Loading...
HomeMy WebLinkAbout20080365 Ver 1_Application_20080228~1 U.S. Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division ~'EB 2 ~ 2008 North Carolina Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Subject: PRA-GRSM 1B19, Rehabilitation of Newfound Gap Road Great Smoky Mountains National Park, Swain County, NC 401 Water Quality Certification To Whom It May Concern: 080365 In cooperation with the National Park Service, Eastern Federal Lands Highway Division, of the Federal Highway Administration (FHWA), is currently preparing plans for the rehabilitation and improvement of the Newfound Gap Road in Swain County, North Carolina. The proposed rehabilitation begins immediately north of Collin's Creek Picnic Area and ends roughly at the southern Park boundary of the Cherokee Indian Reservation, and will include milling, patching, resurfacing, reconstruction of the existing roadway, and drainage improvements for a total length of 6.5 miles. The proposed improvements also include the widening and reconfiguration of Newfound Gap Road to add turn lanes at the entrance to the Oconaluftee Visitor Center and Park Circle Drive, Tow String Road, and the Collins Creek Picnic Area. Tow String Road will be realigned and the parking area for the Oconaluftee Visitor Center will be reconfigured. Wetlands are located in the vicinity of the proposed improvements to the Oconaluftee Visitor Center, however, impacts will be avoided. Approximately 0.08 acres of wetlands will be impacted through the widening of Newfound Gap Road to add a turn lane at the entrance of Tow String Road. Once Tow String Road has been realigned, a portion of the unnecessary roadway will be obliterated. The ground elevation in this area will be lowered and planting maybe added to encourage this area to become wetlands to mitigate for the 0.08 acres impacted. The extension of a culvert would impact approximately 11 linear feet of Collins Creek. J AMERICAN ECONOMY j 1. ~~~~,.. ~~~~ ~~~~ Y,~TI~, 2 -, C~~~/1 ~'~~ ~ '' ~~w ~;~ ~ oo /~ 21400 Ridgeto~, 8 ~,/ Sterling, VA 2016~~P~q~, ~.~~~ ti In Reply Refer to: HFPP-15 2 The FHWA respectfully requests certification of the proposed improvements. In order to assist with your review of this project, enclosed you will find seven hard copies of the Pre- Construction Notification Application Form and the State Clearinghouse final approval letter, one hard copy of the Environmental Assessment and one hard copy set of the project plans. You will also find six CDs which contain an electronic copy of the project plans and Environmental Assessment. A check for $240.00 for the permit fee is also enclosed. APre-Construction Notification Application Form with supporting documentation has also been submitted to the Asheville Field Office of the U.S. Army Corps of Engineers. The FHWA is also initiating coordination with the North Carolina Division of Land Resources, and the North Carolina Wildlife Resources Commission. If you have any questions concerning this matter, please contact Ms. Lisa Landers, Environmental Protection Specialist, at Lisa.Landers a„fliwa.dot.gov or (817) 978-0571. Sincerely yours, Kevin S. Rose Environmental Team Leader Enclosures cc: Mr. Dale A. Ditmanson, Superintendent, Great Smoky Mountains National Park, National Park Service, Gatlinburg, TN Mr. Mike Tomkosky, Project Manager, Denver Service Center, Great Smoky Mountains National Park, National Park Service, Gatlinburg, TN Mr. Kent Cochran, FLHP Coordinator, Southeast Region, National Park Service, Atlanta, GA r ~~ 0~ ~~ ~5~' {"~ ~~ ~Y~~ -+1 Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USAGE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you are requesting an Individua1404 Permit or Individual 401 Water Quality Certification. The USAGE Individual Permit application form is available online at www.saw.usace.army.mil/wetlands/Permits.html. The USAGE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USAGE website at www.saw.usace.armymiUwetlands/index.html, or contact one of the field offices listed on page 3 of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional information regarding the identification and regulation of wetlands and waters of the U.S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell the applicant which 401 Certification will apply until the 404 Permit type has been determined by the USAGE. Applicants are encouraged to visit DWQ's 401/Wetlands Unit website at http://h2o.enr.state.nc.us/ncwetlands to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for. General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the Internet should contact DWQ's Central .Office in Raleigh at (919) 733-1786. Trout Waters Coordination -Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on page 4 of this application) prior to submittal of the application. Page 1 of 12 Coastal Area Management Act (CAMA) Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on page 4) the applicant should contact the North Carolina Division of Coastal Management (DCM). DCM will determine whether or not the project is within a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency. In such cases, DCM will require a LAMA Permit and will coordinate the 404/401 Permits. F The applicant may also chooe~to coordinate with the United States Fish and Wildlife Service to ensure that the proposed project will have no impact upon any endangered or threatened species or critical habitat as regulated by the Endangered Species Act, and the State Historic Preservation Office, North Carolina Department of Cultural Resources to ensure that the proposed project will have no impact upon any properties listed or eligible for listing on the National Register of Historic Places. Compliance with these regulations is required to be eligible for any Department of the Army permit. The addresses for both agencies are listed on page 3 of this application. USACE Permits -Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office. Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This -PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 67 Fed. Reg. 2090 (Jan. 15, 2002), available at http:%/www.usace.army.miUinet/functions/cw/cecwo/rea/2002nwps.pdf. Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules -All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is required or specifically requested fora 401 Certification, then anon-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fee of $475 is required. A check made out to the North Carolina Division of Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, see the DWQ website at http://h2o.ehnr.state.nc.us/ncwetlands/fees.html. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application fora 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of 12 US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Caldwell Haywood McDowell Swain US Army Corps of Engineers Alleghany Catawba Henderson Mecklenburg Transylvania 151 Patton Avenue Ashe Cherokee Iredell Mitchell Union Room 208 Avery Clay Jackson Polk Watauga Asheville, NC 28801-5006 Buncombe Cleveland Lincoln Rowan Yancey Telephone: (828) 271-7980 Burke Gaston Macon Rutherford Fax: (828) 281-8120 Cabarrus Graham Madison Stanley Raleigh Regulatory Field Office Alamance Franklin Nash Surry US Army Corps Of Engineers Caswell Forsyth Northampton Vance 6508 Falls of the Neuse Road Chatham Granville Orange Wake Suite 120 Davidson Guilford Person Warren Raleigh, NC 27615 Davie Halifax Randolph Wilkes Telephone: (919) 876-8441 Durham Johnston Rockingham Wilson Fax: (919) 876-5823 Edgecombe Lee Stokes Yadkin Washington Regulatory Field Office Beaufort Currituck Jones Pitt US Army Corps Of Engineers Bertie Dare Lenoir Tyrrell Post Office Box 1000 Camden Gates Martin Washington Washington, NC 27889-1000 Carteret* Green Pamlico Wayne Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans *Croatan National Forest Only Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland North Carolina State Agencies Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-6893 Division of Water Quality Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Telephone: (919) 715-0476 Fax: (919)715-2219 State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 27699-4617 Telephone: (919) 733-4763 Fax: (919) 715-2671 US Fish and Wildlife Service /National Marine Fisheries Service US Fish and Wildlife Service US Fish and Wildlife Service National Marine Fisheries Service Raleigh Field Office Asheville Field Office Habitat Conservation Division Post Oflice Box 33726 160 Zillicoa Street Pivers Island Raleigh, NC 27636-3726 Asheville, NC 28801 Beaufort, NC 28516 Telephone: (919) 856-4520 Telephone: (828) 258-3939 Telephone: (252) 728-5090 Page 3 of 12 CAMA and NC Coastal Counties Division of Coastal Management 1638 Mail Service Center Raleigh, NC 27699-1638 Telephone: (919) 733-2293 Fax: (919)733-1495 Beaufort Chowan Bertie Craven Brunswick Currituck Camden Dare Carteret Gates Hertford Pasquotank Hyde Pender New Hanover Perquimans Onslow Tyrrell Pamlico Washington Western Piedmont Region Coordinator 3855 Idlewild Road Kernersville, NC 27284-9180 Telephone: (336) 769-9453 Mountain Region Coordinator 20830 Great Smoky Mtn. Expressway Waynesville, NC 28786 Telephone: (828) 452-2546 Fax: (828)452-7772 NCWRC and NC Trout Counties Alleghany Caldwell Ashe Mitchell Avery Stokes Burke Surry Buncombe Henderson Cherokee Jackson Clay Macon Graham .Madison Haywood McDowell Watauga Wilkes Polk Rutherford Swain Transylvania Yancey APPLICATION FORM BEGINS ON PAGE 5. PLEASE DO NOT SUBMIT PAGES 1- 4. Page 4 of 12 Office Use Only: Form Version March OS 200803.65 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ^~ Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ Q 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NwP 1a. Linear Transportation Projects 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information 1. Owner/Applicant Information Name: Kevin S. Rose, Federal Highway Administration -Eastern Federal Lands Highway Division Mailing Address: 21aoo Ridgetop circle Sterling, VA 20166 Telephone Number: (5r1) asa-151 Fax Number: (e~1) a3a-1 sn E-mall AddreSS: Kevin.Rose@fhwa.dot.gov 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: n/a Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 5 of 12 III. Project Information 6 Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in rel;~tion to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name Of prOJeCt: PRA-GRSM 1619, Rehabilitation and Improvement of Newfound Gap Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a 3. Property Identification Number (Tax PIN): nra 4. Location County: Swain County Nearest Town: Cherokee Subdivision name (include phase/lot number): Directions to site (include road numbers/names, landmarks, etc.): Newfound Gap Road from southern Park boundary to 500 feet north of Collins Creek Picnic Area. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35 3a o5.s~ ~ s3 20 or.se ~W Property size (acres): The Great Smoky Mountains NP is 521,086 acres 7. Name of nearest receiving body of water: Collins Creek g. R1VeT BaSm: Little Tennessee (Note -this must be one of North Carolina's seventeen designated major river basins. The 1Ziver Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time Of th1S appllcatlOn: Project is within the Great Smoky Mountains National Park. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: Rehabilitation and improvements include resurfacing, full depth reconstruction, drainage improvements, widening of New Found Gap Road to reconfigure and add tum lanes at Oconaluftee Visitor Center, Tow String Rd., and Collins Creek Picnic Area. Tow String Rd will be realigned. 11. EXplain the purpOSe Of the proposed WOrk: The project will improve deficient roadway and inadequate intersections. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with COriStruCtlOn Schedules. Permits were obtained for the reconstruction of 10.5 miles of Newfound Gap Road north of proposed project under PRA-GRSM 1 B17. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: o.os ages of wetlands win be fined to construct a turn lane on Newfound Gap Road and reconfigure Tow String Rd. Page7of12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain es/no Distance to Nearest Stream linear feet) Area of Impact (acres) 1 fill forested yes 450 0.08 Total Wetland Impact (acres) 0.08 3. List the total acreage (estimated) of all existing wetlands on the property: n/a A delineation has not been performed on the entire National Park. 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must he included. To calculate acreage, multi171v length X width, then divide by 43,560. Stream Impact Number indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length linear feet Area of Impact acres 1 Collins Creek culvert piers perennial 25 feet 11 0.006 Total Stream Impact (by length and acreage) 11 0.006 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill_ excavation. dredging, floodinsr, drainage, bulkheads, etc. Open Water Impact Site Number indicate on ma Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. Area of Impact acres Total Open Water Impact (acres) 0 Page 8 of 12 6. List the cumulative impact to all Waters of the U.S. resulting from the protect: Stream Im act acres : o.oos Wetland lm act (acres): o.os en Water Im act acres : o Total Im act to Waters of the U.S. (acres) o.oss Total Stream Im act (linear feet): ~ ~ 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ^~ No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, imgation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide information related to site constraints such as topography, building ordinances, accessibility, and fmancial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not.feasible. Also discuss how impacts were minimised once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The new alignment of-row sung Rd. was had the fewer impacts to wetlands and large trees while improving sight distance. Newfound Gap Road was widened to the east at the Collins Creek picnic area to have the least impact to the Creek. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USAGE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http: //h2o. enr.state. nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The obliterated section of Tow String Rd. will be graded at a lower elevation and planting may be used to encourage the area to become wetlands ___ 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/w~/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount ofNon-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of public (federal/state) land? Yes ^^ No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not .sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes Q No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^^ • No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * ( Impact I Required Zone ,~~„-_e c ~~~ Multiplier ,,,~,,,__,,__ 3 (2 for Catawba) 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additiona120 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. Page 11 of 12 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The crest smoky Mountains National Park totals approximately 5zl,oas acres. The project would construct approximately 1.61 acres of new impervious surface. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. There will be no sewage disposal associated with this activity. XIII. Violations (required by DWQ) Is this site in violation of .DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this anafter-the-fact permit application? Yes ^ No ^~ XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact neazby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Cazolina Division of Water Quality policy posted on our website at htt~//h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: Tnis is reconstruction and improvement of an existing roadway. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~ Applicant/~gent's Signature 'Dafe (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 ::i~ .vs" • A' "~ ,e~~, North Carolina Depaxtm.ent of Administration Gwynn T. Swinson, Secretary I~fichael F. Basley,~Governor ivir. Phillip Francis L.S. Dept. of the Interior rational Park Service 107 Park Headquarters Road Gatlinburg, TN 37738 Re: SCH File # 06-E-4000-0058; EA; Dear Mr. Francis: September 29, 200 Phase II portion of the Rehabilitation of Newfound Gap Road The above referenced environmental impact informati ental Policy Actm Ac o dung SoaG.S.113A- Cltaringhouse under the provisions of the National Envtronm 10. when a state agency is required to prepare an environmental do eum ate End ironmental Pol cy Act. federal law, the environmental document meets the provisions of th Attached to this letter for your consideration are the comments made by agencies in the course of this re .-iew. If~any further environmental review documents are prepared for this project, they should be forwarded to this office for intergovernmental review. Should you have any questions, please do not hesitate to call. Sincerely, t~~~2~ ~~ 5t.%~ Ms. Chrys Haggett Environmental Policy Act Coordinator Attachments ec. Region A Trlepho-te: (9l9)807.2a=! Maillr~pAddress: Fax (919)733.9571 IS;I prlail gcrvice Coster Stale Courlcr MSI-OI-Oo Re;eigh, NC 17699.1301 a-mall Chrys,Baggert rC~ncrnolLner An Bqual Opportuntry/~(firrna(ive Action Employer ~n• i nt.nT nnn~ ~r rti-~ ~ r irr nni rTr.vn i Locadart Addrr~s: 116 West Jones Street Raleigh, North Carolina i irt~G i 09,126/2005 15. d4 5197153060 a NCDENR PAC7t 'nlF'uor ~~ h1~~EwR North Carolina Department of Environment and Natural Resources Michael F. ~aaley, Govemar ~ WYiINam ~. RoS9 Jr„ Secrotary :~ ME[40RANa0A'1 xD ~ d~tatM Cl+sririghouse FRpM: Melba MaGee 8nvi,ro~nrnental Review CQaxQinator ~, >vaw~qu~d etp~AO&d i:~aChan6rsatr3tnbkY Mountains l4ationel Perk, Phase IY, 9wai.n County ~p,~g; September 27, 2805 Theed in~oxma.Gion£ ~eisttachedHOOmmantoa~0etorrthe PPli aat~d the Drvpos in~oxmnAC~Ol1. Thank you i'or tk~a opportunity to review. AtCacha~ento 1601 Mail Service Center, Rale~hl North Carolina 27699.181 Phone: 919-73349841 FAX; 919.715.30801 Internet: www.enr.stat®,nc.uslENR/ ~ ~ ePperRvn~b I p~IrtnetNe Adlan Empl~ra • 64 96 Recycled 11ti 96 Poet Consumer Paver a ~1 (1(1 • 1 L.T /1T .1/'1/17 1T M1 I T I!`r /1/1 I rTr . vn 1 v NCDENR PAQE 01ldb ~g128~2005 15: d4 9197153060 ~^'~^1 ~ ~ North Carolina W1ldlif~ Resa~x~es commission Richard B. ~anailtvn, executive piroctor I T0: Molce of I.o lslBati a and n ~r~Coord3mencal Affairs, bENI~ OfPi ~ 7~~ G(a.~-,~ FRt3M: Marla Chambcra, Western. NCQ~' $omait Coordinator )Ffabatat Conservation Program, NCVVRC PATE: September 16, 2005 SUBJECT: Rcvtew ofathe Environmental Asse6sxnent for the National Park Service's tchabilitgtiQn of. ~iewfound CtaF Road (US~41) is the Croat Stno.ky Mountains ~iationa.l Peek, Phew n, from CotNna Creek Picnic Area south fA the pack boundary, Swain County. Project PRA-GRSM iB 13 The National Park Service (NFS) has submitted ~Fqz ~v(aw ~ p„nviro~nmental A,9Sessrnent (EA) document for the aubjecc project. North Carolina WildliYe Resat>z'~ Cotnmisaio~ (NCW~C} staff biologists have raviawed ehe inforrnatioa provided. These commCnts ~'b provided iri acootd~nea with the ptovisione of the National Environmental Policy het (~? U.S.C. 4332(2)(C)) a»d th.e Fish and Wildlifa Caordination Act (d8 Stet, 401. as amended; l6 U.S.C. 661-667d), . The Nations] Fork Service proposes to rshabilit'gte tlto pavetuent and drainage on Newfound ~#ep Road {US-441) and, for the prefert+ed Full Build Alternativ~o, co~stntct left turn lines at saver intereectiaas In the Groat Srnaky Mountains National Park. The project length is approxitriata]y 6.5 ntilas a~txd progoscd impacts include 15 foot of attcarn for a culvert extension, 0.08 acres of. wetlands and 0.01 acres of floodplain for a toad rcaligr-ment, and a net impact of 2.04 acres of terrestrial land. 'The Oconaluftc¢ River runs along the side of Newfound Clap 1t0~ the length of the project, ~ 'l; he acottaluftao River and its tributaries upstream. o£ tho confluence with Bxadlay Fork ato elaseifitd l3-Trout Hi$h Quality Water (HQW). Aownstream of that confluence, doe ti.vex and tributaries era clasaifiod C-Trout HQW, cxcopt Etavon Pork, a-hich is Class C-Trout waur. The olivo dert~cr (Percina squamara), Federal Species of Concern (F9C) and hate Special Concern (SC), and the wounded darter (Efleaostoma vuinerarum), state SG, inhabit the lion of Inland Flshcrlcs + 171 M,ail5ervice Cet~te~ ' 1~Jei~t1, N4 Telephony: (919) 733.3633 + Fax: (119) 715 7b43 Z7b99-1721 e9/2a/200e 15: 4a gi9715305a NCDENR 'PAGE 03/eE, Nawf quad Gtp Raad- ~-~ 1 Sapbomba 16, 200$ comas Smoky Ivima. Nat'l Park, Swain ~cl 2 . oconaluftec River. 'There have been seveta~ doc~am~n ~, ~ ~ ~ lnbj~ ~~a9.~Thia spec es w$s (,N~t'~orptl~t ChrivG017htinus carottnansis), F5C a gT 2004 comment letter. Rte not eoilsi~red in the EA, as we had requested in our Jatluary racommEr-d that in-stream work and land disturbanoa within the 23-foot wide buffer zrnne are prohibited during tht trout spawning seasons of Qctober 15 through April 13 to protect the egg s~nd t'ry Stages of trout. At a minimum, sediment and erosion control measures should adhere to the dosign standards far sensitive watersheds. Temporary or pextnan.ent hotbaceous vegetation should be planted on all Bata soil as sdon as possible and within 15 calcnder days of ground disturbing activities to provide long-term erosion contd. The box culvert extension is 4lannod for the Cal]ir~ Creole Plcnic A>,ea intarsett7lon+ A wetland exists in this area, but is not proposed to be impacted, Ctilverts should b®placed with the flsor of the batrc'1 agpraxirnately 121nches below the sQeara bottom w allow natural stream bottom materials to became established in tl~ oulvett and tb pro~ldt aquatic life passage during periods of law flow. The extension should con'cct the atisting perched conditiae of the culvert and re-establish prvpor flow and aquatic life passage through the Dressing. Tow String Road is proposed to be realigntd at the intersection with Ngwfuund Cap Road t4 tr~apxave safety by inrseasitng sight ~stan~ sib of thcmcxistingea»d proposed Iocat<ons along the ee$c etde a# Newfound Clap Ao of ?ow String Road. Rte recQmzt1end that the x`1PS itnvesdBava duo optioA of bodging the wetland to avoid or mininni2e impacttsl If a ~~° is not used, culverts of adnguate size and ntunber should be used to tbai,ntun connectivity of the wetland. The document indicated that mitigation for the wetland irnpact9 would include oxpandin$ she wetland arcs by lowering the ground elevation adjacent to the existing wetland andlor transptandng vegetation salvaged from the road construction into rho newly crested wetlar-d efts. Although the exact location ass net indicated, wo recoaunend that the existing roadway that is to be elitainated should be removed back w origtnal ground eltvadortg, reconnocting the adjacent wetlands, and the natural floadplain elevations and l~inctians by raetored• Disturbed ~~ should be quickly seeded or mulohed t~ stabilir~e the eoi.l attd native species should be planted. If the wetland restoration ox creation is sucdcots rentoued osdbed to view the wetl~td a d1lesmiabouto main.rai~a a small walking trail along . wetland restoration and mitip~tion. . 'I'ho F~11 Build 1Alternative would ~tentially impact 1,207 linear feet of proposed sewer lisle and would inspect 1,0931inear feet of. e~cisting water line, which sre proposed under a separate projeot. Vito would like to take this opportunity t0 reco~uaQend that sewer Lines do toasted away from rho Octmaluftae River, preforably at loser 104 foot away to protect the banks, floodplains, vegetAtiatt buffer, at-d wildlife along the river. The potential for acid producing rock was lnveedgated and fotmd to be very low, No excavati~ is proposed at the intersection with the highest potential: Try rcroovel will be coordinated ro avoid the roosting season of the Indiana bat (14f'YVt~ sod~ts), fcdasal and elate Endangez~ed. It agpeara that several of the alternatives that were sclect~d avoided i»a~p~ta to steep banks along the Qconalu{tca Eivar or leapt conetivction farther away the rivet or its /~/1 • 1 LT /1T !~l\I~'f 7T M'1 1 T III nn 1 rTr ~/Y'f I 1 I/T~l I ` N~DENR g+~/29/2005 15:44 9197153060 • N¢wioutud Chap road, US-~41 ~~ptaaibat 16, 200 C„tQat Smioky Mme- Nat'l Fark, $wa~r C4, '~ tributaries. We concur wttn and apprc~l~ist ~~~~~ ~'d the a"tt~r~°~'1'Easutcs Iiet,¢d is- section 3.x.7 co ~;~i,~ze Impacts tYorrl p Thank you for the o~portunfty to review and coamr~enc vz~ this project, If you h~-ve at~y que~dona t+cgaxd~S these comments, phase contact ~mo at (704) ~4S-3B41. 'd cc: Maralla 8uzjcick, [TSPtiVS Btl~ Wrenn, NCDwQ Sarah McRem, NCN.[~ David IvicHcnry, NCWRG NC»ENR ..PAGE . n5r` nr, 09/26/2085 15:44 9197153060 , ' , ~rxta of North C~tdfiirla ~twri++e aflPlen 1+~C~EN oep3ftment of Envfr4nRlvlt and Natur~il R~SOUKlS II~itERGOVERNMFN'TAL REVIEW - PRO1~Cf CQNIMENTS Meer review of dti! pro,~et it hse bMn d4urrnined that the Ota+lA perrtthlel ertdlor app~lc lndlt7lad~rn~y t1BOd to be obaeinad to order Ibr Rltir ptojut t>s eoM~ly wreh Notch Caroline law. Oueidoru teperdrly efir~ p~rtnhe should b^ eddrewed m ehv paolonol QfAte Irtdiosed en t11+ rw~a of d11a Ibtm. All eppllmtlons InEortnadoa and qulde~(rlly Irlllke EO thew pienr end ~rrtttla ~ ~valtable froth tfie same Reglon4 OlliCia , . PEfiMITj 9iPE4AL aPPUGTION PROCEDURES Of RQOUMF~IF.NTS ' N0""~ pro~ast ~ I 6taeitoy flow lino{} 0 oglttlh tr Ceru{ttwt m optNto twettaWtw treeeaent Aepllottmt 90 dqi Oddre begM tartsQUfliOA or awetd of Cortetraabn 30 ~y fitlCith~ sewer slrstertl Oxsertslans 8 ae~wr syaatnr cato.Cta. OnKla kt~eAl~ Pettrp,Hasden tedlnio- conElrwxrr uarel, IJO dM) not t1llclterylnq fnto stfte euraa trramn. . NPD>~•plnnlt tb dl~lefge irder SurI4Ke weier andrr: Irpppgaort 110 delra bebre tin s On'a!M Ingastlan Pree+ppllCRl0a petAtit q 4par~0o end oonatltnc[westeretertbtlAdtl oonfeence pswLAddltbr+alty4 ebteM pMn1t re~Ons~t+arreteer^s!r>raeenent !tl ^ 120 dm dhdtistpktalfuosdtet~utfldwstets hedlty^grentgoell+s-NPOk3Rspyrmtw9GdaridterroeelpcdpWUOtlsiue (Nll~l erNpOBpenrlle.wt~kHererlsltsa Q 1Nete- Llse Pfermh Reagp~etlen taehnlgl eonterettae irN+^Ily nete~W ~ 70~d0ly ^ wall Censtiuctlan P~rrtUt Compleb apgHtmon nerle W niG11Vld irrd pttmlt Issued onor 14 tl+e 7 days d hstiDanan ei s weu. {i 9 eysy © brldgC and FIII fermi[ ApppcatlOn ca'y ntues h0>10f Wt1 on u~t edl0tltlt fID~~ p~oOrtY ~~ i ~ ~ tdert~nt Or~tia Irtrpedllen.pneppYredan wnhrena ur;wL nley raqulre t 190 days! • - ~ to FiU I'rpr}I NAG pQpertRkrtt or AdmMimetton and Peaenl Dndep and FA prink. P.Mlit m consavet ~ oppaa Au PaUutlon A4atament ~ ~~ (^gtlde endJar F1nIas10e 3oweai as Au 15 q NCAt; ~ Nll4, I1Q.01 ao. ~o.osoav+,oeaa~ Any open 4uMing aseodate0 wig sualect propowl multba In GOmplienee with 15 A Nt:.r,C7O.1g00 0 p~rnalllioe 4r•rM70'retlaM OFeeucnrresf Oonttlnhg aette^~as materiel must be In compllanee with b0 deye 15 A NCA[ 20,t T to 1a1 {t 1 whiGt rogwra nodf'itaagn N~~ l9Q deysl and rtfnovai alar To den-auNon, ~+orrk4Ga ArbNeaS Control gaup 9t g.7a~-Or:ZO, Q CttmpleN s0uree p~rnllt required W1der 19 A NCAr: ze,oaoo q Ttte 5emmtnmelan Pdludon Control ARat 19"J3 rm~^t ba pr0p^rIV 9ddrNead ftlr ~ lin~1 dlsturhln9 aetlvlty~ An erosion i wdlrnaruasbn len wtil ba -epulree Iron; dr more Beres to Ea dlsturbld oleo ftla4 with props Ae9ional Gr(Ite tlrnd t]uellry Section! at Igle ]0 l 20 days (30 daysl mntrn O dey4 bNerra bag+neu+q eltivity. A lee o- S90 for ett flrtt oath er.ny psrt oven eCn;. ' p 'the Sonlmentati0n pellutienl COAtfdl A~ 4I 1479 muq be nidrlssed wl~ hlAeCt Sb ilte relererleed 6oGt Oldlnenee- 9e•4atr^ Setllrr+,npmpn Md rarosign Control ntuft a a0dressee In ~+SCOrdinet wleh Nt~Glf's eppra^Od Db9~ P>ftieubr att~enelon ^t+~lld bt givgn t0 dtaign end Inotellstton 0/ ipproptlatt peAtneter tr;dment tnpphtg devlns< u well ea ~bIQ srbrllw^tar {4n+reYenCQ! ind uutllt7~ MlninO R4rtt11t ~ Un-sRe Inl~ittl4n WY01. Ser-tty bondfAed rrhh D1Nh. Bend anlaune wrNsj ~~ ~ tMhi rod nwnbt:r ~ aeTes o} elh~ed land, Aey eta MME graeeu tttsn •+rte acne must be D~~ 'Cite approprtal4 band Mu^t be NOri+~d be14N tFte perrniceen be Ittrred, North Groyne Rutnitq ~rertntt t)n-tiro fnstre~tlar by N.C plvlslnn of Ferese Peseun~e If pannle aae!<ietts ~ day. SOeeW tie~no C4arane! euming fennlt`31e0untle! ~.M.4n Inspee!elan by N.~,QIYillvn ot'Fawn Aeeourros regtriKd~tn+ore ~+~ fn t.OSidl N,Gwlth organle sells .t-ef !ff 9rot+fld derrfnq iCtlvltld ate hvelwd. Inq~~ ahatr~ ~ requoseod .~t I..n ttn dip belbre eetvel Oue+ k planned.' ^~ ~pa.rl*rq ~.Cala.. N!A 1(1 • I f`Tl1T !1/'1l1~ ~T M"'1 1 T 1rr !'~n 1 /'TrVT 1 !D dens Ido d~yq i de7 fl+/A1 t oar RilA1 vo -12o tlays (wA1 ,,,.,. , _ 09/28/2005 15: 4d .-...~ Q Qom Sahey etirn,~e 9197183060 PBRMffS Q ~ iw++rtr to arW wpleremgr dr ar its wyp Waphydeal 6plonadn t~emie 6see lalole Grtslrurtlan km+tt +Id1MlonrpualftyrCartlAvelon ~' GMA Ppnntt for LItAJ~It dwdoanw+e t`ai~l!-gtinis(ir MWCttae+naiopmenc NCDENR SPe~ ;I-tL11Pl't.ICATiGN PRdCeGUA29 orA@QUIRIMEN'r5 .. it peemi} rr;ulnd,applfodon 40 4ye bafer~ tkgln ee^see-Kapn. M~.. muff Aire NIL:iUalrA~d Otr~f1Y1 aria rnrtaro ee~nr~hurw ~i+yw..~y„~, p„+b ro^an+rtM4n Is aeeore0rq w t7ENRaPP~d pUro. May oleo nq~dre pemrletiardar Rreequile ainoal progrun. W i 40'1 Pe~mlf tleerl ibrpl of 6rgtnaeK, . a^ insp~tton a~sla la noaeesy a*eiily Hawed Weexfwdenr A rttlnimuen pa a1120dtl0 rralse aOmrnPenY d>•+pvllaaon, Fn ~ proosspnp fa bs+ad e+n a oar~naps er tl+a feel oroleat a~ wu ba r~quirad wan Coreplutlrn. ~ auvCr bond or ta.000 ud~ DINR NMinq oo loit N NlGgpndMonol thtt am wIM a0ened byr dr1U apaamr sha4 coon atianda+nunr,bu OIWOOd aetording tv DENR cutae and r.gY4tlq~ne, APpllgaan alSd Mfi QeHn ss ffue ro dayr prior m r~suo OrpaeatilL t~ppllemon by leareai Np fbndan! epplrselon fjiYi~, Avtltkatlen ha based on ttruauro ~ u Charged tamer Ine4W~ dargtptlerns ' 6eywibgrofsmrenua6pioefe+ewnershlpotripsrynpropo~, ~ d N/A a75o.Ot1 tieA r^Wt>e~4mpae~r appNenio^ 150.00 f~ reiwt eeearrrpany appit~pon Noenral praeess 1rn,~ C+ Irmo tLntq (60 daj q 10 den IM/A) • . 104tpa IN/rVl , 15-Zti~r (Ilt-~- ss~ 60 - nwd~iyal , uQ `~.. 1=3 diysl Q Se~~l9wdatle r++onur++t~r+a.ro locoed m ornlse Mt proms eroa. If any ^1Qrlument nndc to br n~a+Md qr despvNed, ploue Aatiyr N.G aeod.ae Surveys cart treat wi.i Jir, N,C. Yft+I ~ [] Ahandonmone of irry+allsrlf requiead muebe in iCaordanq wltt+Tiet! 1l~, SubChapear l: OIOa Q Nndllatbn ertna prlp^r regional adltcir y M4~ele~ it•orpnln• untl~pu,~ sron9a ~~~ NST51 ihdlSCOwar~ad tlu AnQ 91~Y eanvadon ooeraaan. Q Conrp<;annwltlt Id1- NCAC7N lOC010005r#1 SrortowaearA,dCel I6 reQuln!d. ~~ Sys , ' lNlN a Gshor eirrrMOrrre aoJeh kidkionet pegec as naeatary, belnq Car(y^ to CIK aort+ment aun:ortNl REGIGNAI. oFFIG65 • ~u "ons regarding these permlu should be addressed to the Regional 4ff1ct: marked below. Aah9rille Ae~lonal 0(fice ^ Mooresville Regia~$I lafflu ^ Wilmington Ra4lenal Office 9 Wbadfln Placs 919 North Mein Street 1 Z7 Cerdinol drlw Extsrnslon Ashevillerly.C.2lj$Ot Mooraavtlle, N,C.2811 S Wilmington, N.C.284a5 (82A1?51.6a08 f;7p416d3.169$ 1910) 395.3900 .- O Pgettev111~ asgianal OKico 2715 Green Street, Suica 71 d ~Y+Ste-rile, N.C.28301 (9101486-t S4T R~IeIQh RvpleelQl Offlca 3940 Barrett Orhre, pd. ®Cnc ZT687 Raleigh, N.C.Z7d11 (9191571.470Q t G 4Vasshlnpton Rtfigiooal OMce 943 Washington Square Mall ' W~t;hingt4n, N.C. 27889 (ZSZ1946.6481 1111 • 1 11T 11T !1!1!17 7T IY1 1 O Wlnstan~SokR1 Rl~iorul d}ftce--~ sQS' Witrghtawn Streat Vvlnston-Sttlers>r N.C.27107 (3361771.4QOQ s T I1`r• 111. I r Tr . VT1 1 I IR"lA I NORTH CAROLINA STATE CLEARINGHOUSE DEP3-RTMENT OP' ADMYNISTRATION a ~ , ,p7 ~L,,,~.~„~,.~ ' INTERGOVERNMLNZ'AL REVZEDP d~l~"'~ 9TATF NU1~ER~ 06-E-0000-0058 DATE RECEIVED: 08/24/2005 AGENCY RE9P0NSE: 09/19/2005 REVIEW CL09ED:09/24/2005 MS CARRIE ATKINSON CL-cARINGHOUSE COORD DEiT OF TRANSPORTATION STTEWIDE PLANNING - MSC #1559 RALExGH NC REVIEW DISTRIBUTION DE~~R LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE DE.T OF COMMERCE DEFt OF CUL RESOURCES DE=T OF T~NSPORTATION SWrC PLANK & ECON DEV COMM PRC7ECT INFORMATION APF~ICANT: U.S. Dept. of the Interior TYF~: National Environmental Policy Act 1 A essment •~, ~ , ` + 4•v ~) 4 '- f`~ • `IL-1 t.w;r ~~''~.',','.t+G ~,..,, ^Cc, +~ „~ '-r '~ ~ '--• / ERD: Environments ss DES: Phase II portion of the Re'~i~2lmilesooforoac~andnpr0po9edaintersection resurfacing approximately 6 CRCSS-REFERENCE NUMBER: 09-E-0000-0195 The attached project has bepieasemreviewtandhsubmit yourtresponsenby the above int=_rgovernmental review. inc:cated date to 1301 Mail Service Center, Raleigh NC 27699-1301, If additional review time is needed, please contact this office at (919)80'1-2925. AS :. RESULT OF THIS REVIEW THE FOLLOWING IS SUBMTTTE~: NO COMMENT COMMENTS ATTACHED O ~v ~~!~ SYG:tED BY: DATE : O I,~ v `~ H12 ~,_ +~ `'~ . ,~~~y,, . ~ orth C azolina De artment of Administration P Britt Cobb, Secretary Michael F. Easley, Governor May 18, 2006 Mr. Phillip Francis U.S. Dept. of the Interior National Park Serv>. ers Road 107 Park Hem ~38 (}atlinburg, Dear Mr. Francis: Road -0058' EA; Phase II portion of the Rehabilitation ~ rs c~ ~ Gap Re; SCH File # 06-E 0000 ~ osed In including resurfacing approximately 6 112 miles of road and prop act information has been submitted to the State Clearinghouse The above referenced environmental imp -Act. According ~ G.S• 113A-10, when a under the provisions of the ~iatio~anFe vi mental document under the provisions of federal law, the the rovisions of the State Environmental Polio oAct. Attached to this state agency is required to pLep~' urse of this review, environmental document meets p , a encies in the letter for your consideration are addittonal comments made by g be forwarded to ' nrnental review documents are prepared for this project, they should If any further enviro this office for intergovernmental review. void ou have anY 4uestions, please do not hesitate to call. Sh Y Sincerely, ~ ,~/s~~ Ms. C s gaggett Environmental policy Act Coordinator Attachments cc: Region A ly(pl[ing ~ddressr 1301 Ma-NC 1699.1301 Raleigh, Telephoner (y!9)B07.2~ZS . Faz (9t9)733.9571 Stnk Courier e31- ncmail,net e-mall Chrys.Hagg rQ An EgrmJ OPPertuntry/A~rmatlve Action Employer Lacotton Address: 116 Wit Jones Street Rdei~Ft, North Caroline . NORTB ~T1~NT OS ADMINISTRATION SE DEPAR " s INTER60VE"s1L'~i'Y'r~ 1tEVIETnT" MS RENEE GI,EDkiILL-EARLEY CLEARINGHOUSE COORD DEPT OF CUL RESOURCES ARCHIVES-HISTORY BLDG - MSC 4617 RALEIGH NC REVIEW DISTRIBUTION DENR LEGISLATYVE AFFAIRS DEPT OF AGRICULTURE DEPT OF COMMERCE DEPT OF CUL RESOURCES DEPT OF TRANSPORTATION SWNC PLANK & ECON DEV COMM pT}.~ n7C1t~m~: 06-~-0000-0058 H12 DATE ggC,EIVED: 08/24/2005 AGENCY RESPONSE: 09/'19f,20,OS~,,,,~ REVIEW CLOG I~~9y~~24%2005 ,F~.. ~~~ .. ~~,161 1B 190 .. .~ D3 ' 3 ~ ~ y ~~ ~~ ~" ~~ ~, ti PROJECT INFORMATION G ~ "" APPLICANT: U.S. Dept. of tae Interior TYPE: National Environmental Policy Act ~l.~~n ~O ERD: Environmental Assessment DESC: Phase II portion o' the Rehabilitation of Newfounc Gap Road including resurfacing approxi^ately 6 1/2 miles of road and p.oposed intersection CROSS-REFERENCE NUMBER: 0;-E-0000-0145 The attached project has been submitted to the N. C. State Clearinghouse for intergovernmental review. Please review and submit your response by the above indicated date to 1301 Mai; Service Center, Raleigh NC 27699-1301. If additional review time ~s needed, please contact this c£fice at (919)807-2425. AS A RESULT OF TAIS REVIEW T[i~ FOLLOWING IS SUBMITTED: NO COMMENT COMM S ATTACHED SIGNED BY: r DATE : ~ `"v~./ ~~r ~~~ ~~'~!~ ~,,.,. J 4 O IL ys ° Carolina Department o£~ p o~Ce~ j~gOUZCe~ N ~ State Hsstosic rtesecva Petet•g. $a^dbeel:, /tidminiettsso~ .~ 1.!'r'1 1~_~ Go~~ ~~w Mi~hsel F. ~~slcy, Seecetnri' '~ tai[bceh C H D ~ $eaorsty ~ ~C. ~ u )efFtry J. GrcmJ, ~P ry r ' o ~ May 15, 2406 rn Oirc4 ttir Jac1c Van Dop c "., ~ ~aviLOnxctental Compkaace Specialist °'~c ; r Z ` ~~~„/ Federal ~,ighway Admitusuanon 21400 Ridgtt°P Cuae Sterling, VA 201GG-6591 Counts, ER 03-3494 . base II gehabilitatioa of N~fouad ~P ROad' Swain Re, 1' Off ce of pr~hiveb and Fliaoory Division of }iisc'oticnl Re~nutrex Dovid Hrook Diteuor pear Mx. Vas Dop: re ort, the . 5 200G, tsaasmitting the ~isto~ico A t e went fo ~e a °~pe .~~ you for pout le~doe J~$ oxt, and the dzaft Memorandum ~ archaeolog1Ca1 suroCy delirles project ' re ozt by New South Associates meets out offi~e[s g`v' . The a>:chaeological serve'' and testtn$ , P sad those of r)ae Seczeta=s of she Iatenot. ~~ ro ect area. Fos purposes of compliance we cones that the following P=OPe~es arc e course of the Sur~eY~ £0~ sites were located ~~ p 1 n"~''g d' '~atioaal Historic Pxesextration Act, wig Section 10G of the - Re 'ter of Histouc places under ~e cxtterion cited: •ddle aloodLtiad eligible for lisang in ~e \aboaal B~ ~ prchatc, Ivll . rehistoxic site is d~ a ua d s~fed ~,taral deposits 31SW412 Criterion D This intact p aad Qua occupaaons~~ features. al site is the probable loss ou F'bee ~-o T'bis historic aschaeolo~ a Cha~P 31SW414** Criterion D ~e_ceat~y cornxniss~Y associated wirh th Comp~9 s Smokemoat Plaat• . rural de osits associated o~c . ' on D Ibis site >.s the probable locadoa of eel P buildings, uader]ain by ~~'ct Pxehis 31SW415 Caters. Ch~,pson Fiber Company . cultural zem~s• c dough ddle/]ate Azcbai This m,rlticomponent site dates from The ~ Cuterioa D exiods, and contains intact sQari£ied cultural 31SW416 early Mississippi P ed datable remains aS weU a5 piesez~ Tekphone/Pax deposits az>.d features, ~1~~~yai6s/issee!: ktallfn~ Addeas ~ ~Ici N •6t7 r)1g)7lS~G547/71Sie~ 4G1'1 Mail Sm'ice f;entr.. ~ !Ih ~ Z76V,}4G17 (71'~~3'r6545/115?~'~~ I,yp,tion R,dei NC lei [ NC -7 5J; N. I;Inun[ tiftce[, ISI' 4617 Mail3cnriev (.c^Q" ;ilr~, NC ,7ur>4G17 ~M1A1j8'C8AT1~N 3 i 9 v, Nlnua[ S[RC[, Rdeigll Nf% • 4617 Mail `p,[~ic0 G~~n~• • ~ ~ POi~1VN3NG ~'I `• ti, l'+lnune 5eect[. Raleigh, Nf% •, ' ~ L • M 31SW412 and intact gottions of 31SW414*'" avill not be affected by the proposed coastnactioa. The report authors have secomraeaded that date zecovery be conducted at 31SW415 and 31SW416 if these sites cannot be avoided. We concur with this zecommeadation. The above comments are made pursuant to Section 106 of the National Historic Presezvadoa Act atld the Adcisorg Council on Historic Pxesesvatioa's Regulations for Complrauce with Section 106 codified at 36 CFR Pan 500. 'Thank you for pour cooperation and consideration. zf you have questions coacemiug the above comment, please contact Renee Gledhill-Esrlep, envitoz~rnental review coordiaatot, at 919/733-4763. In aU. furiue commuriicatioa concerning this project, please cite tie above refeFenced sacking number. S' cerely, e~~~ Fes` Peter Saadbeck cc: ' Erik Kreusch, GSMNP Johannes Loubser, Necv South Assopates /~T • I 77. /1T r1l1l17 7T M1 I T If"!' !~/~ 1 rTr. VT1 1 11/T"1l1 ~~1~ ~ '~ ~ 1 r~ Seater (typ) Hold down materia!(ty~ Loop wires (t Provide diagonal c `- such that slot is full depth at tum I ~L 0 k 4 0 M 0 m mused saw cuts Lead-in wire cut SAW CUT LAYOUT 12"x 12"x i2"Cast iron box Edge of pavement IZ" x 12"x 11"Cast iron box with weather tight cover 3 with weather tight cover 3"concrete encased 1"Galvanized conduit for lead wires a 2„ ° ~ ~ Bronze bushing Bronze bushing Bronze bushing ° Bronze bushing ° ° 2 Weather tight connection i"Galvanized conduit for Weather tight connection ° ° lead wires 3„ ~ ° ; ~ ~ ° 6° concrete encased Tee at low pofit ~ °• - `~°y,~ ~} ° .> Concrete curb Tee at low point ° -?`~ ~y _, ;.?.. ~ ~,,..,l, ,~; j i "PVC drain (threaded) ~ ~ ~, ~ J~ 1 "PVC drain (threaded) ~- Place 2 Cu. ft. granular bac~ll r "' Place 2 Cu. ft. granular back!! rt ';r _ 2"PVC conduit to counter cabinet ~ 2"PVC conduit to counter cabinet r ~ 1 "PVC drain (threaded) 1 "PVC drain (threaded) Place 2 Cu. ft. granular bac~l! Place 2 Cu, ~: granular bac~ll SPLICE BOX -WITHOUT CURB SPLICE BOX -WITH CURB N0 SCALE ~uyc ~~ pavcu~cut w ~co~ yr t.uru (typ/ SCHEMATIC OF VEHICLE LOOP DETECTORS SECTION A-A SECTION 8-8 SECTION C-C SECTIONS 1 ~~ ~~ REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA•GRSM iB19 C.38 NOTES: i, for periods as noted In Table A, pavement may be unmarked If appropriate vehicle positioning guides are provided. 1. Typical spacing between Vehicle Positron Gulden is 40 ft as shown. In areas of severe curvature the spacing is 10 ft. Areas of severe curvature are shown In the plans or provided in the Vehicle Positioning Guide Schedule. 3. See Section 728.21(b) requirements for vehicle positioning guides. 4, When ADT > 1000 and special hazards are present, supplement the R4-1 sign at the beginning of each no passing zone with a W14-3 sign mounted on the !eft of the roadside. 5. Repeat R4-i at 3, 000 ft intervals minimum. a Place at limits of construction - - - - - I only W6-3 30"x 30" I NO PASSING NIXT %f(MIlES 18" x 30" ~~ 8i-directional, yellow vehicle positioning guides (cycle length) TABLE A ADT MAXIMUM DURATION BEFORE MARKINGS ARE REQUIRED S 1000 14 Days > 1000 3 Days W6-3 30" x 30" NO PASSING NE%f XA MILES 18" x 30" Place at limits I - - - - - of construction only NO SCALE ry a M 1 ~ s L LENGTH AND SPACING TABLE APPROACH * MINIMUM LENGTH OF CNANNELIZING DEVICE SPEED TAPER LENGTH** BUFFER SPACE TAPER BUFFER WORK MPH FEET FEB. AREA SPACE SPACE SPACINGIN FEET 25 Shoulder taper formula: 155 25 50 50 30 L = W20~ for S 5 4D MPH 100 30 60 60 35 > 45 MPH L = 1S for S 150 35 70 70 _ 40 Where: 305 40 80 80 45 L = Minimum length of taper 360 45 90 90 W = Width of offset in feet 50 S = NumeHcal value of posted speed 415 50 100 100 limit or 85 percentile speed prior 55 to work fn miles per hour 495 55 110 Ii0 "` Approach speed based on the regulatory posted speed, not the advisory speed. **lengthen taper as needed to provide minimum of three channelizing devices in taper at required spacing. SIGN SPACING TABLE ROAD TYPE DISTANCE BETWEEN SIGNS IN FEET A 8 C Urban 40 MPH and less 100 100 100 Urban 45 MPH and greater 350 350 350 Rural 500 500 500 Expressway/Freeway 1000 150D 1640 W14-3 NO See Note 7 PASSING ZONE END G20-2 ROAD WORK See Note 5 ~B A IL, ~ Remove conflicting avement marki P p ngs Double 4" temporary solid 10' min. Traffic flow ~- yellow centerline. See Note 4. See Note 3 ---- ---- _ ~ --- . ---- --__ ~~.