HomeMy WebLinkAbout20030549 Ver 1_Triage Check List_20030506Triage Check List
Date: S'L ' 03
To: ? ARO
? FRO
? MRO
? RRO
Project Name: `C??+?rC IrtAPS 1"cr l-trc C
DWQ#: O 3 - 05%
Coun 14 4p ty. tDoE
44y Mike Parker
Ken Averitte
Alan Johnson
Steve Mitchell
From: Qdb
WaRO (Tom Steffens
WiRO Noelle Lutheran
? WSRO Cyndi Karoly (Central Office)
Telephone : (919) _?39 -qqrZ..(o
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
Minimization/avoidance: .?
Buffer Rules (Neuse(?ar_Pamlicq,?_atawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments:
TOWA +U*