project Name: ~, o t c lac r.en+- ~ n 5 t? 12 S r ,~ ~ c -, . ~ 5,. e~ 1 Gr
Date of Issuance of 401 Water Quality Certification: S ~l o (~ 5
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
~ I, 'S ~ w , ~~+ ~~•~ ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: ~, ~~o,..._ Date: 2)15108
Agent's Certification
I, hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Date
Engineer's Certification
Partial Final
I, as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, :weekly, full time) the construction of the project,for the
Permtttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No.
tf
[r
\~ ~~
n..
~1.+~ I
M~~ ~ ~ ~~
y~ V r /,`~
~?'~ p(/
. ,rFRo~,
Transportatron Permitting Und
1650 Mail Service tenter Raleigh, tdath Carora-a 27699-1650
2321 crabhee Boulevard, Suite 250, Raleigh, North Carona 27604 '
Phan: 919-733-1786 /FAX919-733-6893 ! Internet httoJ/h2o.enr.state.nc.us/ncwetlands
An Equal OpporWn~y/Aftem~atNe Action Empbyer - 5096 Recydedlt0% Post Ca~sur~r Paper