-- -. 4"Temporary solid .~-- i0' m1n. - W~1 See Note 3 Trafficflow --~ white edge line. See Note 4. ~- i u i t s` C B ADVANCE WARNING AREA ~. Channellzing devices A ROAD DO ROAD WORK NOT NARROWS AHEAD PASS W20-i W5-1 See Note 5 R4-1 /V\ W13-i 0 0 N n 0 N 7 M See Note 8 TAPER AREA ~ BUFFER. SPACE (See Length and Spacing Table) Device spacing (See Length and Spacing Table) NOTE: 1. Signs are shown for one direction of travel only Place devices similar to those depicted for the opposite direction of travel. Z. ~nallocation and spacing ofsignsand devices maybe changed to fit field conditions as approved by the CO. 3. For project specific minimum width, refer to Special Contrail Requirements, Section 156. 4. If the roadway surface is paved, install temporary pavement markings. Ifnearest no-passing zone is within 400; extend markings to rnnneil zones. 5. If closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-I) and "END ROAD WORK" (G20-1) signs. 6. Install "PASS WITH CARE" sign (R4-1) at ends of no-passing zone if directed by the CO. 7. Omit the W14-3 sign if already within a no-passing zone. 8. Place the barrier according to the Roadside Desfgn Guide by the American Association of State Highway and Transportation Ofi9dals (AASHTO). Terminate bamer ends outside the clear zone or protect the ends of the banter with a crash cushion. 9. Do not allow equipment, materials, or vehldes ro be parked or stored in the bufl`er space. i0. Ifsigns will be in place more than 72 consecutive hours, use ground-mounted past ADVANCE WARNING AREA See Note 1 Temporary concrete barrier. See Note 8 WORK SPACE TAPER AREA Reduce or eliminate drums in downstream taper if necessary to provide access to work space A ,~ TERMINATION AREA END G20-2 ROAD WORK See Note S NO SCALE LENGTH ANO SPACING TABLE LENGTH OF CHANNELIZING DEVICE APPROACH SPEED* MINIMUM TAPER LENGTH** BUFFER SPACE TAPER BUFFER CE WORK SPACE AREA SPA MPH ~~ FEET SPACING IN FEET 25 Shoulder taper formula:. 155 25 50 50 30 for S S 40 MPH 1= W2 Z00 30 60 60 35 0 S 250 35 70 70 40 for S L 45 MPH L = 1 305 40 80 80 45 Where: L = Minimum length of taper 360 45 90 90 50 W = Width of offset in feet S = Numerical value of posted speed .415 50 100 100 55 limit or 85 percentlle speed prior to work !n miles per hour 495 55 110 110 * Approach speed based on the regulatory posted speed, nor me aawsory ~N~~~. **Lengthen taper as needed to provide minimum of three channellzing devices In taper at required spacing, 3 d 9 5 W14-3 N~ See Note 7 PASSING ~p G20-2 ZONE ROAD WORK See Note 5 B A SIGN SPACING TABLE ROAD TYPE DISTANCE BETWEEN SIGNS IN FEET A B G Urban 40 MPH and less i00 100 100 Urban 45 MPH and greater 350 350 350 Rural 500 500 500 Expressway/freeway 1000 1500 2640 Device spacing (See Length and Spacing Table) NOTE:. 1, Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel 2. Flnal location and spacing of signs and devices maybe changed to Bt field rnndltldns as approved by the CO. 3. For project speciRc minimum width, refer to Special Contract Requirements, Section I56. 4. If the roadway surface is paved, Install temporary pavement markings. Ifnearest no-passing zone Is within 400', extend markfngs to connectzones. 5. If closure Is completely within the project Umlts, eliminate the "ROAD WORKAHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs. 6. Install "PASS WITH CARE" sign (R4-2) at ends of no-passing zone If directed by the CO. 7. Omit the W14-3 sign If already within a no-passing zone. 8. Da not allow equipment, materials, or vehicles to be parked or stored !n the buffer space. 9. If signs wl!! be In place more than 72 consecutive hours, use ground-mounted post. T2ffc flow ~- 7lafflc flow --~ Double 4"temporary solid yellow centerline. See Note 4. 4"Temporary solid white edge line. See Note 4. 10' min. See Note i0 mrn. W~2 See: Note W I. v~ I' ~ Channellzing devices. C B q TAPER AREA BUFFER SPACE ADVANCE WARNING AREA (See Spacing Table) (See Length and Spacng Table) 0 ROAD DO ROAD wORK NOT NARROWS AHEAD PASS w2o-1 ws-1 Q n See Note 5 R4.1 n c W13-1 0 a ~- Remove confllcting pavement markfngs VARIABLE WORK SPACE ADVANCE WARNING AREA See Note 1 1 Reduce or eliminate drums in downstream taper If necessary to provide access to work space TAPER AREA A TERMINATION AREA E6p G20-Z app WOp( See Note 5 NO SCALE LENGTH AND SPACING TABLE APPROACH MINIMUM LENGTH OF CHANNELlZING DEVICE SPEED* TAPER LENGTH** BUFFER SPACE TAPER BUFFER WORK MPH FEET FEET AREA SPACE SPACE . SPA CING IN FEET 25 Shoulder taper formula 155 25 50 50 30 L = W80 for S 5 40 MPH 100 30 60 60 35 L = 35 for S > 45 MPH 250 35 70 70 40 .Where: 305 40 80 80 45 L = Minimum length of taper Wid h f ff 360 45 90 90 50 o o W = t set In feet S = Numerical value of posted speed li i l 425 50 i00 100 55 m t or 85 percenti e speed prior to work in m!!es per hour 495 55 110 110 * Approach speed based on the regulatory posted speed, notthe advisory speed **Lengthen taper as needed to provide minJmum of three channellzing devices !n taper at required spacing. GZO-2 See Note 3 END ROAD WORK rr~A 1 Device spaang (See Length and Spacing Table) nrorE; 1. Final location and spacing of signs and devices maybe changed to fit freld conditions as approved by the CO. 2. For project specific minimum width, refer to 5pedal Contract Requirements, Section 156. 3. If shoulder closure /s completely within the project limits, eliminate the "ROAD WORKAHEAD" (WZD-i) and "END ROAD WORK" (G20-Z) signs. 4. Remove or cover Workers symbol sign (WZI -Ia) when workers are not present. 5. Do not allow equipment, materials, or vehicles to be parked orstored in the bufferspace. 6. If signs will be !n place more than 71 rnnsecutive hours, use ground-mounted post Traffic Bow channellzing devices 10' min. Trafrc flow ~ ~~ ~ ee ~ to ~ P N h 0 N a M C B A TAPER AREA BUFFER VARIABLE WORK SPACE SPACE ADVANCE WARNING AREA (See Spacing Table) (See Length and Spacing Table) ROAD ~ WORK SHOULDER AHEAD WORK W20-1 WZI-5 W11-1a See Note 3 See Note 4 /V\ - Wi3-1 ROAD WORK AHEAD W20-1 See Note 3 I~ A TERMINATIONAREA END G20-Z ROAD WORK `See Note 3 NO SCALE SIGN SPACING TABLE ROAD TYPE DISTANCE BETWEEN SIGNS IN FEET A B C Urban 40 MPH and less 100 i00 i00 Urban 45 MPH and greater 350 350 350 Rural 500 500 500 Expressway/Freeway 1000 1500 1640 i F 0 LENGTH AND SPACING TABLE APPROACH LENGTH OF CHANNElIZING DEVICE SPEED* BUFFER SPACE TAPER BUFFER WORK AREA SPACE .SPACE MPH FEET SPA CING IN FEET 25 155 10 50 50 30 200 20 60 60 35 250 20 70 70 40 305 20 80 80 45 360 20 90 90 50 425 20 100 100 55 495 10 110 110 SIGN SPACING.TABLE ROAD TYPE DISTANCE BETWEEN SIGNS IN FEET A 8 C Urban 40 MPNand less 100 100 100 Urban 45 MPH and greater 350 350 350 Rural 500 500 500 Expressway/Freeway 1000 .1500 2640 NOTE; 1. Signs are shown forone direction of travel only. Place devices similar to those depicted for the opposite direction of travel. 2. Final locaton and spacing of signs and devices maybe changed to fit field conditions as approved by the CO. 3. for pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the crontractor on the pilot car. 4. If closure !s completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-i) and "END ROAD WORK" (G20-2) signs. 5. For nlghttlme Ragging operation, provide fioodllghting at fiaggerstatlons. 6. For project specific minimum width, refer to Specfa! Contract Requirements, Section i56. 7. Do not allow equipment, materials, or veh/cles to be parked or stored in the buRer space. 8. If signs will be in place more than 72 consecutive hours, use ground-mounted post. * Approach speed based on the regulatory posted speed, not the advisory speed Device spacing (See Length an Spacing Table) 10' min. Traffic flow ~- See Note 6 ~._. _r. .__- --_ __- ® ® ® ~ ~ Trafficflow ---~ ® ® / Flogger locaton C B A TAPER AREA BUFFER VARIABLE 100' (max.) SPACE WORK SPACE ADVANCE WARNING AREA (See Sparing Table) (See Length and Sparing Table) ROAD ~ ONE LANE , WORK ROAD Af{Ep,p AHEAD W20-4 W20-7a W20-1 See Note 4 vv ~ I MPH FEET W13-1 W16-2 BUFFERSPACE~ Flaggerlocatlon • ChanneHzing devices TAPER AREA A 100'perlane TERMINATION AREA END ROAD WORK G20-2 See Note 4 NO SCALE REG STATEI PROJECT I S 0~ SHTEETS SE NC PRA•GRSM 1819 C.33 TYPICAL APPLICATION: ONE WAY, TWO LANE ROADWAY, CLOSING ONE LANE L 0 M M 0 ROAD WORK 1 MILE W20-1 36"X 36" p Traffic flow Tragic flow b 1600' CLOSED SMILE VV10-5R 36" x 36.' XX B W13-1 o W4-2R M,P.H. Z4"X 14" 36" X 36" b b b (ADVANCE WARNING ROAD RIGHT LANE WORK CLOSED 1 MILE W20-i SMILE W20-5R 36" X 36" 36" X 36" ~"` W13-i M.P.H. 24"X 14" 1000' C ' W4-ZR 3b"X 36" APPROACH MINIMUM TAPER LENGTH (FT) CHANNELIZING DEVICE SPEED LANE WIDTH SPACING (FT) (MPH) 10 tt 11 ft, 12 ft. TAPER AREA WORK AREA 25 105 Si5 115 ZS SO 30 I50 165 180 30 60 35 205 2Z5 245 35 70 40 270 295 310 40 80 45 450 495 540 45 90 50 500 550 600 50 100 55 550 605 660 55 i00 * Speed is based on the regulatory posted speed and not the ha~rc control warning speed. Remove conflicting pavement markings as required (See note 5) Temporary 4-inch solid edge stripe (see note 4) Drums (See note 3) !0'(m1nJ (See Table) ' (BUFFER SPACE) NOTfS: i. final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO. 1. For operations that require a lane closure for a day or less, drums maybe substituted with cones, type A in the work area. 3. Right lane closure is shown. For left lane closure, substitute W20-5R and W4-1R with W10-5L and W4-ZL. 4. For long-term operations (operations where the lane is continuously closed for more than three days) remove canflicting pavement markings and place edge line as shown. G20-2 36"X18" END ROAD WORK p p END G20-2 ROAD WORK 36" X 18" U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL (ANDS HIGHWAY DNISION CONSTRUCTION TRAFFIC CONTROL SINGLE LANE CLOSURE LAYOUT NO SCALE DETAIL APPROVED FOR USE DETAIL ^~^~° °~°' E635-05 NPS PM6 NO.: 090 P Advance warn arrow panel ~0 ft I l NOTESr 45 L All striping shall6e !n accordance with the Manua! on Unlfarm Traffic Control Devices fMUTCDI latest. edition. 4"solid yellow striping 4"double solid 2. Edge striping sha11 be 4"offset yellow striping from the Edge of Pavement. Layout striping and obtall CO approval prior to final striping. TWO-WAY TWO-LANE TRAFFIC --.LANES SEPARATE Slrgle Shcd WNfe Strfpirg ledge atripingJ offaei4from Edged Pavennnt ~IOft 3,_ O~ - ~_ 4"wide broken white striping Double Solid Yellow striping (canferllneJ~ BROKEN SINGLE WHITE AND DOUBLE SOLID YELLOW STRIPING Edge ~ pv/emant(fjpJ i i N 4"wide to fr .~o fr ~ broken yellow striping ~ 12 ft 3f I~ i _ _ 4"wide broken white striping J t B DOTTED I WHITEY ST R~I ~D e a ~ . ~. Edge of Pavement 4' wide solid white strlping, offset 4" from Edge of Pavement (TyplcalJ Edge of Pavement 4"wide solid white strlping, offset 4' .from Edge of Pavement fTyplcall !0 ft 0 ft 4" wide ~- broken yellow strlping 10 ft 3 f ~4° wide broken yellow striping 4" wide single solid yellow strlping Edge of Pavement 4° wide solid white strlping Edge of Pavement 4"wide solid white strlping BROKEN SINGLE YELLOW STRIPING Edge of Pavement 4° wide solid white strlping, offset 4" from Edge of Pavement (7'yplcalJ "wide double solid yellow strlping Edge of Pavement 4"wide solid white strlping DOUBLE SOLID YELLOW STRIPING NOTES: 1. All strlping slwll be In accordance with tl~ Manual on Uniform Traffic Control Devices (MUTCDJ latest edition. BROKEN & soup YELLOW STRIPING 13ft 4"wide mini-skip strlping ~ MINI-SKlP STRIPING Edge of Pavement 4" wide solid white strlping, offset 4" from Edge of Pavement (Typlcall ----Travel Lone ~"wide double solid yellow strlping 4"Double Solid White strlping Travel Lane PUlloUt Edge of Pavement PULLOUT SOLID r WHITE STRIPING 2. Edge strlping shall be 4"offset from the edge of pavement. Layout strlping and obtain CO approval prior to flea/ strlping ~~~~ N P ro 4" Typkal "STOP" WORD MARKING i c e F i :~ v O O C M L 6.75' a TURN LANE-USE ARROW T ro .4" Minimum "YIELD" WORD MARKING 4~ b M ~ 8' "AHEAD" WORD MARKING ac ro ~a ti "ONLY" WORD MARKING 4, "Typical o~ ,9.75' "SCHOOL" WORD MARKING 6' E~ oh ~v vi ni 8" ~, ~ ~:~. O b :~:• M M :•:. YIELD AHEAD TRIANGLE SYMBOL ~~ ~ ~ N .... Mo ti N NOTE: 1. Place pavement word and symbol markings in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), current edition. 2. Al! letters, numerals and symbols shall conform with the "Standard Highway Signs ;current edition. 3: The Accessibility Parking Space marking only Includes the accessibility symbol unless a border is indicated in the Striping Plans. PAVEMENT MARKING AREAS TYPE SQL Through Lane-Use Arrow 12 Tum Lane-Use Arrow 16 Turn and Through Lane-Use Arrow 26 field Ahead Arrow (V<70 km/h) 26 Yield Ahead Arrow (V>70 km/h) 37 Accessibility Marking (symbol only) 1 Accessibility Marking w/border (White) 5 Accessibility Marking w/border (81ue) 9 AHEAD Word Marking 30 ONLY Word Marking 2i SCHOOL Word Mar!<ing 33 STOP Word Marking 22 YIELD .Word Marking 24 45" 24"Minimum ~~::., E ~•.:. M h N • 6"A .,i. 9~ ~ :::~ ::{" " ~- 3" R i i~Z Blue background when border specified in the Striping Plans White border when spedfied in the Striping Plans 3"Minimum 3" R ACCESSIBILITY PARKING SPACE MARKING NO SCALE -1 TURN AND THROUGH LANE-USE ARROW THROUGH LANE-USE ARROW Notes. !. Locations and height to be in accordance with the 'Manual on Uniform Traffic Control Devices for Streets and Highways' (MUTCD), latest edition. 2. Use wood battens bolted to post at vertical spacings not to exceed 30-Inches. 3. Use double posts If W !s over 3 feet. 4. For sign punching details, see tl~s blank standards In tl~ 'Standard Highway Signs" as specified !n the MUTCD; latest edition. W as M M D C 0 h m ti N z Hinges for bolt FASTENER DETAIL I ~t Sign panel `\~~~~ ~Dla. bolt, wingnut and wdsher,aluminum UNFOLD SIGN .FOLDED SIGN W i ,.. I ~ W/5 3W/5 W/5 NNes \ I L L Lo~vtloru and haigNM be In aaxrdarxe with tla'Ndnuaion Uniform Traffic dlUai t fCDJ l f x -- C~~ ------ --- ~-] . ss e , a CoNrol0evices for Streets and HlphwayAfklU l 2 es. Use wood battens bolted to posiatvertlcafspacfrga notto exceed 30•lnc ~ 3, Use double posts If W Is aer 3 feM. _ ^~ I ( 4. For sign punch'rq dNalls, see Ne blank standards !n He'Standaid C~~-- ------ ~-~ Nlghva/ Signs' as specified In the MUTCD, latast editian. e cf steel for fhe name y ll t U %' 5 ' Y ~r-- ------ ~- 5. p se a x ro p a Fa steel posts provide o the soli plate os for the park Soll plate Js rr>rrequlred for breakawo/ deslpn. G fa signs requiring posts sizes 6 x 6 and gradte . slpns are cansldered to da non-breokoway ff muiNpfe posts are requlr~ aM pasts cnnrpf be spaced ~ i ~ aa m N s ~ DOUBLE POST ts of D~iaFaace Mlea n ~ored bo~i w»h arz e or sh'ele cr non•breakaway signs. W W/6 W/3 W/3 W/6 _. ~v C -~--- --~--- -~~-~ . ~ --1-t--- --~--- --t1--- srmcLE Posy rRIPC~ Posr (See Nates) x 0 T h 2 Q x W W/8 I W/4 W/4 .I. W/4 W/8 C-~~----~~----$~----~~-~ BREAKAWAY SUPPORT DETAIL C ~~----~~----~~----~~-] PosiSlze Hde Diameter _I I ____I I ___ I I ____I I _ 4'x4 flaneftegNred C-~~----~~----~~----~~-~ fix s 15' Gxs r G x e' 3' QUADRUPLE POST i vl o- m ~~w,~,,,. ~.,,,~w~,,,~ ...,~.,M..-_ .... ............_... or galvaNzed steel or equal as approved b/ the CO. WITHOUT' BATTEN WITH BATTEN FASTENER DETAIL .Past Size D fMnJ Maximum Slgn Aroa fsq. ffJ -- (IraN Single Past DcuMe Past Trlae Past Quadruple Post 4x4M+ood1 3' b ~ 4 x 6 M'wd1 4' l5 35 45 60 6 x 6 fWcodl 4 20 50 75 100 lJ .",. ' _.~_ ~~~ ,,, h Reinf. Rope lTy ~„a TOP VIEW Scale: Not to Scale i 9 1 i D k Q h N Oi o- M 0 0 m Chamfer ~~~ a n n~ n ii u ii u u uuu u ii u li u u nuu unu uuu II II u u u u u u u u n u u u u u u n u n u u n n II II Il II II II II II II Al tl Il II Ii II II II II 11 11 II n II II II II 11 !! II i n II (I n II II A It I1 II II II II it I! li fl II J1 II !I Re1nf. Rope SACK .ELEVATION Scale: Not to Scale a 7ij ~ ° q ~ 6d, 60°' ~i q. TYPICAL SECTION Scale: Not to Scale tecessed black painted numbers rk grey concrete color,federalColor Number 36!52 ~ound Llne Wore: Post extends I'-e" underground ~ ~`F ;4' `~~ .A ~ a •: 0. Recessed Dlack numbers NOTES: 1. Concrete color of milepost steal! be dark grey, Federal Color Number 36152. 2. Recessed concrete numbers shall be %Q"deep and 4" high They steal! have concave edges with black gloss paint,FederolColor Number 17038, as approved by the CO. 3. Mllemarker locations to be field verified by t1~ CO prior to Installations. y 5, ~~ ~ i Paveme Should Clearances are minimum TYPICAL CROSS SECTION Scole: Not to Scale FIII slopes Ground Cut sl _~r Notes: 1. All headwalls are oriented parallel to the roadway centerline unless otherwise indicated on the plans or by the CO. 2. When pipes are on skew, adapt and lengthen t~adwaNs as directed. 3. Quantities shown !n the table are for one headwall with pipe at right angles. 4. Construct headwalls using the dimensions shown under values for 1/2:1 slopes unless otherwise designated by the CO. 5. Headwall openings are to match t!~ size and shape of tl~ culvertlnside diameter openings (fe.round). L/2 - 5/6rD 12/s D L/2 - 5/6•D i ~ ,y o,, c?y O ~ ~ o ~'~ ~J r ;,~ ~~~yr ~~ ~~~yr~ 6° Q a 7 M A -.~ ELEVATION -DOUBLE VALUES FOR 1%2:1 SLOPES VALUES FOR 2:1 SLOPES SINGLE DOUBLE SINGLE DOUBLE D l1nJ 18° 24" 30" 36" 18' 24' 30" 36' 18" 24° 30" 36" 18" 24' 30° 36" L or L' 7'-0" i0'-0' 13'-0" 16'-0' 9'-6" 13'-4' Il'-2" 2r-0° 8'-6" 12'-4' 16'-2" 20'-0" 11'-0" 15'-8' 20'-4' 25'-0' N 3'-9' 4'-10' 5'-11° 7'-0' 3'-9° 4'-10° 5'-11" 7'-0" 3'-9' 4'-f0" 5'-11" 7'~0" 3`-~' 4'-10' S'-Ir 7'-0' B I'-0' 2'-0" 2'-5" 2'-10' 1'-3" 2'-0' 2'-5" 2`-10° !'-9° 2'-0" 2'-5° 2'-10° 1'-9° 2'-0° 2'-5' 2`-10" A lm1nJ r-3° r-s' r-s' 2'-~ r-3" r-s° r'-s° 2'-0' r-3° r-6° 1'-s" 2'-0° r-3" 1'-6" r-s' 2'-0° C r~" 1'-4° t'-a' 2'-~ 1'-~ 1'-4° r-e° 2'-0' r-o° i'-4° r-s° 2'-0° r-o° 1'-4° 1'-a° r-o^ Stone(CY) 1.45 2.87 5J4 828 1.89 3.66 6.47 10.37 1.78 3.60 650 10.53 222 4.39 1,83 1262 ELEVATION -SINGLE E--=---I A ~ SECTION A-A (xlnlet end Ontyl ~, 0 a 0 h h a a L Pavement structure Sl DEW ALK WITH CURB Welded wire fabric f6 x 6 - W1.4 x Wl.4J with bar supports every 4 -feet longitudinally 4"Portland cement concrete 4"Bed course SIDEWALK a M q V 0 0 NOTES: 1. Place 3/-inch transverse expansion Joints at Intervals of not more than 60 feet to match ad Docent curb expansion .Joints. 2. Place control Joints at intervals equal to the width of the sidewalk as shown on tl~ plans,All concrete control Joints shall first be struck by tf~ hand using a Jointing too! aligned with a straight edge true to f1ne, AJI hand tooled concrete control Joints shall then be saw cut to a depth of no less than 1,5 Inches with a period of no more than 24 hours after the initial placement of the concrete. 3. Use this detail for trash can ~ds,whlch shall be black In color. 4. Deliver welded wire fabric to site In flat sheets. All welded wire fabric will be placed on 1%26eam bolster wire bar supports during construction, NOT TO SCALE. r REG STATE PRO]ECi SHEET' Ti7TAL N0. SHEETS Surface and bed course sE NC PRA-GRSM 1819 C.22 material same as sidewalk. Surface to be flatter than Finished sidewalk grade or equal to 1:48 12 max. Pavement surface ~i - NOTE: i 1, The maximum cross slopes of ramps must not ____ exceed 2°~ in any direction. -- 1:20 or Hatter 2. Use a coarse broom Hnish running SJdewalk Variable Variable perpendicular to the slope to create a slip Ramp Length Concrete curb resistant surface on concrete ramp surFaces. or 3, Construct curb ramp perpendicular to the curb and gutter curb, Avo1d skewing the ramp face. RAMP -TYPICAL SECTION 4. Construct ramp transitions between walks,. gutters, or streets that are !lush and free of abrupt vertical changes not to exceed 2, 5 inches. ~utslde i nI 7i 7 h NO SCALE mrmmum DIAGONAL CURB RAMP a 0 A a° a, F 0 0 N _' 7 f?u SECTION A-A ! %8" - %Z"Sealant I"Grout "Dla. Steel pin, 3' long e '4 Reinforcing rods. Extend to ° . ~ ° ~ within t" of ends of wl~elstop e _° ° ' 1"R d ° ° . Exlstl ng ° \ I` area ~ ~ekl i / ~q"~-- Note; 1• Center wheel stops between, and perpendicular to, stall Imes. 2. Variations in wheel stops will be allowed with A tl~ approval of the CO to meet manufacturer's standards. ~-- 6" Minimum' WHEEL STOP C?_ ' ~-Painted stall lines -~ ANGULAR PARKING ;increase distance for walls or other obstructions, os directed by tl~ CO. ~ ~ Edge of pave nme t 7'-8"------~ Edge of pavement a Painted stolllines ^ NOT TO SCALE 0. ° U.S. DEPARTMENT OFTRANSPORTAT[ON ~' FEDERAL HIGHWAY ADMINISTRATION FEDERAL (ANDS HIGHWAY HEAD-ON PARKING ~ErAIL N CONCRETE WHEELSTOP STANDARD ADPRDVED FOR USE _~-.. REVISED: DETAIL E609-2 . _ :: 6" ~~ MDUNT ABLE PORTLAND CEMENT CONCRETE CURB a 0 a 0 a u d , 1 0 t A Y 3 0 0 Y v 0 N ~1 0 O O ~~ o ~2°R~ ~2~ r1~2'~R ~ .~. ~ 0.08'/ft o ~ ~~ ,~ . ~' ~ .o ,.~ ., b ~ ..,.Q . e_ °..~ e ~ A d O n n n a e a ~ I .o c 'a a ~? ~ _ 6" _ Z' Note: !. Place 3-lnches,minlmum aggregate bed course under all curb and gutter. 13-1N MDU~T ABLE) 10-INCH DEPTH (NON (MOUNT ABLE) EMENT CONCRETE CURB AND GUTTER PORTLAND C REG STATE PRO]ECT N0. NC PRA-GRSM 1839 C.2O SE 5" !2" STONE CURB 16-INCH DEP LE) (NON-MOUNT AB ~u.~~ Q 6" ASPHALT CONCRETE CURB 5-INCH TABLE) l NON MOU asphalt tack coat may be rapid .curing liquid asphalt or emulsified asphalt: UFEDEERALH ~HWAY ADMINISTRAI7DNN FEDERAL V+NDS HIGHWAY DETAIL CURBS NOT TO SCALE STANDARD APPROVED FOR USE ••h"' REV4SED: t. D---- E609-1 6,. I8-1 NCH DEPT H (NON- MOUNTABLE) a 0 q R nj O O `V 3 g 0 D W SMulder RUBBLE PAVED WATERWAY ~ Paved waterway Ditch foreslooe wId 5"Rubble course 4"Mortar foundation 4" Bed course Level Lateral pay limits for paved waterway (Horizontal planel Q' ~~ B L waterway B 3/"Preformed Jolrt f~~~~~ 5" Rubble c 4"Bed coi 4" Mortar f SECTION A-A ,vorES; !. rl~ approximate sMpe of the paved waterway is an arc with o radius of 2.9 feet. 2. At Inlets and other special locations, widen and shape paved waterway to drain. 3. For concrete and rubble paved waterway construction only construct In uniform sections 20 feet !n length, except closure sections are not to be less tlwn 5 feet In length Place expansion Joints at 100 foot Intervals. 4. Stone used for rubble waterway will match any exlsting,adJacentstone,as approved by the Co. 5. Rubble waterway stones sMll be embedded in tip concrete foundation a minimum of 1-inch Do not place mortar In the stone Joints unt11 after the concrete has token Its Initial set. 3' ~ ~ I ~~~ SECTION B-B -Graded hinge point Variable ~~ ~n ~ 3'-a' i Q PLAN REG SPATE PROJECT SHEE N0. SE NC PRA-GRSM SB19 C.16 I C a ri O N a c m v a ~; 0 0 C pL L .,, ..r..... _. _... PLAN SECTION A A TYPE 68 INLET ~" 3rs ?"centers 3rs on 6"centers m Z'-~ Z'/~ ~~ ° 1i" Z~/2,~ See Detail A .~ D •' D Z ,• ~ ~~_~.L.^ m SECTION 8-8 8" Z'-6'/4n (tYP~) D ~ ~ ~N D ~ D ".... 4 n I~ ~p ~pD ~NT ti 2" 3" 5" Z~zn (typ•) 7, 4" Z''4v4n 4" Gray Iron Castings, AASNTO M 105 METAL FRAMES AND GRATINGS TYPE 68 NOTE: 1. Construct Inlets parallel to the roadway centerline and grade. For pipes on skew, adapt Inlets as directed by the CO. 2. For frames and gratings minor variations in desfgn and dimensions are permitted to allow manufacturers standaMs. 2~3'~8" ~~H" ~8 ~~ .~4 n ti ~~ H H 7qn ~4n 14x fig" 7 ,SiBrr 7 ~L$n DETAIL A U,S. DEPARTMENT OF TRANSPORTATION FEDERAL H[GHWAY ADMINISTRATION FEDERAL LANDS HIGHWAY U.S. CUSTOMARY STANDARD INLET TYPE 6B NO SCALE STANDARD APPROVED FOR USE 612005 STANDARD Rees®: 604-7 a h 7 aj m O O A /~, o o N a .~ ~' a ~ m 0 ~` ~ ~- / v ~ oD2 8' costal ' ~ ~ (!'-111/s"min.l ---- ~- . ~I ~ / IIL ~ •~ ~ ~ ~I `~ ~l ~~ ~I ~~,r ~1 t 1 ODd~o~ter tour~d~pe •2) INLET, TYPE 6A E ~ A io ~ N ~ 1 Q ~ O 0o U ~ , C t~ _ rl/_„ ~„ s'-aj4" „ ~ „ 3' - d` ~ s „ I'-4" !'-4" Vie„ I~ 1~4„ I~„ OO ' 0 0 m ~ o 0 ~ ~~ 0 0 oa ~ 0 0 0 o T \ METAL FRAMES ANO GRATINGS TYPE 6A ro See Detail C l~" ~~e" ~ ~i ~ ~ ~~ ~ ~ Single course ° 3~ ~~ of brick ~~ ~~~ r - I1'/e„ 3" I' - ll%s" 3" C K N ~ L~ m o ~ °. ° ~ • ~/s" ~ ~„ v Type 6A-6 "Diaphragm ~ third points Type 6A-3 3" 12" 3" 'v ~ ~---~ ~ LADDER RUNG "~J or 3~"o Steel or Wrougl~ Iron to be used wl~re depth exrxeds 4'-0" °. DETAIL C ° •° ' *4 bar (TypJ b , • ~ Notes: Ladder rungs ~ ° a ~ of 12" centers ~ 1. At tl~ option of ti>° Contractor walls • ^ less than 4 feet may be of concrete as shown. •. ° ~ 'S bars °~. ~ ~YPJ ° ~ ' 1'-11%s"x 2'-6" 2. Construct Type A Inlets far pipes 24 2" ~YPJ ° ° ' " ° ~ Inch and larger For Ample Headroom', o 2 (TYPJ ~ unless otherwise directed by the CD. N ~ 'S bars-l2" OC N ~ ''5 barsi2" OC ~ ~ •5 barsl2" oC • ° 3. Construct Inlets parallel to the ~ ~ ~ I .5 baoDC o ~ roadway centerline and grade. Adapf ~ 0 5 boys-6 QC ~ o ~ o •5 bars-6" OC Inlets as directed by the Co. slope to ~ sMpe to ~ slwpe to 4. For frames and gratings minor drain ~ drain I drain variations In design and dimensions e ~ ° ° ~ ' ° are permitted to allow manufacturers ~ ~ . ° ~ e standards. Ll lt d • m e Headroom Ample Neadfoom For minimum Inside Inlet dimensions only U.S. DEPARTMENT OF TRANSPORTATION SECTION A-A SECTION A-A SECTION A-A FEOE~oErsa~~iosHCHwv~ON w ° i i , , Sl~ulder F~~~s/ 1~2" o~ _ ~ 5/2" Slob-B Slab-A -~ ~" g D (2'-0'" MInJ " "5 bdrs-l2"a.c 0 "5 bars-5o~ -2" 2%z" 1/2" fTyp.) Shape to drain TYPE - 4A 7 i " i 8" D}2" I'-6" TYPE - 4c Note: !n rock wltlout backwall or floor. Reinforce some as Type 4A Shape to drain TYPE - 4B D/2 * 2" ~, - Notes: 1. At Nae option of the Contractor, walls less tl~n 4 feet deep may be of concrete or concrete block. 2. Inlets to be parallel fo roadway centerline and grade. c For pipes on skew,adJustlnlets as directed. ~ 3. Ditch or paved waterways to be warped and widened near inlets as directed by the CO, to fac111tate drainage : and to protect slopes at ends of inlets. ~ 4. For payment purposes,one slab A plus one slab B or two slabs B constitute one concrete cover. 1%z° (TypJ y' - - 5 bars-!2' O.C. ~----~ ~- - ~ -----i- --- ` - ~~ •5 bars-3"O.C. ~• Precast .SLAB-A D/2 ~ 2° ~ (Min=!'-27 " ~- "5 bars-12" O.C. _ ~-- ----- i -----~------ ------~ ~ "5 bars3"O.C. Precast ~. SLAB-B Length of slabs 8'-0" 2 Ri-n" 6" ~ i~ ~----- i i i i i~ ~ i i i i ----------- ii i ~~ h i ~~ PLAN ~, ~ ~~ -- - ~ ~ ~ ~ ~ g ~ ~ - -~--T T I - Vertical Bars , at 12° Centers b it- ~- -~-- ~ 0 ~ -~ -~---{- +--~ Norizonta! Bars i at 6"Centers ~ ~ FRONT ELEVATION (Type 4B,shown,other types comparable) U.S. DEPARTMENT OFTRANSPORTAT[ON FEDERAL HIGHWAY ADMINISTRATION FEDERAL LANDS HIGHWAY ~ DETAIL INLE T, TYPE 4A, 4B, ANI STANDARD APPROVED F00. USE -d-- REVISED: 6" CONCRETE ROUND PIPE CULVERT PIPE FILL HEIGHT AND PIPE CLASS TABLE SIZE EMBANKMENT TRENCH DIAMETER MINIMUM COVER CLA55 !I CLASS 111 CLASS IV CLASS V CLASS II CLASS III CLASS IV CLASS V INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET 12 18 12 12 10 10 10 10 15 23 18 18 26 13 24 12 10 25 39 13 13 31 45 30 36 48 60 71 84 IZ 12 12 12 12 IZ 9 9 12 15 13 i3 10 13 9 13 i7 17 i9 15 IS 20 26 28 30 30 30 35 41 44 44 41 15 13 10 15 15 15 i5 15 16 13 i6 20 20 23 22 20 26 30 32 35 37 40 46 56 49 49 49 96 12 13 20 15 24 108 14 15 20 18 26 BEDDING DEPTH PIPE SIZE (H) DEPTH 12"T054" 4^ > 54" 6^ Frnished subgrede or embankment Finished subgrade height before trench excavation - - Roadway embankment ~//// Limits of pipe compaction 2H H 1H r~ ~~~ ;%, Bedding (See table) EMBANKMENT INSTALLATION d h a "; MULTIPLE ROUND PIPE INSTALLATION LEGEND: .Bedding material (uncompacted). Embankment material placed In layers not exceeding 6"compacted depth. Compacted backfill material placed in layers not exceeding 6"compacted depth meeting the following; Maximum particle size = 3" Soil classification; A-1, A-2 or A-3 Or, lean concrete backfilf in accordance with Section 614. Impermeable backfill material. Embankment slope High water elevation i'-0"f ~ Piping plug IL.~ A 1~ " dla. hole for 1 " dia, Joint tie r-.-, MINIMUM SPACING DIAMETER EMBANKMENT TRENCH 11"-36" 15" 2H 36"-96" 0.5H 72" OVER 96" 48" 71" SECTION A-A ~A Pipe culvert Constructs piping plug oflmpermeable backfill maters! at the pipe inlet where granular material is used for backfill. Width maybe adjusted to tie into impervious material. PIPING PLUG a ! D.~ i'-5"max. 1'-3"min. Do not install fastener over pipe joint raperea Holes permJtted when precast 'D • D • D ' D '~D ',D '~G p 0 Ring if required - 2'-9r/1"max ~ ~ u N SUPPLEMENTAL CONCRETE PIPE TIE NO SCALE Concrete pipe tie holes (typ.) Compacted // backhU to H springfine ... 2 ...- Bedding (See table) TRENCH INSTALLATION Culvert end treatment Width NOTE: 1. When directed, camber pipe culverts upwards from a chord through the inlet and outlet inverts art ordinate amount equal to 1 % of the pipe length, Develop camber on a parabolic curve, If the mtdpolnt elevation of the on the parabolic curve as designed exceeds the elevation of the Inlet invert, reduce the amount of camber or increase the pipe culvert gradient. 2. Measure minimum cover from the top of the pipe culvert to the subgrade for fiexi6le pavements, and to the top of the pavement far rigid pavements. Measure maximum All height from the top of the pipe to the top of the pavement for both flexible and rigid pavements. 3, Pipe compaction limits shown are for pipe Installation in an embankment, For pipe Installation in a trench, the compaction limits shall be the walls of the trench. 4. Where unyielding or unstable material is encountered, install the pipe culvert according to the limits of pipe compaction shown on Standard 602-3, 5. Maximum fill heights for pipe culvert installations maybe increased on approval of site-spedfic structural pipe designs meeting the criteria of AASNTO Standard Spedfications for Highway bridges. a 0 E y 9 "a z ~. 3 s h e 0 0 m a~ 0 Y a 7 M NOTE. POLYETHYLENE (PE) PLASTIC ROUND PIPE CULVERT 1, when directed, camber pipe culverts.upward from h the Inlet and outlet mveits an h HT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 3350 RIBBED roug a chord t ordinate amount equal to 1 °~ of the pipe length. If the FILL HEIG CORRUGATED Develop camber on a parabolc curve, levation on the parabolic curve as t i SMOOTH WALL (SOLID. WALL) oN PIPE MINIMUM PIPE MINIMUM COVER CELL CLASS. CELL CLASS, e n midpo designed exceeds the elevation of the inlet mount of camber or increase h PIPE MINIMUM cEU cLassrFrcarr NUMBER 335434C SIZE CELL CLA55, CELL CLASS. COVER 324410C N0 SIZE N0.334433C N0.335434C e a Invert, reduce t the pipe culvert gradient. SIZE COVER MINIMUM WALL THICKNESS (INCHES) 292 ~ 1.477 D 385 1 ' ' R . N0.315411C DIAMETER INCHES INCHES MAXIMUM FILL HEIGHT (FEET) 2. ubgrade forr Nexible pavemen~,~ the t DIAMETER ES INCHES , 1. 1.154 0.607'; 0,857 ! 0.923 IN~HES MAXIMUM FILL HEIGHT (FEET) INCHES MAXIMUM FILL HEIGHT (FEET) 10 11 18 11 18 14 s o ulvert and to the top of the pavement for rigid imum fill height from the INCH 11 12 i2 57 I ' I 12 1 11 10 14 11 21 18 18 pavements. Measure max top of the pipe to the top of the pavement for 18 11 15 152 I I 1 10 1y 12 30 12 21 31 both flexible and rigid pavement. 14 12 18 ~ 38 14 12 12 i0 36 i1 42 12 15 11 27 30 12 38 38 30 10 12 12 lU 48 11 21 16 36 11 17 36 i1 11 42 11 27 48 12 POLYVINYL CHLORIDE (PVC) PLASTIC RD NN BPRP R C~LVDR CLASSIFICATIO 84 FILL HEIGHT TABLE AND MINIMUM CELL SMOOTH WALL (SOLID WALL) RIBBED PIPE MINIMUM CELL CLASS. 11454 N0 CELL CLASS. N0.12364 PIPE MINIMUM SIZE COVER CELL CLASS. CELL CLASS. 12364C N0 . SIZE COVER MINIMUM WALL THICKNESS (INCHES) N0.11454C . DIAMETER 0.358 ~ 0.438 0.358 !, 0.438 XIMUM FILL HEIGHT (FEET) HES DIAMETER INCHES INCHES MAXIMUM FILL HEIGHT (FEET) MA INCHES INC 12 12 37 16 12 12 65 `, ! 62 69 66 15 12 31 12 23 15 12 18 12 33 14 12 19 21 O 30 12 28 20 36 11 17 19 _ __ ~ __ ._ _ __ ~ _ _ .__..._ _. ~ 42 12 16 18 17 ~-- - ~ -~ C'~ 48 11 24 TOP 00 p ~ ~____ C -.aIJ~. SIDE FRONT PL,gSTIC PIPE END SECTION NO SCAIF m S Flnlshed subgrade - - - - ~- - - Roadway embankment .- 1H or 12' (max.) i ~ ~ 1H or 11' (max.; ~ -.-. N.... ..-.-/ - - H Z H Bedding Natural ground ABOVE NATURAL GROUND Frnlshed subgrade - ~ - Roadwayembankment 2H or 11' //: Bedding i E i Nabiral ' ON NATURAL GRO~I1Nfl Frnlshed subgrade --- `~-- R~avay emi~ankrr~rt 1H or 12' /////~ ryl Finished subgrade Roadway embankment 1H or 11' (max.) ~ 1H or 11' (max) } .:H..... ~ ......-H.- Natu21 ground BEDDING DEPTH PIPE SIZE (H) DEPTH 11" to 54" 4" > 54" 6" ~'z"/toot of cover, / L Remove unyielding material 11" (min.), 14" (max.) J and replace with selected Bne compressible material. Ughtly compact in layers not over 6" in uncrompacted depth. ON UNYIELDING MATERIAL 18" (min.) to trench excavation Finished subgrade * Reduce to 18"for ~ See bedding '- ~ - - - trench excavations depth table Roadway embankment 1H or 12' (max) PIPE BEDDING _. _ H _ - ... .. ~ H o{~ 36" (max) for embankment installations Natural ground Remove unstable material to Rim bearing soli and replace with approved granular foundation fill material properly compacted ON UNSTABLE MATERIAL Original natural ground surtace ~, ~~~u~~~vn,~~n~~n~ii~r, Roadway excavation Finished subgrade or embankment height before trench excavation 18"f Z 28" f Bedding -~ ~ •- .- Culvert end Y treatment Bedding material (uncompacted) Embankment material placed In layers BELOW NATURAL GROUND OR ® not exceeding 6"compacted depth. TRENCH EXCAVATION IN EMBANKMENT a e p a M a Compacted backfill material placed in layers not exceeding 6"compacted depth meeting the following: Metal Pipe: Maximum particle size = 3" Soil classification: A-1, A-1, orA-3 Plastic Pipe: Maximum panicle size: Ir/z" Soil class/ficatlon: A-1, A-1-4, A-1-5, orA-3 Or lean concrete backBll in accordance with Section 614. 0 0 M Metal end section Embankment slope High water elevation Diameter ~ 1'-0" ~ Diameter or5pan \~~ minimum ~ ~ or5pan ° Toe plate ° ~s9' ~n% ° Toe plate ° r o---------------o ~ r p---------------a ~ ELEI/ATION MULTIPLE PIPE INSTALLATION ~A 1'-0" f Y Pipe culvert NOTE: 1. When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 196 of the pipe length. Develop camber on a pa2bolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient. 2. H equals the diameter of all round pipe culverts or the rise dimension ofall pipe arch culverts. MINIMUM SPACING DIAMETER SPACING ar SPAN UP to 48" 14" Half diameter or span 48"and UP OR 36" whichever is less Minimum spat (see table) Width • ~ ~ ~~ ~~_~ SECTIONA A 1,-~" f . Piping plug A Construct piping plug of impermeable backf~ll material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material. PIPING PLUG No sca~E Metal end section ABOVE AND BELOW NATURAL GROUND 12-Y BARS (SPACED AS SHOWN) TYPICAL CONCRETE PIPE COLLAR. MIN OF (A°) INTO UNDISTURBED MATERIAL ALL AROUND TRENCH BOTTOM B MIN ,(~, THRUST COLLAR I~1 D I X a 0 3" CLR (TYP) ELEVATION TYPICAL CONCRE COLLAR. MIN OF UNDISTURBED SO 6-X BARS EACH WAY, EACH 12-Y BARS (SPACED AS SHO PIPE SIZE X BARS Y BARS A 8 16" - 36" #5 #5 16" 19° 42" & ~ #6 #6 20" 21" , i 3 a a CONCRETE PIPE COLLAR HEADWALL FOR DOUBLE PIPE CULVERT DIMENSIONS, REINFORCING STEEL AND CONCRETE TABLE OF QUANTITIES D H SQUARE HEADWALL IS° SKEW 30° SKEW 45° SKEW INCH FEET A FEET 8 FEET L FEET CONC. CUYD STEEL LB A FEET 8 FEET L FEET CONC. CUYD STEEL L8 A FEET B FEET L FEET CONC. CUYD STEEL LB A FEET 8 FEET L FEET CONC. CUYD STEEL LB 48 5.00 4.00 6,00 14.00 2.13 180 4.15 6.25 14.75 2.15 191 4.50 7.00 16,00 2.43 103 5.75 8.50 10.00 3.05 257 54 5.25 4.75 6.75 16,25 1.57 110 4.75 7.00 16.50 2.60 217 5.25 7.75 18.25 2.87 139 6.50 9.50 12,50 3.54 295 60 5 50 5,25 7, 50 I8, 00 2, 94 136 5.50 7,75 18.75 3, 07 248 6.00 8.75 10.75 3.39 279 7.50 10.50 15.50 4.17 336 66 5.75 6.00 8.15 10.25 3,43 289 6.00 8,50 20.50 3.45 290 6.75 9.50 13.00 3.88 317 8.15 11.75 28.15 4.77 407 72 6.00 6,50 9,00 11.00 3,84 318 6,75 9,25 22.75 3.97 331 7.50 10.50 15.50 4.46 368 9,25 11,75 31.25 5.46 457 78 6.25 725 9,75 24,25 4.38 361 7.50 10.00 25.00 4.51 374 8,15 21.25 27.75 5.00 410 10.00 13.75 33.75 6.07 498 84 6.50 7.75 10.50 16.00 4.83 410 8.00 10.75 26.75 4.96 414 9,00 12.00 30.00 5.58 476 11,00 14,75 36.75 6.83 586 90 6.75 8.50 11.15 18.25 5.43 45B 8.75 11.75 29.25 5.62 475 9.75 13.00 32.50 6.14 526 11,75 i6.00 39,50 7.56 638 96 7.00 9.00 12.00 30.00 5,92 491 9.15 12,50 31.00 6.I2 509 10,50 13.75 34.75 6.86 575 11,75 17.00 41.50 8.39 699 102 7.25 9.75 12.50 32.00 6.49 553 10, 00 13.00 33.00 6.69 571 11.00 14,50 36.50 7.37 637 13.50 17.75 44.75 9.04 783 208 7.50 10.25 13.00 33.50 6.95 591 10.50 13.50 34.50 7.14 604 11.75 15.00 38.50 7.97 676 14.50 18.50 4750 9.86 842 124 7.75 11.00 13,50 35.50 7,56 632 11.15 14,00 36.50 7.76 654 11.50 15,50 40.50 8.59 717 15.50 19.00 50.00 10.64 893 120 8,00 11,50 14,00 37.00 8.05 666 11,00 14,50 38.50 8.40 695 13.25 16,25 42.75 9.31 771 16.25 19.75 52.25 11.37 949 126 8.25 11.15 14.50 39, 00 8.71 748 12.50 15.00 40.00 8.90 760 14.00 16.75 44.75 9.97 858 17.15 20.50 55.00 12.27 1053 132 8.50 11.75 15.00 40.50 9,23 775 13.25 15,50 42.00 9.58 805 14.75 17,25 46.75 10,65 902 18,00 22.25 57.25 13.05 li05 i38 8.75 13.50 15.50 42.50 9.93 831 13.75 16.00 43,50 10,11 842 15.50 18.00 49.00 11.44 955 19.00 22.00 60.00 14.00 1173 144 9.00 14.00 16,00 44.00 10,48 902 14.50 16.50 45.50 10.83 912 16.25 28.50 51.00 12.16 1039 19.75 21.75 61.25 14.83 1281 150 9.25 14.75 16,50 46.00 11.21 950 15,25 17.00 47.50 11.57 981 17.00 19,00 53.00 12.91 1087 20,75 13,15 64,75 15.76 1341 156 9.50 15.25 1700 47.50 11,80 991 15.75 1750 49.00 12.15 1022 17.50 19,75 54,75 13.59 1144 21.50 14.00 67.00 16.61 1394 162 9.75 16,00 17.50 49,50 12.57 1077 16.50 18.00 51.00 12.93 1109 18.25 20.15 56.75 14.37 i236 12.50 14.75 69,75 17.69 I533 168. 20.00 16,50 18,00 SI,00 13.19 1121 17.00 18.75 52.75 13.63 1257 19.00 10.75 58.75 15,18 1188 23.25 25.50 72.00 18.60 1581 174 10.25 1725 18.50 53.00 14.00 1173 17.75 I9.15 54.75 14.45 1222 19,75 21.25 60.75 I6.00 1353 24.25 16.15 74.75 19.73 1673 180 10.50 17.75 19,00 54.50 14,65 1118 18.50 19.75 56.75 15.29 1176 20.50 21,00 63.00 16.94 1411 25.00 26.75 76.75 10.59 1727 HEADWALL FOR SINGLE PIPE CULVERT DIMENSIONS, REINFORCING STEEL AND CONCRETE TABLE OF QUANTITIES D H SQUARE HEADWALL i5° SKEW 30° SKEW 45° SKEW INCH FEET L FEET CONC. CUYD STEEL L8 L FEET CONC. CUYD STEEL LB L FEET CONC. CUYD STEEL LB L FEET CONC, CUYD STEEL LB 48 5.00 8.00 1,25 101 815 1.19 109 9.25 1,44 120 11,25 1.75 144 54 5.25 9.25 1.50 224 9.50 1.54 126 10.75 1.75 i48 23.00 2,12 175 60 5.50 10.50 1.78 143 10.75 1.81 151 12.00 2.02 164 14.75 2.49 208 66 5.75 11.75 2.06 175 12.25 2.15 186 13,50 2.37 103 16.50 2,89 249 72 6.00 13.00 1.37 196 13.50 2.46 207 15.00 1.73 232 18.50 3.37 186 78 6.25 14.25 2.68 22I 14.75 2.78 233 16.50 3.11 159 20,15 3.82 317 84 6.50 15.50 3.02 256 16.00 3, l i 268 18.00 3.51 299 22.00 419 368 90 6.75 16.75 3.37 284 1715 3,47 297 19.25 3.87 327 23.75 4.78 406 96 7.00 18.00 3.74 309 18.75 3.90 325 20.75 4.30 364 25.50 5.29 442 102 7,25 19.15 4,11 354 20.00 4.18 371 22.25 4,76 416 27,25 5.83 510 108 7.50 10.50 4.52. 381 21.15 4.68 399 13.75 514 447 29.00 6.39 554 114 7.75 11.75 4.93 419 21:50 5.10 430 25, 00 5.66 479 30.75 6.97 594 120 8.00 13.00 5.36 441 13.75 5.53 460 26.50 6.17 521 32:50 2.57 634 116 8.25 14.15 5.81 502 15.00 5.98 514 28.00 6.70 572 3415 8.20 711 132 8.50 25.50 6.27 527 26.50 6.52 560 29.50 .7,15 618 36,00 8.84 754 138 8.75 26.75 6.75 570 17.75 700 584 31.00 783 658 37,75 9.51 799 144 9.00 18.00 7.24 619 19,00 750 654 31.15 8.33 713 39.50 10,10 885 150 9.25 29.15 775 665 30.25 8.01 680 33.75 8.94 761 41.25 10.91 933 I56 9.50 30.50 8.27 691 31.50 8.54 728 35.25 9.56 805 4315 11.74 996 162 9,75 31.75 8.81 767 31.75 9.08 783 36.75 IO.ZI 889 45.00 11.50 1094 168 10.00 33.00 9.37 796 34,25 9.73 838 38.00 10.78 919 46.75 13.28 1146 174 IO.ZS 34,15 9.94 847 35.50 10.31 867 39.50 11.46 974 48.50 14.09 1197 280 10.50 35,50 10.53 877 36.75 10.90 920 41.00 12.17 1022 50.25 14.91 1260 0 C S 3~ D D/2 D/2 See Hook Bolt Detail U1 U1 L SINGLE PIPE CULVERT 1'-0"min. Washers s/e"hex nuts ~4"max. HOOK BOLT DETAIL ¢ Roadway ¢ Culvert Skew angle Skew angle TYPICAL HALF PLAN Varies 1~ 0 x d 0 e M a 12" SECTION A-A 3"max ~ #4 bars at equal spacing rr 10" (max) both faces. ,q r + ___,_. ~rr NOTE: 1. Concrete conforms to Section 601, Pour concrete monollthidlly. Chamferal! exposed edges ~4"and finish al! exposed sun`aces with a Class 1 ordinary finish. 2. Clearance far reinforcing steel is 1" unless otherwise noted. 3. Headwall dimension "H"maybe reduced in solid rock provided the wall is keyed into the rock at least 1 foot. Excavate and backhll according to Section 109. 4. Set hook bolts on nominal I8" center around pipe perimeter at center of headwall. Hook bolts conform to ASTM A307. Galvanize according to ASTM A153. 5. Forlnstallations w/th more than two pipe culverts, Increase the dimension "L"and all quantities shown for double pipe instal/at/on by adding a length equal to dimension "8" and the incremental change in quantities for each additional pipe culvert 6. forskews other than those shown, multiply quantities and dimensions A ; B" !~ "L"for square headwalls by secant of the skew angle. 7. Final quantities will be determined by using the tables on this standard. 8. Do not order materials until the length, skew angle, and slope bevel in the field have been approved. •~ ISOMETRIC VIEW A 8 A L A~ DOUBLE PIPE CULVERT HEADWALLS NO SCALE ~. ROAD __ ~--- '- - , ~~ A A _ J- - T •-- _ w i ' r-o" ~ ~ ~ DISTRESSED 1 AREA ,TYP. ~ n 1'-0" TYP, PAVEMENT REPLACEMENT IF THIS CUT LINE IS LIMITS (2' FROM THE EDGE PATCH CUT PARALLEL/PERPENDICULAR ~ pAVEMENT,REMOVE TO CL OF ROPDWAY TO EDGE OF PAVEMENT. a M m P M O O a A~ ~ ROAD W= ~~ A~ IF THIS CUT LINE IS PAVEMENT REPLACEMENT OF PAOVEMENT,REMOVE LIMITS PATCH CUT PARALLEL/PERPENDICULAR i0 EDGE OF PAVEMENT TO DISTRESS CRACK TYPICAL PLAN DETAIL ARIABLE HACP OVERLAY, FINAL ROAD AS REQUIRED BY SURFACE ASPHALT PATCH -THICKNESS TYPICAL SECTIONS OF EXISTING AC PAVEMENT, N BUT 2.5 "MIN. w SAW CUT VERTICAL FACE FULL DEPTH EXISTING PAVEMENT VARIES GEOGRID i ~ 6 6.. ;, % .