HomeMy WebLinkAbout20030981 Ver 1_Certification of Completion_20051213~ Waterford
II Developmell~
Relationship Real Estate'"
December 8, 2005
401/Wetlands Unit
North Carolina Division of Water Quality
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
RE: DWQ Project # 03-0981
To Whom It May Concern:
(- l~
~~~~~~~
[)~ C ~ ~ 1~iGy
Enclosed please find the signed Certificate of Completion for the project referenced
above. This project was for the construction of Green Level to Durham Rd for the
Stonewater PUD. All construction is complete and we are in the process of
completing the punch list work following inspection by Town of Cary and NCDOT.
If you need further information or we can be of further assistance I can be reached
at 919-941-9881 or by email at Johnson@waterforddevelopmentnc.com. I
appreciate your cooperation with this matter.
Sincerely,
~~
R. Scott Johnson, P.E.
Land Development Manager
Waterford Development NC
cc: Ross Massey, Chas. H. Sells
Kevin Martin, Soil & Environmental Consultants
1005 Slater Road Suite 2Q0 Durham. NC 2r 7t)3 p. 919.941 .9888 t. 919.941 .9889 uvw~rd.watert:~rcidF~~~~l~,,~~r~r• rui~i
3
Certificate of Completion
DWQ Project No.: ~~ ' C~~l ~ ~ County: ~,/JC~~ .
Applicant: l~nh0_~ -t- L'tRS/o.~ ate=
Project Name: W a-kr -~T~, -- S l1) air d~o.ie. ~ ~ rr~...-~"
Date of Issuance of 401 Water Quality Certification: 2 ~~ ~Pu i Sid PYJ,o,~n vti,1 - ~~$-~(7~--
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North
Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, ~ o(pcr k ~ , NAvrr+ ~ k c..,,D ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Qualify. Certification and Buffer Rules, the
approved plans ands cifications, and other supporting materials:, .
Signature: ~ Date: ~~ ~ 7 ~~~
Agent's, Certif ication
I, ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
~ ~~y~.
within substantial compliance and intent of the 401 Water Quality Certification and Bu LsA~'%,
approved plans and specifications, and other supporting materials. ~~~f/,~~''~~~
Signature:
Date:
If this project was designed by a Certified Professional
~~SS/® o~
~~ ~~
-~'
ply, iy3f AL `~
YF %~~~ G`
C
~~C~~,y .
as a duly registered Professional ~-fi.e.,
Engineer, Landsca a Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe eriodic ,weekly, full time) the construction of the project, for the Permittee hereby state that,
to the bes o my abilities, due caze and diligence was used in the observation of the construction such that
the construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification~nd^Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Registration No.: d ~y`'1'~ Date: i ~-/7/JJ