Loading...
HomeMy WebLinkAbout20010120 Ver 1_Certification of Completion_20080331 ~';Prtifi.cate of Completion DWQ ProjectNo.: Dl0/ ZOrr1o~l County: Applicant: NC~oT .~~ v~ 5,. U/a~e aid ~,-~ ~ Project Name: ~ ZRO(v , w~c/ h%•~ il/C' S5 ~-o.zr USUS~ ~ 5/~ IIZJ ,~ ~~- / / Date of Issuance of 401 Water Quality Certification: ~" ~ r~~A~ os 2° °S(~~, Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification ~ _ . . ~ ,. I, ,~ ~,~/, ~ivK/rila~'1 ~ C• ,hereby statt:t~iat, to the best of my abilities, due care and ~,•+ . diligence was used in the observation of the construction such;~~.iat the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. " Date: Z~~SI o8 Signature: Agent's Certif ication ~ . " I, ,hereby state that, to the best of my abilities, due care and diligence-was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Dater If this project was designed by a Certified Professional I, ~ , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent~of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: ~ ~! 1 • State of North Carolina nt=nartment of Environment al IU 1 VulU1 UI i ~c::~v~..~ vG-~ Division of Water Quality Michael F. Easley, Governor ' William G. Ross, Jr., Secretary Kerr T. Stevens, Director ' Cr ,~ ~~. ~ M~ :.:~~, ~a A ~ a ~~..--~~ ~~ ~Qi:~ I ~w aj~"d9, r, ~ ` ~ -~T-^ -•' ~ `-; ~~~ P~= ~~~~~ NORTH CAROLINA DEPARTMENT OF ~~ ENVIRONMENT AND NATURAL RESOURCES Ccrti(-icate of Completeness D~~'Q Project No.: OIO120 County: Applicant: NC ~OT ~ f71 / ~j WakQ aMd .Dur~iam Project Name: R- Z90t:o W%e>!Cr-inq o>C NC 55 ~rom tJS ~5J 7~ SR 112 ~ Date of lswance of 40l Water Quality Certification: /V~aYG/1 I3, ZODI Certificate of Completion Ltpun completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit. North Carolina Division of«'ater Quality, 1621 Mail Service Center, Raleigh. NC. 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification _ I, /• ~/, ~or/~'ltcr/f P t, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other~sup~p~or~ting materials. Signature: ~ ~.~ ~ 't---~~ Date: 2l~ "' o $ Agent's Certification 1 ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional l~ , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No Wetlands/40l Unit 1621 Mail Service Center Raleigh, Notch Carotina 27699-1621 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/]09o post consumer paper State of North Carolina .~ Department of Environment ;~•• and Natural Resources Division of Water Quality c'A:.~. .e~~,~~ ~~ ~ 1 ~ • ~~~~.~ ~~l,~t ~~ ,^~ ~"~ r~TF <OG' ~rfit ~ 8 ~. Michael F. Easley, Governor s~ William G. Ross, Jr., Secretary NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, Director ENVIRONMENT AND NATURAL RESOURCES Certificate of Completeness D~~'Q Project No.: DID 12 o rvtod County: Wake un^~ ~un~arvt_ C~A~vI'~~t.5 Applicant: /~C~aTi ~~~ s Pn,iect Name: _ R' 2~~(P, WiileyJ~'r19 a~ NC S5 -~i-oi-•t US(~~{ /-y S~2 //Z1 J ~ / Date of Issuance of 401 Water Quality Certification: J ct/1 Gf i-l Yom, tp , 203 Certificate of Completion Upon completion of all ~~ork approved within the 401 Water Quality Certification nr applicable Buffer Rules, and am' subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit. North Carolina Division of Rater Quality, 1621 Mail Service Center. Raleigh. Iv`C. 27699-1621. This form may be returned to DWQ by ehe applicant, the applicant's authorized went, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, ~~/ ,~~/n~vl . P ~ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ~ . W~cn.,y-. Date: e,~/5~~8 Agent's Certification I. ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration Date Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 State of North Carolina n^n-~r+mnn} of Cr~~~~rnmm~nt and Natural t~esources Division of Water Quality Michael F. Easley, Governor ~' William G. Ross, Jr., Secretary Kerr T. Stevens, Director ,~, °, ~~ Gov a F~ =;J ,~, x. ~. ~_ •r. ~x:: ~ ~1~ I-T,-i ~` ~1^ Z NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Certificate of Completeness D~~'Q I'rojert Nt~.: 0101 Zo r+aod County: Wake wv.c~ ~v"l•.o.~ Co~y~'~t't5 Applicant: NC 17DT, /71 V 5 l'n~jert Name: ~- 2~0~, wii~erJr'~1q o~ n!C SS ~on1 USfQ~f ~o SR //Z / Date of Issuance cif-301 Water Quality Certification: _ Tu ~~ g, Z 003 Certi("icate of Completion Ltpon a~mpletion of all work approved within the 401 V~'ater Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit. North Carolina Division of Water Quality, 1621 Mail Service Center. Raleigh. NC. 27699-1621. This form may be returned tc~ DR'Q b~• the applicant, the applicant's authorized agent, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, .T L3/ Boa/rKR~I ~ f~ ~. ,hereby state that, to the best of my abilities, due care and diligence w•as used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specitcations, and other supporting materials. Signature: O , ~ ~ Date: ~C ~~rl ~ g Agent's Certification 1• ,hereby state that, to the best of my abilities, due care and diligence vas used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1. , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No Date Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 -FAX 733.9959 State of North Carolina (-1nr11r~mr•r~~ r,f C...,rir..r-~mn..