\ . ' TACH COAT PRE COAT (TYPICAL) LIMIT Of UNDERCUT GEOTEXTILE, BACKFILL WITH TYPE II AGGREGATE BASE, GRADGJG D SECTION A-A ASPHALT PAVEMENT FULL DEPTH PATCH -TYPE 2 NOTES 1. USE FULL DEPTH PATCH, TYPE 2 AS DIRECTED BY THE CO. REG STATE pRO~ECT SHEEt 1U~~~- N0, SHEETS SE NC PRA-GRSM 1819 CJ Existing asphalt pavement Existing base course New asphalt pavement -New base course SOW CUt (Depth of cut equals %2exlsting asphalt pavement depth, 2" minimum) NEW PAVEMENT Asphalt overlay (Final course) Saw cut (Depth equals 'd'J 0 0 x 0 b E a w b a m rv ro n Existing asphaftFrnement ---- Existing base curse ----- '' Remove pavement (mill) Transition length variable (See table( OVERLAY Asphalt overlay (depth IJ Asphalt overlay (depth 2J d2 Existing asphaltpavement --- d~ ~- ~- --- --------------------------------- Existing base cours~ (for Coble d~ - d2=dJ OVERLAY -DEPTH TRANSITIONS d -Inches Transition Length -Feet I 20 !.5 30 2 40 ~ 50 3 60 Nar TO SCALE 0 DEPTH (dJ Rlprop Class Depth (dXlnJ r r2 2 18 3 24 4 30 5 42 6 48 PLAN a~' 0 k h u U E p c' 8. 0 a c B a 'o 0 n 0 CULVERT WITH, HEADWALL 0 k' a N N M End section PLAN r 0~ 11f.,mefcr of n/nc /n) End section _ ~ Grou FLEVaTioN Depth (dJ Geotextlle,type ~ CULVERT WITH END SECTION. NOTE: For arch or elllptica(plpes, use equivalent dlometer for (Dl dimension PLAN r ~ n xor To scuE ~ of CULVEH! Wll N NU "~ END TREATMENT N a q 0 M Existing, slope 3:/ or steeper BENCHING DETAIL A SLOPES STEEPER THAN /r3 't Existing slope Flatter than 3:1 :~ :~ J~ BENCHING DETAIL- 8 SLOPES FLATTER THAN 3:l (See note 3J NOTES: 1. Where the embankment foundation Is a Mllside or nt another existing embankment, the foundation must be benched while the embankment Is being constructed. 2 For slopes 3:l or steeper, refer to Benching Detail A Cut 8 ft wide horizontal bencl~s In tip existing slope. Bench tl~ slope as the embankment Is placed and compacted !n I ft thick layers until o backfll! l~lght of 4 ft Is reacl~d. Excavate and backfl!! In a slmllar manner until the tap of slope Is reached. 3. For slopes flatter tlwn 3:1, refer to Bencf~ng Detail B. Cutlnto the existing slope until a max/mum l~lgth of I ft is reached, allowing the Iprizontal distance to vary. Place embankment material. Excavate and backflll 12' max (Typ1 !n a slmllar manner until t>~ top of slope is reached. Backfll! sayer 4. Benching Is considered incidental to t!~ Item of roadway excavation and no additional measurement '~., of quantity or payment will be made for benching. ` 5. Refer to Section 204 for benching specifications. Embankment Varies (See note 4) 12° max (TypJ Backfill layer NO SCALE ~: _. .~ : ; REG. STATE PROJECT N0. SE NC PRA•GRSM 1839 C.4 E ! V t/ :I L C a H pk O i a F b C 0 r 3 0 0 n u M M S0 S z 0 Y' a N Q M m O O !C Note Distance L is to be malntalned os the dlstonce to slope stokes to establish the 61end of cut and fill slopes into the original ground. A 8 /~~I !V SI.ALE U.S. DEPARTMENT OF TRANSPORTATION FEDE FERAL LANDS H GHWAY~ON DETAIL CUT AND FILL SLOPE TRANSITIONS sra+oaRO A~rROVeo FoR use -i-- E204L 1 ReV[SED: CHECK DAM SPACING (S) c y a a r 0 ti 0 n e 3 1 ~ z~ 0 Y a N 7 M O CROSS SECTION V DITCH CROSS SECTION TRAPEZOIDAL DITCH Class 1 rip2p Ponded water ~ 1.1~Q 1• ~~ PITCH GRADE (G) PROFILE VIEW HITCH DITCH GRADE * (G) CHECK DAM SPACING S (tt) 2% 75 3% 50 4% 40 5% ' 30 6% 25 * Do not use Check Dams below 2% or above 6% ditch grades NO SCALE 6 ft Long post (max.J Spacing 10 ft max. with wire Wire Mesh Geotextlle fabric NOTES: B ~ Rlprap; Class 1 Middle and vertical wires hall be r~ " mJn ° ~ ~ E ' ~' 24" mm fuse only with fnstallatlon of silt 1. Use silt fence check dam Installation. for !pw i E Top and bottom strand ° . s ~ ~ ~ E M 1 fence check damJ ros on flow conditions only when specified on min. shall be % Wire ~ ~ ~ ~ 0 24' Control Plan. (~ e filter fobrlc a a~~ ~ 2. Wire mesh shall be a minlmum of 32 Inches !n I ~~~~ I ~ Flow -~.. wldt6 and shall have o minlmum of 6 line wires " ~`' ' "french //,~(~yy/,~y//~ with 12 loch. stay spacing. Wood post driven 35" 6" 3. Filter fabric. shall be a minlmum of 45 Inches In (Steel post driven 24"J Backfllled and compacted so11 width and shall be fastened adequately to the i Into ground (min.J wire as directed 6y the CO. II 1 , Provide sufflclent length ~ ~ ~ ~ 4• Steel post shah be 60 Inches minlmum In Aefght l t to prevent water from flowing , ,~, ~~~„ A, ~„I, ,~ , ~,,, ~~~, . ~~~' ~"~~' i .~ ype. eself-fastener an le stee and be of th 9 around the end of fhe silt fence ~ 5 ches minlmum In height a ~ B i ln diameter 3 lnches on b. Extend wire and fobrlc into trench. SECTION B-B WIRE-BACKED SILT FENCE CHECK DAM fSee nofe 2J i Llmfts of Existing grouni (und(sturbedJ Staple spacing Section A Section B 6' (maxJ ELEVATION ~ Flow Staple Section 8 Section A ~~ Posts Staple '- PLAN JOINING TWO ADJACENT SILT FENCE SECTIONS o~ aE ~o A °E h Spacing 10 ft max. filter fabrlc~ w wre Middle and verttca! wires shall be ~ ' min. Top and bottom strand shall be %s" min. Provide sufflclent length. to preventwater from flowing around the endof the sift fence ~, A ~` E~EVaTioN PLAN W1RE-BACKED S1LT FENCE INSTALLATION AT TOE OF F1LL AI I VCIMiL WIRE-BACKED SILT F c NO SCALE sraronaan ncvaovEO wn usE -.~-. ~ REVISE: 6/99 c ~ _. - 1 r 1 i a e M 0 x 4 11 /:.........L A I 0 NO SCALF ," .. ," ...__~ Yame Geatext0e, Type P/ Frame Drop inlet with grai Gather excess at come Bury geotextile to a depth of 8" (min.) ~ below ground line, ~~ SILT FENCE DROP INLET PROTECTION (TYPE A) x 1"x 1"wood frame Drop inlet with grate - Fltered water Overflow ~d/ment laden runoff ~ Q ~~ ~~ Grave! filter Extend mesh Sediment laden runoff 18" IZ"(typ,) min. Accumulated sediment ffil '. Filtered :.. water Wire mesh NOTE: i. For gravel Biters use Z" - 3"diameter coarse aggregate. 1. Use wire mesh with y1"x'/1"openings, C ~ ~ 3. Use Type A inlet protection in sump locations only 4. Use Type 8 Inlet protection only In sump locations where heavy concentrated Rows are not expelled. Do not use where ponding around the structure might cause incronvenience or damage, GRAVEL AND WIRE MESH DROP INLET PROTECTION (TYPE B) Curb inlet .B Y Y~ Wi ~La N y W ~rW.r .YWW ~ ~ ~ ~ J. ~rWi Wire mesh o i2" mlh. Wire mesh J °' ° 11 11 a ~ ~~i-i~H~ i ' Filtered ~ ' water Accumulated sediment SECTION A-A vrarcr nna BLOCKAND GRAVEL DROP INLET PROTECTION (TYPE C) G ' Gravel (extends across J ~ !~ entire opening length) 8 Concrete block Gravel filter Sediment laden runoff Wlre mesh ~ AccumWated sediment Gravel frlter Overflow ,Filtered water ' D ! D D Wire mesh ~ ~ 2" x 4" wood stud, used to retain rnncrete blocks Curb inlet SECTION B-B CURB INLET PROTECTION, BLOCKAND GRAVEL (TYPE D) inlet SECTION C-C CURB INLET PROTECTION, WOODEN WEIR (TYPE E) Emergency overflow ° ~ 2"x4"anchor(typ.) . ~ Sandbag (typ.) Z"x 4"spacer (typ.) Z"x 4"weir Wfre mesh 2'-n" Sand bag or alternate weight REG STATE PR07ECf SHEE1 N0. SE NC PRA-GRSM 1619 4Z.1 ~L c a Oq ~, N O O U.S. DEPARTMENT OF TRANSPORTATION FEDERAL H]GHWAY ADM1N15TAATtON EASTERN FEDERAL LANDS HIGHWAY DIVLS[ON GREAT SMOKY MOUNTAINS NATIONAL PARK NeWFOUND GAP ROAD- 1619 OPTION 4 DRAINAGE PIPE PROFILES 1 REG STATE PROJECT SNO~ SHEETS 0 ON ~. SE NC PRA-GRSM 1819 4X.4 NE FOU D G PRO D @ OLLI SCR EK P CNIC AREA ENT ~ NCE ,,,,, _ _ _ _ ~ St~. 561+0.00 ~_l _..~_ ~ 15b1+o~,oa r s 1 1 3 REG STATE PROJECT SHEET N0. TOTAL SHEE15 OP T ION ~ SE NC PRA-GRSM1619 4-X.3 - NE FOU D G PRO D @ OLLI SCR EK P CNIC AREA E ~ ~ CE - .82% +o.r % o. o% +8.o 558+5 .oo verla Gra e = 2, 80.5 --~ -' 60+5 .00 Sta verla 560+ Gra 0.00 e = 2, 1 74.5 -~ ~~ ~ Sta 558+ 0.00 I 5s+o .oo ver a ra e = 560+0 .00 erl Gra e = 2, 5.9 -8.0 ~ - . -3.26 . +4.7 "- ~ Sta erla 557+ Gra 0.00 e ° 2, I 83.5 Sta 559+ 0.00. _ ! 59+5 .00 -2.1 557+0 .oo S erl + Gra 0.00 e = 2, 1 85.0 ~ Sta verla 559+ Gra 0.00 e = 2, 1 79.0 3 1 1 3 2 1 1 2 3 0 N n 0 e s v ti M 0 0 O ION REG SPATE PRO]ECf SNO ~ SHEETS N E FO U D G PRO D @ OLL I .~ '' SE NC P RA•GRSN 18 19 4-X 1 SCR EK P CNIC AREA E NCE - - 00% •-9.87 . __ ----- --- ----- -- - ---- ----- -- -- --- -8.00° -2.1 Sta 554+ 0.00 I ver a ra e = Sta 556+ 0.00 l 54+5 .00 56+5 .00 Overt Gra e = 2 86.61 - .00% -8.51° --- ---- ---- ----- `-- - __ - .00% -3.7 - - Sta 554+ 0.00 _ I Sta 556+ 0.00 l + 0 l l n y 0 00% 8 -7.1 ° . __ _ ' Sta verl 553+ Gra 0.00 e = 2, 1 94.0 -- - - -- i Sta erla 555+ Gra 0.00 e = 2 I 89.5 ', '--_"~ ~~--- --~ 55+5 .00 , -- _ _--' - '--- -- 1.2 - - ----- - Q + ,,- 53+0 . oo Overt Gr e = 3 95J1 55+0 .oo Overla Gra e = 2 90.71 3 1 1 3 3 1 1 3 REG STATE PRO]ECI' SNO SHEETS 1 SE NC PRA•GRSM 1819 4-X.1 ~' OP ON EA ENT NCE NE FOU D G PRO D @ OLLI SCR EK P CHIC AR ~' Sta 552+ 0.00 B gin Cr wn~Co rection ~ End Crown Corre ion ° . 00 8 -2. 4% , - . a -_ verla Gra e = 2, 00.3 50+5 00 " . verla Gra e = 2, 96.0 52+5 .00 -8.00 °. -1 2% - ~,2 - ---- --- - ---- --- -- ---- 3 2 ~ " , , __ - -g, 0% _ _ --- ---- ---- --- ---_ ---- ----- -- Sta 550+ 0.00 1 ~_ - Overla Gra e = 2 401.69 _ --""" Sta 552+ 0.00 I 550+0 .00 ve a a e = 52+0 .00 ' U i , i -7.1 % 0.90% - - ~,~ ~ • - ----- ---- --- ----- ---- _2 ,- ~" k ~- " Std 549+ 0.00 1 _ °" .~ ~ _ ~ --- St .551+ 0.00 ! ~. 549+5 .oo ~& a 3 a 0 ti h n m ti i i o , i ~ .. ;2 --- - - ~ / ° i a - ---- ----- ---- ---- ? _ i - -- " Sta 549+ 0.00 1 _ - ~ verl Gra e = 2, 03.5 St .551; 0.00 1 a verla Gra e = 2 99.2 ~ 51+0 .00 3 0 3 1 1 0 1 1 -3 ~~ i l i i i a s ~ N N n1 °o 0 e 'L 4" Single Solid Whlte Striping _____~~ / %' 0 4" Single Solid. / __---~" ~ White Striping ~ ~ ~ Tempoicry Gdt/_ j~9 ~ .Concrete Barrier u~ +is _ __ ---~ -" ----- UND RDAD '-_~~ ~~ 4' Double Solid ~ Yellow Striping Q &n ~,I f,~ / ~,--,~ Begin Option 4 I I y 'STOP; -NFG- CL Sta, 548+67.00 ~ Tie to Existing Y ~ ~.__~ .Pavement Markings ~,~ y Sta 000+22 LT 4 ~. a~ ~° u NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, 3. Signs shown reFlect existing signs and layout, proposed informational signs shall follow sign schedules. TRAFFIC WARNING LEGEND 4. Locations of all permanent and temporary construction ~ Traffic Control Drum signs as shown on these plans are approximate. Obtain approval from the CO prior to 19nalizing locations. ~ Type III Barricade 5, See sheet 4-T.3 for. temporary construction signage. 6. Use Standard 635-11 for lane shift. See Standard 635-6 for lane closures. End Option 4 -NFG- CL Sta. 561+05.00 Tie to Existing Pavement Markings 0 0 v1 _-.~ - _____- 1 ~ ~her_= e~ --' ~~ ~4" DDUbie Solid Yellow Striping a M ~ a N ~~ M m n" y 0 0 e a e 3 n ~ . a 3 M i ~I p NOT TO SCALE a y i. Obtain approval from CO of final location and spacing of signs and devices. 2. Signs i and 3 shall be mounted with Type B warning lights and warning flags, TRAFFIC WARNING LEGEND ^ „ O.S. DEPARTMENT OFTRAN$PORTATION (-~I~rj("~ Warning Llght, Type B, With Waming Flags FEDERAL HIGHWAYADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD -.1819. p~/M PDrtabie Variable Message 51gn OPTION 4 TR,4FFIC' CONTROL LOCATIQN MAP - NPs PM75 NO.: 0905fi3 GENERAL NOTES: 1. Obtain approval from CO of final location and spacing of signs and devices. 2; See details 635-2, 635-6, 635-11, 635-12, and E635-14 for additional traffic control details. 3. Cover all conflicting signs during construction operations while using details 635-2,635-6,635-11,635-12,and E635-14. 4. Place variable message signs/changeable message signs at locations shown on the Traffic Control Map, and as directed by the CO. Coordinate message text on the variable message signs through the CO. The contractor is responsible for the variable message signs 24 hours a day, including the inputting/changing the message and maintenance of signs. 5. No work on the entire project shall be permitted on weekends or holidays or during the month of October. Holidays shall include all National legal holidays and Goad Friday and weekends will begin at Noon on Friday and end at 8:00 AM on Monday. No work shall be done the entire week after Easter Sunday. Na work shall be done on the Friday after Thanksgiving, and no work shall be done from December 23, through January 2. 6. The pavement depth differential between lanes of traffic shall not exceed 1 1/2" when opened to traffic. Pavement differential restriction not in effect if differential is behind a lane closure. 7. One, onle-lane closure will be allowed for Option 4. A maximum of 4 one-lane closures will be allowed at any one time for entire project (Schedule A and Options). Do not stop traffic for more than 10 minutes at one-lane closure setup. 8. Maintain two-way, two-lane traffic throughout the daytime from June 15 to August 15. 9. Daytime hours one defined as from 8:00 AM to 9:00 PM. 10. Maintain two-way, one lane traffic using flaggers throughout the nighttime and daytime except as noted above in General Note #5 and #8. All work, except final surfacing, can be done at night with appropriate lighting plan as approved by the CO. Fnal surfacing must be accomplished during daylight hours. i i Y it NEWFOUND GAP ROAD: The Contractor shall construct Newfound Gap Road Widening at the Collins Creek Picnic area while applying the following: Sheet 4-T.4 1. Install temporary control signs and devices per Sheet 4 T.3. Obtain approval from CO of locations. 2. Install erosion control devices. 3. Construct the temporary lane shift per the traffic control plan and Detail E635-9 prior to commencement of work, 4. Using Detail 635-12 construct culvert extension. Construct Newfound Gap Road Widening up to bottom of the aggregate base course. 5, Sawcut existing edge of pavement. Place pavement up to but not including the final 1 ,gyp of SACP. 6. MIII existing pavement to the extents of the roadway widening. Place final surface layer 7. Place final pavement markings and permanent signs. 8. Obtain final approval from CO. 9. Remove ali temporary traffic control signs and devices and open road to traffic. ~~ 0 c ti c a M1 r F L 4"Solid Chevron - Striping in Gore See Detaii E634-4 4" Single Solid White Striping ~ Gatlinburg ~---- 4" Double Solid-~ Yellow SMping I Collins `~ I -Begin Option 4 i Creek j -NFG- CL Sta, 548+67.00 I---------------~ Tie to Existing Pavement Marking CL Sta 552+34 RT NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. Pavement markings are referenced to the centerline alignment. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall. follow sign schedules. r-------------, laColinsl I Creek I 4" Solid Chevron I I___________ _J Striping in Gare CL Sta 557+32 LT See Detail E634-4 End Option 4 RELOCATE -NFG- CL Sta. 561+05.00 Tie to Existing 4" Single Solid Pavement Marking White Striping 4" Mini•Skip r______________I White Striping ~ C~ Gatllnburg ~ / ,,, _ ~ Cherokee ~ CL Sta 554+63 LT +SO +55 +55 RELOCATE -'""" ~4" Double Solid j Yellow Striping .~.~~ ~ ~ +10 "Single Solid +Orr~~~ 4~` White Striping L M~ CL Sta 557+52 RT Limit of Option 4 ~"~ °~', ~/ ,~ ,~~ 45 Tie to Existing I I ' STOP I CL Sta 556+12 RT Pavement Markings ~ I w ~\`" /I w W e ~ Sta 000+22 LT u~ Q J Zti Q ~V V oa oa"--~ Cherokee k ~~~ t Lett Wi #5f18 thru #5F38 Rlg t Wing #5F40 thru #5F48 ~~ ~ a; o #SF26 (LeR wing) q N #5F27 (Right wing) ti ~ ,',' .,, a. ,° ~ .., ° ° ,. . ,~, ~ . ,~ fo 2 - #5F24 (Left w/ng) 2 - #SF25 (Right wing) i1'-0" (Left wing) 9'-9" (Right wing) SECTION B-B ,~ _-_ 11'-0" (LeR wing) A #SF39 Left WJng #5F49 Right Wing - * #5F2 ' * -These bars. shown in box r~ • bar Ilst. ti, #4W16 ~ *s #5F3 (3 total) Y SECTION C-C o a 1-#4W14 Lett Wing w 2-#4W15 Right Wing 3 {,j i ~ N 3 M ~ ~. c 4 '~ y A ° ~ ' r- -- -- - Q ~ ~ di ~ I C .C 1-#4W6 thru #4W9 Left Wing Op(rona! 3 const jt 2-#4Wi0 thru #4W13 Right W/n e a 3 S ' `0 0 2-#4W4 LeR Wing Construction ; 1- #SF3 3 a m ~ 1-#4WSR1ght WIn9 joint I ~ N I ~ 3 e @i - `~. #5F3 o h ~ (Stream face) n ~qp N II ' y " ~ ~ N O ti ~ y y = - - - - - ' Construction joint e - - -------------- ----------------- -- B g t t e ry - #5 F"bars ~ ~ I I ' #5F28 thru #SF38 LeR Wing #5F39 LeR Wing #SF40 thru #5F48 Ri ht Win 9 9 #5F49 Right WJng Left win 10 spa. ~ 1'-0" = i0'-0" 2-#5 F4 thru 1-#5 F14 9" 7" Right wing 3 8 spa. ~ 1'-0" = 8'-0" 2-#5 F15 thrv 1-#5 F23 6" 3 7" ELEVATION A ~ , (Left wing, right wing similar) REINFORCING BAR SCHEDULE LEFT WING BAR NO• SIZE TYPE LENGTH F3 3 5 1 9'-3" f4 1 ea 5 1 4'-10" thru of 5 1 - f14 22 5 1 8'-1i" F24 4 5 STR 11`-4" F16 3 5 STR 14'-3' F28 i ea 5 STR 3'-2" thru of 5 STR - F38 11 5 STR - 4'-5" F39 1 5 STR 4`-7" W4 6 4 STR I1'-8" W6 1 ea 4 STR 9'-9" thn~ of 4 STR - W9 8 4 STR 1'-5" W14 1 4 S7R 11-6" W16 16 4 2 1-8" ~ ~ REINFORCING BAR SCHEDULE RIGHT WING BAR NO• SIZE TYPE LENGTH f3 3 5 1 9`-3" F15 2 ea 5 1 4'-10" thru of S 1 F23 21 5 1 8'-11" f15 4 5 STR 9'-1" F27 3 5 STR 12'-0" F'40 I ea 5 .STR 3'-1" thru of 5 STR f48 11 5 STR 4'-4" F49 1 S STR 4'-6" W5 6 4 STR 9'-5" W10 2 ea 4 STR T-il" thru of 4 STR - W13 B 4 STR 2'-1" W15 2 4 STR 9'-5" W16 16 4 1 1 `-8" *~ *~ * If wing footing is lowered 1' add 1' to length of F3 thru F23 bars. ** If wing footing Is lowered 1' add 2-W4, W5 andWi6 bars. Stream face 11 I _ #4W24 Leif Wln o #4Wi5 Right Wing NOTE: Box reinf. not Fill face shown in elevation fj~ I" D #5 "F' bars 0 3 BAR TYPES O 1011 ~" M ~~ O ~ ~ ~~~ " ~" H ~~ i ~ ~ M^ 1'-1" All dimensions are out to out ~ ~ Construction joint with ~ ~a"x31"key #SF26 LeR Wing #SF27 Right Wing 6" I I G b ,~N ~ - ' ~ "' - #5 "F" Bar M ii 6" #SF24 LeR Wing #5F15 RIghE Wing SECTION A-A REG STATE PROJECT SNEEr TOTAL N0. SHEEfS NeW Exten510R FJdSI'!n CulVen` SE NC PRA-GRSM 1819 45.3 10`-10" Similar to detaJl "A" FHWA STRUCTURE NUMBER 5460-093R Fil! S/o e 1 •i a a P See detail "A" __ ~~ ~ ~~ ~ slab @ 1'-6"spa. Optional ~ ~• Ll Const 1t._ N ~~~ -a; r- .~... .• , ••. ; o i ~ e o 3 ', ; ~~ ~ , fh ' ^~ o ~, ~ ~ BS ~' a~~i a ~ ° °~' -- - ~... 0 0 ~ *0 ~ ~~ ~ ` ~~ ~\ ~ , #454 0712" spa. F.- IOw --------`~ ----- Center in bottom 1,~„ 1'-0"slab (~ N+alls ELEVATION DETAIL"A" Q 10'-10" Exlstln Culvert . ~.~ v •~ ., .~. ~., '• •' rnP~ :~ ~ ~. . , .. . Z- --------------------------------------- - - #453 .. , BAR TYPES REIN FORCING BAR SCHEDULE g" BAR N0. SIZE TYPE LENGTH *Fl 88 5 1 8'-6" FZ 12 5 Str 10'-6" *WS 40 4 Str 10'-b" Si Z2 .7 Str ZO'-7" SZ ZZ 7 Str T-4" S3 58 4 Sfr 10'-6" 54 50 4 Z 4'-1" H1 4 7 Str 24'-8 Q k 3 Dl 37 5 Str 2'-b" ~ _ o ~ ~ ~ ` " FI 1 'S WZ 3'-0" All bar dimensions are out to out 5" 10 spa @ 1'-0" =10'-0" S" * If box footing is lowered. i' add 1' to length of Fl bars. #7WZ (Typ ext; comers) k 1-#7S1 ** If box footing fs lowered 1' add 8 Wi :bars. ; -- ----- - NOTE; ------ " Wings not shown - --------------------------------- - fordarity, ° ~ ~ Optional Const Jt. u N ~ 3 ~ for phased rnnstrvctlon - y o '-0" T-0" ~-0~~ ti ~ v t 1'-0" T-0„ '-0" T-0" ~ #7W2 H N ~ ~ b" 6 spa ~ 12" = b'-0" b i v #7S2 Z-#4S3 (Typ.) #7S1 I N ------ - - °o ° ~.. -I- --- --------------------------------- - - Z"d. ~ ~. 4" j ry 2-#45Z 3" Dla, ry i ~ ~ Optional ~ ~ CORS('. IG o CfYP~) Weephole #SFI ~ @~ ~ ° (~YP~) ' ,~ 1~1'P•) a ° Consk Jt. with N a ~ N " ~ ~' i"x3~'z"x3~" w J ~, ,~ . l o ... ,. .. ,.. ~. ' o . ~ . '' ~ .'> . ~', ~ M 3 .. r 3" #5FZ (ryp: ea. ttg.) ~ ~) (TYPO #sFZ coot 0 s-#4w1 ~ SECTION B-B GYP. each wall) U.S~ DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DNISION .. .,, o,,. ...... ... ' t ' ~ ~' ~ '' ' _______ ________ GREAT SMOKY MOUNTAINS .NATIONAL PARK NEWFOUND GAP ROAD.- 1819 5" 10 spa ~ 1'-0° = 10'-0" 5" #5F1 (Typ: ea. wa11) CULVERT BARREL. B /--I PLAN NPS PM35.N .. WO 3 '~ 1 i f a r i L NOTE: Existing wings not shown, c M H I h I'~-~/ ExisBng I ~ ~ I C I ! I I I I I Headwall l.. III ' III I I I I I I I I I I I I I I 1 11 1 I ~ 1 1 I - I I I I I I ~ I I I I I I I I I I I I I 1 1 1 ~ I. I I I I I f___T_f_f_____ _________________TTT___TT_T___________}____________f_fT__-_il-T I III - III III ~ I11 III I I I - 11 1 I I I' - I I I I I I 1 1 I 11 1 11 I ~ 11 1 I I I I I I I I I 11 1 I I I I I I I-I ~ ~ I 11 11 ~ ~ I I I - I I ~ I I I I I I I I I I I I -I I. I II II II II 11 ' I I I I I I I I I I I I 1 1 ~ II II II II II I q Iii iiI ~ Iii' iiI e 3 I I I I l N ~ l ii iil - ~ Iii iil III' H gill' Ili I11 III ll ~ v III III. III -III I Z I I I I ' I l i I I I 11 ~ ~ I I I I I I 1 I ~ I I I I ~ i i I I I I I I I I. 1 I I I I i i I 3 I I ; ~ I I I N I N II' t ~~, 1 b o O, S "' ~ 'Tee. (- ~ ~ sn r I s, s k by { ~^ 11 `-6" i I I' I t I I I 1 I I I I I I I I I I I I I I I I I I I I 11 1 I I i l l I I I I I I I I II I I I I II I I I I I 11 1 I I 11 1 I I I I I II I I I it 1 1 ~ I i l I 1 I III I III I ii ii I i I I I ii I I I 1 1 1 11 1 11 II 11 I I I I I I I I I I I I ~ Culvert il'-6" 15'-0" PLAN 11'-6" 8I ~ I a e i i l i'-6" r b tl' e ~I ~o REG STATE PROJECT SHEET TOTAL N0. SHEETS $E NC PRA-GRSM 1B19 4.5.2 FHWA STRUCTURE NUMBER 546D•093R N U.S. DEPARTMEPIi OF TRANSPORTAT[ON FEDERAL HIGHWAY ADMINISTRATION = EASTERN FEDERAL 1AN05 HIGHWAY DMSION `D GREAT SMOKY MOUNTAINS NATIONAL PARK "' NEWFOUND GAP-ROAD -1Bi9 HEADWALL AND WINGWALLS suleu~rar . NOS PMTS NO.: 09563 `~• ~a W~ C 2 q O H H H 0 h Q Weep hole (typ.) /i titi 16° '~~ i n~' ~ ^~ 6 6'-IU3/a" 1'-1iF"~ ieft wing z,-6" Rignt Wing Grp-1 END ELEVATION ~~ 555150 ¢ Remove Wing WaIIs.LT Remove Concrete Apron LT Extend 3 @ 7x4' RCBC-10,81E with Wing Walls 548180 f1 See Sheet 4-5.1 for i8"CMP Culvert Extension Plans See SCR Section 108.01 for Parameters on Work Time Limitations 0 x k S d C a° ~`i W Picnic Area Entrance 2-19'x11"CMP 0 Y S Q h h M h 0 0 L NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. Station Cher,_~ w ~ x w u as m Uq J ' ~~ o ~U U a ~~ i a ° z a s t Q h Q M ti N Q 1 L CURVE INFORMATION EWFOUND GAP ROAD Curve = NFGCCC2 Curve = NFGCCC3 Curve = NFGCCC4 PI 554+48.04 PI 560+08,66 PI 560+79.30 D= 11° 15' 06" (LT) 6= 7° 22'.00" (RT) ~= 6° 32' 41" (RT) R = 1,250.00' R = 700.00' R = 450.00' T = 123,13' T = 45.06' T = 25.73' L = 245,47' L = 90.00' L = 51,40' 548+80 ~ 18"CMP NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Cherokee '~~ 535+50 ~ Remove Wing Walls LT Remove Concrete Apron LT Extend 3 Cm 7x4' RCBC- i0.8 LF with Wing Walls See Sheet 4-5.1 for Culvert Extension Plans See SCR Sectioh 108.01 for Parameters on Work 71me Llmltatlons ~~ -NFG- WL STA 561+05,1, 11.8' RT Plcrtlc Area Enhance 2-19 x11"CMP L REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 4.8.4 LOCATI ON PANEL SIZE T XT SIZE Sign No. Text No. Sign Text Station Side Width Nei ht 9 Area Corner Radii Border Width Margin Width Numbers Upper Cose ower Case ' Series Color Comb, Quantity Total Area Su ort PP Wo Pay) Remarks (in.) Go.l (sq ft) (inJ (in.) (in.) (inJ fio,) ( ~.) (s ft) Portable Sign (IJ 00 Black - - l0 1(11!2 8 R4-l SS ~ P 24 30 5 See ote 1 on 2 A Orange =l2 Portoble Sign (U Requires Double -Post ROAD Black - - I 18 1(2)12 9 W5-1 NARROWS 36 36 9 See ote on 2 Orange =24 Portable Sign (I) No Black PASSING - - l2 1(1)12 10 W14-3 48 36 6 See ote J on 2 ZONE Orange °l2 Portable sign Black - - 4 25 - ll W6-3 30 30 6.25 See ote 1 on Orange Portable sign B10ck S~ppJ, NO PASSING. - - 4 J5 - 12 Panel NExT xx MILES 18 30 3.75 See ote 1 on Orange Place 1 Mile Apart Along Black Length of P.roJect, Each UNEVEN - - 2 l8 2(2)12 Side of Road lg W8-ll 36 36 9 See ote 1 on Requires double post LANES Orange. =4B Sheet Total /6 1 90 U 96 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAYADMINtSTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION >vorES: 1. See "Manual on Uniform Traffic Control" and "Standard .Highway Signs" Total 32 257 .240 GREAT SMOKY MOUNTAINS NATIONAL PARK 9 NEWFOUND GAP ROAD - 1B1 for dimensions. Rounded Total 32 260 240 OPTION 4 roximate Location il f A t l Pl d D t CTIOri . or pp e a an an ro 2. See Traffic Con coNSTRU 3. Final locations of the signs shall be approved by the CO. ~ SIGN SCHEDULE NP5 PMTS NO.: 090563 4 h N 0 0 -1 L . ; 0 Y n N n 0 0 M REG STATE PROJECT SHEET N0. TOTpL SHEETS SE NC PRA•GRSM 1819 4.83 LOCATION PANEL SIZE ~ TEXT SIZE Sign No. Text No. Si n Text g Station Side Width Heght Area Corner Radii Border Width biargm Width Numbers Upper Case ower Case Series Color Quantity Total Area Support Remarks (inJ 6a1 (sq ftf (in.) (in.1 . (in.) (inJ (in.l (inJ Comb. (s ft) (No Pay) Mount warning lights Type B with ROAD Black flags on each non-portable sign l W20-1 WORK - - 48 48 l6 2(2)l2 Requires double past ' See ate I on 2 32 AHEAD =48 Orange END Block Requires double post 2 G20-2 - - 48 24 8 S 2(2)12 ROAD WORK ee ate I on 2 16 =48 Orange Mount warning lights Type B with MOD ROAD WORK BIaCk flags on each sign 3 NEXT .25 MILES - - ~O 30 12 5 S 2(2)12 Requires double post G2O-I EXPECT DELAYS . ee ate I on 2 25 =48 Orange ONELANE Block 4 W20-4 ROAD - - 48 48 l6 See ate l on 2 32 AHEAD Orange Mount in combination with other ) Block portable signs 5 W13-( V` _ - 24 24 4 S t l ee a e on 4 16 M F H Orange ~ Black 6 W20-7a - - 48 48 16 S t . . ee a e I on 2 32 - Orange. Mount in combinatioh with other XXX Black portable signs T W/6-2 - - 24 IS 3 S t 1 - FEET ee a e on 2 6 Orange ,I Sheet Total l6 l59 l44 uFEDERALHIGHWAYADMNISIRATIONN IYOT ESr EASTERN FEDERAL LANDS HIGHWAY DIVISION 1. See "Manual on Uniform Traffic Control" and "Standard HlgliWOy SIgnS" GREAT SMOKY MOUNTAINS for dimensions. NEWFOUND GAPLROAD - 1819 2. See Traffic Control Plan and Details for Approximate Location. OPTION 4 3. Final locations of the signs shall 6e approved by the CO. CONSTRUCTION SIGN. SCHEDULE 'L REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC pRA•GRSM SB19 4•B.2 PAVEMENT SUMMARY PAY ITEM PAY ITEM 40101-0600 40101-1400 PAY ITEM PAY ITEM PAY ITEM PAY ITEM pAYITEM PAY ITEM 30501-0000 5uperpave Pavement Superpave Pavement 1-Inch ~ 41301-0400 As halt Pavement P 41501-0000 Paving R Length 20315-0000 Sawcutting 20401-0000 Roadway 30101-1000 e B t Aggregate ~ 1/2-Inch Nominal Nominal Milling, 1.5-Inch Geotextile, Type ange Location /Station Pavement Excavatlon e as Aggrega Grading C (TON) Topsoil Course ON ~ ) Maximum Size 0.3 to ggregate A Maximum Size A regate, 0.3 to g9 De th (SQYD) 6 (SQYD) (LNFr) (CUYD) , <3 Million ESAL <3 Mllllon ESAL (TON) (TON) 026 276 NFG Road Sta 548+67 to 561+05 1,238 1,238 157 353 52 332 362 3 a 026 3 276 ?; TOTAL 1,238 157 ~ 353 52 332 382 , m E E EROSION CONTROL SUMMARY m a 0 c 0 ~ PAY ITEM PAY ITEM 15705-0100 Soil 15706-0200 Soil ~ STATION Erosion Control, Erosion Control, , i Silt Fence Check Dam (LNFT) (EACH) 0 ~ 1 a NFG Sta 548+67 to 561+05 1250 4 I As Re uired 3 U.S. DEPARTMENT Of TRANSPORTATION ~ FEDERAL HIGHWAY ADMINISTRATION '~ TOTAL 1250 3 EASTERN FEDERAL LANDS H[GHWAY DMS[ON GREAT SMOKY MOUNTAINS NATIONAL PARK a NEWFOUND GAP ROAD -1819 o OPTION 4 PAVEMENT AND EROSION CONTROL SUMMARIES m 0 0 N p~ PS PMTS N .:090563 ti - L_ 0 Y F e q N h 0 N ~`, N REG STATE PRWECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 4.8.1 oa M m Fi E i i I I . h m i U.S. DEPARTMENT OF TRANSPORTATION FEDERAL H[GHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD -.1819 OPTION 4 TABULATION OF QUANTITIES - - NFS PMTS NO.: 090563 Pay Item Item Description U it Quantity n NFG Road As Required Totals 15101-0000 MOBILIZATION LPSM 1 1 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM 1 1 15401-0000 CONTRACTOR TESTING LPSM 1 1 15705-0100 SOIL EROSIOM CONTROL, SILT FENCE (WIRE BACKED) WFT 1250 1250 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 3 3 20102-0000 CLEARING AND GRUBBING LPSM 1 1 20301-1200 REMOVAL OF HEADWALL (RCBC WINGWALL) EACH 1 1 20303-1600 PAVEMENTREMOVAL SQYD 25 25 20315-0000 SAWCUTTING PAVEMENT LNFT 1244 1244 20401-0000 ROADWAY EXCAVATION CUYD 157 8 165 20403-0000 UNCLASSIFIED BORROW CUYD 425 425 20801-0000 STRUCTURE EXCAVATION CUYD 15 15 30101-1000 AGGREGATE BASE GRADING C TON 353 353 30501-0000 AGGREGATE TOPSOIL COURSE TON 52 3 55 40101-0600 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 343 343 40101.1400 SUPERPAVE PAVEMENT, 1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 391 391 41301-0400 ASPHALT PAVEMENT MILLING, 1.5-INCH DEPTH SQYD .3026 304 3330 41501-0000 PAVING GEOTEXTILE,TYPE 6 SQYD 276 276 55201-0100 STRUCTURAL CONCRETE, CLASS A CUYD 36 36 55401-1000 REINFORCING STEEL LB 4164 4164 62501-0000 TURF ESTABLISHMENT, ACRE 0,2 0.2 63316-1000 REMOVE AND RESET SIGN EACH 2 2 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID LNFT 7376 7376 63401-2400 PAVEMENT MARKINGS, TYPE L, BROKEN LNFT 96 98 63405-2900 PAVEMENTMARKINGS, TYPE H, TURN ARROW EACH 1 1 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH EACH 75 75 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 50 50 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4 63503-0400 TEMPORARY TRAFFIC CONTROL-CONCRETE BARRIER LNFT 400 400 63503-0700 .TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 4400 4400 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL LNFT 4900 4900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 260 260 63506-0500 TEMPORARY TRAFFIC CONTROL, fLAGGER HOUR 83 83 63701-0000 FIELD OFFICE. EACH 1 1 U.S. -DE~AATN4IEN~' ~F T~IIE INTERIOR DESCRIPTION OF PROJECT PROJECT LENGTH: Newfound Gap Road .............................0,13miles IMPROVEMENT;' OPT70N 4 Roadway widening of Newfound Gap Road to add a tum lane at the entrance to Collins Creek Picnic Area. Improvements include resurfacing, paving, grading, drainage, pavement markings, and traffic control. ROADWAY WIDTH SURFACE BASE Newfound Gap Road 22R SACP AGGREGATE DESIGN DESIGNATION NEWFOUND GAP ROAD ADT(1007) 5,190 ADT(2017) 7,710 DHV 2,300 D 50/50 V 50 C/A PARTIAL e(max) MATCH EXISTING SPECIFICATIONS: "Standard Specifications for Constrodlon of Roads and Bridges on Federal Highway Projects", FP-03 U.S. Customary Units PLANS PREPARED BY Kimley-Horn and Associates, Inc, PO Rox 33068 Raleigh, North Carafina 27636 FOR U.S, DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LMaDS HIGHWAY DNISION STERLMG, VIRGIINA JANUARY 2008 ~,`~ NE~ROgOD GAP COLLINS CREEK PICNIC AREA OPTION 4 INDEX TO SHEETS SHEET NO DESCRIPTION 4-A.1 LOCATION MAP & INDEX OF SHEETS 4-A.2 THRU 4-A.3 TYPICAL SECTIONS 4-B.1 TABULATION OF QUANTITIES 4-B.2 PAVEMENT & EROSION CONTROL SUMMARIES 4-B.3 THRU 4-8.4 CONSTRUCTION SIGN SCHEDULE 4-C.1 LINEGRAPHS 4-E.1 EROSION CONTROL NARRATNE 4-E,2 EROSION CONTROL PLAN 4-S.1 THRU 4-S.4 COLLINS CREEK CULVERT EXTENSION DESIGN 4-T.1 SIGNING AND MARKING PLAN 4-T.2 TRAFFIC CONTROL NARRATNE 4-T.3 TRAFFIC CONTROL LOCATION MAP 4-T,4 TRAFFIC CONTROL PLAN 4-X.1 THRU 4-X.4 NEWFOUND GAP ROAD CROSS SECTIONS 4-Z,i DRAINAGE PROFILES 9~ 9,~m~ '~ < ~~ = 6~~G GP,~~yO L NA~CI®NA~, ~AI$~. ~lE~$V~CE _~y~ ~~~~ 1L ~~~~ JL ~®'U 1V JL ~~1V N~T~®NA~~, ]~Al~]~ UNESCO e/~/ ®~~~ ~ Ili IFK ~~~~~ ~~~~ PLANS FOR PROPOSED PROJECT PRA-GRSM IB19 OP~101~ 4 ROADWAY WlDEN1NG OF NEWFOUND GAP ROAD TO ADD A TURN LANE AT THE ENTRANCE TO COLLINS CREEK PICNIC AREA. SWAIN COUNTY, NORTH CAROLINA 0 p~ 0~ SMOKEMONT CAMPGROUND ,r z~~ LOCATION MAP MINGUS MILL PARKING AREA OCONALUFTEE VISITOR CENTER ~~ 0~ ~~ G~ COVE FDR ROAD e a v 0 M I ~ °o m L ` ~ i a 0 Y a e O N O N b N T REG STATE PROJECT SHEET N0. TOTAL SHEETS OI f ON - 1 SE NC PRA-GRSM 1819 3•Y3 TO ST NG OAD S a. 14+ 4,07 Sta. 4+64. 7 - % +.2 % - I Z - ---- ----- ---- St -Des. . I4+5 GrQd .00 = 1 .5~- ----- ---- ----- -- - - - -- - 14+50 00 Orl .Grn _, . = 2J 1.15 - S e . 14+ g(} 4r 3.02 oooion - Sta. Begi 14+33 Tran 02 pion L2 i2 - ---- --- - --- Des rod 2,1 .16 --- ----- ---- ----- ---- ---- - --- - ' 14+0o ao u Orl ra e .Grn = , = 2,l 2.14 S E a. 13+ d Tran- -4, 8.79 ition 0° Sta. End _ 13+58 ransit + 79 n ~2 -- ----- ---- ----- ---- ----- ---- ----- ---- ----- --- ~ ..-r~+ .orr -r-- --- --- ----- Su Orl rode Grnd _ , = 2,12 = 2,12 .93 .05 S 3 1 1 3 0 REG STATE PROJECT SHEET N0. TOTAL SHEETS 0 IAN SE NC PRA•GRSM 1819 3-Y.2 TO ST ING OAD Des. Su Grad grade = 2,l = 2,12 .44 .57 13+00 00 S e a. 12+ g +T2 O 1J4 00%n Sta. a=g(n 2+81. 2 OOot 4 on --- ---- ----- ---- ----- - S E a. 12+ d Tran 2.52 ition St Des .12+5 Grad .00 = 2,1 _ 1 5.16 sta. End 2+42. ansiti 2 1z+5o 0o e o Orl .Grnd ° 2,12 .77 e= ' B e gin Tr (+) 3 nsition 00% Begi e= (- Transa 3.00 ion _ 0%+ _ _ st Des. . i2+o Grad .oo = 2,1 r .40 1z+oo 00 u Orl ra e Grnd = , = 2,12 .46 6 1 1 3 5 0 0 0 a h 0 a C i a a y H h O REG STATE PROJECT SHEEP N0. TOTAL SHEETS O ON SE NC PRA•GRSM 1B19 3•Y.1 TO ST NG OAD S E e a. li+ d Tran + 3 5.00 ition 00% Sta. End e= (- 1+55. nsiti 3.00° 0 n ---- ---- ----- ---- - --- - ----- ---- ----- - _---- -- . . ----- ---- ----- ---- ----- -- ----- ---- -- S Des. . I1+5 Grad .00 = 2,1 1 .25 11+50 0o u Orl ra e Grnd = , = 2,12 .99 -l. 8% +1.5 s Des. , rJ+o Grad .o0 = 2,1 1 .70 ~~ ~1+00 00 Orl .Grnd -, = 2,l .57 B e gin Tr Matc nsition Existi g -2 0% +2.0 Begi e= M Transi tch Ex ion sting St Des. . J0+9 Grad .00 = 2,1 1 .78 i o+95 00 Orl . Grnd -, = 2,1 .66 __ S G+CQ ~ -- _ ____ ____ _ ____ __ 3 1 1 REG STATE PROJECT SHEET N0. TOTAL SHEEfS SE NC PRA-GRSM 1819 3-X.12 OP ON NE FOU D G PRO D @ OW TRIN ROA INT RSE ION .2- .85i~ .15% ___ __-- - -- ----- ---- ----- ---- ----- ---- _---- St .715~ 0.00 1 - "~ ~:Z"4 85%+ .15%_ ---- __ _" --_~ "~- --- --~ - _ -- ----- ---- ----- --- - ----- -` St Overl . 714* Gr 0.00 de = 1 ,117.10 4 ,. Over! y Gr de = ,!18.01 14+0 .00 3 i i 3 O P ON REG STATE PROJECT S p~ SEETS SE NC PRA-GRSM 1B19 3-X.11 N E FO U D G PRO D @ OW TRIN ROA INT RSE IO - ° } ,_, St Over! .713+ Gr 0.00 de ° ! 18.96 13+5 .00 -3.77 +4.23 °. __- -- ' a ~ 9 - ----- --- - ----- --- --' i St Over! , 713+ Gr 0.00 de = 1 119.87 13+0 ,oo E E e d Cro d Iran Matc n Corr ition Existi coon g , -- ti.2 3.25% +4. 5% , _,. "'' ' Overla Gra e = 2 20.86 12+5 .00 6 5 3 1 1 3 v C 0 e N 0 8 a 0 s 0 Y 8 .~ REG STA TE PROJECT SHEET N0. TOTAL SHEETS SE N C PRA _ -GRSM 1B19 3-X.10 OP ION ry NE FOU D G PRO D @ OW TRIN ROA INT RSE IO S a. 712 02.87 C own C rrectio 1 Z - -- - ---- ----- --- --- - -~ - , - ----- ---- ----- ---- -- St 712+ 00 0 ! - l O . Gr . e = 80 121 ver . ,~ -- ----- - -- ---- st . T11+ .o0 1 11+5 .00 3 1 1 3 5 REG STATE PROJECT 5 0~ HE S OP ION 5E NC PRA-GRSM iB19 3-X,9 NE FOU D PRO D @ OW TRIN ROA INT RSE I0 _ y , -~ -- ----- ---- --- - ---- ----- ---- ---- --- -- st . 7r1+o .oo I ~ = _ ,..~ 11+0 .oo ti Z ~~ m x F i~ ~. b ~ , r , H i a S a. 710 50 /, , C own C rrecti ,~ o E d Tran ition ,~ 0 N +6 , o C~ __ - __ - Y -. v St .710` 0.00 1 Overla Gra e = 2 24.04 710+5.00 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 3 1 1 3 a a~ m REG STA TE PROJECT SHEET N0. TOTAL SHEETS SE N C PRA •GRSM 1819 3•X.6 0 ON NE FOU D G PRO D @ OW TRIN ROA INT RSE ION , , ,~ , , ,~ `.2 0.37 ° +7.6 .2 , ---- ----- _ ---- _ , , f _ ____ verla Gro e ° 2 25.09 io+o .oo , . ,~ 1.2 .47% +8.4 ---- -_ ---- -_ - ---- Overl Gr e = 2 126J2 3 1 1 3 REG STATE PROJECT SHEET N0. TOTAL SHEETS IAN SE NC PRA-GRSM 1819 3-%.7 NE FOU D G PRO D @ OW TRIN ROA INT RSE IO ` '~ S a. 709 00 ~' B gin Cr wn Co ectio , ,~ ----- --- -- ---- - -- ----- ---- ----- - -- ----- ---- --'~ St 709* 0.00 1 ver a ra e = n ,~ . 61% ' .2 ----- ---- ---- ----- - -~ -- -- ----- ---- ----- ---- ----- - -- ----- ---- '~~ St 708+ D.00 l 08+5 .00 0 5 3 1 3 0 N b z s REG SE STATE NC PROJECT PRA-GRSM iB19 SHEET N0. 3-X.6 TOTAL SHEETS OP ON NE FOU D G PRO D @ OW TRIN ROA INT RSE ON ,~ , ,' - - --- ~ -- ----- ---- ----- ---- ----- --- ----- ----~ ~ St Overla 708+ Gra 0.00 e = 2 I 28.88 os+o oo . , - -- - ~ Z --- -- ---- ---- ---- --=. ----~ -~ ~ + 00 0 l -- ----- ---- ----- ---- ----- --- ----- -- -- St Overla 707 Gra . e = 2 29.88 07+5 .00 0 Y 3 1 x 1 5 REG STATE PRO)ECi SHEET N0. TOTAL SHEETS OP ION SE NC PRA-GRSM 1819 3•X,5 NE FOU D G PRO D @ OW TRIN ROA INT RSE IO ,' S a. 707 25.00 '' E d Cro n Corr coon e a c xis i g Z 0.80°. 7 ~, .2 -- ----- - Overla Gra e = 2 30.68 07+0 .oo -- , ,, . , ,, ~; -0. 0 . +7 0% " -- ----- - -' ~~~~ St 706+ 0.00 I Overl Gr de = 31.67 3 1 1 3 0 5 ii a a 4' 7emparary Silt fence e Existing ~`1l y~oP '; Ground ~_ 1 Flow --~~ 1 zl 2:1 _ Temporarily Grade NF to Drain Instal! type 1A Erosion Control Matting in Temporary Diversion Channel Detaill i3+28 ~~s°k Install 31 LF-14" HDPE TYPE S PIPE Install Stone Headwall LT and RT 14+33 Insta11441F- 24" HDPE TYPE S PIPE Install Stone Headwall LT and RT 1/ I ~ (/ ~~ j Temp. Dlverslan z 706+45 ~ Channel (7yp.) Install Concrete Plpe Collar LT See Detail 1; ~ Install 11 LF- 24"RCP This Sheet / I ±~ Remove and Reset Stone Headwall LT r I i Temp. Checht~ ~ ~ Dam (Typ. J ' ,,_. { U .,T; ~ ~ W o~ j' a rni ..` ,~ W ~ ~` /f/ / /'! / 11 M f'' •~ ~ ¢ %~/~ ~r ~~ n / f ~~ m % % 'fi/ ~ ~ '~ ,%- ; ~~ 3 0 / a ~,`~,OJ -~ i Ga c N 7 ti L ~f~1, 1 ~ ~.... ~~i / , '~ .~ `~\ NOTES i. Install temporary silt fence at the proposed tae-of-slope from Station 708+99 to 710+00 and from Station 710+83 to 711+20. All other locations, install at a distance of 4' from proposed toe-of-slope. !1'L °~ „' , ~ ~''.'~ % ~ i1~~' - 1 ~ ~`~~ 1 ~~~~~ Install Temp. Sllt Fence at Boundary of ExlsMng Wetlands. t/erlfy with CO. (Typ.) l -~~, ~ `o~ i r 1,1 INS ~~~ ~~~,~ ~ c, Remove 55 LF- 24"CMP and Remove Stone Headwalls LT and RT Do Not Disturb i ;\ r 1o ,,1 n~ ~ 1 '',~L- , .)n111 f `,I 1, ~,.. ..-. 1 ~ ~ ~'~ '~`~~~`~ E 1~'~ ~ J !/ ~~ ~t:~, ..-..- , ~_. \. -~~ ..~ `~ - -~ Temp. 511[ ,'~,, ,,~nce7~p.) ~~ ~\ ~ \,\ ., . E~4FGJ 710+18 ~ Remove 47 LF-18"CMP Remove Stone Headwall RT Instal! 51 LF-14"HDPE TYPE S PIPE Install Stone Masonry Headwall LT & RT SHEET TO REG STATE PROTECT N0. SHI SE NC PRA-GRSM 1819 3-E,? ~~~~~ i ~ -'" ~ ~ _ ~ ~rnr. `~ ,i ~~ 4 , V /r r // t ~ ~~\~~ ~"~c'e ~~ ~~ U.S. DEPARTMENT OFTRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD -1819 OPTION 3 EROSION CONTROL PLAN PHASE I Station 702+30 Lo Station 715+12 ~, ~~~ NPS IS NO.: D9 5 3 Erosion Control Narrative GENERAL GUIDELINES: The Erosion Control Plans (ECP) are meant as a guideline for preventing erosion and controlling sediment. The work outlined in this narrative ronsists of applying measures throughout the life of the project to control erosion and minimize the sedimentation of rivers, streams, and Impoundments such as ' lakes, reservoirs, bays, and coastal waters. The measures consist of stabilization and structural practices, storm water controls and other miscellaneous pollution prevention controls. The Contactor Shall: 1, Coordinate the installation, use, and removal of erosion and sediment control measures with roadway construction activities to assure economical, effective, and continuous erosion and sediment control. Employ temporary stabilization practices in incremental stages as construction proceeds. Z.InstaN all erosion and sediment control measures as shown in the ECP or as directed by the Conhacting Otflcer (CO). Do not modify the type, size, or location of any control or practice without approval from the CO. 3. Work to prevent initial soil erosion rather than trying to rontrol eroded sediment Therefore, stabilize all disturbed areas as soon as practical, but no more than 14 days after construction activfty has temporarily or permanently ceased. 4. Control onty sediment-laden runoff generated by the project site. 5. Do not drive construction equipment across Mowing waterways. 6. Do not allow construction vehicles to track sediment off site of the project !!mils. 7.In general, preserve existing vegetation, trees, and shrubs when possible, and where directed by the CO and as directed in section 107 of the Spec+al Contract Requirements. Project Description: This project Is located in the Great Smoky Mountains National Park (GRSM), Swain County, North Carolina and functions primarily as a tourist desbhation. Option 3 of this project is located around the intersection of Newfound Gap Road and Tow String Road. The scope of work for Option 3 Is to widen Newfound Gap Road to accommodate a left tom lane onto Tow String Road and to re-align Tow String Road to provide a safer intersection geometry. Additional improvements will include drainage, grading, wetland mitigation, pavement markings, trafTic control and other work. Existing Site Conditions: The proposed site consists of moderately Bat floodpfain at the base of fairfy steep mountains with rorh outcrops. fie drainage makes Its way through a series of ditches and storm drain systems and ultimately Into the Oconaluftee River, the major drainage way for the area,- where it rontinues Rowing to Fontana lake, Critical areas: Extra care should be taken when constructing culvert replacements, to prevent silt from entering waterways. Off-site areas: During excavation operations, the removed asphalt pavement and excavated material shall be legally disposed of off government property. Erosion and sediment control measures: Siltfence - A temporary sediment barrier consisting of a wire-backed synthetic filter fabric stretched across and attached to supporting posts and entrenched Outlet Protection - Strucfuralty lined rip rap aprons at the outlets of pipes. Rock Check Dam - Sma1! temporary stone dams constructed across a Swale or drainage ditch. Seeding -The use of vegetation !n stabplzing exposed areas. Temporary Diversion Channel - A temporary channel lined with erasion control matting with the purpose of preventing olfsite drainage from flowing into disturbed areas. SEQUENCE OF CONSTRUCTION; PHASE L• 1. Clearly delineate wetlands in area and surround with silt fence as shown on plans. 2. Contact CO to roordinate removal of vegetation from existing wetlands that are to be disturbed during osnstructlon of the roadway.. 3.Install temporary diversion channels, silt fence or other measures as shown on the plans. Clear onlyas necessary to Install these devices. Seed or place erosion control matting on tempo2ry diversion channels ar berms immediately after construction. 4. Uerify with CO that all erosion control measures have been installed properly. 5. Begin clearing and grubbing. Maintain devices as needed. Rough grade site. 6.Install culverts. 7. Stabilize site as areas are brought up ro finished grade with vegetation, paving, ditch linings, etc. Seed and mulch denuded areas. within 14 calendar days of completion of any phase of construction. 8. When construction of phase I is romp(ete and all areas are stabilized completely, contact CO /nr inspection of site. 9.1f site is approved, remove temporary diversions, silt fence and other erosion control measures and seed out or stabilize any resulting bare areas. Silt fence surrounding existing wetlands are to remain in place. PHASE 11; I.Install temporary diversion channels, silt fence or other measures as shown on the plans. Clear onlyas necessary to install these devices. Seed or place erosion roniml matting on temporary diversion channels or berms immediately after construction. 