Loading...
HomeMy WebLinkAbout20051267 Ver 1_Certification of Completion_20080331O~O~ W AT ~RQG ~_ ~ ~ ~ DWQ Project No.: ~ S ~Z 61 Applicant: Ar ~ 0~ 1 Date of Issuance of 401 Water Quality Certification: -~ ~ t 8~ a'~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality County: ~~~ ~h~ Project Name: ~~. ~e~~ ~~- S }c vatvr c ~ aa~e-~ :nom. uT t o /~-tt 1 l Lw~ w S~ 132 l ~~t• l! a.~,(~ Qcf,~ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification ~-- I, '1.w , PS~~+ ~`^ an ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 4 _ ~~ _ Date: 21 ! 51 D 8 Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Date Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature '~',' v ,~ ~~~ ~ t 't~ ~ ~~ 1 !j ~` ~ r ~ ~~- Transportation Pemtitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786! FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands An Equaf OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper Registration No.