~ al~c~ Natural resources •Division of Water Quality Michael F. Easley, Governor ~' William G. Ross, Jr., Secretary Kerr T. Stevens, Director Certificate of Completeness D\1'Q Prt~jcct Nt~.: OIDI Zo rhod County: ~ak~ cw`~ Jun}~awt, ~~h~~tS Applicant: NC~T~ ~l / S Yn,iect Name: ~- Z~D(P, widcrJi'~q of n/C SS ~,-o.yi USCQy 7'b Sre l/Zl Uate of lssuanre t,l -301 \~'ater Quality Certification: f I I Z) f ~ 3 .~,~n-, ~ra ~ ~;~ ~~ ~~ ~~~ `l; i~ NORTH CAROLINA DEPARTMENT OFD ENVIRONMENT AND NATURAL RESOURCES Certificate of Completion Upon cc,mpletion t,Call work apprm~ed ,~•ithin the 401 \Vater Quality Certification or applicable Buffer Rules, and an}• subsequent modifications, the applicant is required to return this certificate to the 401/\Vetlands Unit. North Carolina Division of 1\'atcr Quality. IG'_'t Mail Service Center. Raleigh, NC. 37699-1631. This form may be returned to D\\'Q by the applicant, the applicant's authorized went, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification ^ 1, __ ~ ~ g°w~'n. r ~ ,hereby state that, to the best of my abilities, due care and diligence ,L•as used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 \Vater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date:__ ~t'!g~Q8 Agent's Certification 1, ,hereby state that, to the best of my abilities, due care and diligence .vas used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 \Vater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: ]f this project yeas designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, wee}:ly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence ~ti•as used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Wetlands/10] Unit 1621 Mail Sen•ice Center Raleigh, Noah Cazolina 27699-1621 Telephone 919-733-1786 F,\X 733-9959 State of North Carolina rlr~n-~~-+mnn4 of Cr~,.;r..mm~n} al~-u Ivalural resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Kerr T. Stevens, Director a ~ f~~ ~ j7 r z v;s ,,~~ ~~ ~ t~ ~. ~ ~~ NORTH CAROLINA DEPARTMENT OF ~~p'~. C> ENVIRONMENT AND NATURAL RESOURCES ~r ~ ~` ~~~ Ccrtiticatr of Completeness x D\\'Q Project Irt~.: 0101 Zo r+•tod County: V~/Qk2 an~c( Jun~w~ (Jot,~r~~t'LS Applicant: ~Ci7i~T~ ~/~ S Yn,icrt tiamc: ~' 290Cv, w~ijcrli~~lq o~ i1/C SS ->~orrt US(~~ /•o Sr2 //Z / Date of Issuancr e~f-301 Water Quality Certification: O t l O,f/a7 ~f Certificate of Completion Ltpon completion Droll wprk apprrn•ed within the-101 \Vater Quality Certirication or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the -101/1Vetlands Unit. North Carolina Division or11'ater Quality, 1G'?l 1\lail Service Center, Raleigh, NC. ?7699-16?1. This form may be returned tc~ D«'Q by the applicant. the applicant's authorized went, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,- ~~/- ~ok/i'KR/J , P E. ,hereby state that, to the best of my abilities, due care and diligence ~~•as used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature:_~_t.~~ ~._ Date: ~L~.S/`~3 Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence ryas used in the observation of the construction such that the consruction w•as observed to be built within substantial compliance and intent of the 401 ~Vater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, ~veelJy, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence vas used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. 1Vetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 i - State of North Carolina rlnrlllrfmnn+ n~ t-n~rirnmm~r'+} cillu rvalurai rsesuurces Division of Water Quality Michael F. Easley, Governor •' William G. Ross, Jr., Secretary Kerr T. Stevens, Director D~~'Q Prc~jcct Inc,.: 001 Zo r+•to~ ~~~. ~, NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANO NATURAL RESOURCES Certificate of Completeness County: yyutk2 a~v~ Jun}+ar.1 ~'.o~h'tt~CS Applicant: NC ~OT ~ ~1 V S I'n,jcct lame: ~' Z~O~, wii~crJi'~q o~ NC SS -~-ro~rt (/SCp~/ ~-o SR //Z/ Uate of ]ssuancr of -301 Water Qualih• Certification: O (~ 2910 Certificate of Completion Ltpan cc~mplction of all +vork appmvcd ++•ithin the 401 ti~'ater Quality Certification or applicable Buffer Rules, and any subsequent modiGrations, the applicant is required to return this certificate to the 401/Wetlands Unit. North Carolina Division of «'ater Quality, IG2l Mail Service Center. Raleigh, NC, 27G99-1621. This form may be returned to D«'Q by the applicant, the applicant's authorized agent, or the Project Engineer. It is not necessary to send certificates from all of these. Applican is ~C~ e~rtiFcation 1, T y"' ~~"~''~h ~ ~ ~ ,hereby state that, to the best of my abilities, due care and diligence ++•as used in the obsen•ation of the construction such that the construction v<•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Q.l.