1. Ilerlty with CO that all erosion control measures have been installed PropeMY 3. Remove existing pipe under old Tow String Road. Construct temporary diversion channel In area. 4. Begin clearing and grubbing. Maintain devices as needed. Rough grede site. S.Install culverts grade mitigation area. 6. Stabilize site as areas are brought up to fnished grade with vegetation, paving, ditch linings, etc. Seed and mulch denuded areas within 14 calendar days of completion of any phase of osnstruction. 7. When construction of Phase 11 is complete and all areas are stabilized completely, contact CO for Inspection of site. B.If site is approved, remove temporary diversions, silt fence and other erosion control measures and seed out or stabilize any resulting bare areas. MAINTENANCE PLAN: All erosion and sedimentation control devices shall be checked by the contra ctor for stability and operation no less than once per week and also within 14 his of any rainfall producing more than 0.4 in of rain within a 24 hr period. Any needed repairs will be made immediately to maintain all measures as designed. Maintain a cumulative and current written log of the condition of the erosion control devices and submR to the CO upon request. Maintain erosion control devices as follows: Silt Fence -Retrench If fence has been undermined and replace any deteriorated fabric. Sediment shall be removed when the level of sediment deposition reaches half way to the top of the banter. Check Dam -Remove sediment accumulation behind the dams when it reaches one half the original height. Add stone to dams as needed to maintain design he/ght and cross section. Seeded Areas -The seeded areas will be checked regularly to ensure that a good stand Is maintained. Fertilize and reseed as needed. If work on the project ceases for more than 30 days, all disturbed areas shah be temporarily seeded and erosion control devices maintained. Temporary Diversion Channels -Remove sediment accumulation from channel when it reaches on half the original depth of the channel Repair or replace damaged erosion control matting as necessary. L ~, -- - NPS PMTS NO.: 090563 L ~ CURVE INFORMATION REALIGNED TOW STRING ROAD Curve = TSC3 Curve = TSC2 PI 11+77.78 PI 14+00,52 p= 44° 26' i.4" (RT) p= 32° 45' 26" (LT) R = 160.00' R = 200.00' T = 65.36' T = 58.78' L = 124,09' L = 114.34' G~~CURVE INFORMATION NEWFOUND GAP ROAD Curve = NFGTS-3 PI 711+22.55 R = 1,200.00' T = 100,23' L = 200.00' ,p5, -TS- (;L 5 0• 14+46.0 se0 ~ 8.00 (RT) S e~ PT 14+56.1 C;~t/q9 -NFG- CL STA 708+49.24 42,00 (LT) ~, ~ ~, -NFG- CL STA \, 7Q,8+49,24 ~ \ 22.00 (LT) cd~'~\ . 10~ .~` 6G9\~ \ ~ \ \ ~\ \\ ~- •`,. ~ ~. i' -NFG- CL STA ~ ' 707+80.OD 22.00 (LT} ~\~~ 20' R GZa , 3') \\9 0 0 M ry pN M \ ~~ ~-TS-(,L~IR \ X09 -NFG- CL STA \ \ 709+01.30 \ 42.00 (LT) 1~ ~ i ~ POT 10+00.00 / ~ / ~/ ry /~ ~~~/ // / / / / •41.74 PT i2+36.52 -TS- CL STA / / ~~ ` D+95.0 / o / '~ 8.66 (RT) E TO / ~ ~ ~~~ TI EXIST / ~ ~ ~C ~ / 8 yti ~ Q ` ~' ° \ ~ ~ 12`42 A ~ 1~ / r *. 1+ . j / 8.00 (RT) / / / IO'R / / ~/ Begin Option 3 egin on ru on TS STA 10+10.00 RE-ALIGNED TOW STRING ROAD -TS- CL STA N 64° 40' S2" W 10+92,49 18.39- (LT) TIE TO EXIST TS- CL STA 11+02.49 18.00 (LT) TS- CL STA 11+02.49 8.00 (LT) PC 11+12.42 TS- POT STA 14+66.07 ~ '\ ~ ~ '~ ~~ ~ ', ,` i ___ .-NFG- CL STA ~ '\ ~ i--' ~ \~\ 709+01.30 ~ 22.00 (L17 ~~ a .c-i% / -NFG- CL STA \ \ kis' ~ 709+12.00 \ \ ~; ~. ~ ~ P 22.00(`7) ~` '\\ ~~~ /~ ~ ,\ X10 /~, \ -- --_.~ ~ ~ i ~cD~ 11 OT /` m ~ {' G~ p~~ 4 NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based uppon field surveys and bylthe cont~ractorlpriliir tosconstructioni acotivary Pavement Removal C E a 0 0 f ~ ~ y 1 k a s ~ 3 ~ V n 0 L REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM iB19 3-C.2 I -- - ~ - -- + _ - - - - ~ - - - ~ i -- - - - - -- - ~ ~ ~ 2140 2140 - " i --~ -r - ~ ' -' ~ ~- ~ 2135 2 135 -- --- -- ~ --.. _ ey _. on = ~ ~ ~ - ___j -_ ~ 2 130 2 130 - - -+ -- - - - - --- -a - --- - - - - - ~ 2 125 2 125 - - - - --- --- - - --- , - i ~ - I- - - -- ---- --- -- --- - _ - - - r ' _ - --{ ,_ - _- - _ _ ~ ~` - --- - - 2 120 2 120 - - "' 2 115 2115 - -- - - --- - i ---- --- - _ - _ _. ~ _ -- - - ~ 2 110 - --_-_ , _._. _ _ ._ -- 2110 - --- ~- i - -- - - 1- -- - - - -- I ' I ~' ~ - _ - i f-- - --'- -- - -- I I' 10+00 11+00 12+00 13+00 14+00 15+00 • NPS PM6 NO.: 090563 L_ i r c a e i 0 r F a h h M 8 C CURVE INFORMATION EWFOUND GAP ROAD os Curve = NFGTS-1 Curve = NFGTS-2 Curve = NFGTS-3 Curve = NFGTS-4 PI 704+70,03 PI 708+70.72 PI 711+22.55 PI 713+67.15 ~= 15° 17' 4" (RT) Q= 33° 07' 32" (RT) D= 9° 32' S7" (RT) Q= 9° 4' 0" (RT) R = 1,800.00' R = 540,00' R = 1,200.00' R = 1,830.00' P T = 241.52' T = 160.60' T = 100.23' T = 145.13' L = 480.17' L = 312.20' L = 200.00' L = 286,65' ~ CURVE INFORMATION PT i REALIGNED TOW STRING ROAD i3+18 Curve = TSCi Curve = TSC2 Instal131 Lf-14" HDPETYPE S PIPE PI 11+77.78 PI 14+00.52 Instal! Stone Headwall LT and RT 0= 44° 26' 14" (RT) 4= 32° 45' 26" (LT) R = 160.00' R = 200.00' T = 65.36' T - 58'78 i4+33 PC 13+41.74` L = 124.09' L = 114.34' Install 44 Lf-14"HDPE TYPE S PIPE Install Stone Headwall LT and RT PT 14+56.08 S 82° 33' 42" W 70b+45 Install Concrete Pipe Co11ar LT ,~~ 5n Install 12 LF-14"RCP /'\`~f% Remove and Reset Stone Headwall LT k` i i ! I I 704+00 fL Begin Paved Shoulder and Rumble Strip x Instal! Tree Protect/on fence (Typ) l; "/ /. ~l z -~ '" ~ '• a ~ i Begin ~onsvurnon j , -..~ °j ~ ",•' ~ ; TS STA 10+10.00 j ; 1, 2.42 ~ ~ `• j ... ~ .. '~ `' , I ( Pullout at Sta 10+50 Overlay 1 1/1" SACP,1 I/1" NMSA " ; , ~~~ Remove and Replace 5 Concrete Wheelstops ~~ . ~1 • ~ V i r' ~ , '~' I~ ~~/ /' ~ I ' ~~ I `~,y` l, t ~ -, 0" of ~ ra / ~ , •,~ r. r , ~ ' ~ ~ f N O r I .. k! ~ ~ ~^ ~_, Remove Pavement See Wetland Mitigation Pfan for Grading Plan Sheet 3-C.3 714+00 ~ 00+23 End Paved Shoulder. Remove 55 LF 14"CMP and and Rumble Sirlp Remove Stone Headwalls LT and RT ~~ End Option 3 End Widening r ! End -NFG- CL POC STA 715+12.00 = ~ ' ~ ~~ -NFG- WL STA 715+20.02;11.0' RT ~`~ J '~~_ ,, ~~, --~ PCC 710+22.32 12 '' ~ r-' . r f/ ~~` ;~ r;' Gad ~ ~ ~ . ` ;: _4P91~' ~tlon 3 -`" ` ' i6e in Idenin gip - + _.-- _ -NFG- WL STA 702+29.59, 11.9' RT -NFG- CL POC STA 708+75.00 = TS POT STA 14+86.07 710+18 ~ Remove 47 Lf- i8"CMP Remove Stone Headwall RT Install 51 LF- 24"HDPE TYPE S PIPE Install Stone Masonry Headwall LT ~ RT _ ~ .NOTES: 1. Baseline stationing )s based on wheel. measurements along the left side edge of ppavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction. activity. 3. Do not disturb existing wetlands beyond the construction limits shown. See Sheet 3-C.3 for protection measures to be installed before construction begins. Pavement Removal ~ ~. a ~ ,\ 4 .~ ~ ~ .,` ~ j .. ~ ~. '~.A i~ ~, \~~ ~~`~ 1 ~~ \ \~~-,,; _ chi ~~`~ ~.,.~ rod 712+22.32 ~~ i SHEET TOTAL REG STATE PRO]ECT N0. SHEETS SE NC PRA-GRSM 1819 3•B.5 PANEL SIZE TEXT SIZE LOCATION Color Remarks Sign Text Corner Border Margin Upper ower Su ort Sign Text Station Side Width Heght -Area Radii Width Width Numbers Case Case Series Comb, Quantity T (sal ft}° (No pPay) No. No. (in.) fia) (s ft) GnJ q lin.l (inJ (inJ (io•1 fin,) Portable Slgn 0o Black 8 R4-l Nor - - 24 30 5 See ote l on l 5 - PASS Orange Portable Sign ROAD Block - 9 W5-I NARROWS - - 36 36 9 See ote 1 on 1 9 Orange Portable Sign Block _ See ote ! on 3 J8 ~ PASSING - - 48 36 6 10 W14-3 toNE Orange Portable sign Black - - 30 30 6.25 See ote 1 on 4 25 - I1 W6-3 Orange E ba Portable sign I o Black _ ' ~ SLIp pl, NO PASSING 15 12 Panel NEXT XX MILES - - 18 30 3.75 See ote 1 on 4 U~ Orange FI Place 1 Mile Apart Along m Length of Project, Each o Black 212)12 Slde of Road o UNEVEN - - 36 36 9 See ote 1 on 2 1$ _48 Requires double .post n 13 W8-ll LANES Orange A D C O O n ~ ~ Cc~ 5 ~ U.S. DEPARTMENT OF TRANSPORTATION a Sheet Total 15 90 48 EpSTEMIFEDERALLANDSDIGHSWA~YDMSION '` GREAT SMOKY MOUNTAINS NOTES: Total 30 245 I92 NATIONAL PARK 1. See "Manua! on Uniform .Traffic Control" and "Standard .Highway Signs" NEWFOUND GAP ROAD - 1619 for dimensions. Rounded Total 30 250 195 OPTION 3 roximate Location. CONSTRUCTION 2. See TrafflC Control PIOn and DEtall for. App SIGN SCHEDULE N 3. Final locations of the signs shall be approved by the CO. n~,MUNO,,o9o56, a N L_ i 1 0 k a h ^i N C a L a REG STATE PROTECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM 1619 3.8.4 Si T t LOCATION PANE SIZE TEXT SIZE gn ex C B d No. No. Si n Text g Station Side Width Neii~ff Area orner Radii or er Width Margin H"dth Numbers -Upper Case ower Case Series Color Quantity Total Area Support Remarks (inJ ICJ (sq ft} (in.} IioJ (inJ {ia) (io,) (~,) Comb. (s ft) (No Pay) ROAD Mount warning lights Type B with WORK Black flags on each non-portable sign 1 W20-1 - - 48 48 16 212)12 Requires double post AHEAD' See ote I on 2 32 Orange =48 END BIaCk Requires double post 2 G20-2 ROAD WORK - - 48 24 8 2f2J12 See ote I on 2 16 Orange =48 ROAD WORK Mount warning lights Type 8 with 3 MOD G2O I NEXT .25 MILES - _ 60 30 12 5 B10Ck 212}12 requires doublespost - EXPECT DELAYS . See ote l on 2 25 =48 Orange Portable signs 4 W20-4 QNE LANE Black ROAD - - 48 48 16 - See ote I on 2 32 ;, AHEAD Orange Mount in combindtion with other S + W13-! %'V\ - - 24 24 4 Black portable signs ~ MPH See ote 1 on 3 12 - Orange ~ Portable sign 6 W20-7a - - 48 48 l6 S Black ee ote 1 on 2 32 - Orange ,Mount in combination with other ~ Black portable signs 7 W16-2 - - 24 I8 3 - FEET See ote ! on 2 6 Orange NOTES: Sheet Totol 15 I55 ~ I44 uFEDERALHICHWAOYADTMINlSTRA ONN EASTERN. FEDERAL LANDS HIGHWAY DIVISION 1. See "Manual on Uniform Traffic Control" and "Standard H1ghWay $ignS" GREAT SMOKY MOUNTAINS for dimensions. NATIONAL PARK 2. See Traffic Control Plan -and Details for Approximate Location, NEWFOUND GAP ROAD- 1619 OPTION. 3 3. Final locations of the signs shall be approved by the CO. CONSTRUCTION SIGN SCHEDULE 1 _ ~ L SHEET TOTAL REG STATE PROJECT N0. SHEETS SE NC PRA-GRSM 1819 3-8.3 a 0 q m " f m M o° b 3 a z 0 ti h u M H O 0 U.S. DEPARTMENT OF TRANSPORTATION 0 FEDERAL HIGHWAY ADMINISTRATI Y EASTERN FEDERAL LANDS HIGHWAY DIVLSION GREAT SMOKY MOUNTAINS NATIONAL PARK ~ NEWFOUND GAP ROAD - 1819. q M o OPTION 3 " EROSION CONTROL SUMMARY 0 0 N ti. PMA NO.: 090563 STATION PAY ITEM 15705-0100 Soil Erosion Control, Silt Fence (LNFT) PAY ITEM 15705-1300 Soil Erosion Control, Temporary Diversion Channel (EACH) pAY ITEM 15706-0200 Soll Erosion Control, Check Dam (EACH) Wetland Boundary North of TSR 365 Wetland Boundary South of TSR 405 Phase 1 Erosion Control NFG Sta 702+30 to 708+46 616 NFG Sta 706+28 to 708+26 198 NFG Sta 707+24 1 NFG Sta 708+22 1 NFG Sta 711+02 to 715+12 410 T5 Sta 10+95 to 14+34 339 TS Sta 11+OOto 13+28 228 TS Sta 11+99 to 14+34 235 TS Sta 12+OS 1 TS Sta 13+07 1 TS Sta 13+42 to 14+34 92 TS Sta 14+26 1 Phase 2 Erosion Control NFG Sta 710+04 to 710+51 47 TS Sta 710+56 1 TS Sta 11+29 to 14+65 372 TS Std 13+28 146 TS Sta 13+23 i TS Sta 13+29 68 TS Sta 14+24 146 TS Sta 14+25 70 TS Sta 14+26 1 TOTAL 3034 703 8 REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 3.8.2 PAVEMENT SUMMARY z a O~i ti 4] DRAINAGE SUMMARY u~ E E y m M 5 6 ti 8 s 0 y 3 i I' J e U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHW0.Y ADMIMSTRATION ~ EASTERN FEDERAL LANDS HIGHWAY DTOLSION GREAT SMO KY MOUNTAINS NATIONAL PARK NEW FOUND GAP ROAD -1619 Y OPTION 3 PAVEMENT AND DRAINAGE i SUMMARIES ' Q ti NPS PMIS NO.: 090563 L ocation /Station Range ength Pavement Construction Width (FEET) v PAY ITEM 20315-0000 Sawcutdng Pavement (LNFT) PAY ITEM 20401-0000 Roadway Excavation (CUYD) PAY ITEM 21101.1000 Roadwa y Obliteration, Method 1 (SQYD) .PAY ITEM 30101-1000 Aggregate Base Grading C (TON) PAY ITEM 30501-0000 Aggregate Topsoil Course (TON) PAY ITEM 40101-0600. Superpave Pavement 1/2-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL (TON). PAY ITEM 40101-1400 Superpave Pavement 1-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL (TON) pAY ITEM .41301.0400 As halt Pavement P MIINng 1.5-Inch Depth (SQYD) PAY ITEM 41501.0000 Pavin g Geotextile, Type 6 (SQYD) NFG Sta 702+30 to 715+12 1,282 1282 165 364 52 336 392 3134 285 NFG Sta 709+00 to 712+00 6 6 Tow Strang Road 209 Old TSR (Removal @ Widening) 464 16 100 Old TSR (Removal @ New TSR) 50 656 TS Sta 10+00 to 14+67 228 85 115 TS Sta 10+95 to 14+50 8 TS Sta 10+95 to 14+64 31 23 TS Pullout Sta 10+50 124 TOTAL 1,432 173 656 623 75 427 513 3,467 285 PAY ITEM pAY ITEM PAY TEEM PAY TEEM PAY ITEM 62011-0500 Stone 62028-1000 20301-1200 20302-2100 60201-0800 Masonry Remove and ' STATION Removal of Removai of 24-Inch Pipe Headwall for Reset Stone REMARKS Headwall Pipe Culvert Culvert . 24-Inch Plpe Masonry (EACH) (LNFT) (W~) Culvert Headwall (EACH) (EACH) 706+45 12 1 710+28 1 47 52 2 Towstring Road 00+23 2 55 13+28 32 2 14+33 44 2 TOTAL 3 102_ 140 6 1 L REG STATE PRO]ECf SHEEP N0. TOTAL SHEEfS SE NC PRA-GRSM 1819 3-B.1 i s i i i i c N uFEDERA HIGHWAYFAD N15TRA ON I ` ON EASTERN FEDERAL LANDS HIGHWAY DMS AINS NATIONAL PARK GREAT SMOKY MOUNT NEWFOUND GAP ROAD -1619 F OPTION 3 TABULATION C OF QUANTITIES NPS PMTS NO.: 90563 _ Y _ •- e 0 0 ~ ... Quantlty Pay Item Item Description Unit NFG Road As Required Totals -15101-0000 MOBILIZATION LPSM 1 1 1 1 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM 1 1 15401-0000 CONTRACTOR TESTING LPSM 3034 66 3100 (5705-0100 SOIL EROSIO CONTROL SILT FENCE WIRE BACKED LNFT 703 703 15705-1300 SOIL EROSION CONTROL TEMPORARY DIVERSION CHANNEL LNFT 8 8 15706-0200 SOIL EROSION CONTROL CHECK DAM EACH 1 1 20102-0000 CLEARING AND GR BBING LPSM 3 3 20301-1200 20301-3400 REMOVAL OF HEADWALL REMOVAL OF WHEELSTOP EACH EACH g 102 5 102 20302-2100 REMOVAL OF PIPE CULVERT LNFT 25 25 20303-1600 PAVEMENT REMOVAL S YD 1438 1438 20315-0000 SAWCUTTING PAVEMENT LNFT 173 7 180 20401-0000 ROADWAY EXCAVATION CUYD 2814 66 2900 20403-0000 UNCLASSIFIED BORROW CUYD 656 656 21101-1000 ROADWAY 08LITERATION METHOD 1 S YD 671 29 700 30101-1000 AGGREGATE BASE GRADING C TON 75 5 80 30501-0000 AGGREGATE TOPSOIL COURSE TON 40101-0600 SUPERPAVE PAVEMENT,1/2" NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 437 23 460 40101-1400 SUPERPAVE PAVEMENT, 1" NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL. :TON 574 36 610 3467 33 3500 41301-0400 ASPHALT PAVEMENT MILLING 1.5-INCH DEPTH S YD 285 15 300 41501-0000 PAVING GEOTEXTILE TYPE 6 S YD 140 140 60201-0800 24-INCH PIPE CULVERT LNFT 5 5 60915-1000 WHEELSTOP CONCRETE EACH 6 6 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT EACH 1 1 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL EACH 1 1 62501-0000 TURF ESTABLISHMENT AC 625 625 62901-0500 ROLLED EROSION CONTROL PRODUCT TYPE 2A S YD 1000 1000 63313-1000 RUMBLE STRIP SHOULDER LNFT 2 2 63316-1000 REMOVE AND RESET SIGNS EACH 100 100 63401-1500 PAVEMENT MARKINGS-TYPE H SOLID LNFT 14503 497 15000 63401-2300 PAVEMENT MARKINGS TYPE L SOLID LNFT 100 ' 100 63401-2400 PAVEMENT MARKINGS TYPE L BROKEN LNFT 1 i 63405-2900 PAVEMENT MARKINGS TYPE H TURN EACH 5 5 63502-0600 TEMPORARY TRAFFIC CONTROL- BARRICADE TYPE 3 EACH. 5D 50 63502-0900 TEMPORARY TRAFFIC CONTROL- CONE TYPE 28-INCH CH E 100 100 63502-1300 TEMPORARY TRAFFIC CONTROL- DRUM A . 4 4 63502-1600 TEMPORARY TRAFFIC CONTROL- WARNING LIGHT TYPE B EACH 5400 500 5900 63503-0700 TEMPORARY TRAFFIC CONTROL-PAVEMENTMRRKINGS LNFT 5400 1000 6400 63503-0800 TEMPORARY TRAFFIC CONTROL-PAVEMENT MARKING REMOVAL LNFT 250 250 63504-1000 TEMPORARY TRAFFIC CONTROL- CONSTRUCTION SIGN S ~ 1 1 63506-0100 TEMPORARY TRAFFIC CONTROL- ADV, WARNING ARROW PANEL TYPE A ~'RH 100 100 63506-0500 TEMPORARY TRAFFIC CONTROL-FLAGGER 1 1 63701-0000 FIELD OFFICE EACH 4 4 64502-0000 LOCATE UTILITIES EACH 1 1 64701-1000 MITIGATION WETLANDS MI'flGATION LPSM a 0 0 a m M 0 0 e a REG STATE PRO]ECI' SHEET N0. TOTAL SHEETS ION SE NC PRA-GRSM iBt9 3-x.3 NE FOU D G PRO D @ OW TRIN ROA INT RSE ON S B a. 705 in Cr 00,00 wn Co rectio e o :2 .80% 7.20% ,, , `:2 _ ---- ---- ---- ---- -- - ----- --- St Overla 705* Gra 0.00 e = 2 1 34.40 ~.2 0.77% 7.23' Over! Gr e = 2 135.!5 04+5 .00 1 1 1 REG STATE PRO]ECi SNEEi TOTAL N0. SHEETS 011 I0N SE NC PRA-GRSM 1819 3-X.Z a a ai S NE FOU D G PRO D @ OW TRIN ROA INT RSEC~TIO ',2 -2^26° +5.74 verla Gra e = 2 35.8 04+0 .00 Overla Gra e =.2 36.42 6_ 5 3 1 1 3 5 0 ION NE FOt REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1619 3-X.1 ~-. ~eZ g 9%2 l% _ ._ Sta 702{ 0.00 l 702+5 .00 .~ F 12 00% ---- -- -- C __ _____ ---- ----- ---- ----- --- Sta 702 0.00 N J 1 O 02+3 .00 Y Y~ Y '° _ - ----- ~y h _ ~,e ~_ _____ ____ _____ ___.. J V 3 1 3 60 NOTES: Begin Option 4 ~,.•~~ ~ --- 1. Baseline stationing is based on wheel measurements TS Sta, 30+10 Tie to Existing 1 ~ ~ Z along the left side edge of pavement The pavement Pavement Marking has been measured and PK nails every 500 feet, 2, All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed (2) Type III Barricade informational signs shall follow sign schedules. 4, Locations of all permanent and temporary construction signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. 5. See sheet 4-T.3 for temporary construction signage, 6. Use Detail E635-9 for lane shift. See Detail E635-6 for a ~°+°~ lane closures. e~=~' r~~,y " ---, ;STOP; , zo ., TS Si'a 14151 R Relocate o _ ~ (3)lype III Barricade a m 0 ~i °s 4" Double Solid Yellow Striping / / i/ /~ / ~A Begin Option 3 0 •NFG- CL Sta. 702+30 ~\`~b Tie to Existing Ga Pavement Markings _i-------1--~~•,l /~~/` _~ /~ /~ ;~ "Single Solid ~~~ White Striping ~ ~ ti ~~ ~~ , ~` ~~ ~ ~ ~ ~ ~ \ ~. \~ ChPfo~ End Optiom3 ee -NFG- CL Sta. 715+12 Tie to Existing Pavement Markings f a a m 0 N 4" Single Solid White Striping TRAFFIC WARNING LEGEND • Traffic Control Drum Type III Barricade .,_.. sak m rxr NPS PMTS No.. 090563 NOTES: ~...... ,dam, it 1. Baseline stationing is based on wheel measurements l th l ft id d f t Th ~ ` ' ` Z' a ong e e s e e ge o pavemen . e pavement \ ~ has been measured and PK nails every 500 feet. 1 ` 1 2, All striping shall be in accordance with the Manual on 1 ~ Uniform Traffic Control Devices (MUTCD) latest edition. 1 '~ 3. Signs shown reflect existing signs and layout, proposed i f ti l h ll f l l ~ 1 n orma ona signs s a ol ow sign schedu es. (2) type IIi 4. Locations 6f all permanent and temporary construction Barricades signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. 5. See sheet 4 T.3 for temporary construction signage, ~ 1 6, Use Detail E635-9 for lane shift. See Detail E635-6 for ~~d~ ~ 1 1 lane closures. So~~ ~ ~~ 1 1 Work Zone P~ 0 1 1 ~ 1 1P _ / ,~ ~1A 1 ,STOP; O 1 1 , 1 1 Sta 000+19 LT O ti +10~ n ~ ` ~+93 os ®~ i 4" Double Solid Yellow Striping ~ r z Y t Y Y // / Begin Optlon 3 ~ ~ / -NFG CL Sta. 702+30 ~/ / Tie to Existing // Pavement Marking ,t9 Ga~,\~'0 Y,;. ~ ~ /~ i~ ~~ 4" Single Solid White Striping (3}Type III Barricades ° Single Solid ~ White Striping ~ h i ~~\ n~ ~~ ~~ ~~ ~~ ~ ~ ~~ \~ ~ ~ ch End Optlon 3 ~~o/r -NFG- CL Sta. 715+12 oe Tie to Existing Pavement Marking TRAFFIC WARNING LEGEND • Traffic Control Drum w Type III Barricade 0 ROAD W4RK AHEAD ~ END ROAD WORK i N Y n NPS PMLS NO.:-690563 ROAD WORK 0 NEXT 0.25 MILES EXPECT DELAYS i. Obtain approval from CO of final location r-1 TRAFFIC WARNING LEGEND and spaung of signs and devices. ^ r^ U.S, DEPARTMENT OFIRANSPORTAIION ~/~`1~/~/ Warning Light, Type B, With Warning Flags FEDERAL HIGHWAYADMINISTRATiDN EASTERN FEDERAL LANDS HIGHWAY DMSION i. Signs 1 and 3 shall be mounted with Type a GREAT SMOKY MOUNTAINS NATIONAL PARK warning lights and warning flags. NEWFOUND GAP ROAD - iB19 pl/,~ Portable variable Message Sign OPTION 3 TRAFFIC CONTROL NOT TO SCALE LOCATION MAP GENERAL NOTES: 1, Obtain approval from CO of final location and spacing of signs and devices, 2, See details 635-2, 635-6, 635-11 and E635-14 for additional traffic control details. 3. Cover all conflicting signs during construction operations while using details 635-2,E635-6,635-1i and E635-14. 4. Place variable message signs/changeable message signs at locations shown on the Traffic Control Map, and as directed by the CO. Coordinate message text on the variable message signs through the CO. The contractor is responsible for the variable message signs Z4 hours a day, including the inputting/changing the message and maintenance of signs. 5. No work on the entire project shall be permitted on weekends or holidays or during the month of October. Holidays shall include all National legal holidays and Good Friday and weekends will begin at Noon on Friday and end at 8:00 AM on Monday. No work shall be done the entire week after Easter Sunday. No work shall be done on the Friday after Thanksgiving, and na work shall be done from December 23, through January 2. 6. The pavement depth differential between lanes of traffic shall not exceed 1 1/2 " when opened to traffic. Pavement differential restriction not in effect if differential is behind a lane closure. . 7. One, onle lane closure will be allowed for Option 3. A maximum of 4 one-lane closures will be allowed at any one time for entire project (Schedule A and Options). Do-not stop traffic for more than 10 minutes at one-lane closure setup. 8. Maintain two-way, two-lane traffic throughout the daytime from June 15 to August 15. 9. Daytime hours are defined as from 8:00 AM to 9:00 PM, NEWFOUND GAP ROAD; The Contractor shall construct Newfound Gap Road Widening and Tow String Road Realignment while applying the following; Step 1-Sheet 3 T,4 1. Install temporary control signs and devices per Sheet 3-T.3, Obtain approval from CO of locations. 2. Install erosion control devices. 3. Construct the temporary lane shift per the traffic control plan and Detail 635-i1 prior to commencement of work. 4. Construct Realigned Tow Stnng Road and roadway widening up to bottom of the aggregate base course. 5, Sawcut existing edge of pavement. Place pavement up to but not including the final 1 ~h" of SACK Step 2- Sheet 3-T.5 1. Shift traffic from existing Tow String Road to realigned Tow String Road, prior to commencement of work, .per the traffic control plan and Detail 635-11 prior to commencement of work. 2. Sawcut existing edge of pavement. Obliterate existing Tow String Road. 3, Mill existing pavement to the extents of the roadway widening and realignment. Place final surface layer. 4. Place final pavement markings and permanent signs. 5. Obtain final approval from CO. 6. Remove all temporary traffic control signs and devices and open road to traffic. 10. Maintain two-way, one lane traffic using fiaggers throughout the nighttime and daytime except as noted above in General Note #5 and #8. All work, except final surfacing, can be done at night with appropriate lighting plan as approved by the CO. Final surfacing must be accomplished during daylight hours, 0 r a r n` ry Q h 0 0 A~ M L~ i 5 T .,, y ' 4" Solid Chevron- Sthiping in Gore See Detail E634-4 0~ Begin Option 3 -NFG- CL Sta. 702+30 Tie to Existing Pavement Marking Begin Option 3 - TS Sta. 10+10 Tie to Existing Pavement Marking 4" Single Solid White Striping d +~+ 5~~~ ~P~ ~~h ~--~ ESTOP; ~ TS Sta i4+S1 RT i~ ,~ r,STOP ~`--~ Sta 000+29 LT Relocate NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. Pavement markings are referenced to the centerline alignment 2. Ali striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 7i4+00 ~ End Paved Shoulder and Rumble Strrp I Tow String ~ ~ ~ Road i Horse Camp j CL Sta 713+49 RT RELOCATE "Single Solid White Striping h ~~ ~~ ~~ ~ ~ \ \ ~ ~. \\ ch~~k End Option 3 ~~ -NFG- CL 5ta, 715+12 Tie to Existing Pavement Marking t10fl 7D4+00 f1 Begin Paved Shoulder and Rumble Strip 4" Double Solid Yellow Striping i Road ~ t ~ j Horse Camp j CL Sta 704+45 RT '^ 4"Single Sohd White Shfping 10`x10'Typic~ z ~J- -l L c t c 4 O Q h 4 M L 4' Temporary Silt Fence Existing y~oPe Ground ~_ f+~~ Flow ?I 2;1 ~~ Temporarily Grade N~ t0 Drain Install type 1A Erosion , Control Matting in Temporary Diversion Channel Detafll 13+28 ~m~b Install 32 LF- 24" HDPE TYPE S PIPE install Stone Headwall LT and R7 14+33 install 44 LF-14"HDPE TYPE S PIPE Install Stone Headwall LT and RT 1 1 i ,; Temp. Diversion % 706+45 ~yp,~ Install Concrete Plpe Collar LT See Detail 1; /l~ Instal! 11 LF-14"RCP This Sheet + !~ E Remove and Reset Stone Headwall LT ~~ j ' ;` Temp. Check ^ Dam l7YP~1 ~ , { ; / L ~~ I / 1~~I - 'tJ r, ,',', 1' ~; 11 ~. 1 l 1~ ~ P ~~ `~ ~ ~ 1 o t;.. Instal! Temp. S!!t Fence at Boundary of Existing WeNands. Verify with CD. (Typ.) 00+13 Remove 55 LF- 24" CMP and Remove Stone Headwalls LT and RT ~- Do Not Disturb ~~~ i ~.;~ °- ~ _. l`\ os ~.~' % \ `~\ %p~ r // ,/~// ~/ ~ ~ /~~i i %~ n~ n3 ';-%%./~r~/ NOTES: ~t~ ~ ~ '~ ~ P~ ~~ 1. Install temporary silt fence at the proposed ~~~ -_~ toe-of-slope from Station 708+99 to 710+00 ~a and from Station 710+83 to 711+20. All other locations, install at a distance of 4' from proposed toe-of-slope. %_. .~ ,. ~ ,Temp, Sllf ,~,. .. ,.F,,~,py,,,,p,~ . ~ ~ ,~ ~ ~ '~ ~~ ~, \ ,\ \ \~ ~~~ ~~.~' End~Opti_ + . 710118 ~ Remove 47 LF-18"CMP Remove Stone Headwall RT Install 52 Lf-14"HDPE TYPE S P1PE Install Stone Masonry Headwall LT & RT REG STATE PRO]ECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 3-E:Z \ ~ ~~ '" h \ ~~~~ , y ~, ~~\~ ~, ,\ ~ ~`~ ~ •~ ~~ J/ .~ Q ~~\ \ ~~~, ~~ U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD -1619 OPTION 3 EROSION CONTROL. PLAN PHASE I Statlon 702+3D to Statlon 715+12 ~,~ NP PMI6 NO.: 0563 Proposed: " Variable Depth SACP, 1/Z Nomina! se NC PRA-GRSM 1819 _--__ - _ 3-A.4 Max Slze Aggregate, 0.3 x 10 .to 3 x 10 ESAL`s, NOTES: 1 1/2"Min, Depth Type IV Pavement Smoothness 1. Locate all utilities prior to beginning Asphalt Tack Coat work. Cal! North Carolina One-Cal! Service. (800) 632-4949 or (336) 855-7799, ¢ Roadway Mill Existing Pavement, Z, Match proposed roadway and shoulder 3"MIN, Varies 0" to 1 1/Z" j j cross slopes to existing unless otherwise stated in plans, j 3. Match proposed curve widening in superelevated sections to existing ---- - unless otherwise stated in the plans. -______--~ 4, Rewndition ditch and instal! Type 1A --------- j eros/on control matting as directed by ------- __ -------- the CO. ________ ___ -- ----- I j 5. Place aggregatetopsoflcourseand - _ _ ____----- ____--- seed all disturbed areas, except paved _-----'-" I -"- areas, In accordance with sedfons 305 - - ----------- j and 625. ______-- --- ---- ~ 6. Maintain a Bnal elevation ofshoulder, ------------- I adjacent to die edge of pavement, - Proposed; I 1/Z-inch below edge of pavement. Var, Depth SACP, Existing: j I "Nominal Max Size Aggregate, Asphalt Pavement 7. Round hinge point as directed by CO. 0.3 x i0 to 3 x i0 ESAL`s Aggregate Base 8. Maximum shoulder rollover is 896. /I T p DET/il L /` 9. WL =Wheel line Survey i -NFG- CL =Centerline Variable Depth Pavement Wedging See Cross Sections for Locations Proposed: Vanab/e Depth SACP, 1/Z"Nomina Max Size Aggregate, Proposed: ° 0,3 x 10 to 3 x 10 ESAL's, a 1 1/Z Thldr SACP 1/Z"Nomina! Max Size Aggregate, ' 1 1/Z"Min. Depth ry 0.3 x 10 to < 3 x 10° ESAL s Type IV Pavement Smoothness Type IV Pavement Smoothness m Asphalt Tack Coat 3" Thick SACP, i" Namlhal Max Size Aggregate, " VARIABLE DEPTH. ~~ Q,3 x 10 to < 3 x 10° ESAL's WEDGING " ,~ Mill Existing Pavement Z" 3 MIN. I o° j ~~ 17 5 - ~ ----- - ------° --------- -- -I M 0 _______ _ _ _____________________ _ i a _ I ------- - --------------------- - - ~-------------------------------- -- --- ------------ ----- - ----- Proposed: 3 j Var. Depth SACP, " i Nomina/ Max Slze Aggregate, Z i 0.3xIOto3x10 ESAL's b Existing: Minimum 6"Thick Asphalt Pavement ~ Aggregate Base L r DETAIL 8 Variable Depth Pavement Wedging See Cross Sections for Locations 1 1 V 'I 1 Proposed; i 1/2"Thick SACP 1/2"Nominal Max Slze Aggregate, 0.3 x 106 to < 3 x i0 ESAL's Asphalt lack Coat Variable Depth Aggregate Topsoil ~, i'~ ~' ~' MATCH EXIST MATCN_ EXISTING ~ Roadway MATCH EXISTING Existing: ~ Variable Depth Asphalt Pavement , Aggregate Base ; $ Wheel Survey ; ------- i ---- ------ i------- MATCH EXIST VARIES 8' +/- 8' +/- VARIES VARIES SHOULDE TRAVEL LANE TRAVEL LANE SHOULDE TYPICAL SECTION N0. 3 TOW STRING ROAD OVFRLAYPAVEMENT SECTION TS PT STA i0+10.00 TO STA 10+95.00 ~ Roadway Existing Ground ~ \ 2'i 6" Proposed: 11/2" thick SACP, 1/1"Nominal Max Size Aggregate, 0.3x106 to3x106 ESAL's 3"thick SACP, 1 "Nominal Max Slze Aggregate, 0.3x106to3x106 ESALs 6"thick Aggregate Base Coarse, Grading C 8% Existing ~ ~1 /~ Ground 6" +- - ___,~ VARIES 3' 8' +/- 8' +/- 3' VARIES SHOULDE TRAVEL LANE TRAVEL LANE SHOULDE TYPICAL SECTION N0. 4 TOW STRING ROAD NEW LOCATION PAVEMENT SECTION TS PT STA 10+95.00 TO STA i4+b4.07 (REALIGNED TOW STRING ROADJ L ~I ~ IL n NOTES: 1. {ovate all utilities prior to beginning work. Call North Carolina One-Call Service (800) 632.4949 or (336) 855-7799. 2. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated in plans. 3. Match proposed curve widening In superelevated sections to existing unless otherwise stated in the plans. 4. Recondition ditch and install Type 2A erosion control matting as directed by the CO. 5. Place aggregate topsoil course and seed afl disturbed areas, except paved areas, in accordance with sections 305 and 625. 6. Maintain a final elevation ofshoulder, adjacent to the edge of pavement, 1/2-inch below edge of pavement. 7. Round hinge point as directed by CO. 8. Maximum shoulder ro0over is 8%. 9. WL = Wheef line Survey -NFG- CL =Centerline VARIES ~ VARIES SEE CROS~~NS ~ SEE CROSS SECTIONS 8% ~ Variable Depth ~~ Aggregate Topso~l~ Debrrs ,~ ~' ,~ i .~ /~/ Recondition Ditch F e 0 N 8 a L In Locations Where Crown Correction Is ~2equired See Overlay Wedging Detail B Shut 3 A, 4 Proposed: 1 1/1"Thick SACP 1/Z" Nominal Max Slze Aggregate, 0.3 x 106 to < 3 x i06 ESAL's type N Pavement Smoothness ~k ~ 7 i/2"Thick SACP, 1 "Nominal Max Size Aggregate, 0.3xi06 to <3xi0 ESAL's 6"Thick Aggregate Base Course, Grading C * ~C ~: Rumble Strip See Sheet C, 41 for Detafl is MATCH Existing Ground ~~ ` 2,1 - ~~---~" VARIES 8% Wheel Une I~ ~ ' SawcutClean 6" ~~ Approximate Location of~ VARIES Exisbng 3"Sanitary Pipe** 3'to 4' VARIES 0' TO 12' SHOULDER TRAVEL CANE ~ -NFG- CL ~ MATCH ~EXISTIN6~ Install Z' Wide Paving Geotextile, Type VI on 71/2" SACP Layer Over Joint 11' TRAVEL LANE I l' +/- Proposed: 11/1"thick SACP, 1/1"Nominal MaxSize Aggregate, 0.3 x 106 to < 3 x 106 ESAL's, Type N Pavement Smoothness Asphalt Pack Coat MHl Existing Pavement 1 1/Z" i Existing; ~' Minimum 8.5" Thick Asphalt Pavement ; Aggregate Base ; i F ---- ~ _i ~ ~ ~` % ~- r~ Approximate Location of Existing b"Waterline* NOTES; 1. Locate all utilities poor to beginning work. Call North Carolina One-Cal! Service (800) 63Z-4949 or (336) 855-7799. 2. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated in plans. 3. Match proposed curve widening In superelevated sections to existing unless otherwise stated in the plans. 4. Recondition ditch and install Type ZA erosion control matting as directed by the CO. 5. Place aggregate topsoil course and seed al! disturbed areas, except paved areas; in accordance with sections 305 and 6Z5. 6. Maintaid a Bnal elevation of shoulder, adjacent to the edge of pavement, 1/1-inch. below edge of pavement. 7. Round hinge point as d/reded by CO. 8. Maximum shoulder rollover is 8%. 9. WL =Wheel line Survey -NFG- CL =Centerline 10. Instal! geocomposlte edgedrain from Sta. 706+50 to Sta: 715+12 at depth of 14 fiches to base of drain. TRAVEL LANE VARIES 11' TO 23' EXISTING UTILITIES *-NFG- CL STA 710+75.00 TO STA 7i5+11.00 **-NFG- CL STA 711+85.00 7l7 STA 715+11.00 TYPICAL SECTION ND" IA NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL POC STA 702+30.00 TO STA 715+11.00 (TOW STRING ROAD INTERSECTION) CONSTRUCT TYPICAL SECTION IA !f WORK FOR OPTION 3 IS INITIATED AFTER THE COMPLETION OF THE WORK IN SCHEDULE A In Locations Where Crown Correction is Requfred See Overlay Wedging Detail B Sheet 3 A.4 Proposed: i 1/2"Thick SACP i/Z"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x 106 ESAL's Type IV Pavement Smoothness * ~ 71/2"Thick SACP, 1 "Nominal Max Size Aggregate, 0.3x106 to <3x106 ESAL's 6"Thick Aggregate Base Course, Grading C ~C * ~k Rumble Strip See Sheet C.41 for Detail Existing Ground ~ Y1P~ VARIES Wheel Llne !~ 6" 1 ~ SawwtClean Edgy Approximate Location of~) Existing 3"Sanitary Plpe** VARIES 3' to 4' VARIES 0' TO i2' SHOULDER TRAVEL LANE ~ -NFG- CL I ~ MATCH i EXISTIN i Proposed: 1 i/2"Thick SACP i/2"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x I06 ESAL's Type IV Pavement Smoothness Asphalt Tack Coat 3"Thick SACP,1"Nominal Max Size Aggregate, 0.3x106 to <3x106 ESALs ,~ Mill Existing Pavement Z" ,~ Existing: ,~~ M1Mmum 6" T ltkk Asphalt Pavement ; Aggregate Base ,~ Variable Depth i Mg7Cy Aggregate TapsoTl~' . Debris EXIST i Geocomposite Pavement Edgedrain See Note 10 Instal! Z' Wide Paving Geotextile, Type VI on 71/1" SACP Layer OverJolnt 11' +/- TRAVEL LANE TR,4VEL LANE VARIES_ VARIES 11' 1TJ 23' EXISTING UT7LITIES - *-NFG- CL STA 710+75.00 TO STA 715+11.00 **-NFG- CL STA 712+85.00 TO STA 715+12.00 * CROWN CORRECTION REQUIRED SEE CROSS SECTIONS FOR LOCATIONS ~k ~- APPLYIN TWO APPROXIMATELY EQUAL LIFTS', NEITHER TO EXCEED 41NCHE5 ,~k ~C Xc 1' PAVED SHOULDER AND RUMBLE STRIP ~, STA 704+00 TO ¢STA 714+00 TYPICAL SECTION ND. 1 B NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL POC STA 701+30.00 TO STA 715+11.00 (TOW STRING ROAD IN7T:RSEC770N) CONSTRUCT TYPICAL SECAON IBIF WORK FOR OPTION 3I5 TO BE COMPLETED. CONCURRENTLY WITH THE WORKlN SCHEDULE A i1' +/- ~ 3' _.._ \\ ~~ ~_7 `~Recrondltlon Ditch Approximate Location of Existing 6"Waterline* ~i.~ i51FIP~TBTMrr,N1f OlF 'THIS IN~°E1RI~1R L 00 DESCRIPTION OF PROJECT ~~~~®~~~ ~D~][$~ ~]E~~Ig~]E PROJECT LENGTH: Newfound Gap Road ................... ,.,,,..0.24mlles Tow String Road,,,,,,,,,,,,,, .,..,..,.,,,,..O,Im!!es 'lJ[~~~ Jl ~~®~ JL ~~'LJ N~~IN~ IMPROVEMENT.• N ~ ~ ~ ®N ~ ~ Jl OPTION 3 ~-- Roadway widening of Newfound Gap Road to add a tum lane at Tow StringRoad,Re-alignment of Tow String Road. Improvements include UNESCO ~~~~ ~~1 ~~~~~~ ~~~~ resurfacing, paving, greding, drainage, pavement markings, traffic control and wetland mitigation, - ROADWAY WIDTH suRFACE BASE PLANS FOR PROPOSED Newfound Gap Road 22ft SACP AGGREGATE Tow String Road 8ft SACP .AGGREGATE DESIGN DESIGNATION NEWFOUND GAP ROAD ADT(2007) 5,190 ADT(2027) 7,710. DHV 2,500 p 50/50 V 50 C/A PARTIAL e(max) MATCH EXISTING SPECIFICATIONS: "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects ; FP-03 U.S. Customary Units PLANS PREPARED BY ~-^ Kimley-Horn and Associates, Inc, PO Box 33068 Raleigh, North Carolina 27636 FOR U.S. DEPp RnLMyI~HwOFA~MINSNRPTIORTATION EASTERN FEDERAL LARDS HIGHWAY DIVISION STERLRIG, VRGIfiIA JMIUARY 2008 3 /'~.- r ~ ~ GP~~t~~J COLLINS CREEK PICNIC AREA ~~ PROJECT PRA-GRSM I B19 OPT IOIU 3 ROADWAY WIDENING OF NEWFOUND GAP ROAD TO ADD A TURN LANE AT TOW STRING ROAD AND RE-ALIGNMENT OF TOW STRING ROAD. SWAIN COUNTY, NORTH CAROLINA 0 p~ z~ ~,~ NFwR qp0 GAp MINGUS MILL PARKING AREA LOCATION MAP OPTION 3 INDEX TO SHEETS SHEET NO DESCRIPTION 3-A.1 LOCATION MAP & INDEX OF SHEETS 3-A.2 THRU 3-A,4 TYPICAL SECTIONS 3-8.1 TABULATION OF QUANTITIES. 3-8,2 PAVEMENT & DRAINAGE SUMMARIES 3-6.3 EROSION CONTROL SUMMARY 3-8.4 THRU 3-B,5 CONSTRUCTION SIGN SCHEDULE 3-C.1 LINE GRAPH 3-C,2 TOW STRING ROAD PROFILE 3-C.3 WETLAND MTfIGATION GRADING PLAN 3-D.1 NEWFOUND GAP ROAD/TOW STRING ROAD INTERSECTION DETAIL 3-E.1 EROSION CONTROL NARRATIVE 3-E.2 THRU 3-E.3 EROSION CONTROL PLANS 3-T.1 SIGNING AND MARKING PLAN 3-T.2 TRAFFIC CONTROL NARRATNE 3-T.3 TRAFFIC CONTROL LOCATION MAP 3-T.4 THRU 3-T.5 TRAFFIC CONTROL PLANS 3-X.1 THRU 3-X.12 NEWFOUND GAP ROAD CROSS SECTIONS. 3-Y.1 THRU 3-Y3 TOW STRING ROAD CROSS SECTIONS 3-Z.1 THRU 3-Z.2 CULVERT CROSS SECTIONS ~~ V~~ ~~4 6~ 9~~7y~rO 9~ ~' OCONALUFTEE VISITOR CENTER ~~ 0~ ~~ BIG COVE G~ CONNECTOR ROAD (SAUNOOKE BRIDGE' ROAD REG STATE PROIECf I SNO~ I SHEETS SE NC PRA-GRSM LB19 2-Z.4 0.5.DEPARTMENT OFTRANSPORTATION FEDERAL N]GHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION a M 0 ., a 0 L GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - iB19 OPTION 2 DRAINAGE PIPE PROFILES -l c 1 1 I F a REG STATE PROJECT SHEET N0. `" ~ SE NC PRA-GRSM 1B19 2•Z1 i ~i ~ i I I 2 35 F e M o. ry O O n 'L _-r _ - __ -- _ _ - , ... ..r. _ ...., -H.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHNIAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION ' , GREAT SMOKY MOUNTAINS _ ~ ~ NATIONAL PARK ~ NEWFOUND GAP ROAD - 1619 OPTION 2 ' DRAINAGE PIPE PROFILES ~ i ~ _ I. Srak/n Fen NPS PMTS ND.: 090563 t 1 a c '4 v 2A50 2A40 2A30 REG STATE PROJECT SHEE1 N0. SE NC PRA-GRSM 1819 2-Z.1 2,050 2A40 2A30 U.S. DEPARTMENT OFTPANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DINSION _ GREATBMOKY MOUNTAINS NATIONAL PARK .NEWFOUND GAP ROAD - iB19 OPTION 2 DRAINAGE PIPE PROFILES L 1 REG STgTE PROIECi SHEET N0. TOTAL SHEETS OP ON SE NC PRA,GRSM 1819 2-Y1 0 NAL FTEE VISI R C NTER SOU EN RANC 3 -2.0 I. .3 St .15+5 .00 ! 15+50 00 St .15+0 .00 ! 15+00 00 Des. Grade = 2,0 2.09 3 .00% -2.0 % ~3 st . l4+5 .oo r -- ----- - ~. ----- --- - ----- - ~~ 14+50 00 Des.. Grade = 2,0 2.13 St .16+5 .00 16+50 00 . 00% -2.0 - - ----- - -- ----- ---- st .14+0 .oo ! -- ----- ---- - --- f ~3 ---- - - i3 14+00 00 es. ra e. _ 16+00 00 St Des. .16+0 Grade .00 = 2,0 ! 5.02 3 1 1 3 1 1 a 0 a c a Y a 7 ~1 V 0 REG SE STA N TE C PRA- PROJECT GRSM 1819 SHEET N0. 2-X.20 TOTAL SHEEfS OP ION . NE FOU D G PRO D @ CON LOFT E VI ITOR CENT R I "~ __ __-- - __- ---- ---" _ ____- ---- -- Sta 826+ 0.00 I 0 Sta. clay 26+51 Grade 9 R = 2,0. 1 4.06 ----- 26+5 __ _ .00 Overla Gra e = 2 41.58 7 +2 j . , , _ __ - - - - ---- Sta. 26*0 .ll R l - -_~ ~ -- ---- 26+0 ---- 00 ----- --- verl Gra e = 2, 40.4 . +2.7 '~--- --- ---- ----- - - - Sta. 2550 67 R 1 ! ~ d G 0 = 2 73 1 _---- --`- _ - - - --" Sto erla 825+ Gra 0.00 e = 2, 1 39.4 0 erlay e ra , . -- Z5+5 ;00 j 3 1 1 5 i 4 a 4 U s a REG STATE PROJECT SHEET N0. TOTAL SHEETS OP ION SE NC PRA-6RSM IB19 2-X.19 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R -2.70 j . 12.70 . __ _,. • ----- -- - ----- --'"" _ - ~ ~~ ~ Sta verla 825+ Gra 0.00 e ° 2, I 38.6 ~ Ov rlay rade = 2,04 .92 2.70°. i j +2.70° OJ9 % ,- _ _____ _ __ ____ ___ -- --~ ~ ,~~~ Sta 824+ 0.00 ! Ov Q. rlay + rade 2,04 .I! 5 3 1 p e l i O C u FV C a k a Q q 6 N a S tiEG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA•GRSM 1819 2-X.18 OP ON NE FOU D G PRO D @ CON LOFT E VI ITOR CENT R ~ En Transi ion En e= Crow Existin Corre ion . 6% ~ + .06% sta sz3+ 00 8 - S 82 60 +99 R J . . _ _ ~ " - ''" " Sta 8241 0.00 J Overl . Gr y . de = ,039. 3 Be e= in Tran (+) 2. ition ~/o A _ ~ ;~ 4+ , S u n J u u n a e g r i y D I + C 1.65 % _ _ ~~~ " -__- - - -__- _ _ ____ _=_ "" "" r __ "~ " _ "" -- " Sta 823+ 0.00 l Sta. er(ay 23+4 Grad .30 = 2,0 I .9.20 -- ----- P 7i 23+5 .00 ~ 6 3 1 i 1 o .. F a a O~ O O a REG STATE PROJECT SHEET N0. TOTAL SHEETS O ON SE NC PRA•GRSM 1819 2-X'.17 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R . i , ~" ! 6 _ - ,, -- ---- == ---- --- ----- ---- s ' ----- - ._ _-- ----- --- - ---- - -_ _- Sto 823+ 0.00 __ ! Ove ta. 82 ay G {99.0 ad e = R l 2,038 0 i -' ,- ~ ---- - - ---- ----- - - ---- --- Sta 822+ 0.00 I 0 Sta. erla 822* Grad .0l R = 2,0 1 8.84 3 1 1 REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 2-X.16 0 ON NE FOU D G PRO D @ CON LUFT E VI ITOR CENT ~ __ ___ -~" ~~ - _ _ __ - - - . _--- ---"" ____ ____ _____ ____ - ----- I--- ---- - __ -- _--_- Sta 822+ 0.00 1 S Over a. 82! G 99.20 de = R I ,039. St .821+ 7.U0 e= (+) 2. ~ _,__ ,_ - _- __ _____ ____ ____ _____ ____ ____ I St verl . 821 Gra 0.00. e = 2, I 38.7 0 Sta. erlay 2I*49 Grad 33 R = 2,0 I 9.27 5 3 1 1 0 60 a° 2 a m y k k O IO n' REG S TATE PROIECi BEE N0. T TOTAL SHEETS IV SE NC PR A•GRSM 18 19 2•X.1 5 N E FOU D G PRO D @ CON LUF T T E VI I OR CENT R .2 j ° _ -- a z ~~ - ---- i+o o -- ---- --- ---- ---- --- ---- -- ---- --- t verl ---- 821+ Gra - - .00 e = 2, --- ! 9.5 - - -- e ---- a. 82 ay G - ~ 99.4 ade = --- 1 2,039. - - 9 - S u n c I Sta. End e= E 20+5 . rown ist 00 orrecti n Be e= in Tran (-} 2.0 ition /o -2.0 % l i .00 °, i - 00% -8.00 ° _ --- -- -~ -- -- .- 20+s .oo Q erla + Gra e = 2, 40.4 S De . • 820 Grod 4951 = 2, ! 0.11 3 1 1 3 0 6 0 v a a 0 N 0 N REG STATE PRO]EC! SHEEP N0. TOTAL SHEETS - SE NC pRA-GRSM 1919 2-X.12 OP ION NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R e __ - . . - .~ - -- ----- ---- ----- ---- ____ - _ --- ---' St l .818+ Gra 0.00 e = 2 l 8 43 St . 817* 9.83 l ver , . = + . ~' ~ '~ -- ' ,I ---- ----- ---' St verla .817+ Gra 0.00 e = 2, 1 44.2 St Des. . 817 Grade .83 = 2,0 1 4.38 - / ~ i -2-. 1 ~~ . 1 ,,-- i St verla .817+ Gra 0.00 e = 2 1 , 44.5 S Des t . .816+ Grad 9.86 = 2,0 1 4.75 3 1 1 3 5 6 0 b z ~~ m H k k a M a a 0 a REG STATE PROJECT SHEET N0. TOTAL SHEETS OP ION SE NC PRA•GRSM 1819 2-X.11 NE FOU D G PRO D @ CON LOFT E VI ITOR CENT R 1~~ -2.0 % 08 % ~- ' ~-2. 0% ~° 16+5 .fl0 St verla . 8(6+ Gra 0.00 e = 2, I 44.8 St Des. 816* rode .88 = 2,0 1 .04 - z // 0. T ,~ 1~ -2.0 % 1. 4 % ~ ~ -~ '~-2. , ---- - i 16+0 .00 St . verl 816+ Gra 0.00 e = 2, I 45.0 S De a. 816 .Gra 00.00 = 2, R 1 45.32 3 1 3 REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA•GRSM 1819 2•X.10 OP ION NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R z -~ --~~. ~ ~' W -2.0 I i i ,- ' 2.0 ---- -- ----- ---- ----- ---- ----- ---- ----- ---- ----- ---- --E__ .=__ ___ _____ -=== ==== 15 5 00 St Overla .815+ ~Gra 0.00 e = 2 1 044.81 Sta. es. G 5+50. ade = 0 R ,045. I + . Z . / i °~ a2 ,~ ~~ i , W z cn O ~' -2.0 i j ~ ~:t~0 ° i i l is+o oo St verla .815+ Gra 0.00 e = 2, 1 45.2 St Des .815+ Grad 0.00 = 2,0 ! 5.83 _ . 5 3 1 10 3 60 C z 0 U y C L v n s a L U.S. D1El~AiB'~Nd~N~' ~1F '~~IE IN3°IERI~R LOCATION MAP OCONACUFTEE VISITOR ~~ .CENTER ~~~' o G~~Q- 8IG COVE CONNECTOR ROAD (SAUNOOKE RRiDGF ROADI PROJECT LENGTH: Newfound Gap Road, ,,,,,,,,,,,,,,,,,,,,,, „0.50 miles IMPROVEMEM,~ ~~~~°~° ~~®~~ ~® lJ N~°~IN~ OPTIDNI _ 4~~~®+ 4~~ ~~~~ Roadway widening and rewn~rguratlon of Newfound Gap Road to add N N turn lanes at the entrance to the Oconaiuftee Visitor Center and Park Clrcle Drlve. Reconflgurat/on of parking area for the Dconaluftee Visitor Center. Improvements include resurfacing, paving, grading, drainage, ~4®1~ ~¶~ ~~j ~I~~~~ ~I~~ pavement markings, and trafl7c rnntrol, ur~sco ~( 1C~ rii~ ROADWAY WIDTH SURFACE BASE -_ Newfound Gap Road 22ft SACP AGGREGATE DESIGN DESIGNATION PLANS FOR PROPOSED NEWFOUND GAP ROAD ADT(2007) 5,090 PROJECT PEA-GRSM 1 B19 ADT(2027) 7,710 p T ~ l DHV 50/50 O ! I l01 V r~ V 50 emax) MarcHexrsrlNG ROADWAY WIDENING AND RECONFIGURATION OF NEWFOUND GAP sPECrFICATIONS: ROAD TO .ADD TURN. LANES AT THE ENTRANCE TO THE ^standard specifications for construction of Roads OCONALUFT EE V 1 SI T OR CENTER AND PARK CIRCLE DRIVE. and Bridges on Federal Highway Projects", fP-03 us. Customary units SWAIN COUNTY, NORTH CAROLINA PLANS PREPARED BY 0 O to ^-^ ~~ 2 Kimley-Horn and Associates, Inc, PO BoK-33068 Raleigh, North Carolino 27636 SMOKEMONT FOR CAMPGROUND ~ BEGIN OPTION 2 -NFG- CL NB 803+40.00 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN fEDERII LMNS HIGHWAY DIVISWN. STERLWG. VIRGMIA N~,V OgNp Gqp MINGUS MILL PARKING AREA OPTION 2 INDEX TO SHEETS SHEET NO DESCRIPTION 2•A,1 LOCATION MAP & INDEX OF SHEETS 2-A.2 THRU 2-A,8 TYPICAL SECTIONS 2-B.1 TABULATION OF QUANTITIES 2-B1 PAVEMENT & DRAINAGESUMMARIES 2-B,3 EROSION CONTROL SUMMARY 2-8.4 PERMANENT SIGN SCHEDULE 2-B.5 THRU 2-BJ CONSTRUCTION SIGN SCHEDULE 2-C.i THRU 2-C.3 LINE GRAPHS 2-C.4 NEWFOUND GAP ROAD PROFILES 2-D.17HRU 2-D.4 OCONALUFTEE VISITOR CENTER PARKING AREA LAYOUT/GRADING PLAN 2-E,1 EROSION CONTROL NARRATNE 2-E.2 THRU 2-E.4 EROSION. CONTROL PLANS 2-T 1 THRU 2-T.3 NEWFOUND GAP ROAD SIGNING AND MARKING PLAN 2-T.4 TRAFFIC CONTROL NARRATNE 2-T,5 TRAFFIC CONTROL LOCATION MAP. 2-T.6 THRU 2-T.10 .TRAFFIC CONTROL PLANS 2-X.1 THRU 2-X.20 NEWFOUND-GAP ROAD CROSS SECTIONS 2-Y.1 VISTIOR CENTER SOUTH ENTRANCE CROSS SECTIONS 2-Z.1 THRU 2-Z.4 CULVERT CROSS SECTIONS END OPTION 2 -NFG- CL NB STA 831+15 0~ ~ O~ti~ 9G~ ?,CI Qe~o~• ~p,~~,pfo 9~~~ 2-C.3 ~,c~ Proposed; 1 1/Z"thick SACP, I/1" NominalMax Size Aggregate, 0.3 x 106 to < 3 x 10' ESAL's, Type N Pavement Smoothness Asphalt Tack Coat Mill Existing Pavement 11/1" Existing: Minimum 8.5 Thick Asphalt Pavement Aggregate Base . Wheel Line ILV i \ -- \~_ - ') Approximate Loptlon of Existing 3"Sanitary Pipe -MATCH EXIT * ~ - -- - ------ -- Instal! 1' Wlde Paving Geotextile, Type VI on 71/1" SACP Layer Over Joint Sawcut Gean Edge Ii` In Ldcations Where Crown Correction Is Required See Overlay Wedging Deta!! A Sheet 1-A.8 ~ -NFG- CL N8 I I Ii` I GRADE DINT MATCH * EXISTING i1' TRAVEL LANE TRAVEL LANE Proposed: 1 1/2" Thick SACP i/1" Nominal Max Size Aggregate, 0.3 x i 0 ° to < 3 x 10 ° ESAL s type IV Pavement Smoothness Asphalt Tack Coat 71/1" Thick SACP,1 "Nominal Max Size Aggregate, * ~: 0.3 x I06 to < 3 x 106 ESAL's 6" ThickAggregate Base Course, Grading C -Geocomposlte Pavement f^ll~l ~ i J pproxlmate Location of Existing 6" Waterines VARIES 0' TO Ii' TRAVEL LANE Z F 8% i; ~ 4' SHOULDER VARIES 11' TO 22` TYPICAL SECTION ND. I A . NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 803+40.00 70 STA 810+51.00 CONSTRUCT TYPICAL SECTION 1 A IF WORK FOR OPTION 1 IS INIl7ATED AFTER THE COMPLETION OF THE WORKIN OPTION 1 Proposed:. 11/1"Thick SACP 1/1"Nominal Max Size Aggregate, a 0.3 x 106 to < 3 x 10' ESAL's Type IV Pavement Smoothness 3"Thick SACP, 1"Nominal Max Slze Aggregate, m 0.3x106 to <3x106 ESALs Asphalt Tack Coat• n~ Mill Existing Pavement 1"~ a Existing: °- Minimum 6" ThlckAsphalt Pavement n Aggregate Base Wheel Line lLV I N Variable Depth I o Aggregate Topsoil j Debris 5 ~` ---- ,, `. 3 .\\ ~. ~ ') Recondltlon~ ~ Ditch Approximate Location of Existing 3"Sanitary Pipe e c~ . i I I In Locations Where Crown Correction is Required ~ -NFG- CL NB See Overlay Wedging I Detail 8 Sheet 1-A.8 i1' i I GRADE POINT I MATCH NG ~ I * EXISTING -~ - --- - Install 2' Wide Paving Geotextile, -~ Type VI on 7 i/1"SACP Layer OverJdint Sawcut Clean Edge ii' +/- TRAVEL LANE 11' TRAVEL LANE VARIES ii' T011' TYPICAL- SECTION N0. 1-B NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 803+40.00 TO STA 810+51.00 ~C CROWN CORRECTION REQUIRED CONSTRUCT TYPICAL SECTION 1-B IF WORK FOR OPTION 1 IS TO BE COMPLETED SEE CROSS SECTIONS FOR LOCATIONS CONCURRENTLY WITH THE WORK IN OPTION 1 * ~C APPLY IN TWO APPROXIMATELY EQUAL LIFTS, NEFfHER 70 EXCEED 4 INCHES ---- ~---- 2 V f 8°6 r"~ r"~ ~ T ~ . --• Approximate Location of Existing 6"Waterlines VARIES 0' TO 11' TRAVEL LANE AGGREGATE TOP SOIL 'QI' - -__. Edged2in (Typ.) See Note 10 5 ~'1 ~~ '1 Existing .Ground ABLE DEPTH ?I,y , 4' I VARIES Proposed: 1 1/1"Thick SACP 1/1"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x 106 ESAL's Type IV Pavement Smoothness AsphaR Tack Coat 71/1" flick SACP, 1 "Nominal Max Slze Aggregate, ;k 0.3 x i0° to < 3 x 106 ESAL's 6"Thick Aggregate Base Course, Grading C 4' SHOULDER eocomposite Pavement Edgedraln (Typ.) See Note 10 6 Z•1~P~ ''-_ :1 Existing Ground A~ARIABLEDEPTH ?1,y AGGREGATE TOP SOLI '~' 4' VARIES NOTES: 1. Locate all utllttles prior to beginning work. Cal! North Caro!!na One-Cal! Service (800) 631-4949 or (336)'855-7799. 1. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated fi plans. 3. Match proposed curve wldening in superelevated sections to existing unless otherwise stated In the plans. 4. Recondition ditch and install Type 2A erosion wntro! matting as directed by the CO. 5. Place aggregate topsoil course and seed alt disturbed areas, except paved areas, in accordance with sections 305 and 625. 6. Maintain a Rna! elevation of shoulder, adjacent to the edge of pavement, 1/2-inch below edge of pavement. 7, Round hinge point as directed by CO. 8. Maximum shoulder rollover is 8%. 9. WL =Wheel fine Survey CL NB = Widening Centerline Northbound CL 58 = Widening Centerline Southbound 10. Instal! base of edgedrain at depth of 24 Inches. See chart for Geocomposite Pavement Edgedrain Locations. 11. Begin pavement removal where proposed wldening !s less than 1'-6". See Detail Sheet C.40 Geocomposite Pavement Edgedrain Locations BEGIN END LT/RT + + 810+51 CL SB 822+40 CL S8 RT L ' NPS PMIS NO.: 090563 Proposed: i 1/Z"thick SACP,1/1"Nominal Max Size Aggregate, 0,3x 106 to < 3 x i0` ESAL's, Type IV Pavement Smoothness :k71/2"thick SACP, 1 "Nominal Max Size Aggregate, 0.3x10 to < 3 x 10 ESAL's Asphalt Tack Coat Mll! Existing Pavement Variable Depth See Overlay Wedgrng Deta11 A Sheet 1-A.8 Existing: Minimum 8.5 Thick Asphalt Pavement Aggregate Base Wheel Line ' Z.00°k \ __ +-- `. ' t. -- .~ Approximate Location of Existing 3"Sanitary Plpe ^C -NFG- CL NB ~ 4"DEPTH i AGGREGATE TOP SOIL ~ PGL S8 ~ GRADEPOINT - ~ VARIES Vq~ES 1 16" D Conc. SAW CUT CLEAN EDGE 11' +/- TRAVEL LANE 2,0~9b .. ^~ T th ` !rb Approximate Location of 6" Existing 6"Waterline VARIES 11' 3' MEDIAN TRAVEL LANE PAVED TYPICAL SECTION N0. 2 A NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 810+51.00 TO STA 815+72.14 CONSTRUCT TYPICAL SECTION Z A IF WORK fOR OPTION Z IS INITIATED AFTER THE COMPLETION Of THE. WORK IN OPTION 1 Proposed: 1 1/2"Thick SACP 1/Z" Namnna! Max Size Aggregate, 0.3 x 106 to < 3 x 10~ ESAL's Type N Pavement Smoothness 3"Thick SACP,1 " Nomlhal Max Size Aggregate, 0.3 x 106 to < 3 x 106 ESAL's Asphalt Tack Coat MI!! Existing Pavement Z" See Overlay Wedging Detail BSheet Z-A.8 Existing: Minimum 6"Thick Asphalt Pavement Aggregate Base Wheel Line ILV Variable Depth Aggregate Topsoil .Debris { `. ~-= ~~\ ~, .~ '~/ ~) Recondition Ditch Approximate Location of Existing 3"Sanitary Plpe Proposed: 11/2"Thick SACP i/Z"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x 106 ESAL's Type IV Pavement Smoothness Asphalt Tack Caat 71/Z" Thick SACP, 1 "Nominal Max Size Aggregate, ~ 0.3x10` to <3xi0` ESAL's 6"Thick Aggregate Base Course, Grading C ~~ `-Existing ly;l ~ Ground ~ 18"Depth Conc. Curb ~~-Geacomposlte Pavement Edgedrain (Tsp.) See Note 10 6" 7yp. VARIES Proposed: 11/Z"Thick SACP i/2"Nominal Max Slze Aggregate, 0.3 x i06 to < 3 x 106 ESAL's Type N Pavement Smoothness Asphalt Tack Coat 71/Z"Thick SACP,1"Nominal Max Size Aggregate, ~C 0.3 x i06 to < 3 x 106 ESAL's 6".Thick Aggregate Base Course, Grading C i ~AP~ ~ Existing L ~' -Ground 18"Depth Conc. Curb ~~; ' i Approximate location of Existing 6"Waterline 11' TRAVEL LANE L i 71/Z"Thick SACP, 1 "Nominal Max SIze6Aggregate, ~ -NFG- CL SB 0.3 x 10 to < 3 x 106 ESAL s* ; ~ -NFG- CL NB ~ 4"DEPTH i AGGREGATE TOP SOIL ~ PGL SB ~ GRADE POINT - ~ VARIES Vq~ES -- - - ,~-~ 1s' 16"Depths SAW CUT Conc. Curb -CLEAN EDGE 6" 6" 11' +/- VARIES TRAVEL LANE MEDIAN TYPICAL SECTION NO" 2-8 NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION. -NFG- CL NB PT STA Si0+51.00 TO STA 815+71.14 CONSTRUCT TYPICAL SECTION Z-B If WORK FOR OPTION Z IS TD BE COMPLETED CONCURRENTLY WITH THE WORK IN OPTION 1 3' PAVED 6" VARIES Geocomposite Pavement Edgedrain (Tsp.) See Note 10 PAVEMENT AND AGGREGATE BASE REMOVAL )/C APPLY IN TWD APPROXIMATELY EQUAL LIFTS, NEITHER TO EXCEED 41NCNE5 L NOTES; i. Locate all utilities pNor to beginning work. Call North Carolina One-Cal! Service (800) 63Z-4949 or (336) 855-7799, 2. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated In plans. 3. Match proposed curve widening in superelevated sections to existing unless otherwise stated in the plans. 4. Recondition ditch and instal! Type ZA erosion control matting as directed by the' CO. 5. Place aggregate topsoil course and seed all disturbed areas, except paved areas, in accordance with sections 305 and 6Z5. 6. Maintain a final elevation ofshoulder, adJacent to the edge of pavement, 1/Z-inch below edge of pavement. 7. Round hinge point as directed by CO. 8. Maximum shoulderrolloyerls 8%. 9. WL =Wheel line Survey CL NB =Widening Centerine Northbound CL S8 =Widening Centerline Southbound 10. Install base of edgedrain at depth of Z4 inches. See chart on sheet Z-A.2 for Geocompos/te Pavement Edgedrain Locations.. ' Z.00% +-- ~-T-~--------- ~ -NFG- CL SB q 0 Q "o o" 0 N n Proposed: 11/Z"thick SACP,1/Z"Nominal Max Slze Aggr2gate, 0.3 x 10' to < 3 x 10' ESAL's, Type IV Pavement Smoothness Asphalt Tack Coat .Mill Existing Pavement Variable Depth In Locations Where Crown Con-ectian is Required See Overlay Wedging Detail A Sheet Z A.8 Existing: Minimum 8.5° ThickAsphalt Pavement Aggregate Base Wheel Une ~V VARIABLE DEPTH I AGGREGATE TOP SOIL i ' MATCH EXISTING t -ZT SAW CUT CLEAN EDGE 21` ~ ^NFG• CL NB I ~m Conc. Monol7thiclsland IZ See Sheet Z-C.2 ForUmlts I~ h I~ ~ Insta112' Wide Paving Geotextile, type VI on ~ 71/1"SACPtayer ( Over Joint VARIES SAW CUT J CLEAN EDGE Q -NFG- CL SB PGL SB C GRADE POINT Proposed: ~ I 11/1" Thick SACP 1/2"Nominal Max Slze Aggregate, 2 ~ 0.3 x 10 ` to < 3x.10 ° ESAL's Type IV Pavement Smoothness Asphalt Tack Coat i ~ 71/Z"Thick SACP, I"Nominal MaX Site Aggregate, ~* I 0.3 x 10` to < 3 x 106 ESAL's ~ 6"Thick Aggregate Base Course, Grading C i Q ~ 2 ~ _ Ed cdmaposite Pa See Note 10 i ~ 9 (TYPO - --- uA~rES. F ~p1~ 8% 61 21 1:1 'f 3' 6" ~ % VARIES 17.9' TO 0' UARIE517.1' T018.9' 11' ' TRAVEL LANE ACCELERATION ' I TRAVEL LANE LANE Approximate Location of Existing 6" Waterline TYPICAL SECTION N0. 3 A NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 815+72.14 TO STA 823+28.19 CONSTRUCT TYPICAL SECTION 3-A IF WORK FOR OPTION 215INITIATED AFTER THE COMPLETION OF THE WORK IN OPTION 1 Proposed: i 1/2"Thick SACP 1/Z" Nominal Max Slze Aggregate, 0.3 x i06 to < 3 x 105 ESA1's type N Pavement Smoothness 3"Thick SACPl"Nomina/MaxSizeAggregate ~'-NFG-CL NB &isting 6" Ground VARIABLE DEPTH ?:l,y~ AGGREGATE TOP S0I1 '~I- 4' 4' VARIES SHOULDER D.3 x 106 to < 3 x 106- ESAL's ~ -NFG- CL SB PGL S8 Asphalt Tack Coat ~ ~ GRADE POINT Proposed: .Mill Existing Pavement 2" I ro Conc. Monolithic Island ~ I 11/1"Thick SACP 1/2"Nominal Max Size Aggregate, In Locations Where Crown Correction is Required I2 See Sheet Z-C Z 2 ~ 0.3 x 10 6 to < 3 x 106. ESAL's Type IV Pavement Smoothness See Overlay Wedging Detail B Sheet Z-A.8 I ~ For Limits. ~ ~ Asphalt Tack Coat Existing: ~ ~ ~ ~ 71/Z"Thick SACP,1 "Nomina! Max Size Aggregate,. xc Minimum 6"Thick Asphalt Pavement Q Q I 0.3 x 10 to < 3 x 10 ESAL s I 6"Thick Aggregate Base Course, Grading C Aggregate ~ e ~ i~ ~ ~ I Wheel L'ne I I Instal! Z' Wide Paving I Q I r_~fa~.~;m n.~a ur ~~ W VARIABLE DEPTH AGGREGATE TOP .~ SAW CUT CLEAN I i i/t° sacr Layer i Over Joint MATCH ~' EXISTING ~VARlES; - -~- 1 SAW CUT J CLEAN EDGE rnmposite Pavement Edgedrain (Typ.) See Note i0 ~ "--- UA- RTES. g Nyp'~ _ B% 6,1 Z;1 1:1 3' 6" ` % j VARIES 17.9' TO 0' 11' VARIES i7.1' T018.9' I WIDEN. 11' TRAVEL LANE ACCELERATION- I TRAVEL LANE LANE LApproxlmate Location of Existing 6" Waterline TYPICAL SECTION N0. 3-8 NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 815+72.14 TO STA 823+18.19 CONSTRUCT TYPICAL SECTION 3-B IF WORK FOR OPTION Z IS TO BE COMPLETED CONCURRENTLY WITH THE WORK INOP770N 1 Existing Ground •VARIABLE DEPTH 2 j AGGREGATE TOP SOIL ~'~ -'---~ 4' I 4' I VARIES T SHOULDER ~~~ ~T PAVEMENT AND AGGREGATE ~ BASE REMOVAL *' CROWN CORRECTION REQUIRED SEE CROSS SECTIONS FOR LOCATIONS ~C * APPLY IN TWO APPROXIMATELY EQUAL LIFTS, NETfHER TO EXCEED 4 INCHES NOTES: 1. Locate al! known utilities prior to beginning work. Call North Carolina One-Call Service (800) 632.4949 or (336) 855-7799. Z. Match proposed roadway and shoulder cross slopes to exlst/ng unless. otherwise stated in plans. 3. Match proposed curve widening ih superelevated sect/ons to ex/sting unless otherwise stated ]n the plans. 4. Recondltfon ditch and instal!-type 2A erosion control matting ds dlreded by the CO. 5. Wace aggregate topsail course and seed alf disturbed areas, except paved areas, !n accordance with sections 305 and 615. 6. Maintain a fJnal elevat/oh of shoulder, adjacent to the edge of pavement, 1/Z-Inch below edge of pavement. J. Round hinge point as directed by CO. 8. Maximum shoulder rollover is 8%. 9. WL =Wheel pne Survey CL NB =Widening Centerline Northbound CL SB =Widening Centerline Southbound id. Insta!(base of edgedrafn at depth of 24 inches. See chart on sheet 2-A.2 for Geocomposite Pavement Edgedreio- Locations. L NPS PMIS ND.I uwpos Proposed: 1 1/2" thick SACP, 1/1 "Nominal Max Size Aggregate, 0.3 x 10' to < 3 x 105 ESAL's, type N Pavement Smoothness Asphalt Tack Coat MiJI Existing Pavement 1 1/2" Existing: Minimum 8.5" Thick Asphalt Pavement - Aggregate Base - NB Wheel tine l~ . 6% MATCH EXISTING -~----~ ' j ~ ~-Sawcut ~~/ VARIABLE DEPTH AGGREGATE TOPSOIL 9' +/- PAVEMENTREMOVAL VARIES 11' SHOULDER TRAVEL LANE Proposed: i i/2" Thick SACP ~/2"Nominal Max Size Aggregate, 0.3 x 10° to < 3 x 1 d ESAL's Type N Pavement Smoothness Asphalt Tack Coat ~C ~k 71/2" Thick SACP, 1 "Nominal Max. Size Aggregate, 0.3 x IO° to < 3 x 10° ESAL's 6"Aggregate Base Course, Grading C ~ -NFG- CL NB VARIABLE DEPTH - AGGREGATE TOPSOIL 8~ k.l '/ uARres VARIES TYPICAL SECTION N0.4 A ~: MATCH EXISTING •----- In Locations Where Crown Correction is Required See Overlay Wedging Detail A Sheet 2 A.8 ~ -NFG- CL SB ~ *MATCH ~ EXISTING Existing: Minimum 8" Thick Asphalt Pavement Aggregate Base S8 Wheel Llne i ~~ ------ i J ~~ Install 2' Wide Paving Geotextile, SAW CUT Type VI on 71/2"SACP Layer CLEAN EDGE Over Joint Approximate location of Existing 6".Waterline 2' ~ 11' TURN LANE NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 823+28.19 TO STA 825+26.78 CONSTRUCT TYPICAL SECTION 4 A IF WORK FOR OPTION 2 7S 7NITL4TED AFTER THE COMPLETION OF THE WORK IN OPTION i Proposed: 1 1/2" Thick SACP 1/2° Nominal Max Size Aggregate, 0.3 x 10° to < 3 x Id ESAL's Type N Pavement Smoothness 3" Thick SACP, 1"Nominal Max Size Aggregate, 0.3 x 10° to < 3 x 10° ESAL's Asphalt Tack Coat Mill Existing Pavement 2" Existing: Minimum 6"Thick Asphalt Pavement Aggregate Base N8 Wheel Line MATCH 6% EXISTING •----- J VARIABLE DEPTH-~ AGGREGATE TOPSOIL 9' +/- PAVEMENTREMOVAL VARIES i 1' SHOULDER TRAVEL LANE ~f ~ 71/2" Thick SACP, i " Nominab Max Size Aggregate, ~ ~ 0.3x10 to <3xi0 ESALs i 6"Aggregate Base Course, Grading C-~ VARIES Asphalt Tack Coat ~ -NFG- CL Proposed: 1 1/2"Thick SACP i/2"Nominal Max Slze Aggregate, 0.3 x 10° to < 3 x 105 ESAL`s Type N Pavement Smoothness 3"Thick SACP, 1 "Nominal Max Size Aggregate, 0.3 x 10° to < 3 x 10° ESAL's Asphalt Tack Caat ~ -NFG- CL N8 Mil! Existing Pavement 2" In Locations Where Crown Correction is Required See Overlay Wedging Detail B Sheet 2 A.8 j Proposed: ~ 1 i/Z"Thick SACP 1/2"Nominal Max Size Aggregate,- . 0.3 x 10° to < 3 x 10° ESAL's Type IV Pavement Smoothness VARIABLE DEPTH AGGREGATE TOPSOIL VARIES WIDENING Z' xC MATCH EXISTING i1' +/- 5' +/- TRAVEL LANE SHOULDER MATCH 1K Existing: - Minimum 6"Thick Asphalt Pavement - Aggregate Base ILV SB Wheel Line ~ VARIABLE DEPTH i AGGREGATE TOPSOIL ~ Debris i ~ , _ _ ~"~ \\~ Recondition 6" Ditch Instal! 2' Wide Paving Geotextile, SAW CUT type VI on 71/2"SACP Layer CLEAN EDGE Over lomt Approximate Location Existing 6" Waterline i1' TURN LANE TYPICAL SECTION N0. 4-8 NEWFOUND GAP ROAD WIDENING PAVEMENT SECTION -NFG- CL NB POC STA 823+18.19 TO STA 825+16.78 PAVEMENT AND AGGREGATE k~ CONSTRUCT TYPICAL SECTION 4-B IF WORK FOR OPTION 21S TO BE COMPLETED BASE REMOVAL CONCURRENTLY WITH THE WORK IN OPTION 1 ~ CROWN CORRECTION REQUIRED SEE CROSS SECTIONS FOR LOCATIONS ~c J~C APPLY IN TWO APPROXIMATELY EQUAL LIFTS, NEITHER TO EXCEED 41NCHES I1' +/- LANE 5' +/- SHOULDER L -___--, Proposed: 1 1/1"thick SACP,1/Z" Nominal Max 5tze Aggregate, 0.3 x 106 to < 3 x 10° ESAL's, type IV Pavement Smoothness Asphalt Tack Coat Existing: Mill Existing Pavement 1 1/1" Minimum 8.5"Thick Asphalt Pavement Aggregate Base NB Wheel Line lLV ~ NB Roadway I ~ j I j MATCH j MATCH , EXISTING i EXISTING L_~ Proposed: 1 1/1"thick SACP, 1/2"Nominal Max Slze Aggregate, 0.3 x 106 to < 3 x i0° ESAL's, Type N Pavement Smoothness Asphalt Tack Coat Mill Existing Pavement 1 1/Z" VARIES IO' +/- TO 0' PAVEMENT REMOVAL 10' +/- 10' +/- VARIES VARIES 2' 10' +/- TRAVEL LANE TRAVEL LANE MEDIAN TRAVEL LANE onvvc~cn TYPICAL SECTION N0, 5-A 0 m L r a >. Y 4 Y Proposed: i 1/2"Thick SACP 1/Z" Nominal Max Size Aggregate, 0,3 x 10` to < 3 x id ESAL's Type IV Pavement Smoothness 3"Thick SACP, 1 "Nominal Max Size Aggregate, 0.3xi0° to<3xi0° ESAL's Asphalt Tack Caat Exisirn : Mil! Existing Pavement Z" Minimum 6" Thick Asphalt Pavement Aggregate Base fVB Wheel Lrhe IN ~ NB Roadway I ~ j I VARIABLE DEPTH. MATCH I MATCH AGGREGATE 70PSOIL I ~ ~ j EXIS77NG_ ------- ------------------ -- ,, ~-'~ VARIES 10' +/- 10' +/- SHOULDER TRAVEL LANE TRAVEL L~ NEWFOUND GAP ROAD OVERLAY PAVEMENT SECT70N -NFG- CL NB POC STA 825+16.78 TO STA 827+65.00 CONSTRUCT TYPICAL SECTION 6 A IF WORK FOR OPTION Z IS INITIATED AFTER THE COMPLETION OF 7HE WORK IN OPTIONI -VARIABLE DEPTH AGGREGATE TOPSOIL Proposed: 1 1/2" Thick SACP I/Z" Nomina! Max Size Aggregate, 0.3 x 10~ to ~ 3 x 10' ESAL's Type N Pavement Smoothness 3"Thick SACP,1 "Nominal Max Size Aggregate, 0.3 x 10° to < 3 x 10` ESAL's Asphalt Tack Coat Mll! Exrsting Pavement Z" VARIABLE DEPTH SB Roadway ¢ AGGREGATE TOPSOIL ~ ~,, ,--- --- ~ -- ~- ,,, ~'~y vaalEs VARIES 8% 8% VARIES 10' +/- TO 0' PAVEMENT REMOVAL VARIES ~ 2' EXIST j ~~ ~ ~`. ,~. 7r .~~, NCIJt----~- I - ~_i Approximate Location of .Existing 6" Waterline Existing: Minimum 6"Thick Asphalt Pavement Aggregate Base MATCH ~ SB Wheel Line I VARIABLE DEPTH EXIST- j AGGREGATE TOPSOIL,' Approximate location of Existing 6"Waterline 10' +/- ~ VARIES TRAVEL LANE SHOULDER MEDIAN TYPICAL SECTION ND. 5-B NEWFOUND GAP ROAD OVERLAY PAVEMENT SECTION -NFG- CL NB POC STA 825+16.78 TO STA 827+65.00 CONST RUCT TYPICAL SECTION 6-B IF WORK FOR OPT70N 2 IS TO BE COMPLETED CONCURRENTLY WITH THE WORK IN OPTION 1 PAVEMENT AND AGGREGATE BASE REMOVAL Existing: Minimum 8.5" Thick VARIABLE DEPTH SBRoadway¢ Asphalt Pavement AGGREGATE TOPSOIL ~ Aggregate Base ~ llV SB Wheel Line I MATCH I L. ~ Roadway GRAD~~INT ~ j VARIES ~ VARIES SEE CROSS SECTIONS ~ SEE CROSS SECTIONS Existing Ground ~\ 3:1 6" Proposed: i 1/2" thick SACP, 1/2"Nominal Max Size Aggregate, 0.3 x 10 ° to 3 x 10 ° ESAL's Asphalt Tack Coat 3".thick SACP, 1 "Nominal Max Size Aggregate, 03x106 to3xi06 ESAL's 6" thick Aggregate Base Coarse, Grading C 89b Existing `~:t /~ Ground 6" -----. .-~' VARIES 2' 8' 8' 2' VARIES SHOULDE TRAVEL LANE TRAVEL LANE SHOULDE TYPICAL SECTION N0. 6 OCONALUFTEE VISITOR CENTER SOUTH ENTRANCE NEW LOCATION PAVEMENT SECTION OVC POT STA 13+94.74 TO STA 16+67.74 a~ Y n h r P 'v v Proposed: i 1/2"Thick SACP 1/2"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x 106. ESAL's type !V Pavement Smoothness Asphalt Tack Coat 71/2" Thick SACP,1 "Nominal Max Slze Aggregate, x: 0.3x106 to<3xi06 fSAL's Q 6"Thick Aggregate Base Course, Grading C i V i i y'~~,~ ~ Existing S. Ground 18"Depth Conc. Curb eocomposite Pavement ~Edgedrain (Typ.) See Note 10 on Sheet 2-A.2 6 3' VARIES ~VED ULDER INSET 1 -NFG- CL NB STA 806+40.00 TO STA 810+51.00 -NFG- CL N8 STA 815+72.14 TO STA 817+30.14 ~ -NFG- CL NB -NFG- CL SB ~ ' m j j SEE TYPICAL SECTIONS j U W ~ 3 A OR 3-B FOR W tij PAVEMENT STRUCTURE i ~ VARIABLE DEPTH j gj AGGREGATE TOP SOIL ~ I ~ j j VARIES 6:1 TO 5:1 8.00 8~ VARIES VARIES 2' VARIES 2' 11' TO 0' TAPER INSET 2 NEWFOUND GAP ROAD MEDIAN SECTION -NFG- CL NB STA 8i9+60.45 TO STA 823+18.19 PAVEMENT AND AGGREGATE BASE REMOVAL XY * APPLY IN TWO APPROXIMATELY EQUA1 LIFTS, NEITHER TO EXCEED 41NCHES REG STATE PRO]ECi SHEET N0. ' `• .,. SE NC PRA•GRSM 1B19 2-A.8 Proposed Variable Depth SACP,1/1"Nominal Max Size Aggregate, 0.3 x 106 to < 3 x 10 6ESAL's, 11/1" Mln. Depth Asphalt Tack Coat type 11i Pavement Smoothness Asphalt Tack Coat i Roadway Mill Existing Pavement, 3"MIN. VaHes 0"to 1 1/1" ~ ____ _____ -°----'- i ---- ---- ---___ - Proposed: ____------- - J ~ ----------- i I I Var.. Depth SACP, Existing: ~ i"Nominal Max Size Aggregate, Asphalt Pavement 0.3 x 10 to 3 x 10 ESAL's Aggregate Base DETAIL A Proposed: Variable Depth Pavement Wedging Variable Depth SACP, 1/1"Nominal. See Cross Sections for Locatons Max Size Aggregate, 0,3 x 10 6to < 3 x 10 l=SAL s, 1 i/1"Min. Depth Type N Pavement Smoothness Proposed: 3" M1N. I 1 1/2"Thick SACP 1/2" Nominal Max Size Aggregate, i 0.3 x 106 to < 3 x i06 ESALs Type IV Pavement Smoothness Asphalt Tack Coat 3" ThickSACP, 1 "Nominal Max Size Aggregate, VARIABLE DEPTH ' 0.3 x 106 to < 3 x 10 ° ESAL's WEDGING " - -------- --"---------~ Milt Existing Pavement 1 - ----- - ------- ---------------------- --I Proposed: Var. Depth SACP, 1 "Nominal Max Size Aggregate, 0.3 x 10bto < 3 x 106 ESAL's Existing: i Mlnlmum 6"Thick Asphalt Pavement ~ ---- --------- --- A99regate Base U.S.DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMIP85iRATION ETA L EASTERN FEDERAL LANDS HIGHWAY DNISION L 1 L GREAT SMOKY MOUNTAINS NATIONAL P. NEWFOUND GAP ROAD - iB19 Variable Depth Pavement Wedging OPTION 2 See Cross Sections for Locations F N C O M 0 N _ 1 L NPS PM6 NO.: IPJW"f REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 2-8.1 EPARTMENT OF TRANSPORTATION U.S. D FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL IANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1619 OPTION 2 TABULATION OF ~ _ QUANTITIES ~ _ NPS PMIS NO.: 0905 3 4 Y a M 0 N M N - L Quantity Pay Item Item Description Unit NFG Rd. AS Req'd Totals 15101-0000 MOBILIZATION LPSM 1 1 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM 1 1 15401-0000 CONTRACTOR TESTING LPSM 1 1 15705.0100 SOIL EROSION CONTROL, SILT FENCE (WIRE BACKED) LNFT 1630 70 1700 15706.0200 'SOIL EROSION CONTROL, CHECK DAM EACH 6 6 12 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C EACH 3 3 15706-1400 SOIL EROSION CONTROL, INLET PROTECTION TYPE D EACH 5 5 20102.0000 CLEARING AND GRUBBING LPSM 1 1 20301-1200 REMOVAL OF HEADWALL EACH 1 1 20301-1400 REMOVAL OFINLET EACH 2 2 20301.2400 REMOVAL OF SIGNS EACH 10 10 20302-0600 REMOVAL OF CURB, STONE LNFT 60 80 20302-2100 REMOVAL OF PIPE CULVERT LNFT 63 63 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 3333 17` 3350 20303-3200 REMOVAL OFSIDEWALK,CONCRETE SQYD 96 96 20315-0000 SAWCUTTlNG PAVEMENT LNFT 4045 4045 20401-0000 ROADWAY EXCAVATION CUYD 2659 41 2700 20425-100D DITCH, EXCAVATION LNFT 210 210 20441-0000 WASTE CUYD 909 41 950 25102-3000 PLACED RIPRAP, CLASS 3 TON 85 BS 30101-1000 AGGREGATE BASE GRADING C TON 2080 2080 30501-0000 AGGREGATE TOPSOIL COURSE TON 146 9 155 40101-0600 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 1812 38 1850 40101.1400 SUPERPAVE PAVEMENT,1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 1963 37 2000 41301-0000 ASPHALT PAVEMENT MILLING (VARIABLE DEPTH) SQYD 2068 2068 41301-0400 ASPHALT PAVEMENT MILLING, 1.5-INCH DEPTH SQYD 1946 1946 41501-0000 PAVING GEOTEXTILE TYPE 6 SQYD 263 263 60201.0600 16-INCH PIPE CULVERT LNFT 460 460 60201-0800 24-INCH PIPE CULVERT LNFT 132 132 60201-1000 36-INCH PIPE CULVERT LNFT 108 108 60403-1700 INLET, TYPE 6A EACH 5 5 60403-1900 INLET, TYPE 68 EACH 3 3 60802-020D PAVED WATERWAY, TYPE 2 LNFT 100 100 60901-1500 CURB, CONCRETE, 16-INCH DEPTH (MOUNTABLE) LNFT 1089 1089 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 1832 1832 60901-4000 CURB, STONE, TYPE 1,.16-INCH DEPTH LNFT 455 455 60910-0000 RESET CURB LNFT BO 80 60915-1000 WHEELSTOP, CONCRETE EACH 62 82 61501-0100 SIDEWALK, CONCRETE SQYD. 489 489 61503-1000 MEDIAN, CONCRETE SQYD 70 70 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 25 25 62011.0300 STONEMASONRY HEADWALL FOR 18-INCH PIPE CULVERT EACH 3 3 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT EACH 1 1 62011-0700 STONE MASONRY HEADWALL FDR 36-INCH PIPE CULVERT EACH 2 2 fi2028-1000 REMOVE AND RESET STONE MASONRY HEADWALL EACH 3 3 62501-0000 TURF ESTABLISHMENT ACRE 1.1 1.1 62901-0500 ROLLED EROSION CONTROL PRODUCT, TYPE 2A SQYD 850 850 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING SQFT 60 60 63316-1000 REMOVE AND RESET SIGNS EACH 25 25 63401-1500 PAVEMENT MARKINGS,TYPE H SOLID LNFT 3000 3000 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID INFT 10293 10293 63401-2400 PAVEMENT MARKINGS, TYPE L, BROKEN LNFT 2646 2646 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW EACH 12 12 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW EACH 31 31 63405-3050 PAVEMENT MARKINGS, TYPE H,"ONLY"TEXT EACH 2 2 Quantlry Pay Item Item Description UNt Nom, Rd, As Req'd Totals 63405.3250 PAVEMENT MARKINGS,TYPE H, ACCESSIBILITY SYMBOL EACH 4 4 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 7 7 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH EACH 0 50 50 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 225 225 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 11526 11528 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL LNFT 4000 4000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 355 355 63506-0500 TEMPORARY TRAFFIC CONTROL,FLAGGER HOUR 500 500 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP EACH 4 4 63701-D000 FIELD OFFICE EACH 1 1 64502-0000 LOCATE UTILITIES EACH 5 5 0 y d N N I N M 0 N ~`, L REG STATE PRO]ECT SHEET TOTAL N0. SHEETS PAVEMENT SUMMARY SE NC PAA-GRSM 1819 2.8.2 DRAINAGE SUMMARY a s i i U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1819 OPTION 2 PAVEMENT AND DRAINAGE SUMMARIES q m H H m r NPS PMTS NO.: 090563 PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM 62011-0300 62011-0500 62011-0700 62026-1000 STATION 20301-1400 20302-2100 Removal of 20425-1000 Ditch 25102-3000 60201-0600 18 I h Pi 60201-0800 60201-1000 PAY ITEM 60403-1700 PAY ITEM 60403-1900 Stone Masonry Stone Mason Stone Mason Remove and Removal of ipe Culvert , Excavation Placed Rlprap, - nc pe Culvert 24-Inch Pipe Culvert 36-Inch Pipe C lv rt . Inlet, Type 6A Inlet, Type 6B Headwall for ry Headwall for ry Headwall for Reset Stone Inlet (EACH) (LNFT) (WFT) Class 3 (TON) (LNFT) (LNFT) u e (LNFT) (EACH) (EACH) 18-Inch Pipe 24-Inch Plpe 36-Inch Pipe Masonry H Culvert Culvert Culvert eadwall (EACH) (EACH) (EACH) (EACH) 803+70 1 63 64 1 1 809+25 60 ~ 1 ~ 1 809+75 48 1 aio+94 g 1 811+75 80 1 813+19 28 1 1 815+19 100 60.1 80 2 620+40 4 1 822+50 176 1 823+70 823+81 824+29 1 1 825+b2 ~ 120 1 OVC 11U 25 32 2 TOTAL 2 63 210 85,1. 460 132 108 5 3 3 1 2 3 PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM PAY ITEM 40101-0600 Superpave 40101-1400 Superpave PAY ITEM PAY ITEM Location /Station Range 20315-0000 Sawcuttin 20401-0000 Roadwa Y 30101-1000 A 30501-0000 A re ate 99 9 Pavement, 1/2-Inch Nominal Pavement,i-Inch Nominal 41301-0000 Asphalt Pavement 41301-0400 As halt Pavement P g Pavement (LNFT) Excavation ggregate Base Grading C (TON) Topsoil Course Maximum Size Maximum Size Milling Milling, l.5-Inch (SQYD) (TON) Aggregate, 0.3 to Aggregate, 0.3 to (SQYD) Depth <3 Mllllon ESAL <3 Million ESAL (SQYD) (TON) (TON) NFG WL Sta 803+4D to 826+50 3,885 2432 971 128 853 1176 487 1946 OVC 160 227 1109 18 959 787 1581 TOTAL 4,045 2,659 2,080 146 1,812 1,963 2,068 1,946 F q m F y E t I ~ m N C 0 0 b 3 0 I M a e 0 0 s 0 F Q ti N1 0 ry M 0 0 M r REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 2-8,3 U.S. DEPARTMENT OFTRANSPORTATION FEDERAL HIGHWAY ADM1N]STRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD- iB19 OPTION 2 EROSION CONTROLAND PAVED WATERWAY SUMMARIES NPS PMTS NO.: 090563 TATION PAY ITEM 60802-0200 Paved Waterway, Type 2 (LNFT) NFG Sta 805+90 to 806+40 50 NFG Sta 817+30 to 817+80 50 TOTAL 100 TATION PAY ITEM 15705-0100 Soil Erosion Control, Silt Fence (LNFT) PAY ITEM 15706-0200 Soil Erosion Control, Check Dam (EACH) PAY ITEM 15706-1300 Soil Erosion Control, Inlet Protection Type C (EACH) PAY ITEM 15706-1400 Soil Erosion Control, Inlet Protection Type D (EACH) Phase 1 OVC 1475 822+50 1 824+29 1 825+62 1 Phase 2 803+65 1 803+70 30 803+80 1 809+25 30 1 809+75 1 810+94 1 811+00 1 811+75 1 813+19 35 1 813+30 1 820+30 1 820+50 1 OVC 60 As Re uired 70 6 TOTAL 1700 12 3 5 L_ REG STATE PROJECT SHEET N0, TOTAL SHEETS SE NC PRA•GRSM iB19 2.6,4 LOCAT ION PA L SIZE TEXT SIZE Sign No. Text No. Sign Text Station Side Width Heiht 9 Area Corner Radii Border Width fwlargio Width Numbers Upper Case over Case Series Color Quantity TotalArea Su ort PP Remarks (in.) (o.l (sq ftl (in,l (inJ (inJ lin•) (in.) (io,) Comb. (s ft) (No Pay) I W3-5 SPEEDZONE 775+DO RT 36 36 9 S Black 2(1)12.5 a ~~, 840+00 LT ee ote 1 on 2 IS lnstoll Sign , Yellow 25 S~MEO 782+49 RT Black 3(1)12 5 2 R2-1 804+95 RT 24 30 5 S . 35 ee ote I on 3 15 lnstoll Sign 834+00 LT White =37.5 ~ Black 1(1112 5 R4-7 ~ + - 24 30 5 . 3 NB 819 95 R7 See ote l on I 5 Install Sign White =12.5 R~,TL~E Black !(1)12.5 4 R3-7R NB 828+85 LT 30 30 6 25 S on ~aA~ . ee ote I l 6.25 Install Sign HT White =12 5 4 LT Black , 5 mod. overs~avem~es OVC 36 24 6 t on l R5-7 a~~^9efY~'~S Sta 17+50 R ee o e 1 2 2 Install Sign T White Sheet Total 9 56.25 87.5 uFEDERALHIGHWAYADMNISTRATIONN NOTES EASTERN FEDERAL LANDS HIGHWAY DMSION : Option 2 Total 9 56.25 87.5 1. See "Manual on Uniform Traffic Control" and "Standard N1ghWay Signs" GREAT SMOKY MOUNTAINS for dimensions. Rounded Total 9 60 90 NATIONAL PARK NEWFOUND GAP ROAD - 1619 2. Final locations of .the signs shall be approved by the CO. OPTION 2 PERMANENT ALUMINUM ~ SIGN SCHEDULE 0 Y a h h a N N n L REG STATE PROTECT- SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 2.85 LOCATION PANEL SIZE TEXT SIZE Sign No Text No Sign Text Station Side Width Height Area Comer Radii Border Width Margin Width Numbers Upper Case ower Case Series Color Quantit Y Total Area Support Remarks . . IinJ (inJ (sq ft) IinJ (inJ . (inJ (inJ (1eJ (~.) Comb.. (s ft) (No Pay) Mount worning lights Type B with ROAD Block flags on each non-portable sign 1 WORK - - 1 t 32 212)12 W20-I 48 48 16 See o e on 2 , -48 AHEAD " Orange Requires double post Black Requires double .post 2( 2 2 - 16 ~~ G20-2 ROAD WORK - 48 24 8 See . ote 1 on 2 Oronge Mount warning. lights Type B with 3 M0~ ROAD WORK. NEXT 0 5 MILES - - Block 25 212112 flags on each sign .Requires double post G20-1 . 60 30 12.5 See ote 1 on 2 °48 EXPECT DELAYS Orange Portable signs ONE LANE Block 4 W20-4 - - 1 32 - ROAD 48 48 16 See ote on 2 AHEAD Orange Mount in combination with other ~ Block portable signs 5 ~ - I 24 - W13-1 - 24 24 4 See ote on 6 M P H Orange Portable sign • Black W ~ - - 4 1 32 - 6 20-7o B 48 16 See ote on 2 Oronge Mount in combinotion with other XXX Block _ Portable .signs T - 6 W16-2 FEET - 24 18 3 See ote l on 2 Oronge SheE;t Tatar Q 18 ~^7 1U1 144 U.S:DEPARTMENTOFTRANSPORTATION FEDERALH]GHWAYADMINI5TRATION NOTES EASTERN FEDERAL LANDS HIGHWAY DIVISION . 1. See ~~Mahual on Uniform Traffic Control" and ~~Stondord HighWOy SIgnS~~ GR~NATIONALPPARKAINS for dimensions. NEWFOUND GAP ROAD- iB19 2. See Traffic Control Plan and Details for Approximate Location. OPTION 2 CONSTRUCTION 3. Final locations of the signs shall be approved by the CO. s-cN SCHEDULE NPS PMI6 NO.: W0663 L F ~' E E U ti 0 d 0 M 0 rv 0 N N r 4 0 "1 o ~' 4 C L_ CURVE INFORMATION N~ NEWFOUND GAP ROAD Curve =NFGVCN-1 Curve =NFGVCN-2 Z PI 804+82.35 PI 830+95.18 ~= 8° 54' 17" (RT) 0= 0° 30' 23" (LT) R = 2,100.00' R = 10,000.00' T = 163,52' T =44.18' ' L = 326.38' L = 88.37 PT 806+45.21 +13 CL NB Begin Crown 803+70 ~' NB Correction 18" CMP. +50 CL NB Remove 63 Lf- i8"CMP 3.7% Remove Inlet RT Install 64 LP - 24"HDPE Type S Pipe Instal! Stone Masonry Headwall RT Remove and Reset Stone Masonry Headwall LT Instal1~30 LF ~ ~~. Silt fenCe..~ ~p `~`---,.__ (I ~ ,,' ~ - t I ~~r ---__ - -- ~ ---_ ~. J.~ r ~ ;~. /~ ~~ 3 ~ ~ y-!~`r~ ,, ~. ~~~ ~- ,! ~~~ ~' ,~• - ~~. ~yt9 ~a~y~~b NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity.. ~ Pavement Removal B in 0 tion 2 egin i emng -NFG- CL NB POC STA 603+40.00 Begin -NFG- CL -NFG- CL NB PC 803+18.83 = PT 811+39,37 2 Cherokee ___.---- m +49 -NB " Insta~LF'_ ` +90~GLJV~ ~ 7 l`~`~, ~{ ~ `- ~`~ i ~' - _ , ~ ~ ~~~ ~ ~ ~ - `_~° m F ~ ~ _: _~-- _ ~" -_ _ - --- .-_ - - - - ~T =-~ _~= '- _ _ -_ _ n End Transition a ectlon Devices ~ - Curb N See Detail E636-1 n -Construct Type 2 Waterway 2 N CL N8 Sta 805+90 to 806+40 550' TAPER ~ STn 5,4GE '~^ STATION EQUALITY -NFG- CL NB PC STA 810+51.00 11' RT = - POT STA 10+51.00 809+15 fL NB 810+94 ~ SB Install 60 LF- 24"HDPE type S Pipe 24" HDPE Type S Pipe Install type 6A InletRT Remove Headwall RT Install Stone Headwall LT Install 8 Lf- 24"HDPE Type 5 Pipe Install Concrete Pipe Collar RT Install Type 6A Inlet RT 809+75 fL NB 811+75 ¢ Se Insta1148 LP-18"HDPE Type S Plpe Install 80 LF- i8"HDPE Type S Pipe Install Type 6A InletRT Install Type 6A Inlet RF z ~r CURUEINFORMATION 3 Conc. ~ Curb n ~_. 3 N •S 4° ~. ~~_~ N nl N O a 0 u N A m i a Curve =NFGVCN-3 Curve =NFGVCN-4 Curve =NFGVCN-5 PI 816+64.54 PI 821+09.83 pI828+91.16 ~= 1° 08' 45" (RT) ' ~= 1° 02' 25" (LT) ~= 15° 34' 30" (LT) R = 10,000.00 R =10,000.00' R = 2,375.00' T = 99.99' T = 90.79' T = 324,80' L =199.97' L = 181.57' L =645.60' CURVE INFORMATION S~ NEWFOUND GAP ROAD Curve =NFGVCS-1 Curve =NFGVCS-2 Curve =NFGVCS-3 PI 813+42.27 PI 820+44.37 PI 824+90.04 ~= 0° 28' 37" (RT) d= 2° 34' S3" (RT) ~= 5° 36' 33" (LT) R = 10,000.00' R = 10,000.00' R = 4,500.00' T = 41.63' T = 225.30'. T = 220.45' L = 83.25' L = 450.52' L = 440.55' _____S_e_e_S_hee_ts2-_D.1_&__2-_D.2_f_or_Oconaluftee ________________________~_~~_~_1 ~ VlSltof Center LayOUt OCONALUFiEE VISITOR CENTER f;-,,.-~~5.~-1 _ I / ,l j . NB PC 615+64.55 NB PT 81Z+64.53 ~ N,/ ~ ~~ ' ,i••-' I i 1 --7 ~ -~ ~f/ ~-~ ~ ~ _ - ~'~/I~ - ~-~, ., ... µ ~. '- ,wI~OLta irlJttind-J ~ ~_ r 4s ~ r ~~ ._.. 1 I /"`< I ratable ~ - .,~ __ _ _ _ -~~i..<., _ i - , ,,I I ,6u ~!t-- - `' •~ i q ~ ern .~n,-, I~~.=. ~ ~ ~.m-j A -~ ~ :f L. ~,,. ` -fir- ~~ - - ," 29!' N( NEWFOUND ROAD ~- 12 ~, i +00.00 SBA End Conc. +30.00 SB End Conc.Curb End ~~ Transition ' Mono island 8e m . _ ~_ ________ _____ _ g ____ _____ m v, Transition C C 35 SB PC STA 818+19.07 onstruct Type 2 Waterway L SB Sta 817+30 to 817+80 0' ACCELERATION LANE ~SBPTSTA813 5B' PC STA 813+00.65 NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. 0 Y F e M 0 a 0 m `\ Pavement Removal 8i3+19 ¢ SB 36" HDPE Type S Pipe Install 2B LF 36"HDPE Type S Pipe Install Type 6A Inlet RT Install Concrete Pipe Collar RT Remove and Reset Stone Headwall RT I End Crown 2.0°rb i BEGIN -NFG- 58 WL + _ -NFG- WL STA 820+85 +89 CL SB •D.2 for Oc~srml~ftee,~ ~_ PT 822+00.62 fns al131 LF 18"HDPE 7ypee~5-Qig ~r- ;'%Instal! 2"Stone Masonry Nead walls ii `.`_ .w sr rcea ~ ,I - -- SB-Pi~CCB ~~9 6 -.~ ` ; -__~ ~ ~ ~ t` ~isti ~ eNands,.- ' `" ~ ..D~.. .D~t~7rtr"" i ....( i i ~ ~~._..~ I ` Sri « ,'S, ~: f .. + ` i'• ` " ' r10; __ °' - -~ . ~-._ _- n 1 ~. End Crown ~+~~ 1 ~+ +~^ +77 CL SS +31.99 SB 11.00' RT TIE TO 810+40 fL SB EXIST 18"RCP 815+19 f SB instal! 4 LF- i8"RCP Instal! 80 LF- 36"RCP Install Concrete Collar RT Install 2 Stone Masonry Headwalls Remove and Reset Stone Alace Class 3 Rip Rap at Outlet Masonry HeadwaN RT Construct an Earth Overflow Channel to South, Approximately g2Z+50 ~ NB 100 LF in Length, Approximately 3'-4' wide, depth td be Install i76 Lf- i8"HDPE Type S Pipe Determined by CO. Stabalize First 30 Lf of Channel with Class 3 Install Type 68 Inlet Median Rip Rap, Seed Remainder with Approved Seed Mix. Removal of Trees Greater than 6" D/amter to accomodate the Overflow Channel is Not Permitted. Limit Width of Equipment to no more than 8' Wide. ~k. :' ___~ ~~~. See Sheets 2-D ~`j; F~~ 1~,~ `~, Visitor Center L '~1, (By Others sltor Center 2.7°k LEFT TURN STORAGE ~I n i/ . ~m ,n~ NN WV ~ ~ Ut ~` ~) n ^~ °~~ -- ~D cD N~ n~, W~ Cherokee 824+29~ SB 18" CMP RCP Remove Inlet Median Install Type 6B Inlet Median B25+62 ~ SB Install 120 Lf-18" HDPE Type S Pipe Install Type 68 Inlet Median L NOTES: 1, All callouts are referenced to the centerline .alignment unless otherwise noted. 2. Utility locations are based upon field surveys and utility records. Ail utilities shall be field located by the contractor prior to construction activity. 3. On-site dimensions and radii shown are to face of curb or edge of pavement if curb is not used. 4. Pavement markings in parking areas shall be Thermoplastic. 4"Single Solid White Strlpfng (TYP•J NB 816+14.1 36.28 NB 815+34.71 50.5' R 7739 i ~ BEGIN -0 / `"~ I PC 10+00 ~. /~ /• i ' ~ - ~; - i' % ~ - ,' % ~ I ~~._-._ - Existing OrnnaluRee Visitor Center Parking Area ! - - -- ____ "- " _ Mill Ex/sting Pavement~l l/2'" i Overlay 1 1/2" SACP, (~.5" NMSA, ~, ~ Maintain Existing Curb Reveal ~ i Remove 13 SV ~ ~ ~', .~ Sidewalk Maintafr~~ Exis[Irtg ` , __ -- - ~ -- - Curb Revea! ~ i Tie to Existing ! { ! 30 ,,~i ,~ ~Stane Curb ~' '~'r'~~F--?'- -~ - -- ~I'~~E~_. i L---~- i ~--- \ ~ Remove and Reset ~_~.__., ,'4" Sin~le Solid _ , .~rl, iu 30 LFStone Curb ' ~~ J Stnp~ng (•' 30' N i' ~ ~l, a'n r~`, ~, u! N~ 55' H ~ ~ n 1. 50' R Remove and Reset -'~~` ,~ 501E Stone Curb ~ ,~'~/I' ~l t .~ / N~~ J N8 NB 815+77. _-- - _-,~ ~ ri ~ ._ ~ 5,00 i -" 4.5' R Gates linbur9 '`',~:;~ 0 N N rG °o C ro ~~~Fk' B 16+24 fsZ' ~ , ,; Do Not Disturb ~~~'`N ~ ` ~ `- Ex~sting Wall ~'~' R F NEWFOUND GAP R D -- ,., , ~.~ - - - . y ~-,--,r-,.~.-,-,..- ... ride?. 'j. B 81~ 19+64• 3.96 3.96' R 0 0 O F / / I y~ '~\P/ SB 817+00.00 2.OO Cherokee 1.5' R ----~ ® Pavement Removal New Pavement Typlca/Section I i/1" Thkk SACP,1/2"NMSA 0.3x10 to 3xi0 ESAL's 3" Thick SACP, 1 "NMSA 0.3x10 to 3x10 ESAL's 6" ThlckABC, Grading C N 'L N m O N N Erosion Control Narrative GENERAL GUIDELINES; The Erosion Control Plans (ECP) are meant as a guideline for preventing erosion and controlling sediment, The work outlined fn this narrative consists of applying measures throughout the Iffe of the project to control erosion and minimize the sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The measures consist of stabilization and structural practices, stoma water controls and other miscellaneous pollution prevention controls. The Contractor Shall: 1. Coordinate the Installation, use, and removal of erosion and sediment control measures with roadway construction activities to assure economical, effective, and continuous eros/on and sediment control Employ temporary stabilizatlon practices in incremental stages as construction proceeds. Z, Install all erosion and sediment control measures as shown fn the ECP or as directed by the Contracting Officer (CO). Do not modify the type, size, or locatlon of any control ar practice without approval from the CO. 3, Work to prevent inlHal soil erosion rather than trying to control eroded sediment. Therefore, stabilize all disturbed areas as soon as practical, but no more than i4 days aRer construction activity has temporarily or pemlanently ceased. 4. Control only sediment-laden runoff generated by the project site. 5. Do not drive construction equipment across Sawing waterways. 6. Do not allow construction vehicles to track sediment offstte of the project limits. 7. In general, preserve existing vegetation, trees, and shrtrbs when possible, and where directed by the CO and as directed in section 107 of the Special Contract Requirements. Project Desorption: This project is located in the Great Smoky Mountains National Park (GRSM), Swain County, North Carolina and funct/ons prlmaNly as a touNst destlnatlon. Optlon 1 of this project is located around the OconaluRee Visiror Center. The scope of work for Option 7 is to widen and reconfigure Newfound Gap Road to add tum lanes at the entrance to the OconaluRee Usitdr Center and Park Circle Dnve, The parking area will be reconfigured for the Oconaluftee Visitor Center. Additional Improvements will include drainage, grading, pavement markings, traffic conlrol and other work. Existing Site Canditfdns: The proposed site consists of moderately Rat floodplain at the base of fairly steep mountains with rock outcrops. The drainage makes !ts way through a series of ditches and stomr drain systems and ultimately Into. the Oconaluftee River, the major drainage way for the area, where it continues flowing to Fontana Lake. Critical areas: Extra care should be taken when constructing culvert replacements, to prevent silt from entering waterways. Oh`-site areas: DuMng excavation operations, the removed asphalt pavement and excavated material shall be legally disposed of ofl`govemment property. Erosion and sediment control measures: Silt fence - A temporary sediment barrier consisbng of a wire-backed synthetic filter fabric stretched across and attached to supporting posts and enbrnched. Block and Gravel Drop Inlet Protection (type C) - A sediment Alter area around a storm drain inlet, Curb Inlet Protection, Block and Gravel (Type D) - A sediment filter area around a storm d2in curb Inlet; Outlet Protection - StructureNy lined rip rap aprons at the outlets of pipes. Check Dam -Small temporary stone dams constnrcted across a Swale or drainage ditch. Seeding -The use of vegetation in stabilizing exposed areas. SEQUENCE OF CONSTRUCTION: PHASE i; 1. Clearly delineate wetlands in area and surround with sift fence as shown on plans. 