~.~-~-t----~~ Date: ~l~~l08 Agent's Certification 1• - ,hereby state that, to the best of my abilities, due care and diligence vas used in the observation of the construction such that the construction ++•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project ~+•as designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, vveelJy, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence ~s•as used in the observation of the construction such that the construction µ•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. Wetlandsl.301 Unit 1621 Mail Sen•ice Center Raleigh, North Carolina 27699.1621 Telephone 919-733-1786 FAX 733.9959 %~ State of North Carolina ~;._ n^r, "tr}mnr.} rlf t-+'t,rir..,-i ~/S ff ~~ c+ fi'~-' ~~~~ allu Ivai:ural rsesources ~~~ Division of Water Quality i1"l'11' ,, ` ~ . Michael F. Easley, Governor ~' ''"''?~,~'1'I- ~'R William G. Ross, Jr., Secretary y~H NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, Director ENVIRONMENT AND NATURAL RESOURCES Certificate of Completeness D\\'Q Project tits.: D~Ot Zy rvtod County: Wak2 an~c( Jtnn~o.wt, C,ot~y\'~'I~LS Applicant: NC I'7OT D t V S Pn~jcct lame: ~- 2~OCv, wiilt.~i'~q o~ NC SS -~,-ont (/SCQ~/ ~ S~2 //ZI Date of Iscuanre of -301 Water Quality Certification: O y~2 ~/O~ Certificate of Completion Ltpon completion of all work approved «•ithin the ~O1 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the -301/VJetlands Unit. North Carolina Division of 1Vatcr Quality. IG'? 1 1\4ai1 Service Center. Raleigh. NC. ?7G99-1 G? 1. This form may be returned to D1\'Q by the applicant, the applicant's authorized agent, or the Project Engineer. I[ is not necessary to send certificates from all of these. Applicant's Certification ^ I. -~~'/ ~Or/r12R1~ Y! ~- ,hereby state that, to the best of my abilities, due care and diligence .vas used in the observation o the construction such that the construction v.•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature.~~___~- ~_ - - Date: 2l ~.~/~e Agent's Certification I• ,hereby state that, to the best of my abilities, due care and diligence vas used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weelJy, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence vas used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration N Date Wetlands/401 Unit ]62I Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919.733-1756 FAX 733-9959 - State of North Carolina '/ nr~n^r+mnr~} of r-r,~ir~r-~m~n} dl lu lvalurai Resources _';..~~,~ ~~ Division of Water Quality ~ '`'' ~"~s;~• I:• s ,'~, ~ S ,YS ~, _.~ ~~ ~, ~ ~; Michael F. Easley, Governo'WG~;~,,_ :,., />/~ ~• r ~ , • ~ UnD .,,.. William G. Ross, Jr., Secretary ~~ ~ ~/i4~ GO NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, DlreCtOr ~FQ~~' ENVIRONMENT AND NATURAL RESOURCES H Certificate of Completeness D11'Q Proicct ho.: Ot0 (Zo r+ao~ County: Wake ~^~ Jun}~awt, ('A~y~'~t'ts Applicant: _ ~C Da 7 , D ~V 5 1'n,iert i\amc: ~- Z~OCv, wi~le~Ji'/Jq a~ NC SS -~Yorn (/SCt?~ ~o SR //ZI Date of Issuance of 401 11'ater Quality Certification: O 5 ~ZO~O.f Certificate of Completion L~pon completion of all ~rork appmved ~~~ithin the 401 Water Quality Certification or applicable Buffer Rules, and am• subsequent modifications. the applicant is required to return this certificate to the -lOl/1Vetlands Unit. North Carolina Division of Water Quality. IG'_' 1 Mail Service Center, Raleigh. NC. ?7699-16? 1. This form may be returned to D~L'Q by the applicant, the applicant's authorized agent, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification /~ 1, T l/. ~ti/.'J2~th /- +'%. ,hereby state that, to the best of my abilities, due care and diligence ~ti•as used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: V .~~'-'-i1--~ Date: 2! 1,51 D$ Agent's Certification 1• ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the consvuction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. , Signature: Date: if this project vas designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to obsen•e (periodically, ~+~ee1Jy, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction w•as observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration Date Wetlands/401 Unit 162] Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959