1. Contact CO to cooMlnate removal of vegetation from existing wetlands that are to be disturbed during construction of the roadway and parking area. 3. Install silt fence and other measures as shown on the plans. Clear only as necessary to Instal! these devices. 4. Verify with CO that all erosion control measures have been installed properly. 5, Begin clearing and grubbfng. Maintain devices as needed. 6. install new drainage system at 814+29 SB. Install erosion control devices immediately after construction. 7. Rough grade site in area of new parking area entrance. 8. Grade outlet channel. Seed or place erosion control matting on channel immediately after construction. 9. Instal! culvert. Install Inlet protection at culvert immediately aRer construction. lO.Complete rough grading of site. l1.Stabilize site as areas are brought up to finished grade with vegetation, paving, ditch !!Wings, etc. Seed and mulch denuded areas within 14 calendar days of completion of any phase of construction. i2. When construction of phase I is complete and all areas are stabilized completely, contact CO for inspection of site. 13.If site is approved, do not remove erosion contra! measures installed in Phase 1. PHASE 11: 1. Inspect and maintain all erosion control measures installed in Phase I. 1. Install silt fence and check dams as shown on the plans. Clear only as necessary to instal! these devices. 3. Verity with CO that all erosion control measures have been installed properly 4. Begin clearing and grubbing. Maintain devices as needed. 5. Remove and replace existing pipe. 6. Instal! new pipes. Extend existing pipes. Maintain water flow from existing ditches into new drainage structures. 7. Rough grade site. 8. Instal! Block and Greve! Drop Inlet Protection (Type C) when the roadway grading nears elevation of inlet. 9, Stablllze s/te as areas are brought up to finfshed grede with vegetation, paving, ditch llnings, etc. Seed and mulch denuded areas within 14 calendar days of completion of any phase of construction. IO.When construction of Phase II is complete and al! areas are stabfllzed completely, contact CD for inspection of site. i l,lf site is approved, do not remove erosion control measures installed in Phase 1 and II. PHASE 117; i. Inspect and maintain all erosion control measures installed in Phases 1 and IL 2, Complete and dispose of pavement removal 3. Stablllze site as areas are brought up to finished grade with vegetation, paving, ditch llnings, etc. Seed and mulch denuded areas within 14 calendar days of completion of any phase of construction. 4. When construction of Phase III is complete and al! areas are stabfllzed completely, contact CD for inspection of site 5. Ifs/te'is approved, remove silt fence and other erosion control measures and seed out or Stablllze any resulting bare areas. MAINTENANCE PLAN: All erosion and sedimentation control devices shall be checked by the contractor for stability and operation no less than once per week and also within 14 hrs of any rainfall produang more than 0.4 in of rain within a 24 hr period. Any needed repairs will be made immediately to maintain all measures as designed. Maintain a cumulative and current written Jog of the condltlon of the erosion control devices and submit to the CO upon request; Maintain erosion control devices a5 follows: SiltFence -Retrench if fence has been undermined and replace any deteriorated fabric. Sediment shall be removed when the level of sediment deposition reaches.half way to the top of the barrier. Check Dam -Remove sediment accumulation behind the dams when Tt reaches one half the original. height. Add stone to dams as needed to maintain design height and cross section. Seeded Areas -The seeded areas will be checked regularly to ensure that a good stand is maintained. Fertlllze and reseed as needed. !f work on the protect ceases for more than 30 days, all disturbed areas shall be temporarily seeded and erosion control devices maintained. Curb Inlet Protection, Block and Gravel (type C and D) -Remove sediment and restore the trap to Its original dimensions when the sediment has accumulated to one half the design depth. of the trap. L \\\\\\~ )///~ ss i Rlp-Rar (( a Section tl ~ \ / f4e~dwall ----- ~ ~'"'riunnmrruu r -~ ~~//~// l ~ ~ 111\~~~ /F~D~/I J perspective dew a a n ~; 0 N N Basin below) DI.VI.n n INLET' PROTECTION (TYPE C) 824+29 ~' SB 18" CMP/RCP Remove Inlet Median Install Type 6B Inlet Median 815+61 ~ SB Instal! 110 Lf- i8"HDPE Type S Pipe Instal! type 6B Inlet Median 811+50 ~ NB Install 176 LP- i8"HDPE type 5 Pipe Install type 6B Inlet Median REG STATE PROJECT ~NO~ SE NC PRA-GRSM 1839 2-E.2 z -i~~ 7PE type S Pfpe y Headwalls 1 Temp. Silt at Boundary sting Wetlands. with CO. (Typ.) j =__._...~- ~f-4 ,J-.~ ,~ . ~--- Cherokee ~ U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION T SMOKY MOUNTAINS NATIONAL PI NEWFOUOPTION 20 -1B19 EROSION CONTROL PLAN PHASE I o® Sukh Ret 1. / IAwJ t ivN n~q. Section [fire Basin, Filter and Culvert Pipe Detail 1 Abf b Sub L REG STATE PROTECT SHEET TOTAL N0: SHEETS SE NC PRA-GRSM SB19 2-E.3 H . ~I' + ~ ~ ~ !r ~~. ~ 1 ~~ ~~ ` J~ ~ ~~J ~~ `\ ..803+70 ~ NB ,,~ \~~~~ Il u 18"cMP Cherokee Remove 63 LF- i8" CMP ~ \" I~ i ______~ Remove Inlet RT Install 64 LF -14" HDPE Type S Pipe -~ ~ `~ Install Stone Masonry Headwall RT ~ ~ ~ ~~~,,; Remove and Reset Stone Masonry ~ ~ , i Headwall LT '~ ~- ~ of III<~ ,'~`~ ~~~' ~ Install `~0 LF o ~, •_ , _...__ `U° ~ ~` `~ ~ __ ~ ~` n SlltFence-,\~p ~_.__--.~_--„ --_Install-30-LF f-~ ~'~~~. a' ~~i~.~ 1 -_` _ ~'r -- ___ ~ ,~~'°`.`---.~.sir''`r---~'.`"„~-~'~.•~,.~~.rW--i-.° "~.~ ~-o"a4~ \~~ CO ~ ~~~~~ J- , .f ~" ~ J ~. - =-"- L a ~` .~ ~r-~ ~ - - _ - _ ~_ ~ .. r _._, i'--~-'_ ;/ice ~~!~~N~.M~.~~-_---~ '~.i i^~--~i ~~----~`~'`~1„~..'~~..-~="=~.-~L'~-~-"^ A, '` - r- ,~-~ m .ti,-~ X ~.%- ~ ~~ ~ ~ _~~ ' ~ -'" Grading Construct Type 2 Waterway ~ a / ~,~ ~~ i ~'y ~ D ~_--~/-%` -- C1 NB Sta 805+90 to 806+40 o - f ~ ^i'--~~--_~... _----= ----_ ~ Temp. Check ~' r 3` . ~ ~~ .= `-- _ 1>`~--- Block and Gravel Drop Dam (7YP•J -Dam (Typ.) Inlet Protection (Type D) ~~ `,~ ,, ~'~' j~~ " ~ 8lockand Gravel Drop ~ ,~ ~ J Inlet Protection (Type D) f~ a~~+fi~'~ 809+25 f1 NB 810+94 ~ SB Install 60 LF- 24" HDPE Type S Pipe Z4"HDPE Type S Pipe o Install Type 6A Inlet RT Remove Headwall RT o Install Stone Headwall LT Install 8 LF- 24" HDPE type S Pipe Install Concrete Pipe Collar RT ~ Install type 6A Inlet RT 809+75 ~ NB. 811+75 ~ SB Instal148 Lf-18" HDPE Type S Pipe Install 80 LF-18" HDPE Type S Plpe Install Type 6A Inlet RT Install Type 6A Inlet RT 1 e a Cf C ~ U.S.DEPARTMENi OF TRANSPORTATION FEDERAL HIGHWAY ADM]NiSTRATlON' EASTERN FEDERAL LANDS HIGHWAY DIVISION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - iB19 OPTION. 2 EROSION CONTROL PLAN PHASE II ~ Station 803+40 to.Station 832+00 y i fi4b N(af NPS PMffi NO.: 090563 L z ~`-+~ 3 m m Gat~lrnb_urg o 0 a m m n N m W r Product, type 1A ~ SB Sta 814+40 to 817+00 B13+i9 ~' SB 36" HDRE Type S Pipe Instal128 LF: 36"HOPE type S Pipe Install Type 6A Inlet RT Instal! Concrete Pipe Co!!ar RT Remove and Reset Stone Headwall RT 870+40 ~ SB 18" RCP 815+19 fL SB Install 80 LF- 36" RCP Install 4 LF-18" RCP Install Concrete Collar RT Install 1 Stone Masonry Headwalls Remove and Reset Stone Masonry Headwall RT Place Class 3 Rtp Rap at Outlet Construct an Earth Overflow Channel to South, Approximately 100 LF in Length, Approximately 3'-4' wide, depth to be Determined by CO. Staballze First 30 LF of Channel with Class 3 Rip Rap, Seed Remainder with Approved Seed Mix. Removal of Trees Greater than 6" Diamter to accomodate the Overflow Channel !s Not Permitted. Limit Width of Equipment to no more than 8' Wide. ~~ I -1 iHEET TOTAL N0. SHEEfS 2•E.4 t ~ L NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 Feet. Pavement markings are referenced to the centerline alingment. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, 3. Signs shown reflect existing signs and layout, proposed informational signs shall fallow sign schedules. 4. Pavement markings in parking areas shall be Thermoplastic. Begin Option 2--~ Sta 803+40 Tie to Existing Pavement Marking 4"Single Solda White Striping z ~-~~~ 4"Double Solic In Yellow Striping 0 a0 +61 4"Double Solid White Striping ESTOP i Sta 000+10 LT 4" Mini•Skip White Striping +65- +33 +45~ -t r+74 I' ~ Job Corps ~ I I Center I NB Sta 811 +37 LT ~, I 2 D @ ~ - ~ NB Sta 810+50 RT ~~ ~ e ~ T +4 NB Sta 8 al °~ ~ I 4"Single Solid ~ White Striping +44 I po y ~, ~-' ~ ~ ~ +90 +90 d) , ~ P RDA, ~' v,~ dE~r-0~~' ~ 4"Solid Chevron 4"Single Soli ~ , Striping In Gore White Striping // /,~ See Detail E634-3 , //! // SPEED j a Job COrpSI ~ , / LIMIT ONGESTE I __ Center I / ~__ y / 35 AREA NB Sta 808+31 RT /// / NB STA0807+50 RT N8 Sta 810+5Z RT / Sta 804+95 RT RELOCATE FROM ,/ / 35 NB STA 821 +OS RT y ~./ NPH - ,// /''~ NB Sta 805+OS RT / REMOVE SPEED ~~(g / 35~IPH ONGEST LIMB Gatihn SPEED ZONE AREA ~ 5 AHEAD Sta 781+49 RT Sta 775+00 RT 3~ Sta 781+49 RT REMOVE v i v r 0 v V- Y L i S ti N O O n N y N Cherokee ~I ~i NPS PNLS NO.: L rG~ Cherokee j ~ ~ ~Gatlinburg ~ NB Sta 815+68 LT RELOCATE FROM SB STA 820+41 RT a n m k N 0 Z n N k Gates flub 9 ~STOP~ ~`_~~ i1"StopBar_ NB Sta 815+51 LT RELOCATE FROM NB STA 815+41 LT 4"Single Skip White Striping -+07 58 _ _ NEWFOUND,CAPROAD I c~~: 4"Single Solid White Striping 58 Sta 814+83 RT REMOVE NB Sta 820+50 LT r~ RELOCATE FROM N8 Sta 811+51 LT Changeable Stgn System Relocate Structure _ \ DO NOT '~' ESTOP OVC Sta 10+00 LT & RT `-~~ RELOCATE FROM RELOCATE TO SB Sta 821+46 LT 8 RT NB Sta 825+11 RT & 11"Stop Bar NB Sta 815+4i RT ~"-,~ ,~ ~STOP~ ~ i NB Sta 819+95 RT ~_~ NB Sta 816+11 LT OCONALUt7EEVISIrOR CENTEJ - RELOCATE FROM NB Sta 815+77 LT ~1 4"Single Solid `~I White Striping NB ~t 816+24 LT IL _ _ _ N8 L~8C16+65 LT ~ White ",~- Do NOT ENTER NB Sta 815+41 LT RELOCATE TO N8 Sta 810+50 RT NB Sta 815+77 LT REMOVE NOTES: 1, Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. Pavement markings are referenced to the cehterline alignment. {[~~-- 2. All striping shall be in accordance with the Manuaf on NB Sta 8i5+90 RELOCATED FROM Uniform Traffic Control Devices (MUTCD) latest edition. SB sta 813+00 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Pavement Markings in parking areas shall be Thermoplastic. a f 'L ** OVC Parking area requires 4 Reserved Parking signs, and 1 Van Accessible sign. Remove i of1 existing Van Accessible signs, and relocate remaining to shown location. Relocate all Reserved Parking signs from existing locations to shown location. 4"Single Solid White Striping i 4"Double Solid ~ ~ i White Striping ~ _ /~ ** y y L - - - - - - ( . ~ - - - ' - - 4" Minl-Skip 4"Solid Chevron White Striping -------- Striping in Gore i C= Cherokee i See Detail E834-4 j Gatl(nburg ~ 4"Single Solid ------------- YellowStriping SB Sta 810+42 RT -- RELOCATE 70 r-- --------- i C~ Ocona I uftee i N8 Sta Si5+68 LT 4"Mini-Skip White Striping 4" MiN~Sklp ~,,.,.~ White Striping Oconaluftee ~ ~ Visitor Center~~ j Mountain Farm ~ ~ i Museum ---~ ~~ 1 ~~ ~ IUB Sta 814+76 LT STOP; RELOCATE TO i NB Sta 817112 LT ~`_ J~ REMOVE Do NOT ENTER OVCSta 17+50 LT & RT RELOCATE FROM NB Sta 813+85 LT~& RT of oeava~eel 4"Single Solid Yellow Striping i Visitor Centers ~ `~i a Mountain Farm ~ DER ~_____-~ i Museum NB Sta~813+43 RT ---------------~ SB Sta 822+46 LT 8 RT REMOVE SB Sta 817+00 RT RELOCATE TO RELOCATE FROM OVC Sta 10+00 LT & RT SB Sta 816+36 RT ,~ "~ -------------,STOP i t~ Cherokee i ~ Gatlinburg ~J i `_~~ _____J NBSta815+IIRT& ~ T +41 RT ~' I NB Sta 815 ~~ RELOCATE FROM Eu< NB Sta 821+05 RT SB Sta 823+00 RT NB Sta 820+09 LT xTNC RELOCATE TO REMOVE INFO SIGN SB Sta 819+00 RT N8 Sta 810+51 RT RELOCATE ONE WAY SIGN RELOCATE FROM TO NB Sta 815+90 SB Sta 819+03 RT Cherokee ~ ~i 12"Stop Bar 3 Of cRi ~ ~~ m~ N +04 N ~ y W ~' J ~3 ~D ~ N NH ~ W~ z ~_ Gat/igb~rg nh ~X~ti ~~ y~ ~m ~m ;~ xti ~~ ti +So ~ ~ SPEED ~~ LIMIT 45 ~` SB Sta 825+99 RT 4" Single Solld White Striping 4" Sing/e Solld Yellow Strioinal r-------------- i Oconalufitee ~ ~ Visitor Center I I Mountain Farm ~~ I Museum --------I NB Sta 827+12 LT RELOCATE FROM NB Sta 824+76 LT MUST NB Sta 828+85 LT ------------- AREA N i s i for Center j ~ RIGHT LONE ~ ~ Thru Trafifi i c I ~ruRe 35 MPH SPEED kee rO ~---- ----I LIMIT Che NB Sta 819+59 LT NB Sta 831+15 LT ~~ RELOCATE FROM REMOVE 35 MPH NB Sta 828+42 LT SPEED ZONE NB Sta 834+00 LT AHEAD End Option 1 NB Sta 840+00 LT Sta 831+15 NB ~' es o Tre to Existing ~ 4"Single Skip Pavement Marking M y - a White Striping ~ ~ ~ i ~ ~y~ ~~ `yam - ~~~ ~~~ ~~\ ~ _ _t - J____ _- '~ t\~ ~`~~,_ 1 --_~--NEWFOUND GAP ROAO_1Q_.----'- ~~ ~~ Sta 826+80 SB ~ -,~ ~_ ------------------' Tie to Existing --,-_-- - "--r Pavement Marking N~ UNDGAPROAD~9@r-_----~-- -T----- 4" Minf-Skip White Striping NOTES: 0 Y Q h h N M h L 1. Baseline stationing is based on wheel measurements along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet. Pavement markings are referenced to the centerline alignment. 2. ALI striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Pavement markings in parking areas shall be Thermoplastic. 0 M M -1 i i i i x Llm/t of Option 1 Tie to Existing Pavement Markings Big Cove Road COMMERCIAL CAMPGROUNDS Sta 889+82 LT +53 4"Single Solid White Striping 7T -- ,a O ,.~ ~,, ~ - o~ -.~~~~ ~ ~~ •i ~ ~j ! 4"Single Solfd ~ ~/ White Striping ~''~ ~~ ~/ ~ ~;' o ~i D~ ~o z~ 8"' Park ~z Information om Tune Radio m~ sPEEO To 1610 z LIMB > o 45 Sta 88450 LT ~ ° sta 8s3+oo Lr STOP 1 ~ Sta 887+08 LT I 00 I .~-_-ter'-~-~~-- f~ C f.- ~~ ~~. -- +58 ~- ~ - f~~~~ ~-!_-- i~ f f--" i i pOAp UN~ GM ~" ~, +44 NEWS ;/ ~~ i i i 4"Single Solid White Striping +7s ~;i fi, o~ ,f'i'/ ~''~' / ar ~t9 ~a cp Ga ,,, I L. s S M ry N q h 4"Double Solic YellowStriping 35 MPH 4"Double Solid -~ -(`~ SPEED ZONE Yellow Striping F ~~ ,~.`' s~o AHEAD raEro Big Cove Road a Sta 883+81 RT Sta 883+81 RT COMMERCIAL REMOVE CAMPGROUNDS Sta 882+89 RT NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2, Ail striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCDj latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall fallow sign schedules. End Option 1 End Project Sta 840+75 Tie to Existing Pavement Markings Cam,. ~~, ;~ ,r-~ • ~`~ Sta 2 RT ~ `•~-~ ~~ Cheroke e z -`-~' TJ -~ /1 __.I ~ /~ "'_I. ,, I 0 v al n i D °m N n N d.i N 0~ O H N C u +., ~-4" Single Solid White Temporary Striping 4"Double Solid Yellow Temporary Striping 4" Single Mini-Skip White Temporary Striping Pavement Construction Pavement Removal L F a 0 0 S M NOTES: 1. Baseline stationing is based oh wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Dewces (MUTCD) latest edition. ' in si ns and la out, proposed 3. Signs shown reflect exist 9 w si n schedules. informational signs shalt folio g DO NO' ENTER ~ .--L-~ ~ / ~ L--~ / ~ 4" Single Solid White Temporary Striping ~ / ~ ~ / \y~ / \~ \ ~ 4" Single Skip ~ / \ ~ ~ `I' \ ~ White Tem ovary Striping / ~ ~ / \`I'/ \ N\\ P ~ ~ / \T/ ~ 07 ~ / \ 1 \ / 1 / \ ~ ~ / \I 1 ~ ~~ i ^~'/~ `I NEWFOUND GAP y ,~ _- - J NB ~ ~ -~ ~ ROAD \ _ - _ ~~ ~ ~- ~ ~ .~ __ _~_.~ I I `_ _ --~~" y I .--r- _.__._-_ _____-_......--~ - ___ ----- ---~ - -7----'------~ -- "~~-- -I- +70 SB ' 3 4" Single Mini-Skip White Temporary Striping 4" Single Solid White Temporary Striping Mounted on Type III Mounted Barricade 4, Locations of all permanent and temporary construction signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. 5. See sheet 2-T.5 for temporary construction signage. b, Use Detail E635-9 for lane shift. See Detail E635-6 for lane closures. -.T-----i"- u1 N au ~__~ ---- _ ~~ ~. Iii - - - _" '~ --- __ __ -T` ~r - -r Cherokee NEWFOUND GAP ROAD SB ---"""~-~ 4"Single SoNd Yellow Temporary Striping TRAFFIC WARNING LEGEND .Traffic Control Drum Type III Barricade z ~~ r ~ I l L I .-1--- J ~ ., ~, ~.= ~y~- ~~ i~~~,. ~~ i ~~ ~~ /Y ~ i~ i jai +40 i bar9 . 4° Single Sohd White Temporary Striping NOTES: 1, Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Locations of all permanent and temporary construction signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. 5. See sheet 2-T.5 for temporary construction signage. 6. Use Detail E635-9 for lane shift. See DetainE635-6 for lane closures. Pavement Construction Pavement Removal TRAFFIC WARNING LEGEND Traffic Control Orum Type III Barricade (3) Type III BaMcade l; aY~ ~~ (3) Type III Barricade 0 N m~ ti qm k 0 0 e ti N a Q 0 M 0 m 0 0 N 4" Single Solid Yeilow Temporary Striping NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every SOO feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Locations of all permanent and temporary construction signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. 5. See sheet 2-T.5 for temporary construction signage. 6. Use Detail E635-9 for lane shift. See Detail E635-6 far lane closures. Pavement Construction Pavement Removal TRAFFIC WARNING LEGEND • Traffic Control Drum Type III Barricade :: Ni a a N F a e N m 0 0 L 1. Otitain approval from CO of final location and spacing of signs and devices. ~. Signs 1 and 3 shall be mounted with Type B warning lights and warning flags. NOT TO SCALE TRAFFIC WARNING LEGEND blaming Light, type B, With Warning Flags pi/M$ Portable Varlahle Message Sfgn ROAD o WORK AHEAD o END ROAD WORK ROAD WORK 0 NEXT 0.5 MILE EXPECT DELAY > PMLS NO.: 090563 GENERAL NOTES: 1. Obtain approval from CO of final location and spacing of signs and devices. 2. See details 635-2, 635-6, 635-10, 635-11, and E635-14 for additional traffic control details. 3. Cover all conflicting signs during construction operations while using details 635-2, 635-6, 635-10, 635-11, and E635-14. 4: Place variable message signs/changeable message signs at locations shown on the Traffic Control Map, and as directed by the CO. Coordinate message text on the variable message signs through the CO. The contractor is responsible for the variable message signs 24-hours a day, including the inputting/changing the message and maintenance of signs. 5. No work on the entire project shall be permitted on weekends or holidays or during the month of October Holidays shall include all National legal holidays and Good Friday and weekends will begin at Noan on Friday and end at 8:00 AM on Monday. No work shall be done the entire week after Easter Sunday. No work shall be done on the Friday after Thanksgiving, and no work shall be done from December 23, through January 2. 6. The pavement depth differential between lanes of traffic shall not exceed i 1/2 " when opened to traffic. Pavement differential restriction not in effect if differential is behind a lane closure, 7. One, one-lane closure will be allowed for Option 2. A minimum of 4 one-lane closures will be allowed at any one time for entire project (Schedule A and Options). Do not stop traffic for more than 10 minutes at one-lane closure setup. 8. Maintaintwo-way, two-lane traffic throughout the daytime from June 15 to August 15. 9. Daytime hours are defined as from 8:00 AM to 9;00 PM. 10. Maintain two-way, one lane traffic using flaggers throughout the nighttime and daytime except as noted above in General Note #5 and #8. All work, except final surfacing, can be done at night with appropriate lighting plan as approved by the CO. Final surfacing must be accomplished during daylight hours. F h 0 m 0 0 ti L NEWFOUND GAPROAD; The Contractor shall construct Newfound Gap Road Widening and the Oconaluftee Visitor's Center while applying the following: Step 1 -Sheet 2-T.6 1. Install temporary control signs and devices per Sheet 2-T.S. Obtain approval from CO of locations. 2. Install erosion control devices. 3. Construct the temporary lane shift per the traffic control plan and Detail 635-11 prior to commencement of work. 4. Construct Visitor Center parking area and roads as shown. 5, Sawcut existing edge of pavement and remove. Step 2- Sheets 2-T.7 and 2-T.8 1. Construct the temporary lane shift per the traffic control plan and Detail 635-11 prior to commencement of work. 2. Construct new areas of existing parking area from 812+00 to 820+00 LT. Place pavement up to but not including the final 1 ~/z" of SACP, Open to traffic. 3. Construct pavement widening from 803+40 CL to 821+40 S6 RT Place pavement up to but not including the final i ~/z" of SACP. Step 3- Sheets 2-T.9 and 2-T.10 1. Construct the temporary lane shift per the traffic control plan and Detaii 635-i1 prior to commencement of work. 2. Sawcut and remove pavement. 3. Mill pavement to the extents of the roadway and parking area widening. Place final surface layer. 4. Place final pavement markings and permanent signs. 5. Obtain final approval from C0. 6. Remove all temporary traffic control signs and devices, Open road to traffic. -1 ROAD ~ WORK AHEAD ~ END ROAD WORK o° M a o Y F a S 0 0 N a N i. Obtain approval from CO of final location and spacing of signs and devices. z. Low shoulder signs shall be placed at intervals specified by the CO In both directlons on Newfound Gap Road. NOT TO SCALE s. signs 1, 3, and 4 shall be mounted with Type B warning lights and warning flags. TRAFFIC WARNING LEGEND Warning Light, Type B, With Warning flags PVM$ Portable Variable Message Sign ROAD WORK 0 NEXT 3 MILES EXPECT. DELAY; LOW ® SHOULDER, a 7 O ~; m 0 0 e `4 REG STATE PROJECT SHEET N0. SE NC PRA-GRSM 1B19 1d.5 U.S. DEPARTMENT OFTRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION _ EASTERN FEDERAL LANDS HIGHWAY DMSiON GREAT SMOKY MOUNTAINS i NATIONAL PARK - NEWFOUND GAP ROAD -1B19 OPTION 1 DRAINAGE PIPE PROFILES .~ L NPS PMTS NO.: 090563 i REG STATE PRO]ECf SHEET N0. TOTAL SHEEfS OP ION SE NC PRA•6RSM 1819 2•X.9 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R Q i 1 I ,. ~ : --- ----- --- -2.0 /. i• St .8141 0.00 ! S ..814+ 0.00 R 1 Overla Gra e ° 2 45.1 De .Grad ° 2, 5.78 14+5 .00 ,i ~ Z ' ~ // i ,~_, ~~ ~ ~ i i i / -- ---- --- -- ,, ,, -- - - ----- - - --- ----- ---- - -- r St .814+ 0.00 ! S .814+ 0.00 R l ~~ verla Gra e ° 2, 45.0 Des Grad = 2,0 5.46 14+0 .00 3 1 1 3 0 4 c 0 4 e F a h a N \`I REG STATE PROJECT SHEET N0. TOTAL SHEEfS SE NC PRA-GRSM 1819 2-X.8 OP ION NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R i __ _ _- - -' __ ~- ---- ~ i _ , ;,' St verJ . 8J3* Gra 0.00 e = 2, I 44.9 St Des. . 8J3+ Grad 9.99 = 2,0 I 5.07 13+5 00 ~' . - .0 % I:IO /.•/ j _ 1:20 ,_ -- __, - - j %~ St verla . 8J3+ .Gra 0.00 e = 2, J 44.6 Sfa. Des. 813+0 rode .04 2,04 1 .67 13+0 ,00 % 3 1 1 3 0 D y v v n d m m S REG STATE PROJECT SNO~ SHEETS O P ION -..~ SE NC .PRA-GRSM 1819 2-XJ NE FOU D G PRO D @ CON LOFT E VI ITOR CENT R ' St . 812* 0.00 l St .812+ 0.04 l verla Gra e = 2, 44.2 Des. Grade = 2 0 .28 A ~ 1 , ,/ A : 1 I ~ ' . //. ' i ' .~ / ~ ,~' St . 8121 0.00 I i Sta. 812+0 .04 1 ' verla Gra e = 2, 43.7 12+0 .00 , ~~ 5 1 1 3 6 0 REG STATE PROJECT SHEET N0. TOTAL SHEEfS SE NC PRA-GRSM 1819 2-X.6 0 ON NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R ~ ,. ,~' - - - - - - ,' '~ St .811+ .00 = 1 St .811+5 .04 - I 11+5 .00 '~ / . i i ~' I -2 00 --' -2.0 % . . _ _ ~~~ // St .811+ .00 1 Sta 811+0 .02 1 11+0 .oa ' _ . 0 3 1 1 3 60 C 4 2 e V V H V 1 a REG STATE PROJECT SHEEP N0. TOTAL SHEETS OP ION SE NC PRa•GRSM 1B19 2-)C.5 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R ,, ,~ /// 11 -2.0 % I•! ____ __ -2.00 1 _~_~ ____ __ _____ ____ ____ _~__ ___ -__~ ~ ,' / /// st .810+ o.oo r 10+5 ,00 = • ,~ I~ St . 810+ 0.00 10+0 .oo eslg Gra e = 2, 42.10 5 3 1 1 3 i i 1 v a 0 a REG SE STA N TE C PRA PIlO]ECi •GRSM 1619 SHEET N0. 2•X,4 TOTAL SHEETS OP ION NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R Sta. 809+ 8.00 ,- -2.0 % 2. 0% 0.72° - 1`~ _ , __ _____ 09+5 ___, .00 -~~ Deslg Gra e = 2 41.90 I: ' -2.0 % 2. 0° 1.55° - ' __" "" "" Sta . 808+ 0.00 _ _" - + 09+0 .00 Desig Gra e = 2 41.75 e= (+) 2. -' ,- ~~ ,, ,. ,, I~ ', -2.0 - -- ----- ----- - 2.00% - _ --- ----- E ' ~" _ 08+5 .00 Deslg Gra e~ = 2 41.59 V 5 3 1 1 3 0 ~ z Y a c i REG STATE PRO)ELT SHEET N0. TOTAL SHEETS O P ION SE NC PRA-GRSM 1814 2-X3 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R ,, 08+0 .oo Deslg Gra e = 2 41.44 Sta Be . 807+ in Tra 9.00 ition ° i i ~~ -2.0 % 2. 0% .00% 1 1~ ~ _ _--- ,__ -- ----- 07+s .oo Sta. 07+4 .00 Deslg Gra e = 2, 41.23 -2.0 % 0. 2% ~.3 07+0 :oo Deslg Gra = 2, 40.95 3 1 1 OP ION NE FOU D G PRO D @ CON. LUFT E VI ITOR CENT R B e gin Tr (+) nsitio .0% 06+5 .00 ^ S E e 806 d Tran (+) 1 23.00 ition 0% -- _- __ -- --~ " __ _,- 06+0 .00 ', B B gin Cr gin Tra wn.Co sition rection '- a (+) 3 2% - "-~ ~~___ F --- 05+5 - -- .00 - 0 6 5 3 1 REG STATE PROIECf S 0~ SE NC PRA•GRSM 1819 2-K.2 Sta. 806+ 0.00' Be in Tran ition Sta. 06+2.00 )eslg Gra ° 2, 40.80 End ransioi n e= 1.0 / 1.2 % ~ 2.00°. 8.00% ~~,k~'' ta. 80 +00.0 R I r)as nn G ade = 2.040 6 Sta. 05+5 .00 Begi Transiion - ~_~ i -__ _-= J CU/ Nerla Gra e = 2, 40. I 1 f 1 1 1 F Q M Qi O h Q ry REG STATE PROJECT SHEET N0. TOTAL SHEETS O P ION SE NC PRA-GRSM 1619 2-X.1 NE FOU D G PRO D @ CON LUFT E VI ITOR CENT R 05+0 .oo verla Gra e = 2, 40.T 04+5 .oo erla Gra e = 2, 40.8 T 7 l 1 1 ` _ --- ---- - - 1 _-~- - o4+a .oo Overla Gra e = 2 041.09 - 9~*~ .00-- - - ---- - - ----- 5 1 1 3 p p -1 z ~~ °~., ~%1 __I N ±~~ ----_-_-- .~ _ ~ ~`~ ~ ~~ ~==L= ~ i~ ICI I I I I I I i I ~_ 1~ I ~' _~,\ ~ - N ~ /~ `\ % \ % \~% \.~ Cher.--~k=~ ~~ ~~llllllillll.lIII!IIIIIII~' ~ Lam."-~ __- y}_ I ~,_,_,y„~ ~,_., ~ NEWFOUNDWIP ~ ROAD NB I /1 ~_-~---- ~ _r t' ---- _ --- ----- ~ NEWFOUNOGAPROAi~_ ~ -------- O - - - r'----_._ s NOTES: N C 4" Single Solld tinbur9 Gat Yellow Temporary Striping es ~ ~ " Single Solid 4 Yellow Chevron Striping in Gore PII7mr • • • y ~•~ - .p - ._-r ------=-r- -=----r--------T-----~--- -~NEWFOUNOC.aP -~ -__.-,----~ ROAD SB 4" Single Mini-Skip White Temporary Striping 4° Single Solid oNo White Temporary Striping i ~ 1. Baseline stationing is based on wheel measurements ~ along the left side edge of pavement, The pavement has been measured and PK Halls every 500 feet, 2. All striping shall be in accordance with the Manual on ~ Uniform Traffic Control Devices (MUTCD} latest edition. y 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. r 4. Locations of all permanent and temporary construction ~ signs as shown on these plans are approximate. Obtain approval from the CO prior to finalizing locations. Y 5. See sheet 2-T.5 for temporary. construction sighage. E TRAFFIC WARNING LEGEND 6. Use Detail E635-9 for lane shift. See Detail E635-6 for lane closures, Traffic Control Drum a n Pavement Construction ~ Type IIT Barricade 0 Pavement Removal L L i i u f a Q 0 M 0 0 M Z i ~ ~ ~ ~ 1 ~ ~ ~ ~ ~ ~ ~ Cherokee ~ ~ -~~ ~ ~ t ~ 3 '" ~ ° ~ ~ ~ro~ 4"Single Solid ---.. Yellow Temporary5triping I I I ~~ I I ~~ ------ ~° 0+00 / - ~ ---i----- -----1----~ i ~--~ i ~--~-----~-f'/ - -~- - - ~ OD .y~!~~~.=-v ~= NEWfOUNDGAPROAD -~_.-~~._t9Q t9O ------- ~ _ ~ /ii%` ice" (p w~ ~~,~-"~~ 4"DoubleSolld 4" Single Minl-Skip '~ ~ _~ ~ Yellow Temporary Striping White Tem ora Stri in N r ~ ,~ +40 P ry P 9 ` ~~ i~ y ~,' ~-` ~i~ 4" Single Solid ~' % ~~~~ White Temporary Striping ~ ~' 'i ~a~lit~bO~ i NOTESr 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2, All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4, Locations of all permanent and temporary construction .signs as shown on these plans are approximate. Obtain approval from the C0 prior to finalizing locations. 5. See sheet 2-T.5 for temporary construction signage. us: DEPARTMENroFTRANSPORrAnoN FEDERAL HIGHWAY ADMINISIAATION EASTERN FEDERAL LANDS HIGHWAY DMS10N 6. Use Detail E635-9 for lane shift. See Detail E635-6 for lane closures. GREAT SMOKY MOUNTAIN5 NATIONAL PARK TRAFFIC WARNING LEGEND NEWFOUND GAP ROAD - 1619 Pavement Construction Traffic Control Drum OPTION Z -STEP 3 Pavement Removal ~ Type III Barricade TRAFFIC CONTROL - Statlon 797+50 ro Statlan 814+00 P® smkm klt NPSPMIS NO.: 9 z ~~ F 0 0 m 8 N n N a, v 0 C L Gatlinburg NOTES: ~J~~ -~ - (3) Type III /~ I 4" Single Solid Baniicade ~ II White Temporary I I ~L (3) Type III - _____ ~ L_____I .Barricade -----L'-----~-----L_.__ o _ ~- ~~%~-L= ~ I'I 111111 I ~____, ~ `I NEWFOUND GAP I \ f ROAD NB -_..~! 4" Single Solid White Temporary Striping 4" Single Skip White Temporary Striping ~ y~ ~~~ -1~~ ,9..J-~ ~~~ \~1~- ___ ---~ ---7---------, r-- J----~~1 / ~i -- ___._. ~-- -------~ -- T~ ~ - _ ' - - - ._ -. 1 ----'-' _- ~~~- I-4" Single Solid White Temporary Striping 4"Double Solid Yellow Temporary Striping 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. ~ ENTER ~ Mounted on Type III Mounted Barricade --~ "1' ~.. - ~~ +70 SB ' +40 SB 4" Single Mini-Skip / White Temporary Striping 4" Single Solid White Temporary Striping 4. Locations of all permanent and- temporary construction signs as shown on these plans are approximate. Obtain approval from the C0 prior to finalizing locations. 5. See sheet 2 T.5 for temporary construction signage. 6. Use Detail E635-9 for lane shift. See Detail E635-6 for lane closures. --.T-----~-- N N - -- -^ - _ ` _ ~ ~ r- -f-'-'_ --T-~~ NEWFOUND GAP Cherokee ROAD SB ~ 4"Single Solid Yellow Temporary Striping 4" Single Mini-Skip White Temporary Striping Pavement Construction Pavement Removal U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HlUHWAY ADMINISTRATION EASTERN FEDERAL LANDS NIGHWAY DIVISION GREAT SMOKY MOUNTAINS NATIONAL PART TRAFFIC WARNING LEGEND NEWFOUND GAP ROAD -1819 • Traffic Control Drum OPTION 2 -STEP 2 Type III Barricade TRAFFIC CONTROL L REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM iB19 1d.9 z ~-_. L i~~ Sta 866+48 SB LT 4"Single Solid Yellow SMping 4"Single Skip White Striping 4"Single Solid White Striping~~ 4"Solid Yellow Chevron Striping in Gore See Detail E634-4 4" MI! White NB `rA ~~ NB vennmm Z am m MPGgW1A5 ono Sta 864+81 N8 LT k~ M ..~ // - - +10 G~ - ~ 19 ~~ Blue Ridge Parkway NEXT RIGHT CLOSED 4"Single Solid Sta 867+03 NB LT White Striping +70 ~~ '" ~ +88 // ___ ~'~~ NEWFOUND GAP ROAD - - +30 10 "Mini-Skip White Striping .... ~~~ ~ obS a~f9 ENtER KEEP Ga~~~~ ~ , ' ~ WRONG S~ Sta 866+48 SB LT & RT ~ i m" o WAy ~ Sta 866+38 NB RT F ~',} r Sta Sfi5+15 S8 LT & RT Remove Existing Keep Right Sign M ~ °u ~ ~~ ti G S. End -NFG- SB WL yN Sta 7 + o y -NFG- WL Sta 869+85 m ~ ~ H B r 0 n e ti 0 NOTES: 0 1. Baseline stationing is based on wheel measurements s along the left side edge of pavement.. The pavement k has been measured'and PK nails every 500 feet. e 2. All striping shall be in accordance with the Manual on h Uniform Traffic Control Devices (MUTCD) latest edition. e 3, Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 0 N A ti steep, Winding Mountain Road NEXT 35 MILES BE PREPARED FOF SEVERE WEATHER, .ICE AND SNOW FLIP DOWN \ Sta 873+49 LT 1 `, 4"Double Solid Yellow Striping I-4"Single Solid White SMping ~~ ~ COMMERCIAL VEHICLES PROHIBITED V101"iT9 -$~bfett t0 \ Tin®T Test ® Sta 875+80 LT rA~ /~,\. 4 °"` k' 4~, ~o ~~~ U.S,. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION GREAT SMOKY MOUNTAINS NATIONAL NEWFOUND GAP ROAD - 1819 OPTION 1 SIGNING AND MARKING station BB3+so ro station en+sD p m, ~, 4 i I 0 Y F a e M Q 0 I ~~I I~~ I0~ I~ I ~~/ STOP Sta 000+15 LT Gates 9 4"Single Solid ~ White Striping ~ ~ op ~ 4"Single Skip ~ v White Striping 0 O ~h ~~ ~v U~ +., _ - - - m ~ - - - - - - O On ~h N ' 4"Single Solid o~p ~ Yellow SMping v Gt C~ Parkway ~~ Q Cherokee Sta 853+00 SB RT NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4"Double Solid YeNow Striping r~ / \ ~ / 29- Sta 8 35+95 NB LT / ~ /00+0 ~ NEWFOUND GAP ROAD NB Limit of Option 1 Sta 001+00 T/e to Existing Pavement Markings 1 11"Stop Bar DO NOT ENTER \ Sta 000+95RT QGreot Smoky Mtns ~~ \ ~ 0 4 Single Solid Nat i ono I Park White Strfping ~ 11 \ \ i1"Stop Bar ~ Parkway ~ Sta 86i+56 N8 LT 69 \ 63 53 60 l i~~ ~ y - - - -NEWFOUND GAP ROAD SB - - - - - ~ '~ _ ` -- __ _'_-' - +00 +00 +70 +~ Do NOT 4" Single Solid 4"Double Soli o White StNping White Striping ENrEit ~ ENTER Sta 857+58 SB LT ao Sta 858+95 SB LT a TG 441 So~TH Cherokee ~ MI. Sta 858+21 SB RT ~~ ~ 4"Single Solid YeNow Striping 4"Mini-Skip rWhite Striping ~~ ~; 10 h0 ~~X~~ i, ~~ \~~~~~ Sta 861+70 SB 1T d`RT ~~Oj~ ~,a /~~ 4 h x o, ~` ti Che~o~ 0e 1 L REG STATE PRO]ECi SHEET TOTAL „. N0. SHEETS _, SE . NC PRA-GRSM 1B19 1•T.7 EL}C 3 RING SPEED n ~ lb Sta 849+57 NB LT LIMIT ti Visffor Center O.5mi 45 N ~, Newfound Gap I6mi ~ m Get~ipb~r C~ 0~ ~ Sta 851+OS NB LT ~ 9 ; ~ Gatlinburg 3Omi Q, Sta 847+90 NB LT ~ ~+ ~ CAO y g ~ o Z 0 ` ~ ~ ~ ~ '~ ~~ - ~ her/ ti 0 ~ ~ ~ 3 w _ `Q~ ~ .~, ` '~ ._ NEWFOUND GAP ROAD N8 ~ _ _ -- ~ - ~ ~- frt1 o _ '~ ga ° - _ _ - `D `~ M ~ FOUND GqP ROAD 58 _ -' - - - - - "- E"'`~ °'I 4"Single Solid ; ~N ro Yellow Striping 31 ~p y o Sta 851+56 SB RT ~ to MILE MARKER ~ $ ~ ~ SEE DETAIL E61I-A 4 Single Sklp N 4 Sngle Solid ~ White Striping ~ White Striping z RIGHT o° LANE v NI) c ~ Blue Ridge Parkway 2000 3 NEXT LEFT FEET CLOSED Sta 848+50 SB RT 0 ~ Sta 846+70 58 RT a o NOTES; ~ 1. Baseline stationing is,based on wheel measurements -along the left side edge of pavement, The pavement g has been measured and PK nails every 500 feet. us.OEPARTMENTOFTRANSPORTATION Y 2~ All Striping Shall be In accordance Wlth the Manual On EASTERN FEDERALIANDSH~GHW~AYADMSION e Uniform Traffic Control Devices. (MUTCD) latest edition. GREAT SMOKY MOUNTAINS NATIONAL PARK '^ NEWFOUND GAP ROAD - iB19 3. Signs shown reFlect existing signs and layout, proposed OPTION 1 ~; informational signs shall follow sign schedules. SIGNING AND .MARKING °o Statlon 839+00 m Statlon 852+00 h saremrar NPS PFOS NO.: 090563 REG STATE PROJECT SHEET TOTAL NO. SHEETS SE NC PRA•GRSM 1619 1-T.6 S F U i I a L fat/inbur 9 ONGESTE 0 AREA ti~h~ Visitor Center RIGHT LANE ~ ti Thru Traffic LEFT IANE MPH Sta 828+41 NB LT Sta 831+22 N8 LT +„ Mo bj Q ~\., ~ .~` X~ ~ ~ ~ ~ ~ ~~ _~\ ` 0 '~ ~ -- ~~ ` U _ _ SPEED _ - - LIMIT L~5 4"Single Solid Sta 825+99 S8 RT YeNow Strlping ~ 4° Single Solid ~ White Striping NOTES: Baseline stationin is based on wheel .measurements I 1. 9 along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2, Ali striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3, Signs shown reflect existing signs and layout, proposed I informational signs shall follow sign schedules, rokee m Che n ut=. ~ fD rt~ W ;1} lo o u1 Z M 43. tp ~ 3 m Nom _ - - , ~~ ~- W ~ _ _ ~{ 4° Single Skip White Striping ~ N t~1 li ti m 0 o° e ti M h V 0 0 t i i c E r t c i t Gates linburg DO NDT ENTER Sta 815+52 LT 4"Double Solid Yellow Striping 4" Double Solid-~ White Striping +10 t60 ~ - -_-_- _ N D GAP R A~ STOP Sta 815+52 LT Sta 815+80 LT ut L _ o CFfff' 9"Single SoDd White Striping 12"Stop Bar Sta 814+85RT ENTER Sta 815+80 LT Sta 812+52 NB LT Changeable Sign System, 5 Possible Signs, See Sign Schedule for Display 4"Single Solid - 4"Solid Chevron , White Striping Striping In Gore 10' x 40' Typical See Detail E634-3 `4"Si Solid Whit S .ping kl 10`x Typical 4"Double Salld OCONALUFTEEVlSITDR CEME'R YelIOW Striping / au~c ~ "Single Solid 12° Stop Bar (~ (~, White Striping r "SingleSoJld J_-- STOP White SMptngaf 820+10 LT w,vx 10' x 20' Typi~~~ 820+12 LT f ~e l ~/ -tl _ ~ N 'l I Sta 8I6+24 LTA ~ ~ '1 a +oc 4"Single Solid- White SMping .., ~_„~ I z ~-„' Oconaluftee Visitor Center`s Mountain Form ~ Museum Sta 824+80 NB LT ENTER Sta 823+90 '~ NB LT 8 RT ~ t~, e Sta 823+ 6 NB RT ~~ J " p ea,T Sto 4"Single Solid Cherokee ___~ ~ Yellow Striping ___-_ \ 4"SJngle Soll 3 \ ~ @ White Striping n 1 ~ ~ N '' ~j I r N ~ ~~ +57 ~ i % % J ~ l ~ _ ,~ y ~,o ~ ~ ~ -- -- +31-~ / +75~ 4"Solid Chevron) t85 +10 Striping In Gore 4"Single Solid See Detail E634-4 White Striping Oconaluftee ~' Visitor Center ~ Cherokee a Mountain Farm XMC Gatlinburg ~ Museum Sta 820+40 RT / Sta 816+39 RT Sta Si9t06 RT _ -- - -- a a~ 4"Single Skip m ~ White Striping ~N ~ ~~ 4"Single Solid D~ , ~~ Yellow Striping ENTER o Sta 822+46 Sta 823+90 NB RT SB CT & RT REMOVE Sta 823+46 NB RT a Cherokee Gatlinburg ~ Sta 82i+19 SB LT B In -NFG- 58 WL REMOVE a + _ -NFG WL Sta 820+85 NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3, Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Pavement markings in parking areas shall be Thermoplastic. Sta 823+00 S8 RT 1 Sta 821+19 NB RT Sta 82i+19 SB LT STOP Sta 822+89 NB LT L PS PMTS NO.: 090563 4 a° 0 ~ k F Q m a 0 0 C e a L ut 0 4"Double Sollc Yellow Striping Mingus Mill 00 Historic Gristmill ~p NEXT LEFT Sta 799+08 LT 4"Single Solid White Striping d n s, ~j k S~ 30 N~ Sta 798+25 RT ~ MILE MARKER f9 ~ SEE DETAIL E621 A NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall fallow sign schedules. 4. Pavement markings in parking areas shall be Thermoplastic. AREA 35 Sta 805+05 RT ~ ~ 12"Stop Bar I ~ Limit of Option 1 1 ~ Sta 000+24 m TIe to Existing pavement Marking i 4"Single Solid STOP . ~ ~ White Striping I I Chero kee 10'x2D' Typ Sta 000+10 LT ~ I x I ~ ~ 4"Double Solid z I a White SMping m 4"Dduble Solid o I Yellow Striping 00 I 46 +63 +02 +36 "Single Solid ~ +77 White Striping ~ ~ 0+0 \ - I 0 O +53 48 40 4"Single Solid ~ ~ White Striping k ~, Job Corps . Center Job Corps ~ Sta 808+3i RT Center Sta 811+42 LT RELOCATE f A q 0 N O ti L cd~~ ~~ti o6G9 5ree~ ~o ,fix 1~ e cr~~Q \ ~~ ~a~ \, 4" DoubleSolid ~ Yellow Striping / (/ \ \~ Jj > \V. I ~ \``~~ ~\ 4"Single Sold White Striping NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4. Pavement markings in parking areas shall be Thermoplastic. d ~~ 4"Doub/eSolid- Yellow Striping Y Cherokee ~ C~ Gat I f nburg 4"Single Solid ~ 9~ Sta 791+i4 LT White StHping z 4"Mini-Skip White Striping '~ 4"Solid Chevron ~ Striping !n Gore n +35 o G~ See Detail E634-4 +60 +91 E / +40 +85 +00 / ~~, ,.. ` / ~ ~~.~ ~ _ -~ 41 , ~' +00 ___~ ~~~ /~~ +80 ~ `---= 4"Single Solid ~~r' 4"Single Solid { \ ~ ~ White Striping White Striping , +85 ' +7 STOP- ~~ 11"Stop Bar ` 1 \ Sta 000+25 LT y\ "Solid Chevron /~ Striping in Gore 1~ ~ ~ See Detail E634-4 ~C// c Y N ~ (~ 4" Single Solid ~ F ~ \ , White StripMg ~/ . ~7 i~ 10' x 10' Typ/cal ~ ~,~i ~ ~ o ``mil c~~/ /~` 1-/~ '~~ 24~'fYP `i , ~ `\1 \\ J~ .arc \~ y ~~`\ 4"Single Salia White Striping Kee Gne~o \Q i i 1 F I L i I I i 7 1 i 1 NOTES 1. Baseline stationing is based on wheel measurements ~~ along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, D herokee -~ Statlon 769+SO to 5tatlon 783+50 q~ SroMM Ret' PS P 0 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. V A y L z -~~- 4"Double Solid White Striping ~ 25 r,,,~--1 +2 . ~ ~` I ~-+~3 +73 `~, GatE-- 9 ~4" Single Solid Sta 745145 RT White Striping MILE MARKER SEE DETAIL E621 A Begrn Option 1 Sta 743100 Tie to Existing Pavement Marking 4"Double Sallc Yellow Striping REG STATE PROJECT SHEE N0. SE NC PRA-GRSM 1819 1-T.1 4"Single Solid Eo White Striping r` ~ v n ~ + Vl y h vo GAV Rogo O Cherokee H -~ v ~ ~------------------i 7+ j ® Smokemount 3~ q~ i m I f ~ j Collins Creek 4~ ` I I 4"Double Solid ~ ~ ___ ~ ~~ Sta 768110 LT ~---- White Stnping N a ~ +71 ti +71 Op 0 1 ~ +4 ~ ~ ~ V ~ NEWf0UN0 GAP RDAD O o ~ + p '~ QI ° y ' 4"Single Solid ~ N White Striping C a . ~ NOTES, .~ Cherok ~° Gatl u~ l e '~ e ~ ~ 1. Base ine stationing is based on wheel measurements ~ along the left side edge of pavement. The pavement Y has been measured and PK nails every 500 feet. us. DEPgRTMENr oFrRgNSVOargnoN FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL (ANDS HIGHWAY DMSION i 2. All striping shall be in accordance with the Manual on GREAT SMOKY MOUNTAINS NATIONAL PARK a Uniform Traffic Control Devices (MUTCD) latest edition. NEWFOUND GAP ROAD - 1619 3. Signs shown reflect existing signs and layout, proposed OPTION 1 informational signs shall follow sign schedules, SIGNING AND MARKING 0 Station 743+00 to Staton 769+50 e ~ P® sou m rwr ~ NPS PM15 NO.: W0563 Erosion Control Narrative GENERAL GUIDELINES: The Eros1o» Control Plans (ECP) are meant as a guideline for preventing erosion and controlling sediment. The work outlined In this non-alive consists of applying measures throughout the life of the project to control erosion and minlm/ze the sed/mentatlon of NverS, streams, and Impoundments such as lakes, reservoirs, bays, and coastal waters. The measures consist of stabilization and structure! pactfces, storm water controls and other miscellaneous pollution prevention conGv/s, The Contractor Shall I. Coordinate the installation, use, and removal of erosion and sediment control measures with roadway rnnstruction activities toassure economical, effective, and continuous erosion and sediment rnntrol. Employ temporary stabilization practices !n Incremental stages as construction proceeds. 2, Install al! erosion and sediment control measures as show in the ECP or as directed by the Contracting O~cer (CO). Do not modify the type, size, or location of any control or practice without approval from the CO. 3. Work to prevent initial sot! erosion rather than trying to control eroded sediment Therefore, stabilize all disturbed areas as soon as practical, but no more than 14 days aRer construction activity has temporarily or permanently ceased. 4. Control only sediment-laden runoff generated by the project site. 5. Do not drive construction equipment across flowing waterways. 6. Do not allow construction vehicles to track sediment off site of the project limits. 7.In general, preserve existing vegetation, trees, and shrubs when possible, and where directed by the CO and as directed in section 107 of the Special Contact Requirements. Project Description: This project is located in the Great Smoky Mountains National Park, Swain County, North Carolina and functions primarily as a tourist destination. Option I of this project begins roughly 0.5 miles south of Tow String Road and ends at the southern park boundary near Cherokee, approximately 2.4 miles. A majority of the project is two lane shoulder section wJth roughly a mile of the roadway being a 4 lane med/an divided faci!!ty, fie scope of work for Option i is rehabllitatian of the existing roadway, roadside pullouts, parking area at Mingus MJII and parking area at Oconaluftee Visitor Center, which will include milling, patching, resurfacing and reconstnrcting the existing roadway. Addltlonal improvements wlfllnclude dalnage, pavement markings, tafflc control and other work. Existing Site Conditions: The proposed site consists of rock outcrops and modeately steep to very steep well dalned soil. The dalnage makes its way through a selves of ditches and storm chin systems and ultimately into the Oconaluitee River, the major dainage way for the area, where it continues flowing to Fontana Lake. CNtlcal areas: Extra care should be taken .when constructing culvert replacements, to prevent silt from entering waterways. Ofd site areas: DuNng excavatlo» operations, the removed asphalt pavement and excavated material shall be /egaUy disposed of off government property: Erosion and sediment control measures; Silt Fence - A temporary sediment barrier consisting of awire-backed synthetic filter fabric stretched across and attached to suppofing posts and entrenched. Block and Grave! Drop Inlet Protection (Type C) - A sediment frlter area around a storm daln Inlet. Curb Inlet Protect/on Block and Grave! (Type DJ - A sediment filter area around a storm chin inlet. Outlet Protection - Structua!!y lined rip ap aprons at the outlets of pipes. Rock Check Dam -Small tempoary srone dams constructed across a Swale or drainage ditch. Seeding -The use of vegetation in stabilizing exposed areas. SEQUENCE OF CONSTRUCTION: PERIMETER CONTROLS: PNor to any cleating, grubbing, and excavation construct perimeter controls along the project site to ensure sediment does not leave the project site. Use silt fence as a perimeter rnntrol. INTERMEDIATE CONTROLS/STABILIZATION; Applylntermediate controls duNng rough grading and culvert installation operations. The CO's approval must be obtained before installing controls not specified in the erosion control plan (ECP). The CO may direct the installation of certain controls In order to forestal! or mitlgate potential or existing erosion problems.. Intermediate Controls Include: Applying turf establshment on uncompleted disturbed areas that will remain exposed for over 14 calendar days or as directed by the CO. As soon as practical, but not to exceed i4 calendar days, apply permanent tun` establishment to the frnlshed slopes and ditches according to Sections 157 and 625 of the FP-03. At the end of each day's grading operations, shaping earthwork to minimize and contra! erosion fom storm runoff. Installing check dams along ditches as directed by the CO. Remove check dams Immediately prior to flna! channel grading and stabilization. Installing inlet protection prior to diverting water through Inlets. Provldfng silt fences around all stockpiled excavated roadway material. Applying mulch or turf establishment to stockpiles remaining !n place longer than 14 days or when directed by the CO Ensuring that culvert entrances, outlets, and outlet channels are at flna! gade and are stabilized (with vegetation, Npap or pavement) before routing dafnage through rnmpleted culverts. Installing silt fences Immediately behind completed headwalls and removing any silt fence blocking the culvert end(s). FINAL CONTROLS/STABILIZATION: ARer completlon of roadway construction and as directed by the C0: Frnish gading, pave, Npap and apply permanent tun`estabJishment. Where necessary, replace eroded topsoil and reapply permanent turf materials to disturbed areas where vegetation has not been established. Inspect, clean, and repair all culvert outlet ripap protection and stabilized channels. Remove s11t fences and inlet protection only after all upslope areas are stabilized and vegetation !s well established. MAINTENANCE PLAN: All erosion and sedlmentatlon control devices shall be checked by the contactor for stability and opeation no less than once per week and also within 24 hrs of any afnfalf producing more than 0.4 !n of rain within a 24 hr period. Any needed repairs will be made Immediately to maintain all measures as designed. Maintain a cumulative and current written log of the. condition of the erosion control devices and submit to the CO upon request. Maintain erosion contra! devices as follows; Sift Fence -Retrench if fence has been undermined and replace any deterloated fabric. Sediment shall be removed when the level of sediment deposition reaches half way to the top of the barrier. Check Dam -Remove sediment accumulation behind the dams when it reaches one half the oNgina! height. Add stone to dams as needed to maintain design height and cross section. Seeded Areas - The seeded areas will be checked regularly to ensure that a good stand fs maintained. Fertilize and reseed as needed. If sh ~be tempoal ~ seeded and erosion cror°rol devlcesl mal~nedas Storm Daln Inlet Protectlorr (Type C) -Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one half the design depth of the trap. 0 F a a 0 N 7 M r Pullout at Sta 880+50 Mill and Overlay per Typical Section Maintain Existing Curb Reveal Remove Tnsh Can Pad Remove i7 Concrete Wheelstops Jt9 x Ga~`1~,e NOTES: / ,~ :. ~ ~~ ~ ~o,o~ ~/ ~,,~ ~Silt~frence LF drp /~ / / ~ ~, '~`1 ,/~/ sm:.,r".-~ ,~~ ~~~~~ /,~ ~ ~~ Remove 18 Concrete Wheelstops m o< Om m0 mZ ~m ~~ mA DO vo `I C ~~~-~ ~/ ~ N~FOUND GF~ R ~;--i ~~~ ti- -- --~ x ~t -+ ro o-=_ -. o amvx vkvE 00 -~ vrur Rnx sra ~~ ,-- ,~ I ~ ~~--- J-- rim ~ ~`--~-~ .~~- /--~~ i S~ m; ° /~ ., o ~~ ~ ~ /r /, ~~ ~; a ,c /~ ~~ -,,~` Kt "~~,~.,~ ~~~:. ~~-~" ~-Install Temporery Inlet Protection, Type C 877+72 Install b8 LF -18"HDPE Type S Pipe Install Type 6B Inlet RT Install Stone Masonry Headwall LT 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK Halls every 500 feet. 2. Utility locations are based upon field surveys and utility records. Ali utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify-With CO Prior to Construction 881+71 18"RCP Grade Ditch to-~ Drain to Inlet Begin STA 887+00 End STA 890+I5 rLimlts ofVaving eve 22 Concrete Wheelstops End Pro ect n pion WL STA 890+75 Install 30 LF Silt Fence "'-~ ~~ ~ -.~:. \ \ . ~~ Install Temporary Inlet Protection, 890+15 Remove 80 LF -.16%14" CMP and Inlet Instal! 68 LF - 24" HDPE type 5 Pipe Instal! Type 681n1et RT Install Stone Masonry Headwall LT ~~ s~.f PR ~\ ~(~~. ~~r ~~ • ~ , z --~--- Pullout at Sta 870+00 Mill and Overlay per Typical Section Maintain Existing Curb Reveal Remove and Reset 12 LF Stone Curb, Sta 868+70 Median 866+17 NB 18"RCP Clean Pipe 7 L c 1 a 4 4 0 Remove 56 Lf-18" CMP (Assumed Length) Remove Inlet RT (Assumed Inlet) Install 56 LF -18"HDPE Type S Pipe Install Type 6B Inlet Median Remove and Reset Stone Masonry Headwall LT NOTES: 1. Baseline stationing Is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor priorto construction activity. Approximate Location of full Depth Pavement Reconstruction Verify With CO Prior to Construction Install Temporary Inlet Protection, Type D 0 n ~' ~ 871+55 Install 8 Lf - IZ"HDPE Type S Plpe Instal! type 6A Inlet Install Stone Headwall Insta1130 LF Silt Fence ~mwu wuu c~c arc„ ... w.. .............-... Instal/ 10 LF -18°HDPE Type S Pipe RT Clean Plpe Proposed: Vanes 1 1/Z" to 21/2"Thick SACP 1/2"Nominal Max Size A,~gregate, - 0.3x106 to <3x10 ESAIs Asphalt Tack Coat - wheel Line ~ Variable Depth Aggregate Topsoil i .' ~ Roadway Existing: ~ Variable Depth Asphalt Pavement ~~ i Aggregate Base ; Variable Depth Aggregate Topsoil i i Debris MATCH I MATC.- F~ I MATCH EXISTING _ IX ~ ,%/ EX157 ----- ~ _ --~ ~~ --- -- ------------------------------- ---- I I I I Rernndition Ditch VARIES 10' +/- 10' +/- TRAVEL JANE TRAVEL LANE TYPICAL SECTION N0. 3 SIDE ROADS DVERLAY PAVEMENT SECTION (MINGUS MIL1) (PARK CIRCLE DRIVE) (BLUE RIDGE PARKWAY) (BIG COVE CONNECTOR ROAD) Proposed: i 1/2"Thick SACP 1/2" No !V Pavement Smoothness 0.3 x 106 to < 3 x 106 ESAL's Type Asphalt Tack Coat ~/: 71/2" Thick SACP, 1 "0 3 x106 ~o <S3 x 10 SAL s Mill Existing Pavement 61/2" VARIES ~ _ VARIES Existing: Minimum 6"Thick Asphalt Pavement Aggregate Base -1 --- ----- L * NEITHER LIFT TO EXCEEDA4 INCCHQESAL LIFTS, a Q M N O N m ti DETAIL A-I Full Depth Pavement Reconstruction See Plan Sheets for Locations NOTES: 1. Locate al! ut01t(es prior to beginning work. Call North Carolina One-Calf Serivice (800) 632-4949 or (336) 855-7799. 2. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated in plans. 3. Match proposed curve widening In superelevated sections to existing unless otherwise stated in the plans. 4. Recondition ditch and install type 1A erosion control matting as d/reded by the CO. 5. Place aggregate topsoil course and seed all disturbed areas, except paved areas, in accordance with sections 305 and 625. 6. Maintain a final elevation of shoulder, 1%2--inch below edge of pavement 7. Round hinge point as directed by CO. 8. Maximum shoulder rollover is 8%. 9. WL =Wheel line survey L z ~~ 803+70 i8" CMP Clean Pipe Pullout at Sta 808+00 Mi11 and Overlay per Typical Section Maintain Exist Curb Reveal Sta 807+79, Remove 5 LF- 4"PVC Install 10 LFType 1 Waterway Sta 808+60, Remove 7 CF- 4" PVC Install 10 LF 7ype 2 Waterway i ;` LLir ~l I~ ~l ~~ pl~ o ~ ~ u ~!~ Y i 4- Cherokee ~ -----i 0+44 Limits of O ~`' -~- ~~~ t;;:; ~-" Insta1130 LF N~,vwu%~;`. - " Silt Fence ~!.~" ~i i~ , ice. ~Y .///~. ,// ~. it /," /; // F C ~~ Install Temporary Inlet Protection, Type D ~~t9 ~ Install Type 48 Inlet RT ati1~0 Install 51 Lf-14 °HDPF Type 5 Pipe install Concrete Headwall LT Grade Dutlet Ditch 8 LF to Drain NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior#o Construction i ~L Instal! 30 LF Silt fence I I~ ..„,;- - -; ,~- - - - - - N _ ~.~~ _ _~ -- --¢-.~- O V1 m Install Trafi'ic ~ ~r Detection Devices Install 30 LF ti, See Detail E636-1 Silt Fence ~ 810+00 810+96 Adjust Water Valve Remove 41 LF - i8"RCP as Needed Install 44 LF - 24" HDPF Type S Pipe Remove and Reset Stone Headwall LT and RT -1 -1 ~ STATE PROJECT Np, SHEE SE NC PRA•GRSM 1B19 1•C.5 z ~' a 0 u a' 4 O u c o° v y 0 i 'o 0 b N z 0 Y. Q a a 0 O A h n 813+21 Oconaluttee Visitor Center Parking Area Remove 64 LF -14"RCP/30"CMP Mill Exlsting Pavement 1 1/2 ; j Instal! 60 LF - 36" HDPE Type S Plpe Overlay 1 1/2"SACP, 1/2" NMSA, f Remove and Reset Stone Headwall RT Maintain Existing Curb Reveal -~ ~ ~0 Install Stone Masonry Headwall LT Remove and Replace35 Concrete Wheelstops ~?'~ ~ / Place Class 3 Rip Rap L7 ~ I' ~/ 11 I ` 'wenaa r~m~'~~row j Pullout at 813+50 ~ - --a P ~- --1 P i-- - -I P i-- - -+P ~-- ~ J_- --1 I ""~ ~ ~ .~J Mill and Overlay per Typical Section I '~• "'""- ~ ~„~/ ~J Maintain Existing Curb Reveal ~.~ _ `~ ~ ~. J \ Cherokee ~~ `--~ -- l \ ~ ®® ~----i J Existing Wetlands ii ~I =-~ ~ ~-:"' ~\ ~\® Do NotD(sturb d I I ~-'_' l ~\~ ~ ' tFlnce~ 1NV ~~ Install 30 LF , _~„,~_ - --;".~- L-_"'_- .= z. - \ t~ Silt Fence ----'- j'~ ( ~° ~ ~ L M ~~~~ /~ RI MMD Cp ,' ~3Y~ T3 PaRKW. SPACES ``G7 Q ~ ~ \ ~ T' -- --~"fir- ~ ~eud~-- - -'r~,~~~~r.: ~ ~ x.a - - x w j ---- - N ~ N ND GAP ROAD - ~ ~ / 3 '~ __ _ ._ -,~~-~__--+a~}---.~~ ------_--~;dl-----,-_'----_. '- - - - - - - - - NEWFY~UNDGAP h Q .. i M I-- -i 61- '- --~• l ~• U1 086~~ - ~~ rt Instal1301F ~~ ~ N ~ Silt Fence N n ~ ~ 00 0 ' ~. ' ~~jtL711V -IYf'V- au~ STA 821+00= Gdt~ -NFG- WL STA 820+85 820+40 NB 824+45 SB 18"RCP Remove 20 LF -18"CMP LT Install i6 LF -18"RCP LT Install Concrete Pipe CalJar Instal! Stone Masonry Headwall LT NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement us. DEP,u1m+B~oF~NSPOarAnoN has been measured and PK nails every 500 feet. FEDERAL HICHwAY aoMlNlsrRnnoN EA57ERN FEDERAL LANDS HIGHWAY DMSION 2. Utility locations are based upon field surveys and GREAT SMOKY MOUNTAINS NATIONAL utility records. All utilities shall be field located NEWFOUND GAP ROAD - 1619 by the contractor prior to construction activity. QPTION 1 LINE GRAPH Approximate Location of staao~ siz+ao w'swaon azs+sa - Full Depth Pavement Reconstruction ~. Verify With CO Prior to Construction s~„,~ NPS PMLS z ~~ Gat/inbvr 9 m Cherokee A i a 0 M N 0 i N m N G NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction 829144 5B ~ Clean Pipe-~ ~_- ~~~ ~ .,,_ ..,...~ ~~~ i8"RCP Clean Pipe ~' IF s Cherokee L o NOTES, 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement o has been measured and PK nails every 500 feet, r 2. Utility locations are based upon field surveys and $ utility records. All utilities shall be field located by the contractor prior to construction activity. h Approximate Location of Full Depth Pavement Reconstruction i; Verify With CO Prior to Construction 0 M 842+14 S8 ~ d' ~~ i8 RCP Instal! 2 Headwall Cap Stones LT Gean Pipe 846+34 SB i8"RCP Clean Pipe o k h 7 y 0 0 C "N\1 L Z p ^ Instal! 30 LF N Cl Silt Fence Gat~9 ~ ~ Instalr 7ialflc i C ~ Detection Devices See Detail E536-1 L~ -- - -~~-- -- - - - - ~~ a ~ Instal! Traffic i ~ Detection Devices See DetaU E636-i i NOTES, 1. Baseline stationing is based on wheel measurements along the left side edge of pavement.-.The pavement has been measured and PK nails every 500 feet, 2, Utility locations are based upon field surveys and utility records, All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction e4l 4 W I • i 0 Limits of Paving I Install TYatfJc 857+07 NB J I Detection Devices See Detail E636-i i2"RCP I t, .ti 1 ~, ~27RCPNB ~, `~' ,~ l / o ~ ,~ \ ~ _ NEWFOUND GAP ROAD NB _ _ _ _ _ _ ~ J~ q _ _ _ _ _ ~ ~n~XG, "'` NfWPoUNO GAP ROAD SB _ - _ ~ ~ '~ o ~~ - ~ `a1130 LF 855+29 SB 857+04 NB ~ "~'" -~. ~ C fence 18"RCP i8"RCP ~ {'' h hem Clean Pfpe 4i~~ti o~~e 855+20 SB 0 ~, Install 148 LF- 24"NDPE ~C ~~ type S Plpe r r Parallel to Existing P/pe ~a~G ~ Install Stone Masonry NeddWdll LT dnd RT Us. DEPARTMENT OF TRANSPORTATION - REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA•GRSM SB19 1-B.1 c "m M F m M C o° v y a 3 0 o' ti h n b O 0 tt I a 0 k U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION ' EASTERN FEDERAL LANDS HIGHWAY DMSION f g N ~ N ~, M - GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1819 OPTION i TABULATION OF QUANTITIES. ~ t~RS PMTS NO., W0563 Quantity Pay Item Item Description Unit NFG Rd, AS Re 'd Totals 15101-0000 MOBILIZATION LPSM 1 1 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM 1 1 15401-0000 CONTRACTOR TESTING LPSM 1 1 15705-0100 SOIL EROSION CONTROL, SILT FENCE WIRE BACKED} WFT 780 780 15706-0200 SOIL EROSION CONTROL, CHECK DAMS EACH 10 10 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C .EACH 4 4 15706-1400 SOIL EROSION CONTROL, INLET PROTECTION TYPED EACH 2 2. 20301-1200 REMOVAL OF HEADWALL. EACH 1 1 20301-1400 REMOVAL OFINLEf EACH 3 3 20301-2400 REMOVAL OF SIGNS EACH 79 79 20301-3400 REMOVAL OF WHEELSTOP EACH 148 148 20302-0600 REMOVAL OF CURB, STONE WFT 45 45 20302-2100 REMOVAL OF PIPE CULVERT WFT S84 584 20303-0300 REMOVAL OF CONCRETE SQYD 2 2 20425-1000 DIICH,EXCAVATION WFT 832 832 20701-1300 EARTHWORK GEOTEXTILE, TYPE 1V-8 SQYD 25 25 21101-1000 ROADWAY OBLITERATION. SQYD 440 -440 25102-3000 PLACED RIPRAP,CLASS 3 TON 19.2 19.2 30101-1000 AGGREGATE BASE GRADING C TON 10 10 30302-1000 DITCH RECONDITIONING LNFT 10100 10100 30501.0000 AGGREGATE TOPSOIL COURSE TON 1259 49 1308 40101-0600 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 5314 5314 40101-1400 SUPERPAVE PAVEMENT,1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 9968 818 10786 41301-0000 ASPHALT PAVEMENT MILLING (VARIABLE DEPTH 0"TO 1 1/2") SQYD 2200 2200 41301-0600 ASPHALT PAVEMENT MILLING,2-INCH DEPTH .SQYD 41125 41125 41301-1300 ASPHALT PAVEMENT MiLLING,6-INCH DEPTH SQYD 6867 3189 10056. 42801-0150 FLEXIBLE PAVEMENT,FULL DEPTH PATCH, TYPE 2 SQYD 642 418 1260 60103-0100 CONCRETE, HEADWALL FOR 18-INCH PIPE CULVERT EACH 1 1 60103-Oi40 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 1 i 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT EACH 1 i 60201-0400 12-INCH PIPE CULVERT LNFf 8 8 60201-0600 18-INCH PIPE CULVERT- WFT 328 328 60201-0800 24-INCH PIPE CULVERT LNFT 340 340 60201-1000 36-INCH PIPE CULVERT LNFT 148 146 60403-0000 INLEf(OPEN THROAT) EACH 1 1 60403-0900 INLET, TYPE 4B EACH 1 1 60403-1700 INLET, TYPE 6A EACH 1 1 60403-1900. INLET, TYPE 6B EACH 3 3 60503-0000 GEOCOMPOSII'E PAVEMENT EDGE DRAIN SYSTEM LNFT 10212 .10212 60704-0000 CLEANING CULVERT IN PLACE EACH 13 13 60708-0000 CONCRETE PIPE JOINT REPAIR EACH 1 1 60802-0200 PAVED WATERWAY, TYPE 2 LNFT 50 50 60910-0000 RESET CURB WFT 167. 167 60915-1000 WHEELSTOP,CONCRETE EACH 91 91 61108-1000 ADJUST WATER VALVE EACH 2 2 62001-0000 STONE MASONRY CUYD 0,04 0.06 0.1 62011-0100 STONE MASONRY HEf1DWALl FOR 12-INCH PIPE CULVERT EACH 1 1 62011-0300 -STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT EACH 3 3 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT EACH 4 4 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT EACH 1 1 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL EACH 7 7 62101-0000 MONUMENT (MILE MARKER) EACH 3 3 62501-0000 TURF ESTABLISHMENT ACRE 4 4 Quantity Pay Item Item Descrlption Unit NFG Rd. As Re 'd Totals 62901-0500 ROLLED EROSION CONTROL PRODUCT, TYPE 2A SQYD 5620 5620 63302-0000 SIGN SYSTEM (UNIGUIDEJ SQFT 490 490 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING SQFT 425 425 63401-1500 PAVEMENT MARKINGS,TYPE H, SOLID LNFT 5368 5368 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID WFT 61010 61010 63401-2400 PAVEMENT MARKINGS, TYPE L, BROKEN WFT 9973 9973 63405-1250 PAVEMENT MARKINGS, TYPE C, ACCESSIBILITY SYMBOL EACH 7 7 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW EACH 9 9 b3405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW EACH 7 7 63405-3000 PAVEMENT MARKINGS, TYPE H, STRAIGHT RN ARROW EACH 1 1 63405-3050 PAVEMENT MARKINGS, TYPE H,"ONLY" WORD MESSAGE EACH 1 1 63502-0100 TEMPORARY TRAFFI CONTROL, ADVANCE WARNIN ARROW EACH 2 2 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 24 24 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH . EACH 50 50 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 230 230 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 12 12 63502-2000 TEMP RARY TRAFFIC C NTR P RTABLE C ANGEABLE MES AGE EACH 1 1 63503-0700 TEMPORARYTRAFFIGCONTROL,PAVEMENTMARKINGS WFT 61200 61200 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL WFT 3000 3000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 615 615 63506-0500 TEMPORARY TRAFFIC CONTROL,FLAGGER HOUR 834 834 63602-6020 SYSTEM INSTALLATION, TRAFFIC0ETECTOR WIRE LOOP EACH 10 10 63701-0000 FIELD OFFICE EACH 1 1 64502-0000 LOCATE UTILITIES EACH , 5 .5 R M REG STATE PROJECT SHEET TOTAL- N0. SHEETS SE NC PRA-GRSM 1819 1-8.8 LOCATI ON PANEL SIZE TEXT SIZE Sign No Text No Sign Text Station Side Width Hei ht 9 Area Carver Radii Border Width flargin Width Numbers Upper Case over Case Series Color b C Quantity TatalArea Su ort Remarks . . (inJ (oJ (sq ft) (inJ (in.) (inJ (m.l (inJ (in•1 . am (s ft) tNo Pa ) Y 15+52 LT 15+80 LT 22+46 SB LT Remove. & Replace Existing 22+46 SB RT Signs oo NOT 23+90 NB RT White 8(1112.5 Mount Opposite w/ Rl-l Signs. R5-I !! 75 68 7 ~ 23+90 NB LT 30 30 6.25 See ote ! on . =700 ®815+52 & 815+87 ENTER 57+58 SB LT Red .Mount. Opposite w/ W6-2 Sign 00+951 BR) RT ~ 866+48 58+95 SB tT 66+48 SB RT 66+48 SB LT Remove & Replace Existing 821+19 SB 'LT Black 2(1)12.5 Sign @ 866+38 2 l8 8 W6-! 866+38 NB RT 36 36 9 See ote f on °25 Mount Opposite w/ W6-2 Yellow Sign @ 821+19 Black .Mount Opposite w/ Sign W6-1 19 NB 827 RT 36 36 9 on 2 18 - o ~ t r 9 9 W6-2 + 866 48 SB LT See ote 1 osi to w/ Si n R5-1 0 PP g Yellow @ 866+48 Remove & Replace Existing FEEDING BIaCk Signs 10 CUSTO WiANDFE 822+52 NB LT 36 36 .9 IJ3 .6 .3 - 4/3 - 2000 on 1 9 - Changeable Sign System PICKING PLANTS White (Reta~nJ w/ Signs No. l2, 13, PROHIBITED 14, 15 Remove & Replace Existing RonD Black Signs !! CUSTOM CLOSED 3MLAHEAD 822+52 NB LT 36 36 9 1.50 .6 .47 4 6/4 - 2000 on 1 9 - Changeable Sign .System White (Retain) w/ Signs No. 12, 13, TURN HERE 14, 15 Remove & Replace .Existing RoaD Black Signs. 12 CUSTO CLOSED 15 MILES 822+52 NB LT 36 36 9 1.50 .6 0.4 6 6 - 2000 on 1 9 - Chan eable Si n S stem 9 9 Y 12 13 !Retain) w/ Signs No ~,~ White , . , 14, 15 Sheet Total lU !31.75 I25 uFEDERALH~IGHWAYAD INPISTRATTONN EASTERN FEDERAL (ANDS HIGHWAY D1VlS10N NOTES: GREAT SMOKY MOUNTAINS 1. $ee "Manual On Uniform Traffic Control Devices" and "Standard HIg17Way SIgnS" NATIONAL PARK for dimensions. NEWFOUND GAP ROAD - 1619 2. Final locations of the signs shall be approved by the CO. oPTioN ~ PERMANENT ALUMINUM SIGN SCHEDULE NPS PMIS NO.: 563 a a E E u a gY ! Q N r 0 N a ., L_ REG STATE PROJECT SHEEr N0. TOTAL SHEETS SE NC PRA-GRSM 1819 1.8.15: LOCATION PA EL SIZE TEXT SIZE Sign Text Carver B d Id i No. No. Si n Text g Station Side Width Neght Area Rani or er Width arg n Widfh Numbers Upper Case ower Case Series Calor Quantit y Total Area Support Remarks (inJ Gn.l (sq ft) (in.l (inJ (h,) (inJ (inJ (in.) Comb. (s ft) (No Pay) ROAD Mount .warning lights Type B with WORK Black flags on each .non-portable sign ! W20_l , - - 48 48 l6 312J12 Requires double post See ote 1 on 7 112 AHEAD =T2 Portable signs (4) Orange Black Requires double post 2 G20-2 ROAD WORK - - 48 24 8 3(2)12 Portable signs t4J See ote I on 7 48 Orange =72 ROAD woRK Mount warning lights Type B with ,j MOD NEXT 3 MILES - - 60 30 12 5 Black 3(2)12 flags on each .sign Re uires double t G2Q-l EXPECT DELAYS . See ote I on 3 37.5 q pos _72 Orange Portable signs W20-4 ONE LANE Black 4 ROAD - - 48 48 l6 - See ote ! on 2 32 AHEAD Orange Mount in combination with other ~(~( %' Block portable signs 5 W13-I V~ - - 24 24 4 MPH See ote I on 8 32 - Orange Portable sign . Black 6 W20-7a - - 48 48 !6 S - ee ote I on 2 32 Orange Portable ign 7 W2/-5 SHOULDER - - 30 30 6 25 S t Black . ee o e l on 2 12.5 WORK Orange NOTES: Sheet Total 31 306 216 UFEDERALHGHWAYADMNISTRATIONN EASTERN FEDERAL LANDS HIGHWAY D1VLS10N 1. See "Manual on Uniform Traffic Control" and "Standard NiCJhWay $IgnS" GREAT SMOKY MOUNTAINS. for dimensions ,NATIONAL PARK . NEWFOUND GAP ROAD - fBl9 2. See Traffic Control Plan and Details for Approximate Location. oPTioty ~ 3. Final locations of the signs shall be approved by the CO. cofvsTRUCTION SIGN- SCHEDULE 0 a m e hr_ i E m N a N a 0 N A M L - - REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM 1819 1-6.12 LOCATI ON PANEL SIZE TEXT SIZE Sign No Text No Sign Text Station Side Width Nd hf 9 Area Comer Radii Border Width Margin Width .Numbers Upper Case ower Case Series Color Quantity Total Area Su ort PP Remarks , . lin.) lo.} (sq ft) (inJ (in.) (in.} lin.l (in.l lin.l Comb, (s ft) (No Pay) Mingus MI I ~ White ((2)12.5 Remove & Replace Existing 1 H I stor ~ o cr l stm ~ I I 779+79 RT 67 45 21 t I n I 21 See o e o =25 Sign NEXT Rl GHT Brown cnerokee ~ White I(2)12.5 Remove & Replace Existing 2 791+14 LT 54 30 11 25 S t I n 1 11 25 . ee o e o . . =25 Sign a Gatllnburg Brown Mingus Mr I I White 112112'5 Remove & Replace Existing 3 Historic Gristmi I l 799+08 LT 67 45 21 S t 1 on 1 21 Si n 9 ee o e NEXT LEFT BrOWn =25 `~ cen errps 808+31 RT 48 22 7 33 t 1 White On l 7 33 1(1)12.5. Remove & Replace Existing 4 t . See e O . =12.5 Sign Brown 5 Job corps ~ 811+42 LT 48 22 7 33 S 1 t White on 1 7 33 I(l)12.5 Remove & Replace Existing center . ee o e Brown . =12,5 Slgn aoconoluftee White 1(2)12.5 Remove & Replace Existing vlsftor center 816+39 RT 96 58 38 67 S l t On l 38 67 6 Mountain Farm . ee e o . . =25 Signs Museum 6roWn Remove & Replace Existing a cnerokee 820+40 RT 54 30 11 25 White n 2 22 5 2(2)12.5 Signs 7 Gatltnburg ~ 823+00 S8 RT . See ote l o Brown . =50 Mount w/ R6-1 Sign (One Way) ~ 823+00 Sheet Total 8 IL9,OU I75 U.S.DEPARTMENiOFTRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION NOTES EASTERN FEDERAL LANDS HIGHWAY DMSION : (. Sign depiction for content display only. Final layout, SlZing, font, Ond C010r GR~NATIONALPARKAINS Will f011oW the ~~NOtlOnal Park .Service Uniguide $tandardS~~. NEWFOUND GAP ROAD - 1619 2. Submit. shop drawings of a!1 signs to the G0 for approvdi prior to fabrication. OPTION 1 PERMANENT SIGN SYSTEM 3. Final locations of the signs shall be approved by the CO. SCHEDULE (UNIGUIDE) NDC DMiC Nfl • MIISR2 a° y ql E m E e M h 0 0 N P ' ~~ ~~ L REG STATE PRO]ECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM 1819 1.8.11 LOCAT ION PANEL SIZE TEXT- SIZE Sign Text C B d h( i U No, No. Si n Text g Station Side Width Heght Area orner Radii or er Width arg n Width Numbe rs pper Case over Case Series Color Quantity T al o Su ort p Remarks (in.) 1~.) (sq ft) (inJ (in.l (in.) (in•1 (inJ (inJ. Comb. (s ft) (No Pay) Black Wll-2 ~ 889+12 RT 30 6 25 S on Fluor- IllJl2.5 Remove & Replace Existing 27 30 . ee ote 1 ! 6.25 i escent =12.5 S gn Yellow- Green 28 W3-5a 35 MPH SPEED ZONE 883+81 RT 30 30 6 25 S Black on lllJl2.5 Install Si n g . ee ote I ! 6.25 ~~ Yellow =12.5 RESER~EO Green/ Mod. R7-8 PA~arvc Min Mill 12 l 5 Blue 7(1)12.5 Instal! Sign 27 ~~ OVC _ IS . See ote 1 on 7 10, 5 =87.5 White 28 R7-86 v'~ Min us Mil! g 18 9 1 125 S White on _ Mount w/ Sign No. 27 ACCESSIBLE _ . ee ote l 3 3.375 OVC Blue Sheet Total l2 26,375 112.5 Total 69 423.42 562.5 Rounded Total 69 425 565 NOTES U.S. DEPARTMENT OF TRANSPORTATION TERN FEDERAL LANDS H16HIW~AY DIVISI A : E S ON 1. See " Manual on Uniform Traffic Control Devices" and "Standard Higl)Way SlgnS" GREAT SMOKY MOUNTAINS for dimenSloRS. NATIONAL PARK NEWFOUND GAP ROAD -.1619 2 . Final locations of .the signs shall be approved by the CO. OPTION ~ PERMANENT ALUMINUM SIGN SCHEDULE NPS PMTS NO.: 090563 L REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 1-8.10 LOCATI ON PANEL SIZE TEXT SIZE Sin g No. Text No. Sign Text Station Side Width Height Area Carver Radi Border Width Margin Width Numbers Upper Case ower Case . Series Color Comb: Quantity Total Area Support (No Pa ) Y Remarks (inJ IfIJ (sq ft) (inJ (~L1 lin.1 (1e.1 lin.l (in.l (s ft) 861+70 SB RT Black 2 5 12 1(1112.5 Remove & Replace Existing 20 W4-2R 30 30 6.25 See ate I on . =12 5 Signs ~ 861+70 SB LT Yellow . cAMPINC Black !(012.5 Remove & Replace Existing 2! Custom P Nor Ti N D 864+82 NB LT 36 36 9 1. l3 .63 .38 - 5/4 - 2000 on ! 9 =!2, 5 Sign CAMPGROUNDS White Remove & Replace Existing White Sign WRONG 865+25 SB LT l2 22 R5-1a Wqy 865+25 SB RT 36 24 6 See ate 1 ~ ~ 2 _ Mount w/ W6-2 Sign, on Reverse Side Black WARNING on 11 / Y 1(2112 5 Remove & Replace Existing Wi di St oW e . Sign 23 Custom n ng eep, MDUntoln Road 873+49 LT 79 65 35.66 1.50 ;6 0.4 6 8/6 4.4 2000 White ! 35.66 =25 Capable of Being Flipped. w/ NEXT 35 MILES On SI gn No. 24 Brown Remove & Replace Existing BE PREPARED FOR Black Slgn 24 CUStom SEVERE WEATHER, 873+49 LT 79 44 24.14 1.50 .6 0.47 - 8 - 2000 on ! 24.14 - Capable of Being Flipped w/ ICE AND SNOW YEIIOW 23 Sign No . Black . Remove & Replace Existing COMMERCIAL - J 12 !(2112.5 Sign 25 Mod. VEHICLES 875+80 LT 48 36 12 1.13 .6 .3 5 - 2000 on =P5 . Mount w/ Sign No. 26 R5-4 PROHIBITED White Violators Black Remove & Replace Existing 26 Custom Sub ect to 1 875+80 LT 36 26 6.5 1.13 .6 .3 - 4 - 2000 on 1 6.5 _ Sign Mount w/ Mod. R5-4 Sign fine or arrest White Sheet Total 9 111.8 75 uFEDERA HGHWAYAD NISTRATIONN EASTERN FEDERAL LANDS HIGHWAY DMS10N 1voTES: GREAT SMOKY MOUNTAINS See "Manual on Uniform Traffic Control Devices" and "Standard Highway Signs" 1 NATIONAL PARK . NEWFOUND GAP ROAD - 1B19 .for dimensions. 2. Final locations of the signs shall be approved by the CO. PERMANEN ~ ALUMINUM SIGN SCHEDULE NPS PMTS NO.: 090563 a Q. F ~' F_ E E H m a m m" y F H m ti J 0 k f Q h o a 0 I 0 L M ocation /Station Range ength avement Construction Width ~ ( ~ PAY ITEM 21101-1000 Roadway Obliteration, Method 1 (SQYD) PAY ITEM 30101-1000 Aggregate Base Grading C (TON) PAY ITEM 30501-0000 Aggregate Topsoil Course RON) PAY ITEM 40101.0600 Superpave Pavement ~ 1 2-Inch / Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL TON PAY ITEM 40101-1400 Superpave Pavement ~ 1-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL N PAY ITEM 41301-0000 Asphalt Pavement Milling (SQYD) PAY ITEM 41301-0600 Asphalt Pavement Millin 2-Inch Depth (SQYD) PAY ITEM 41301-1300 As halt P Pavement Milling, 6-Inch Depth (SQYD) Pullout Sta 808+00 Z6 217 Pullout Sta 813+50 56 458 Pullout Sta 870+00 108 891 Pullout Sta 880+50 33 275 Mingus Mill 52 75 Park Circle Dnve 32 31 Blue Ridge Parkway 72 173. Big Cove Connector Road 73 27 .Mingus MIII Parking Area 10 209 5 Oconiufee Visitor Center 505 SHEET TOTAL 0 10 229 1243 5 1841 0 0 TOTAL 440 10 1259 5314 9968 2200 41125 6867 b M N 4 7 O A h PAY ITEM. PAY ITEM 40101-0600 40101-1400 PAY ITEM PAY ITEM -PAY ITEM PAY ITEM PAY ITEM PAY ITEM Superpave Pavement Superpave Pavement, 41301-0000 41301-0600 Asphalt 41301-1300 Asphalt Pavement Construction 21101-1000 Roadway 30101-1000 30501-0000 Aggregate Aggregate , 1/2-Inch 1-Inch al i N Asphalt Pavement Pavement Pavement h Location /Station Range Length Width Obliteration, Base Grading Topsoil Course n om Nominal Maximum Size Maximum Size Milling Milling, 2-Inch Depth Milling, 6-Inc Depth (FEET) Method 1 (SQL) C (TON) (TON) Aggregate, 0.3 Aggregate, 0.3 (SQL) (SQYD) (SQYD) to <3 Million to <3 Million ESAL TON ESAL TON 18 62 125 733 Sta 743+00 to 746+00 300 22 27 72 256 428 428 Sta 746+00 to 749+50 350 22 39 113 230 1344 Sta 749+50 to 755+00 550 22 164 -836 1956 Sta 755+00 to 763+00 800 22 50 110 329 669 3911 Sta 763+00 to 779+00 1,600 22 41 146 244 244 Sta 779+00 to 781+00 200 22 13 82 167 978 Sta 781+00 to 785+00 400 22 25 97 341 548 611 Sta 785+00 to 789+50 450 22 28 171 349 2039 Sta 789+50 to 794+00 45D 26 82 293 489 489 Sta 794+00 to 798+00 400 22 25 154 314 1833 Sta 796+00 to 805+50 750 22 47 154 784 1773 Sta 805+50 to 813+00 750 22 38 62 125 733 Sta 813+00 to 816+00 300 22 10 21 73 122 122 Sta 816+OOto 817+00 100 22 6 22 128 260 1522 Sta 617+00 to 821+00 400 240 488 2856 Std 821+15 SB to 834+00 SB 1,285 20 40 523 1064 6222 Sta 821+00 NB to 849+00 NB 2,800 20 85 67 111 111 Sta 834+00 SB to 835+00 SB 100 20 3 ig 67 111 111 Sta 849+00 NB to 850+00 NB 100 2D 3 19 855 5000 Sta 835+00 56 to 857+50 SB 2,250 20 70 420 627 3667 Sta 850+00 NB to 866+50 NB 1,650 20 46 308 95 222 Sta 857+50 SB to 858+50 SB 100 20 3 1g 152 889 Sta 858+50 SB to 862+50 SB 400 2U 13 75 67 121 111 Sta 862+50 SB to 863+50 SB 100 20 g 19 95 566 Sta 863+50 SB to 866+00 SB 250 20 g 47 71 167 Sta 866+00 SB to 866+75 SB 75 20 2 14 193 445 278 g 60 Sta 666+50 to 867+75 125 76 155 917 Sta 867+75 to 870+00 225 li 26 ~ 195 122 Sta 870+00 to 871+00 100 6 43 87 522 Sta 871+OOto 873+00 200 7 62 125 743 Sta 873+00 to 876+00 300 22 19 21 73 132 122 Sta 876+00 to 877+00 100 22 6 2S2 575 3371 Sta 877+00 to 890+75 1375 22 83 27 55 333 Median X-Overs 70 24 200 Pullout Sta 744+50 440 15 159 60 Pullout Sta 757+00 4071 9963 359 41125 6867 440 0 1030 . SHEET TOTAL L REG STATE PROJECT SHEEP TOTAL N0. SHEETS SE NC PRA-GRSM 1819 1.8,5 c a a "m H 6 H m b v h a a 8 z 0 h b M 3 0 z z~ a 0 k U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DNIS]ON ~ GREAT SMOKY MOUNTAINS NATIONAL PARK N NEWFOUND GAP ROAD - 1619 7 R OPTION 1 ~ DRAINAGE SUMMARY 0 - PS PM15 NO.: 090563 TATION PAY ITEM 60201-1000 36-Inch Pipe Culvert (L~1F1') PAY ITEM 60403-0000 Inlet (Open Throat) (EACH) AY ITEM 60403-0900 Inlet, Type 4B (EACH) AY ITEM 60403-1700 Inlet, Type 6A (EACH) AY ITEM 60403-1900 Inlet, Type 6B (EACH) PAY ITEM 60704-0000 Cleaning Culvert In place (EACH) PAY ITEM 60708-0000 Concrete Pipe Joint Repair (EACH) PAY ITEM 62011-0100 Stone Masonry Headwall for 12-Inch Plpe Culvert (EACH) PAY ITEM 62011-0300 Stone Masonry Headwall for 18-Inch Pipe Culvert (EACH) PAY ITEM 6201.1-0500 Stone Masonry Headwall for 24-Inch Pipe Culvert (EACH} PAY ITEM 62011-0700 Stone Masonry Headwall for 36-Inch Pipe Culvert (EACH) pAY ITEM 62028-1000 Remove and Reset Stone Masonry Headwall (EACH) EMARKS 745+44 1 745+50 752+98 ~ 1 757+79 759+71 1 765+96 1 1 773+98 1 782+52 1 785+56 88 1 788+75 790+48 1 797+70 1 803+70 1 807+79 808+60 810+9fi 2 813+22 60 1 1 872+55 1 1 872+64 1 1 877+72 1 1 881+]i 887+00 890+15 1 1 NB 857+04 NB 1 663+63 NB 1 1 666+17 NB 1 SB 824+45 SB 1 829+44 SB 1 838+04 5B 1 1 842+24 SB i 846+34 SB 1 856+20 SB 2 869+00 SB Mingus MIII 1 TOTAL 148 1 1 1 3 13 1 1 3 4 1 7 i i PAY ITEM 60103-0100 PAY ITEM 60103-0140 PAY ITEM 60103-0180 PAY ITEM PAY ITEM PAY ITEM PAY ITEM 20301-1200 PAY ITEM PAY ITEM 20302-2100 PAY ITEM 20425-1000 pAY ITEM 25102-3000 Concrete, Concrete,- l f Concrete, all for d H 60201-0400 12-Inch Pipe 60201-0600 18-Inch Pipe 60201-0800 24-Inch Pipe REMARKS STATION Removal of 20301-1400 Removal of Removal of lvert C Ditch, Excavation placed Riprap, Headwall far 18-Inch Pie p or Headwal 24-Inch Pie p w ea 36-Inch Pipe Culvert Culvert NFT Culvert (LNFT) Headwall Inlet (EACH) u Pipe (WpT) (LNFT) Ciass 3 (TON) ) (EAC (LNFT) ) (L (EACH) (EACH) (EACH) H 745+44 745+50 752+98 757+79 3 759+71 28 765+96 1 28 773+96 8 782+52 85 6,4 1 785+56 145 168 788+75 166 6,4 i 44 790+48 8 1 797+70 803+70 807+79 5 808+60 7 52 810+96 42 4 6 813+22 64 , 8 872+55 20 872+64 1 20 68 877+72 881+71 315 68 887+00 890+15 1 80 NB 857+04 NB 56 863+63 NB 1 56 866+17 N8 SB 16 ' 824+45 SB 20 829+44 SB 838+04 SB 842+24 SB 846+34 5B. 148 856+20 SB 364 869+00 SB Mingus Mlil 1 1 6 328 340 i TOTAL 1 3 584 832 19,2 a ^, ~i O Q O q ti -1 t 0 F v F E E U, m 4 N a N L REG STATE PROJECT SHEET N0. TOTgL SHEETS SE NC PRA•GRSM 1819 1•B.7 LOCATION PANEL SIZE TEXT SIZE Sign No. Text No. Si n Text g Station Side Width Neighf Area Corner Rauh Border .Width Margin Width Numbers Upper Case lower Case Series Color Quantity T alA a Su ort p Remarks (inJ (inJ (sq ftl (inJ (in.) (inJ (in•) (inJ (inJ Camb. (s {~ (No Pay) SPEED 781+65 LT l R2-1 LIMIT 825+99 SB 851+05 NB RT LT 24 30 5 Black 41012..5 Remove & Replace Existing 45 See ote I on 4 20 =50 Signs 883+00 LT White 782+49 RT Black 311112 5 Remove & Replace Existing Mod. ONGESTE 30 30 & 25 S Si 2 W5-2 805+05 RT . . ee ote l on 3 18.75 gns AREA 831+22 NB LT Yellow °37.5 Mount w/ WI3-1 Signs. l35 M. P. HJ Remove & Replace Existing 782+49 RT Black Signs 3 W13-1 35 805+05 RT 18 18 2 25 ~P" . ee ote I on 3 6.75 Mount w/ Mod. W5-2 Signs 831+22 NB LT Yellow _ lCongested Area) as Seen on Plans 000+25tMM) LT 000+101 PCJ LT . 815+52 LT White Remove & Replace Existing 4 RI-I ~ 815+80 LT 30 30 6 25 9((112.5 Signs V V V Vf 820+10 N8 LT . ee ote 1 on 9 56.25 =112 5 Mount Opposite w/ R5-l Signs 820+12 NB LT Red , C 815+52 & 815+87 822+89 NB LT 000+151BR) LT 887+OS LT Red oh 5 R3-2 24 24 4 S Bl k !(012.5 Remove & Re lace Existin p g 814+85 RT ee ote l ac 1 4 - =12.5 Sign on White Red 6 R3-I 816+24 LT 24 24 4 S t on Black 1 4 111)12.5 Install Sign ee o e l on =12.5 White c~^ NOT S sheet Total 21 109.75 225 uFEDERALHIG WAY ADMNISTRATlONN L . EASTERN FEDERAL LANDS HIGHWAY DIVISION 1. -See "Manual on Uniform Traffic Control Devices" and "Standard Highway Signs" GREAT SMOKY MOUNTAINS. for dimensions. NATIONAL PARK NEWFOUND GAP ROAD - 1819 2. Final locations of the signs shall be approved by the CO. oPTioN ~ PERMANENT ALUMINUM SIGN SCHEDULE L REG STATE PRO]ECi SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 1-B.6 OPTION 1 PAVED OPTION 1 EROSION CONTROL SUMMARY WATERWAY SUMMARY a a " m F a F m h o° ~, r m a 3 8 0 N n b ti Sir S Q j U.S.DEPARTMENTOFTRANSPORTATlON 0 fEDERAI HIGHWAY ADMINISTRATION Y EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK a NEWFOUND GAP ROAD -1619 M OPTION 1 N PAVED WATERWAY AND EROSION CONTROL SUMMARIES m 0 a _ NPS PNIS NO.: 090563 ry '- ~ - TATION PAY ITEM 15705-0100 Soil Erosion Control, Silt Fence (LNFT) PAY ITEM Soil Erosion Control, Check Dam (EACH] -PAY ITEM 15706-1400 Soil Erosion Control, Inlet Protection Type C (EACH} PAY ITEM 15706-1400 Soil Erosion Control, Inlet Protectlon Type D (EACH) 765+96 60 773+98 30 785+56 60 790+48 60 797+70 30 1 810+96 60 813+22 b0 872+55 30 1 872+64 1 877+72 30 1 "890+15 30 1 NB 824+20 (wetland) 210 824+45 30 855+64 30 863+63 30 1 SB 856+20 30 As Re 'd 10 TOTAL 780 10 4 2 .STATION PAY ITEM 60802-0200 Paved Waterway, Type 2 (LNFT) 745+5D 20 757+79 10 807+79 10 608+60 10 TOTAL 50 L REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM iB19 1-8.9 LOCATI ON PANEL SIZE TEXT SIZE Sign No Text No Si n Text g Station Side Width Heght Area Corner Radii Bolder Width Margin Width. Numbers Upper Case ower Case Series Color C b Quantity Total Area Su ort PP Remarks . . (inJ lm.) (sq ft) (in.) (in.l Iin.) lb•) linJ l'm.) om . (s ft) (No Pay) Black Remove & Replace Existing l3 GUSTO sNOwrRES + B22 52 NB LT 36 36 9 1.50 .6 .4 - 6/5 - 2000 on Yellow/ 1 g - Si ns Chan eable Si n S stem g g y OR CHAINS Black (Retain) w/ Signs No. 12, 13, RECOMMENDED on 14, 15 White Remove & Replace Existing 14 GUSTO DANGER•ICE nRECHAINS 822+52 NB LT 36 36 9 1.50 .6 .47 - 6/4 - 2000 Black on 1 g - Sign$ Changeable Sign System REGUIRED White (Retain) w/ Signs No. l2, l3, AHEAD I4, l5 emove & eplace Existing Signs 823+00 SB RT Black Mount w/ Info. Sign C 823+0 S t l 15 R6-1 o A .823+46 NB RT 36 12 3 ee e o on 3 9 - . Mount Opposite w/ R6-1R Sign 858+22 SB RT White 0823+46 Mount- w/ Info. Sign C 858+22 SB - Remove & Replace Existing. S 1 t Black Sign 16 R6-1 nv 823+46 NB RT 36 l2 3 ee o e an 1 3 Mount Opposite w/ R6-IL Sign White @ 823+46 RIGHT 25 6 ~ l Black on I 6 25 ((1)12.5 Mount w/ W16-2 Sign 17 W9-1 LANE 848+50 SB RT 30 30 . See ote . =l2 5 No Yellow Black ° ° ° l 3 Mount w/ W9-1 Sign !8 W16-2 F E ~ 848+50 SB RT 24 l8 3 See ote ! on - Ye11ow Red ~EiD J(!)l2 5 Remove & Replace Existing on ! 4.5 . 19 RI-2 855+95 NB LT 36 36 4.5 See ote l _l2 5 Signs White Sheet Total 9 43.15 25 ~~oean~HIGHWAYADMINISTRATIONN EASTERN FEDERAL LANDS HIGHWAY DMSION NOTES: 1. See "Manual on Uniform Traffic Con-trop Devices" and "Standard Highway Sign S" GREAT SMOKY MOUNTAINS .NATIONAL PARK for dimensions. NEWFOUND GAP RQAD - 1B19 2. Final locations of .the signs shall be approved by the CO. oPTioN ~ PERMANENT. ALUMINUM SIGN SCHEDULE NDS PM15 NO.: 090563 0 Q M L REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA•GRSM 1B19 1•B.S LOCATI ON PANEL SIZE TEXT SIZE ower U l Remarks Comer Border Margin pper or Co i l A e T t Su ort PP Sign N Text No Sign Text Station Side Width Neighf Area Radio Width Width Numbers (in) Case -Case 1 (i Series Comb. ty Quant r a a o (s ft) tNo Pay) o. . (inJ (n.) (sq ft) IinJ IinJ lin,) (in.) n. 15+52 LT 15+80 LT Remove & Replace Existing 22+46 SB LT Signs 22+46 SB RT White 811112.5 Mount Opposite w/ RI-l -Signs D0 NDT 23+90 NB RT e S ote 1 on 11 68.75 0 ®815+52 & 815+87 7 R5-1 NB LT 30 30 6.25 e =10 -2 Si ~ 23+90 Red gn Mount Opposite w/ W6 ~r~R 57+58 SB LT C 866+48 00+951 BR) RT 58+95 SB LT 66+48 SB RT LT 66+48 SB i ti ng s Remove & Replace Ex Black 2ll)l2.5 Sign C 866+38 1 821+19 SB LT e S ote l on 2 18 25 Mount Opposite w/ W6-2 36 36 9 e = 8 W6-1 866+38 NB RT Yellow Sign @ 821+19 Black Mount Opposite w/ Sign W6-1 821+19 NB RT 36 36 9 See ote 1 on 2 18 _ @ 821+19 Mount Opposite w/ Sign R5-1 9 W6-2 , + 866 48 SB LT yellow C 866 48 Remove & Replace Existing Black Si ns FEEDING WILDLIFE 822+52 NB LT 36 36 .9 1.13 .6 .3 - 4/3 - 2000 on 1 9 Can ea61e Si n S stem 9 9, y (Retain) w/ Signs No. 12, 13, ~~ 10 GUSTO PICKING PLANTS WI)~te 14, 15 a E PROHIBITED ; emove & Replace Existing R 5 k 81 ^ SI nS n RonDD CL05E 822+52 NB LT 36 36 9 1.50 .6 .47 4 4 6/ - 2000 on 1 9 - C angeable Sign System (Retain( w/ Signs No. f2, 13, !1 ~ CUSTOM 3MLAHEAD TURN HERE White 15 14 n , 3 Remove & .Replace .Existing Black Si ns a o ~~ 5~i Es 822+52 NB LT 36 36 9 1.50 .6 0.4 6 6 - 2000 on 1 9 _ ngeable Sign System Ch (Retain) w/ Signs No. 12, 13, 12 o GUSTO AHEAD White 14, 15 ~ ~ U.S. DEPARTMENT OF TRANSPORTATION et l t T l8 75 13! 125 FEDERAL HIGHWAY ADMINISTRATION o a She . EASTERN FEDERAL LANDS HIGHWAY DMSION Q '` NOTES: GREAT SMOKY MOUNTAINS See "M 1 anual on Uniform Traffic Cont rol De vices" a nd "Standa rd Highway Signs" NATIONAL PARK NEWFOUND GAP ROAD - 1819 . for d a 2. Final imensions. locations of the si gns shall be appr oved by the CO. OPTION 1 PERMANENT ALUMINUM SIGN SCHEDULE NPS PMIS N ~: 0905 ~ _ M Omits of Rumble Strl Proposed Edge of '-_` Povement ~][~~ n ~ ~] n~] [~ ~] 50:1 Toper l~±Li~II-~ Ll ~ LJ L7-CT~L7- ---------------- --------- ~ i Proposed Rumble Strip Proposed Edge of `_-~ typical Trovelway See Detail 'A" PLAN VIEW L 0 ~ 'Uniform de th througA width of cut with a tolerance between peaks Proposed Surface and volleys of Pavement DDD •o p ~~~,D• p•. D ,• D D D D ,• ~. D p ..D•,•D p.P • ,,•D,~ D,~D; P, D .D•.D• .~ D .• ,. ~ •• ,, ,• SECTION A-A a V v ~a~~e. „~e ~..~a 4" Polyurea Edgeline RUMBLE STRIP DETAIL NOT TO SCALE ' Edge of t Edge%Ine'-- DETAIL "A" L c a 1? v u L v A REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 C,40 W6 ERE PROPOSED E SEMH~L GA~SMT DGE Y NI H WI PROPOSED EDGE OF PAVEMENT Y 6" --------- --- - - - - - ------------------- - - 1' 6" SAWCOT EXISTING PAVEMENT I PLAh1 Ill EW i PAVEMENT REMOVAL 1 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION GREAT SMOKY MOUNTAINS NATIONAL PARK , NEWFOUND GAP ROAD -1619 PAVEMENT TAPER DETAIL q i G a Y o o 0 0 0 PS PMIS NO.: 090 U.S. ~DEP.~R°C~~NT ~~ 3°I~~ IN°~ERg~P$ NAM®NAI~ I~~I$~ ~]ERVI~]E ~~~~ Jl ~~®~~ l~'Jl.~ ~J N~~i ~N~ NAt~CI®N~L I~AI~]~ UNESCO 7Y ®~~~ 1Li1Ld~Il~~`IJAJL.A ~~~JLA PLANS FOR PROPOSED PRO~ECr LENCry: Newfound GaP Road ...................................65 tulles IMPROVEMENT: SCHEDULE A RehabUltotion of Nevfcund Gap Rcad from SW' North of the Collins Creek Pfcnlc area to 3204 soufh of Taw String Rood and exfstlrq roadside pullouts. tmprwerxMs Include resurfacing, full-depth pavement reronsfrudlon,dralnaga,pavemerd rrarkings and traffic control. oPrrDN r ReMMlltoflon of Nswfa~nd Gap Road from 32~'South of the Tav Sirlrg Read to tfle irk boundary of Cl~rokee fndian Reservation and exlstlrg roadside pullouts and parking oreas,lncludlrq the parking area otfhe ,Uirgus lAlll and Ocorloluffee VisJta Center. Impraements Include resurfacingfulldepth pavement reconstructfoa draNwge, pavement morklrgs, and traffic control. OPTION 2 Roadway widening and reconflgurotlan of Newfaurd Gap Rid to add turn Iones at tie erdrance to Ile Oconalufiee Visitor Center and Park Circle Drive. Recorrfigurallon of.~rking area fa tf~ Ownoluftee Vlsltor Center.lmpraements Include resurfocing,pwing, gradlrq,drainage,pavemeMnmrkings,trafflcconiroland wetland mlflgotlon. OPTION 3 Roadway wldenlrq of Newfound Gap Road to add a turn lane at7aw String Road Re-ol(ngmenf of Tow String Rmd. lmpravemenfs Include resurfacing,pavfng,grading, drainage,pavemenf markings,trofflc control,aM wetfond m/tlgafton. OPTION 4 Roadway wldeNrq of Newfarnd Gap Road fo add a Turn lane at Ne entrance to Collins Creek Plcntc Area.lmprovements Include resurtaclrg,pavlrg,groding,dralnage, pavementmakings and traffic control. INDEX TO SHEETS sNOET DESCRIPTION A.1 TITLE SHEET A.2 CONVENTIONAL SYMBOLS A.3 LOCATION MAP 6.1 THRU B.2 CONTROL POINT REFERENCES A-A.1 SCHEDULE A LOCATION MAP & INFORMATION 1-A.1 OPTION 1 LOCATION MAP & INFORMATION 2-A.1 OPTION 2 LOCATION MAP & INFORMATION 3-A.1 OPTION 3 LOCATION MAP & INFORMATION 4-A.1 .OPTION 4 LOCATION MAP & INFORMATION C.1 THRU C.41 GENERAL STANDARDS AND DETAILS M 1819 ROADWAY WIDTH SURFACE BASE Newfound Gop Road 22ft SACP AC~REGATE DESIGN DESIGNATION NEWFOUND GAP ROAD ADTf2007J 5,190 ADT(20271 7,7l0 DNV 2,500 D 50/50 V 50 C/A PARTIAL elmaxJ MATCH EXISTING SPEClF1CAT1ONS: "Standard Specifications for Construction of Roads and Bridges on Federal Highway Protects", FP-03 PLANS. PREPARED BY U.S. Customary Units FOR ^-^ U.S. DEPARTMENT OF TRANSPORTATION ~5~ ][~~]E®~IN~L ]~L~NS FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL tJNDS WCr1WAY DIVISION DO NOT USE FOR CONSTRUCTION Kimle~r•Horn and Associates, Inc, ~~~;~YYzooe PO ox 33068 Rale'ryh, North Carolina 27636 ~'-- PROJECT PRA-GRSM lBl9 REHABILITATION OF NEWFOUND GAP ROAD FROM 500' NORTH OF COLLINS CREEK PICNIC AREA TO SOUTHERN PARK BOUNDARY SWAIN COUNTY, NORTH CAROLINA nnn irnT L DESCRIPTION OF PROJECT c R v 0 Y a ~, °o L REG STATE PROJECT SHEET TOTAL N0. SHEETS abutment aggregate abut. aggr. length of curve liter C 2 NATIONAL BOUNDARY •' •- '° NORTH ARROW 7 SE NC PRA-GRSMYBI9 A.2 ahead alternate AR art. longltuelnal law watts l~• cw STATE BOUNDARY ........................................................................ L EXISTING .PROPOSED and & lump sum CPSM COUNTY BOUNDARY -'-'-'-'-'-'-'-'-'-'-'-'-•-•-•-•- FENCE X X X% XX and others et al and wife et ux magnetic msg. CITY BOUNDARY --------------- ~ N and so forth let cetera! etc. maintenance malnt. GATE opprcach appr, mater/a! matt oDProxlmate approx. maximum max. GUARDRAIL D_ -n- ~- ~-- -a- _ ~ asphalt asph, meter fineasaementl m average dally traffic ADr mettle ton t MEDIAN & SIDE BARRIER ------- ------ mRllmeter mm - back bock to back 8K b, to b, mile past minute(s1 mngularl M.P. STONE GUARDWALL balance point BP minimum min. POST MOUNTED ~ T batter btr. W m/sceNanepus t misc. man NATIONAL PARK or FOREST BOUNDARY /~//////////~////////////~//////~/~//////// SIGNS PORTABLE No Symbol ~ beam bearhy baglnn/hg n. brg, beg; monumen mountalnlsl . mtnlsl. PROPERTY LINE PrL MILE POST ~ bench mark BM negative neg. 1 badge br. norm W erw EXISTING - - - - - ~ wO1J face centerline E newton number no. RIGHT-OF-WAY UNE PROPOSED R/W a Rfghtrof-way RETAINING WALL -~-~ V ~~`~ center to center cc a c. fo c. POWER POLE with UTILITY UNE --B•-P---- P-•- centers efts. algina! ground OG channel change Gear cn. ch. clr. out to out outside dlamefer o, to o. oD RIGHT-OF-WAY LINE Rrw _ EXISTING -~ - - - TELEPHONE POLE with UTILITY UNE --a-T---- r-~-- crolumn cG. p with MONUMENT R/W of Rlght-of-way PROPOSED ~ JO1NT USE POLE wlfh UTILITY LINES -~-P&T--- -P&T-+~ concrete connection cart. corm, pascal pavement a vvmr. PE CE SUPPORT POLE with ANCHOR -~ construction construction JGnt constr. constr. Jt, percent perforate Dct• °r z pert. EASEMENT (Permanent -Non-Permanent) TELEPHONE BOOTH OR PEDESTAL, O B,TP; E8 OR PB mielecommunlcattons Service coniingent sum CT51! plate pL ELECTRIC BOX, PULL BOX ®Power contlnwus cont. pent of compound curve PCC PC coNSrRUCrION UMlrs EM , d corrugated corr. point of curve F F MANAG ENT BOULDERS corrugated metal p/pe ccu/omb CMP C point on tutus point of lniersectlon POC PI FILL __ _ ___ _ ___ ~ --' ~ - UNDERGROUND UTILITIES ----i w ~--- ~ w I-- caunty ca point of spiral to cave PSC or SC C C G-gas, 0-oH, P-power, SA- sanitary sewer, countersink ctsk. point of curve to spiral PCS ar CS CUT ~~~~~~""""'•••••.. ~~ .. •'• ~~~•~•~~~•..•. SS-storm sewer, T-telephone, W-water, FMS-force main sanitary sewer creak Brushed aggregate base cr. cab point on splrol point of spfrai to tangent POS PST or ST r._.-._,~ __,_, ~ PROPOSED CONDUIT FOR FUTURE USE ~_ cable meter m~ or m3 point on tangent POT TRANSITION - ,- •-•~' ~'~- culvert cult', point of tangent to spiral P5 a rs PIPE CULVERT ----- curve delta point of tangent PT curve /aft LT protect . prof. PIPE CULVERT wffh END SECTION D----- ~- curve rlgnt RT ROADWAY, EXISTING ~--~ cut c quonttNes quant. WITH WHEEL UNE ~_ ~ -- ~~~ PIPE CULVERT with HEADWALL I----- i- degree °, deg, radian rod CULVERT with INLET ~ Q•- -- - - degree Celsius des/gn hour volume 'C DHV radius range R R, TRAIL _ -- ,, -, ~ ~ - - - i -~ ` / CULVERT ith FUNNEL DRAIN INLET - - ~--- dlagana/ dlag. reconstruction reconst. • W d/ameter d/aphrogm dla. or D d/aph, relnforcemenf reinforced concrete Dox culvert relnf. RCBC EDGE OF WATER STREAM s `~•.. ~---•••-- PIPE CULVERT with UNKNOWN OUTLET --J' - v -~ dlstrfct Dist. relnfaced wncrete pipe RCP Ond RNER ~- _ danotlon land claim DLC re~lred read. ~•••v--•^~' PAVED WATERWAY ~~~~-~~--'~~~~ -°-'-'°' ~ ~~ ~~ ~` ~~~ dmwing(sl drwgisl. reservla or Reservation res. drop Inlet Dl rithtning wall 9 rRett. waU WETLAND -'--r-_•---•- ~ ~ -•-._._.- -•-- RIPRAP NO Symbol east edge of pavement E EP rlghf-of-way rwd R/W rd. ~-~ UNDERDRAIN 1---+uot---~ I--{UDI edge of wafer edge of read EW ER roadway route rdwy. rte. LAKE, POND Or RESERVOIR; MARSHLAND ~- ~.. ~ ~ -~ T-4x elevorlon Gev h .}, TRAVERSE POINT (Horizontal & Vertical! f i l P i t N th T No Symbol ' elevat/on wlih number El. 94.066 schaG . sc SPRING ~'' Tr ang e n or op o o s 64x .934 embankment Englneertsl equation emb. engrtsl. EO or eq. second longularl second ftlmel secnan s sec. TREE UNE; TREE -~~ ~rr~ ~ , ~Y r TRAVERSE PoINT (Horizontal) T-3 ~ No Symbol excavation G t l exc. Jt slope profectlon uth sl, Prot. S l ` "C.~ BRASS CAP ~ No Symbol a expons on ) exp. . so spaces a spaced spacing spv' ~ yy federal Fed, , specfficaflon spec. INTERSTATE ROUTE STEEL P1N NO Symbol fill finish F fin. square square mater sq m~ a m2 STATE ROUTE ® HU8 & TACK I I ~ flange fig. standard std. No Symbol fabting for example ftg. e.q. station stiffener straight sta. st/ff. str. U.$. ROUTE l'1 ~ SPOT ELEVATION x 99.9 No Symbol' olvanlzed gale street st• ROSION CONTROL ~~ ~ No Symbol g , '/ COORDINATE GRID T1CX gage rgougel go. sidnger stgr, structaal strua headwaG hectare ndwl. Aa superelevotlon rate Superpave Asphalt Concrete Pavement ° SACP SILT FENCE - - - - - - - - - - BUILDING _ _ _ ~- `I hexagon t hex. NW symmetrlcel sym. G S mbol ~ No h/gn wa er CHECK DAM BORIN LOCATION . y nlghwoy hwy. tangent tan. DEPARTMENT OF TRANSPORTATION U S house nse. tangent length 7 . . homestead entry survey HES tampaary bench mark 78M FEDERAL HIGHWAY ADMINISTRATION that Is l.e. EASTERN FEDERACLANDS H]GHWAY DMSION Iden!lffcation rden, thread thd. PAVEMENT RECONSTRUCTION GREAT SMOKY MOUNTA NS lnalusive final. tawnanlp r. I Ins/de dlamefer ID typical typ. NATIONAL PARK tent jt, veniGes per Hour aph PAUEMENT REMOVAL NOTE: NEWFOUND GAP ROAD - 1819 vertical point of lntersectlart VPI Other symbols used In laminatlon lotrrude lam. lat. waenouse was. the plans well be shown CONVENTIONAL SYMBOLS left Lt. west W in 0 legend oR rhB appropriate plan sheet. NDS DMiS Nf1~ n9nSe3 STATE PRO]ECf SHEET N0. TOTAL SHEETS NC PRA-GRSM 1819 A.3 TENNESSEE .--~..~ RTH CAROLINA N ~i ~~ fl 276 \ 19 DEPARTMENiOFTRANSPORTATION )ERAL HIGHWAY ADMINISTRATION ;N FEDERAL LANDS HIGHWAY DN'SION )KY MOUNTAINS NATIONAL PARK FOUND GAP ROAD - iB19 OCATION MAP -1 4 2 4 SCALE IN MILES REG SE Begin Protect `~ PRA-GRSM 1 Bl9 549+00 J~ ~ Ro~nd Bo{lom Road ~~~ ~~ ~uth Dfstrlct j L F' a h Mi s N CALDERWOOD LAKE SANTEETLAH LAKE 23 74 u.s. FEI EASTER GREAT SMC NEw L CP-16038 N 689474.080 E 711335.210 EL. 2388.755 STA. 555+65 OFFSET: 26,06' RT Sta. WL +00 Sta. W 6+00 3@Tx4' Culvert-~I EOP 6.15' SL Sign @ Sta. 556+11 CONTROL POINT CP-16038 See Sheet A-C,1 for Plan Vlew Schedule A) See Sheet 4-C.i for Plan Vlew ~Optfon 4) / CP-16512 \ NAIL N 684905.110 E 717649.370 EL. 2207,660 STA. 638+OS OFFSET; 6.03' LT +- I ~ Sta. wL +00 Sta.. WL +00 I ~18" RCP ~~ ~~ -- ~-EOP Camping Siggn @ Sta. 639+00 CONTROL POINT CP-16512 See Sheet A-C,5 for Plan View / CP-17214 \ PK NAIL N 680686.411 E 720385,433 EL 2143.397 STA. 691+90 OFFSET; 25.50' RT Sta, 692+00 WL rr~ Sta. 693+00 WL ~~ 18" CMP _ _ ~ ~f EOP S,~3 r a 'I i L ' CP-22 ~~ PK NAIL I N 676482.824 E 719983.961 EL. 2088,582 STA. 745+79 ! OFFSET: 36.63' RT ' ii i Sta. WL +00 I Sta. W 6+00 i 24" RCP ~) ~~ i CONTROL POINT CP-22 See Sheet 1-C.1 for Plan View z ~I 0 CP-17000 PK NAIL N 672949.215 E 718712.090 EL. 2063.508 STA. 785+51 OFFSET: 24.09' RT Sta. 785+00 ~ ~ Sta. 786+00 WL WL ~~ ~24" RCP ~~ ~~ --- ~fi-EOP CONTROL POINT CP-17000 See Sheet 1-C.3 for Pian View CONTROL POINT CP-17214 See Sheet A-C.8 for Plan View -l REG 15rATE I PROJECr ~ N0~ SE NC PRA-GRSM 1819 B.2 CP-10048 \ PK NAIL N 664858.664 E 720688.942 EL. 1993.713 Vehicles Pro. Sign @ STA. 877+SO Sta. 875+80 OFFSET: 9.58' 131.36' Sta. WL +OD Sta. WL +00 ---- EOP ---- CONTROL POINT CP-10048 See Sheet 1-C.9 for Plan View U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1619 CONTROL POINT REFERENCES NOT TO SCALE r 4 O O M 7 h 0 O ti IRN W RED CAP N 669 61.538 E 718786.706 EL. 2034.612 STA. 822+48 NB CL OFFSET: 41.98' LT ~ 5 Sign System Sta. 822+52 StaNB CL 00 StaNB CL ~~ --- EOP ----- CONTROL POINT CP-16002 See Sheet 1-C.5 for Plan View Option 1 See Sheet 2-C.2 for Plan View Option 2 ,~t4- K~r ~/ ~~ ---- EOP CONTROL POINT CP-268 See Sheet i-C.8 for Plan View U.~. ~EF~R°~PgQ~N1° ~E °LHIE IN~°lERI4bR L DESCRIPTION OF PROJECT PROJECT LENGTH: Newfound Gap Road .. . . . . . .......... . . . . ..... 3.7 miles IMPROVEMENT.• SCHEDULER Rehabilitation oiNewfound Gap Road from 500' North of the Collins Creek P/cnlc area to 3100'south of Taw String Road and exlsHng roadside pullouts. Improvements include resurfacing, full-depth pavement reconstruction, drainage, pavement markings and tragic rnntrol. ROADWAY WIDTH SURFACE BASE Newfound Gap Road 22R SACP AGGREGATE DESIGN DESIGNATION NEWFOUND GAP ROAD ADT(2007) 5,190 ADT(2017) 7,710 OHV 2,500 D 50/50 V g0 C/A PARTIAL e(max) MATCH EXISTING SPECIFICATIONS: "Standard SpecltTcations for Construction of Roads and Bridges on Federal Highway Projects ; FP-03 U.S. Customary Units PLANS PREPARED BY ~-~ KimleyHom antl Associates, Inc. PO Box 33068 Rakigh, NorM Carolina 2763fi SMOKEMONT ~ K, FOR CAMPGROUND U.S. DEP ERT~ME~GHw OF~TR~PSNTRP oRTAT10N EASTERN FEDERAL LAANYDS HIGHWAY DIN51 N sTERLRJG, v~RCNA G, JdNUARY 2008 P b n PG 3 P% P'C'1 r ~G r ~C1Y'~ GPI 3 STp 0 COLLINS CREEK PICNIC AREA :HEDULE A NA~7CI®NA~]L I~AtI~~ ~ + ]~,~1I(;~+ SCHEDULE A INDEX TO SHEETS ~l~]EA1~ ~~l[®~.~ M[®I.T ~~IN 1V l~TA1.7CI®NAIL 1~~~~. UNESCO ! V ®~~~ JLJL I`j ~~~~'Vi ~ ~~~~ PLANS FOR PROPOSED PROJECT PRA-GSM I Bl9 SCHEDULE A REHABILITATION OF NEWFOUND GAP RDAD FROM 500' NORTH OF COLLINS CREEK PICNIC AREA TO 3200' SOUTH OF TOW STRING ROAD SWAIN COUNTY, NORTH CAROLINA 0 D~ ~p '4 C• 6 P-C.7 A- 9 \TO N~wROg0~ GAP z~ MINGUS MILL ~ PARKING AREA LOCATION MAP SHEET NO DESCRIPTION A-A1 LOCATION MAP & INDEX OF SHEETS: A-A.2 THRU A-A,3 TYPICAL SECTIONS. A-B,i TRBULATIONOFQUANTITIES A-B.2 PAVEMENT SUMMARY A-B,3 DRAINAGE SUMMARY A-6.4 MISCELLANEOUS SUMMARIES A-6.5 THRU A-B.9 PERMANENT SIGN SCHEDULE A-B,10 THRU A-B.12 CONSTRUCTION SIGN SCHEDULE A-C.1 THRU A-C.10 UNE GRAPHS A-E.1 EROSION CONTROL NARRATIVE A-S.1 THRU A-S,3 CULVERT REPAIR DETAILS A-T.1 THRU A-T.10 SIGNING l~ MARKING A-T.11 TRAFFIC CONTROL NARRATIVE A T 12 TRAFFIC CONTROL LOCATION MAP A-Z.1 THRU A-Z.2 DRAINAGE PIPE PROFILES v ~4A,~ ~~ 9Gc vwlvnwri~~ vi~ilurc CENTER BIG COVE. ONNECTOR ROAD (SAUNOOKE :BRIDGE ROAD) Proposed: 1 1/1 "Thick SACP 1/2"Nominal Max Slze Aggregate, - 0.3 x 1 d to < 3 x LOS ESAL's Type IV Pavement Smoothness Asphalt Tack Coat - 3"Thick SACP, i "Nominal Max Size Aggregate, - 0.3x10" to<3x10°ESAL's Mill Existing Pavement 2" - Wheel Line ~ i Variable Depth I Aggregate Topsoil ~ MATCH I EXIST I ~~ i i rl i , ~' Approximate Location of Existing 3" Sanitary Pipe* ~ Roadway TYPICAL SECTION. N0. 1 NEWFOUND GAP RDAD MILL AND OVERLAY PAVEMENT SECTION -NFG- WL STA 549+00.0 TO STA 743+00.0 *EXISTING UTILITIES -NFG- WL STA 710+00.0 TO STA 743+00.0 MATCH EXISTING j MATCH EXISTING Existing: Minimum 6"Thick Asphalt Pavement ~~~ Aggregate Base ~ MATCH EXIST ~--- --- EXISTING PAVEMENT ------------- - ~ ~ i___ Cnnrmm~nclhu Davomanh Variable Depth ,' ~AggregateTopsoil ,' Debris i i i i ~~ ~~ `~_, :~ ~Reconditlon 3' +/- 11' +/- Edgedraln (ryp.) See Note 10 I l' +/- 3' +/- VARIES SHOULDE TRAVEL LANE TRAVEL LANE 5HOULDE Proposed: Vanes 1 1/2" to 21/2" Thick SACP 1/Z"Nominal Max Size Aggregate, 0.3x10` to <3x10 ESALs Asphalt Tack Coat li c ~; "m a ~' Roadway Ditch Approximate Location of Existing 6" Waterllne* Existing: Variable Depth Asphalt Pavement ~ Aggregate Base ~~ NOTES: 1. Locate all utilities prior to beginning work. Call North Carolina One-Call Service (800) 632-4949 or (336) 855-7799. Z. Match proposed roadway and shoulder cross slopes to existing unless otherwise stated in plans. 3. Match proposed curve wfdening in superelevated sections to existing unless otherwise stated in the plans. 4. Recondition ditch and install type 2A erosion control matting as directed 6y the CO. 5. Place aggregate topsoil course and seed a1! disturbed areas, except paved areas, in accordance with sections 305 and 615. 6. Maintain a Erna! elevation of shoulder, adjacent to the edge of pavement, i/2-inch below edge of pavement. 7, Round hinge point as directed by CO. 8. Maximum shoulder rollover is 8%. 9. WL =Wheel line survey 10. Instal! base df edgedrain at depth of 24 Inches. See chart for Geocomposlte Pavement Edgedrain locations. Wheel Line lLV i Variable Depth /~ I Aggregate Topsoil ~' Geocomposite Pavement Edgedrdin Variable Depth I I Debris ~' Locations Aggregate Topsoil I MATCH ~ MATCH I MATCH EXISTING MATCH EXISTING EXIST , BEGIN END LT/R EXIST .------------ - ,~ 55B+00 566+50 RT --- - - --- ---- ""- -----°"--------------"`- i -- - ' 570+50 578+00 RT ,'~~ ~--------------------------------------- --~ \'~,-_,;'~ 598+20 603+50 RT ,'' ~'~ ~ ~ 626+20 643+00 RT .'~ `'~ : ~ 666+00 686+00 RT ,~ pproxfmate Location of Recondition ,~ Existing 6"PVC Waferllne** Ditch 692+00 700+00 RT ~ 693+00 694+50 RT ~ Approximate Location of ,~ VARIES i0' +/. i0' +/- VARIES VARIES Existing 3"Sanitary Pipe** 706+50 727+50 RT 730+8D 743+00 RT SHOULDE TRAVEL LANE TRAVEL LANE SHOULDE z TYPICAL SECTION N0. 2 SIDE ROADS OVERLAY PAVEMENT SECTION (COLLINS CREEK PICNIC AREA) (SM SOW SNTRING RQADj ND) **Tow String Road Only L L ro a m U y h 0 Q M N O \N Proposed; Varies 1 1/1 " to 1 i/1 "SACP 1/1 ", Nominal Max Size Aggregate, 0.3xI0° to c3x10° ESAL's Asphalt Tack Coat Mill Existing Pavement, Vanes 0" to 1 i/1" Existng Ground ~_____ ~'~ Maintain Exist (6" if Possible) 1 i/1" See Typical Section i Sheet A-A.2 for Newfound Gap Road Typical Sedlon ~," Existing: Minimum 6"Thick Asphalt Pavement Aggregate Base ~ Roadway -------- Q 2 U F PULLOUT Il' +/- WIDTH VARIES TRAVEL LANE TYPICAL SECTION N0, 3 NEWFOUND GAP ROAD OVERLAY PULLOUT SECTION -NfG- WL STA 564+49.0 TO STA 573+00.0 -NFG- WL STA 616+57.0 TO STA 618+78.0 -NfG- WL STA 634+10.0 TO STA 636+58.0 -NFG- WL STA 651+85.0 TO STA 654+10.0 -NfG WL STA 687+15.0 TO STA 689+58.0 -NfG- WL STA 711+94.0 TO STA 724+41.0 Proposed: Existing: 1 i/1"Thick SACP 1/2" Nominal Max Size Aggregate, Minimum 6"Thick Asphalt Pavement 0.3 x 10° to < 3 x 10° ESAL s Type IV Pavement Smoothness Aggregate Base X"Depth Aggregate Topsoil Asphalt Tack Coat * ak * 71/1"Thick SACP, 1 "Nominal Max Size Aggregate, 0.3 x 10° to < 3 x 10" ESAL's Q ~ Mill &isting Pavement 61/1" _ Existing 2~1 ,_ ___~ 2 Ground ------ '-- L ~ ~' ~ U ~ ti ' ~ L_ ----- - ------ ------ ------- -- FACEOF CURB W'PROPOSED BERM 1 NSc 1 3 A ~LT~ ~C xc * APPLYIN TWO APPROXIMATELY EQUAL LIFTS, NEITHER UfT TO EXCEED 4 INCHES, NEWFOUND GAP ROAD r i D~A1 L A"1 PULLOUT BERM SECTION -NfG- WL STA 572+48.0 TO STA 573+00.0 (W=S; X=12 J -NFG- WL STA 616+79.0 TO STA 618+15.0 (W=S; X=6") Full Depth Pavement Reconstrvctbn -NFG- WL STA 688+40.0 TO STA 689+40.0 (W=S; X=4") See Plan Sheets for Locations -NFG- WL STA 713+15.0 TO STA 714+15.0 (W=S; X=6") NOTES: 1. Locate all utiNties prior to beginning work. Call North Carolina One-Call Service (800) 632-4949 or (336) 855-7799. 1. Match proposed roadway and shoulder cross slopes to existing unless othenvlse stated !n plans. 3. Match proposed curve widening In superelevated sedlons to existing unless othenvlse stated !n the plans. 4. Recondition ditch and instal! type 2A erosion control matting as directed by the CO. 5. Place aggregate topsoil course and seed all disturbed areas, except paved areas, In accordance with sections 305 and 625. 6. Maintain a final e/evatfon ofshoulder, adjacent to the edge of pavement, 1/1-inch below edge of pavement. 7. Round hinge point as directed by CO. 8. Maximum shoulder rollover Is 8%. 9. WL =Wheel line survey a q m E m m a k 4 M m m M 0 h n n L' REG STATE PROJECT SNEE7 N0. . TOTAL .SHEETS SE NC PRA•GRSM tB19 A-B.1 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION RN FEDERAL LANDS HIGHWAY bMSION A T E S E INS NATIONAL PARK GREAT SMOKY MOUNTA NEWFOUND GAP ROAD - 1819 SCHEDULE A TABULATION a OF QUANTITIES - NPS PMIS NO.: 090563 P It ~ i n i Quantity ay em Item Descript o Un t NFG Rd. As Re 'd Totals 15101-0000 MOBILIZATION LPSM 1 1 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM 1 1 15401-0000 CONTRACTORTESTING LPSM 1 1 15705-0100 SOIL EROSION CONTROL, SILT FENCE (WIRE BACKED) LNFT 240 60 300 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 10 10 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C EACH 1 1 15706-1400 SOIL EROSION CONTROL, INLET PROTECTION TYPED EACH 1 1 20301-1400 REMOVAL OFINLET EACH 2 2 20301-2400 REMOVAL OF SIGNS EACH 35 35 20302.2100 REMOVAL OF PIPE CULVERT LNFT 210 40 250 20303.0300 REMOVAL OF CONCRETE SQYD 4 4 20425-1000 DTTCH,EXCAVATION LNFT 265 265 20701-1300 EARTHWORK GEOTEXTILE, TYPE IV-B SQYD 35 15 50 25102-3000 PLACED RIPRAP, CLASS 3 TON 32 32 25110-2000 GROUTED RIPRAP,CLASS 2 CUYD 8 8 30101-1000 AGGREGATE BASE GRADING C TON 40 10 50 30302-1000 DITCH RECONDITIONING LNFT 9730 9730 30501-0000 AGGREGATE TOPSOIL COURSE TON 1214 61 1275 40101-0600 SUPERPAVE PAVEMENT 1/2-[NCH NOMINAL MAXIMUM SIZE AGGREGATE 0,3 TO ~ <3 MILLION ESAL ' TON 4454 46 4500 40101-1400 SUPERPAVE PAVEMENT, 1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 9254 545 9799 41301-0000 ASPHALT PAVEMENT MILLING (VARIABLE DEPTH 0" TO 1 1/2") SQYD 3350 3350 41301.0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 42961 39 43000 41301-1300 ASPHALT PAVEMENT MILLING, 6-INCH DEPTH SQYD 4461 2126 6587 42801-0150 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 2 SQYD 1394 693 2087 55205-0000 REPAIR CONCRETE(SHALLOW SPALL REPAIR) SQYD 4 4 8 55205-0000 REPAIR CONCRETE(DEEP SPALL REPAIR) SQYD 0.7 1 1.7 55205-0000 REPAIR CONCRETE (COMPLETE8ECTION REPAIR) SQYD 1.6 2 3.6 60103.0100 CONCRETE, HEADWALL FOR 18-INCH PIPE CULVERT EACH 3 3 60103.0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 1 1 60201.0200 6-INCH PIPE CULVERT LNFT 18 18 60201-0600 18-INCH PIPE CULVERT LNFT 48 48 60201-0800 24-INCH PIPE CULVERT LNFT 108 108 60201-1000 36-INCH PIPE CULVERT LNFT 56 56 60403-0000 INLET (OPEN THROAT) EACH 1 1 60403-0900 INLET, TYPE 46 EACH 1 1 60503.0000 GEOCOMPOSITE PAVEMENT EDGE DRAIN SYSTEM LNFT 10080 10080 60704-DODO CLEANING CULVERT IN PLACE EACH 10 10 60707.0300 LINING 18-INCH PIPE CULVERT LNFT 43 43 60802-0200 PAVED WATERWAY, TYPE 2 LNFT 60 60 60901-4000 CURB, STONE, TYPE 1,16-INCH DEPTH LNFT 3 3 60910-0000 RESET CURB LNFT 65 65 62025-0000 REMOVE AND RESET STONE MASONRY CUYD 0.1 0.4 0,50 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL EACH 4 4 62101-0000 MONUMENT (MILE MARKER) EACH 3 3 62501-0000 TURF ESTABLISHMENT ACRE 3 3 62901-0500 ROLLED EROSION CONTROL PRODUCT, TYPE 2.A SQYD 5425 5425 63302-0000 SIGN SYSTEM {UNIGUIDE) SQFT 185 185 63304-0900 SIGNS, ALUMINUM RANELS,TYPE 3 SHEETING SQFf 145 145 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID LNFT 76283 76283 63401-2400 PAVEMENT MARKINGS, TYPE L, BROKEN LNFT 1365 1365 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 24 24 63502-0900 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH EACH 50 50 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 86 14 100 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 10 10 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT J9600 79600 63503.0600 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL LNFT 1000 1000 63504.1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 465 465 63506-0500 TEMPORARY TRAFFIC CONTROL,FIAGGER HOUR 834 834 63701-0000 FIELD OFFICE EACH 1 1 64502-DODO LOCATE UTILITIES EACH 5 5 Y a M h rv 0 pN L N REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM 1819 A-B.Z A i i i M U.S. DEPART ENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMSION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1619 SCHEDULE A PAVEMENT, SUMMARY I - - ~ NPS PMIS NO.: 090563 ocation /Station Range ength avement Construction Width (FEET) PAY ITEM 30101-1000 A re ate 99 9 Base Gradin 9 C (TON) PAY ITEM .30501-0000 Aggregate Topsoil Course (TON) PAY ITEM 40101-0600 Superpave Pavement 1/2-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL S YD PAY ITEM 40141-1400 Superpave Pavement 1-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL S YD PAY ITEM 41301-0000 Asphalt Pavement Mlllin (SQYD) PAY ITEM 41301-0600 Asphalt Pavement Milling, 2-Inch Depth (SQYD) PAY ITEM 41301-1300 As halt P Pavement Mllling, 6-Inch Depth (SQYD) Sta 549+00 to 592+00 4,300 22 239 883 1786 10515 Sta 592+OOto 597+50 550 22 34 113 402 677 662 Sta 597+50 to 627+50 3,000 22 183 616 1242 7330 Sta 627+50 to 630+10 260 22 i6 53 190 325 .308 Sta 630+SO to 639+50 940' 22 51 193 393 2295 Sta 639+50 to 642+50 300 22 19 62 219 373 353 Sta 642+50 to b46+50 400 22 25 82 167 97g Sta 646+50 to 650+50 400 22 25 82 355 250 723 Sta 650+50 to 658+00 750 22 36 154 314 1840 Sta 658+00 to 659+00 100 22 6 21 73 130 112 Sta 659+00 to 674+DO 1,500 22 94 308 627 3667 Sta 674+00 to 675+00 100 22 6 21 73 132 112 Sta 675+00 to 680+50 550 22 34 113 230 1344 Sta 680+50 to 681+00 50 22 3 10 37 70 51 Sta 68i+00 to 690+00 900 22 49 185 376 2216 Sta 690+00 to 693+00 300 22 19 62 314 723 Sta 693+OD to 698+50 550 22 34 113 230 1345 Sta 698+54 to 700+DO 150 22 9 31 110 190 172 Sta 700+OOto 724+00 2,400 22 144 493 992 5872 Sta 724+00 to 726+00 200 22 11 41 146 256 234 Sta 726+OOto 730+OD 400 22 25 82 167 989 5ta 730+00 to 732+50 .250 22 16 51 183 315 300 Sta 732+50 to 734+00 150 22 9 31 63 370 Sta 734+00 to 735+00 100 22 6 21 105 234 Sta 735+00 to 739+00 400 22 25 82 167 990 Sta 739+OOto 741+DO 200 22 13 41 209 477 Sta 741+00 to 743+00 200 22 13 41 84 492 PulloutSta 569+DO 13 230 1901 Pullout Sta 617+50 18 37 -306 Pullout Sta 635+00 43 359 Pullout Sta 652+50 Pullout Sta 653+00 12 28 238 Pullout Sta 688+50 9 44 360 Pullout Sta 695+50 2g Pullout Sta 723+50 14 23 186 Collins Creek Picnic Area 6 15 Smokemont Campground 3 23 Tow String Road 5 26 TOTAL 40 1214 4454 9254 3350 42961 4461 TATION PAY ITEM 20301-1400 Removal of Inlet. (EACH) PAY ITEM 20302-2100 Removal of Pipe Culvert (LNFT) PAY ITEM 20425-1000 Ditch ' Excavation (LNFT) PAY ITEM 25102-3000 Placed ~ ra p p Class 3 (TON) PAY ITEM 25110-2000 Grouted Riprap, Class 2 (CUYD) PAY ITEM 60103-0100 Concrete Headwall for 18-Inch Pipe Culvert (EACH) PAY ITEM 60103-0140 Concrete Headwall for 24-Inch Pipe .Culvert (EACH) PAY ITEM 60201-0200 6-Inch Pipe Culvert (PVC} (W~ PAY ITEM 60201-0600 18-Inch Plpe Culvert (HDPE) (LNP'I) PAY ITEM 60201-0800 24-inch Plpe Culvert (HDPE) (LNFT) PAY ITEM 60201.1000 36-Inch Pipe Culvert (LNF77 PAY ITEM 60403-0000 Inlet (Open Throat} (EACH) PAY ITEM 60403-0900 Inlet Type 46 (EACH) PAY ITEM 60704-0000 Cleaning Culvert In Place (EACH} PAY ITEM 60707-0300 Lining 18-Inch Pipe Culvert (LNFT) PAY ITEM 62025-0000 Remove and Reset Stone Masonry (CUYD) PAY ITEM 62028-1000 Remove and Reset Stone Masonry Headwall (EACH) EMARKS 546+80 1 561+63 10 1 565+40 to 565+65 8 570+07 1 572+32 9 9 572+94 3 598+14 55 56 2 606+02 10 616+79 3.5 4 617+83 3 5 618+55 5 633+25 1 638+i6 42 44 2 642+94 1 0.1 655+01 15 674+95 1 679+19 1 684+34 1 689+40 5 692+OS 43 718+84 1 63 1 64 1 724+25 10 736+44 265 6,4 2 48 739+06 1 1 1 Collins Creek Picnic Area Entrance 2 TOTAL 2 208.5 265 31,4 8 3 1 18 48 108 56 1 1 10 43 0.1 4 -1 L NPS PM15 NO.: 09567 STATION PAY TEEM 60802-0200 Paved Waterway, Type 2 (LNFT) 565+40 5 572+94 8 618+55 5 636+37 12 653+98 12 689+40 8 724+25 SO TOTAL 60 PAY ITEM PAY ITEM PAY TEEM 15705-0100 15706-1300 15706-1400 Soil Erosion Soil Erosion Soil Erosion STATION Control Silt Control, Inlet Control, Inlet , Fence Protection Protection (~~) Type C Type D (EACH) (EACH) 561+63 30 598+14 60 638+16 60 718+84 30 1 734+44 60 739+06 1 TOTAL 240 1 1 L NPS P IS NO.: 090563 REG STATE PROJECT SHEET TOTAL N0, SHEETS SE NC PRA-GRSM 1819 A-8.5 LOCATION PANEL SIZE TEX SIZE Sign Text Comer Border Margin Upper over Color Remarks Sign Text Station Side Width Height Area Radii Width Width Numbers Case Case Series Quantity Total Area Support No, No. Comb. (No Pa ) fin.} (in.l (sq ft} (inJ lin,} (inJ (inJ (inJ fin,( (s ft} Y 554+81 RT White 2(()12.5 Remove & Replace Existing 1 RJ_1 STOP 652+41 LT 30 30 6.25 See ote 1 on 3 18.75 Signs. 000+29 LT Red =37.5 sPEE:D 556+11 RT Block 31012.5 Remove & Replace Existing t1M~T 655+28 RT 24 30 5 See ote I on 3 l5 Signs 2 R2-1 45 715+30 RT White =37.5 Black 111J12.5 Remove & Replace Existing WJ-5R 557+47 RT 30 30 6.25 See ote l on I 6.25 =12 5 Sign 3 Yellow Black Remove & Replace Existing 1(IJ12.5 Signs Mod. ONGESTED 562+58 LT 36 36 9 See ote 1 on ! 9 =12.5 ,Mount w/ W13-1 .Sign 4 W 5-2 a,REa Yellow 125 M. P. N.1 T Remove & Replace Existing Black Sign ~' W13-1 25 562+58 LT 24 24 4.00 See ote I on I 4 - Mount w/ Mod. W5-2 Sign 5 MpH Yellow (Congested Area) 3 0 Black 2(1)12.5 Remove & Replace Existing ~ 582+16 LT 6 WI-5L 687+78 RT 30 30 6.25 See ote 1 on 2 12.5 _25 Sign Yellow Remove & Replace Existing Sign w/ Flip Down Sign. Black Dis la ed Durin inclement WATCH l (1)12.5 p y 9 0 7 Mod. FOR 587+OI L7 30 30 6.25 See ote I on l 6.25 Weather Conditions. W8-13 ICE Yellow =12.5 ei Sheet TOtoI U.S.DEPARTMENTOFTRANSPORTATION 12 71.75 137.5 FEDERAL HIGHWAY ADMTNLS'IRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION- NOTES: GREAT SMOKY MOUNTAINS 1. See "Manual on Uniform Traffic COntr01'~ and ~~Standard f1lgnWay SignS~~ NATIONAL PARK NEWFOUND GAP ROAD -1819 for dimensions. SCHEDULE A 2. Final locations of the signs shall be approved by the CO. PERMANENT ALUMINUM SIGN SCHEDULE z y NP&PMIS NO.: 090563 L t a 4 M h 0 C M REG STATE PROJECT SHEET N0. TOTAL SHEETS SE NC PRA-GRSM iB19 A-B.B LOCAT ION PAN L SIZE TE SIZE Sign No, Text No. Si n Text 9 Station Side Width Height Area Corner Radii Border Width Margin Width Numbers Upper Case ower Case Series Color Quantit Y Total Area Support Remarks finJ (in,l (sq ft) (inJ (inJ (in.l (io.l (inJ (in:) Comb. (s ft) (No Pay> Black Remove & Replace :Existing 8 Mod. aARRicADE 633+00 RT 6 36 9 S t I 2(1)12.5 . .Sign w/ Flip Down Sign W5-2 AHEAD 662+10 LT 3 . ee e o on Yellow 2 !8 °25 Remove Existing Sign & g Wl- D 636+26 RT 30 30 6 25 S Block 2ll)12 5 Replace Sign w/ Wl3-! (35 M P N ) Mount I . ee ote I on 2 12.5 . . . 701+79 RT Yellow _ -25 + (~ 701 79 10 ROAD S t Black ove & Replace .Existing Se Rll-2 CLOSED 650+35 LT 48 30 10 ee o e 1 on I ID - H g White Mount on Gate ~~ Red Remove & Replace Existing l1 S R8-3 , 650+35 LT 18 24 3 ee ote I on I 3 - Sign White Mount on Gate IcE Black Remove & Replace Existing l2 Mod• w© LT S t I Si n R4-2 650+35 24 30 5 ee o e on l 5 - g SNOW Yellow Mount on Gate l3 Mod WATCH Fo + 699 57 LT 30 30 6.25 S e t I Black on I 6'25. 1(012.5 Remove & Replace Existing with 18" x 18" Signs Along . ~FAIt.EN e o e . W8-9a ROCK IFLAGSI l8 18 2,25 Yellow 2 4.5 =12.5 Warning Flags Orange . Black Remove & Replace Existing 14 Wl3 l 35 701+79 RT 18 18 2 25 S e t I Sign - 715+80 LT . e o e on 2 4.5 - MPH Yellow Mount w/-W1-10 Sheet Total l2 63.75 62.5 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. NOTES: EASTERN FEDERAL LANDS HIGHWAY DN[SION 1. See "Manual on Uniform Traffic Control" and "Standard High-Way SIgnS" GREANATIONAL ARKAINS for dimensions. NEWFOUND GAP ROAD - 1619 2. Final locations of the signs shall be approved.: by the CO. scHEaULE A .PERMANENT .ALUMINUM SIGN SCHEDULE L REG STATE PRO)ECI SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1619 A-9.7 LOCATI ON PANE SIZE E SIZE Sin No Text No. Sign Text Station Side Width Neight Area Corner Radi Border Width ~fagin Width 'Numbers Upper Case ower Case Series Color Comb Quantity Total Area Support Remarks . (inJ hJ (sq ft) G~,) (in.) (inJ (inJ (inJ Gn,) . (s ft) (No Pay) Black 1(!)12.5 Remove & Replace Existing LT 5 1 1 25 6 n Si 15 WI-10 ~ 715+80 30 30 6.2 See ote on . °l2 5 g Yellow Mount w/ W13-1 (35 M.P.H) Sheet Total 1 6.25 12.5 Total 25 !41.75 212.5 Rounded Total 25 145 215 U.S. DEPARTMENTOFTRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION NOTES: EASTERN FEDERAL LANDS HIGHWAY DMSION 1. -See "Manual on Uniform Traffic Control" and "Standard . Highway Signs" GREANATIONAMPARKTAINS for dimensions. NEWFOUND GAP ROAD - 1819 2. Final locations of the signs shall be approved by the CO. SCHEDULE A PERMANENT ALUMINUM SIGN SCHEDULE N75 PMIS NO.: 090563 i 0 2 `v C 1 e a 0 k 4 N a ~; 0 N 7 L REG STATE PROJECT SHEET NO. TOTAL SHEETS SE NC PRA-GRSM 1819 A-8,8 LOCAT ION PANE SIZE TE SIZE Sign No. Text No. Sign Text Station Side Width Hei t ~ Area Corner Radii Border Width Marge Width. Numbers Upper Case ower Case Series Calor - Quontity Total Area Su ort PP Remarks (in.) (in,l (sq ft) lin.l (inJ iin.l (~•) - (in.) (inJ Comb, (s ft) (No Pay) Collins ,> White 1(2)12 5 ® 552+36 RT 84 34 83 19 S t l . ti R l E i 1 creek . ee o e on 1 19..83 ng ep ace x s Remove. & °25 S Brown lgn 4~ Gatl inburg + 554 68 LT 55 30 11 46 S t 1 White ((2)12.5 Remove & Replace Existing 2 . ee o e on l 11.46 cnerokee ~, Brown =25 Sign White 3 ® + 554 68 RT 48 36 l2 S t I Remove & Replace Existing ee o e on 1 12 - c~osEO Brown Sign Mount on Gate 4 a Coi I ins 557+23 LT 84 34 19 83 - S t l White 1(2)12.5 Remove & Replace Existing Cr k . ee o e on I 19.83 ee Brown =25 Sign 5 ' 21 32 4 67 S t l White 1(1112.5 Remove & Replace Existing 639+00 RT . . ee o e on l .4.67 =12 5 Signs a Brown 6 a SMOKEMONT 62 32 13 78 S t l White - 1(2)12.5 Remove & .Replace Existing campground 647+68 RT . ee o e on ! 13.78 °25 Sign Riding Stab I e Brawn 7 SMOKEMONT ~ White 1(2)12,5 ove & Replace Existing e m campground 654+37 LT 62 32 13 78 S 1 t l 13 78 S n Ridin Stab I e . ee e o on . -25 g g Brown Sheet Total 7 95.35 137.5 U.S. DEPARTMENT OP TRANSPORTATION FEDERAL HIGHWAYADM]MSTRATIDN ~^ NOTES; EASTERN FEDERAL LANDS HIGHWAY DMSION 1. Sign depiction for content only. Final layout, SlZing, font, and Calor GREAT SMOKY MOUNTAINS NATIONAL PARK will follow the "National Park SerV1C8 Uniguide StandarClS". NEWFOUND GAP ROAD -1619 2. Submit shop drawings of all signs to the CO for approval prior to fabrication. SCHEDULE A 3. Final locations of the si ns shall be approved b the CO. 9 Y PERMANENT SIGN SYSTEM SCHEDULE (UNIGUIDE) NPS PMTS NO.: 0909Gi L- REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1819 A•B.9 LOCATI ON PANEL SIZE EXT SIZE Sign Text Comer Border Margin Upper ower Color Support Remarks No. No, Sign Text Statiori Side Width Heght Areo Radii Width Width Nwnbers Case Cose Series Comb. Quantity Total Area (No Pa } y tin.l Gn.) (sq ft) lin.l (inJ (inJ !in•1 (in.l (inJ (s ft) Remove & Replace Existing White 5 112J12 Sign Capable of Beinq Flipped . - ROAD CLOSED I 13 75 Nothing w/ to Show 8 AHEAD 659+09 LT 60 33 13.75 See ote 1 on . . -25 8 n No Si 13 MILES Brown . g Remove & Replace Existing White Sign Capable of Being Flipped NO THRU TRAFFIC 1 13 75 w/ w Nothin Sh t 9 659+09 LT 60 33 13.75 See ote I on . - g o o TO GATLINBURG Red Sign No. 7 White 111)12.5 Remove & Replace .Existing e l 1 67 4 !0 ~ 664+09 LT 21 32 4.67 e S ote on . =12.5 Sign Brown a Tow str t ng White ll2J12.5 Remove & Replace Existing 11 Road 704+49 RT 81 48 27 See ote l on 1 27 =25 Sign a Horse Camp Brown Tow str i ng ~ White 1 27 1f2J12.5 Remove & Replace Existing 12 Road 713+85 LT 81 48 27 See ote 1 on =25 Signs Horse Camp ~ Brown Sheet Total 5 86.17 87.5 Totol l2 181.52 .225 Rounded TotCl l2 185 230 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS H]GHWAY DMSION NOTES: GREAT SMOKY MOUNTAINS 1. Sign depiction for content display only Final layout, S1ZIng, font, and Co lor NATIONAL PARK Will follow the ~~NatlOnal Park Service Uniguide StandardS'~. NEWFOUND GAP ROAD -1B19 2 . Submit shop drawings of all signs to the CO for approval p rior to fabrication. scHE~ui_E A PERMANENT SIGN SYSTEM 3 . Final locations of the signs shall be ,approved by the CD. _ SCHEDULE (UNIGUIDE) aec oM~c un • nOnSFi 0 k 4 M a N n .._ L REG STATE PROIECf SHEET N0. TOTAL SHEETS SE NC PRA-GRSM 1819 A-B,10 LOCATION PANEL SIZE TEXT SIZE Sign No. Text No. Sign Text Station Side Width Net ~ Area Comer Radii Border Width ~iargio Width Numbers Upper Case ower Case Series Color Quantity Total Area Su art pP Remarks (inJ Cm,l (sq ft) (inJ (inJ . (in.) lin,) (in.) (~.1 Comb. (s ft) (No Pay) Mount warning lights Type B with ROAD Black flags on each non-portable sign I W20-1 WORK - - 48 !6 S t I 32 2(2)12 Requires double post 48 ee a e on 2 AHEAD Orange =48 Black Requires double post 2 G20-2 END - - 4 24 8 S t 1 16 2(2)12 ROAD WORK 8 ee a e on 2 =48 Orange Mount warning lights Type B with 3 D ROAD WORK- NEXT 4 MILES - - 60 30 12 5 S t ! Black 25 2(2)12 flags on each sign Requires double post G20 1 EXPECT DELAYS . ee e a on 2 =48 Orange Mount warning lights Type B with 4 W8-9 LOW SHOULDE - - 30 30 6 25 S l Black 37 5 6(2)12 fla s on each sr n Requires double post . ee ate on 6 . =144 Place through protect at intervals Oran e 9 determined by the CO ONEIANE Black 5 W20-4 - - 48 48 !6 64 - ROAD See ate 1 on 4 AHEAD Orange Mount in combination with other ~ Black poraable .signs 6 W13-1 V\ - - 24 24 4 S t I 24 - ee a e on 6 M P H Orange Portable sign ~ Black l W20 Ta ~ - - 48 48 !6 S t I 4 64 - - ee a e on Orange Sheet Total 26 262.5 288 UFEOERALHIGHWAYADM ]S1RATi0NN NOT ~ ~`J EASTERN FEDERAL LANDS HIGHWAY DMS[ON !. See "Manual on Uniform Traffic Control" and "StOndard Highway Signs" GREANA IONALPARKAINS for dimensions. NEWFOUND GAP ROAD -1819 2. See Traffic Control Plan and Details far Approximate Location. SCHEDULE A CONSTRUCTION 3, Final locations of the signs shat! be approved by the CO. sicN sCHEDULE NVC OM1C N(1 • lIOflCfi a 0 a y d N h N 8 a M -1 L S F i Sign Text Sign Text No. No, 8 W21-5 SHOULDER WORK 9 W2l-la XXX !0 W16-2 FEET Il W6-3 Suppl. NO PASSING 12 Panel NEXT XX MILES PARKING f3 M 2A AREA CLOSED THIS PARKING AREA TO BE CLOSED - BEGINNWG 14 -° z°D7C USE OTHER PARKING AREAS FOR OVERNIGHT PARMNG i woT~s, 1. See "Manual on Uniform Traffic Control" and "Standard- Highway Signs" for dimensions. 2. See Traffic Control Plan and Detail for Approximate Location. 3. Final locations of the signs shall be approved by the CO. GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1B19 SCHEDULE A CONSTRUCTION SIGN SCHEDULE REG STATE PROJECT SHEET T N0. 51 SE NC PRA-GRSM 1819 A-B.il LOCATI ON PANE SI E TEXT SIZE Station Side Width fin.) Height (in,l Area (s ft) 4 Corner Radii (inJ Border Width (inJ Margin; Width (inJ Numbers (in,) Upper Case (inJ ower Case (inJ Series Color Comb. Quantit Y Total Area (s ft) Support (No Pay) Remarks Black 2 12 5 - Portable sign - - 30 30 6.25 See ote ! on Orange . - Black 2 l8 _ Portbble sign - 36 36 9 See ote l on .Orange BI ock 4 12 - Mount in combination with other poratbie signs - - 24 18 3 See ote I on Orange slack 4 25 _ Portable sign - - 30 30 6.25 See ote I on Orange Black 4 15 - .Portable sign - - 18 30 3.75 See ote I on Orange Block 4 32 - To be Mounted on barricade TYPe 111 - - 48 24 8 See ote J on Orange. Black l5 To be Mounted on barricade Type 11i - - 36 30 7.5 See ote 1 on Orange 2 U.S.DEPARTMENT OFTRANSPQRTATION Sheet Total 22 128,5 O FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMS10N L REG STATE PROJECT SHEEP TOTAL N0. SHEETS SE NC PRA-GRSM 1B19 A-B12 LOCAT ION PANEL="` I' E ~' - TEXT SIZE Sign No Text No Sign Text Station Side Width Hei t ~ Area Corner Radfi Border Width Margin Width Numbers Upper Case ower Case Series Color Quantit Y Total Area Support Remarks . . (inJ (inJ (sq ft) (inJ lial (in,) (in.l lin.) . lin.l Comb. (s ft) (No Pay) Place 1 Mile Apart Along BJaCk Length of Project, Each 15 ll UNEVEN - - 9 S t I 72 8(2112 Side of road W8- LANES 36 36 ee o e on 8 Requires double post Orange _192 Sheet Tatal 8 72 192 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION NOTES EASTERN FEDERAL LANDS HIGHWAY DIVISION . 1. See "Manual on Uniform Traffic Control" and "Standard Highway Signs" Totai 56 464 4SO GREANATIONAL PARKTAINS for dimensions NEWFOUND GAP ROAD - 1819 . Rounded Total 56 465 485 See Traffic Control Plan and Detail for Approximate Location 2 SCHEDULE A . . CONSTRUCTION 3. Final locations of .the signs shalt be approved by the CO, sicN scHE~uLE a° a m F J h ~_ F Q 4 N of h ~i 0 N O M ~~ 555+50 3 @ 7x4' RCBC See Sheets A-5.1 thru A-S.3 for Repair of Existing Culvert Walls 548+80 18"CMP Clean Pipe 0 Gatlinburg ----~~ 6.A(. AN NAY. SET Yd ASAKAi r nEr. zsos.aa r ~ °. u,~ _-,,\ ,- r 0 ~o Limits of Paving Po E ~,~ ; ~ i Begin Project I w Begin Schedule A W g STA .549+Od ~ c ~~ o u oa 0 -^---- ~~ Picnic Area Entrance 2-19'x11"CMP Clean Pipes NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction Y 4 7 M N 0 N 561+63 Remove 4LF 18" CMP and Install Concrete Headwall LT Remove 6LF ofAbandoned CMP Pipe Install 30 LF Silt Fence ~~ Gat/ipb4~9 ~ ~ h 0 `Z' '~` ~~ ~ \\\ \~\ ; t,4 ~~\ ~ ~h ~ ~ ~ ~ sr P ``_ ~`~ `w~ ~\ ~~ ~ ~ \~ a a 0 Q~ "m i O i u Q a NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to constnlction activity. Approximate Location of full Depth Pavement Reconstruction Verify With CO Prior to Construction Pullout at Sta 564+50 to Sta 573+00 Mill and Overlay per Typical Section Maintain Existing Curb/Wal! Reveal Sta 565+40, install 3 Feet Stone Curb and 5 LF type 1 Waterway Place Aggregate Topsoil, See typical Section Sta 565+40 to Sta 565+65, Remove Loose Mater/al at Base of Retaining Wall Install Grouted Class 2 Rip Rap to StabiNze Foundation Sta 572+32, Remove 9 LF 4" PVC Plpe and Install 9 Lf 6" PVC Plpe s~ /, ~~ ~~ ~ / / ~~ g d ~ / / ~ ~ N / / / 570+07 24"CMP Clean Plpe 3 m n a t~ s~ V s ~ 1- ~-~ _ -- p ~~ l~/' ? i r,, // //~ D / n / /~/ W // / / Cherokee / 572+94 _~ ~~ / Remove 3 LF - 4"PVC Pfpe Install8 LFType 2 Waterway 572+54 30" CMP Grout Headwall /Pipe Connection RT L NVS PM15 NO.: 090563 REG STATE PRO]ECr SHEET TO' N0. SHE SE NC PRA-GRSM 1819 A-G3 '~ Chem ;; M °u r m i Q4 a J 0 h M N o N L N Ci Q +-, v 0 00 V1 I ~ U +.~ ~ Gatlinburg ~---- Gatl 1t .y O h H Gl G 394151 5'x4.3' RCBC Ln rn to .,. ,/~ ~ NOTES; i,.Baseline stationing is based on wheel-measurements along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. Ail utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction 3 d ~ ~ rn U~j Ln ID to ~o F+ _ _ --- ---~' O ul '~' N n 598+i4 Remove 55 Lf - 36" CMP Install 56 LF - 36" HDPE Type S Pipe Remove and Reset Stone Headwalls RT and LT Install 3D LF~ / Silt Fence Instal130 LF Silt fence ~~ W Cherokee ~_~~ N ~ 3 ID 01 O Vl GAP ROAD _ UI ID rr U.S. DEPARTMENT OFTRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DNISION GREAT SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD - 1619 SCHEDULE A LINE GRAPH Station 577+50 to Station 605+50 a ~- ,op Sabin feet NPS PMTS NO.: 090563 -1 REG STATE PROTECT SHEET N0. SE NC PRA-GRSM 1819 A•C.4 Gatlipburg ^1 Ci e v v h ~ _ v m ~~ 606+02 30"CMP Place Class 3 Rip Rap LT 0 Sta 617+83 Remove 3 Lf 4"PVC Pipe and Instal/ 5 LF 6"PVC Sta 618+55 Remove 5 LF 4"PVC Pipe Install 5 LF Type 1 Waterway L Y a 0 M N C m v tD a "~ ~ ~ ,. h 01 C '---~ -_ 4r ____ ~Gatlinburg NOTES: ~--~ 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the conhactor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction Pullout at Sta 617+50 Che_-~~ Mill and Overlay per typical Section 616+76 Maintain Existing Curb Revea! Place Aggregate Topsoil, See Typical Section 30"CMP Remove Trash Can Pad Sta 616+79 Remove 3.5 LF 4"PVC Plpe and 3 Install 4 Lf 6" PVC Plpe ~ ~, ~W~~ 626+20 36"x46" CMP Cut Metal StrancJs Flush with Face of Culvert and Apply Epoxy at Strand/Pipe Connection Grout Vold Under Headwall RT N o M 3AP ROAD qtr-ors wa I' ------ ' o in 1~ rt `_ 633+25 30"CMP Clean Pipe N\ O Cherokee .---- ~~ ~r ~r I~ nt I ~ ( a 1J n /' ~ W W O )- ~ I U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMS10N GREAT SMOKY MOUNTAINS NATIONAL NEWFOUND GAP ROAD - 1619 SCHEDULE A LINE GRAPH Statbn 605+50 to StaHOn 633+50 °® . $pkNhR NPS PMLS ~~ H V Q ql M m M Z Q 4 0 0 k 0 M N 0 0 m L N n a m ~ Gatlinburg w O N rr a Pullout at Sta 635+00 Mill and Overlay perTypical Section Maintain Existing Curb Reveal Remove irasb Can Pad ' Sta 636+37, install i1 LF Type 2 Waterway 638+16 Remove 41 LF -18"CMP Instal! 44 LF -14" HDPE Type S Pipe Remove and Reset Stone Headwa!!s LT and RT 634+ZZ 18"CMP ~ Install 30 LF o ~ ~Sflt Fence ~ ~~~ /~~ ~\\ e i ~~. ~. ,~ --- -----------F--------- NOTES: i. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction 641+94 18"CMP Clean Pipe Reset Headwall Cap Stone LT N\ Z ~~ 655+01 30"CMP Grout Void under Headwall LT Place Class 3 Rip Rap L7 L U a U ¢~ m m 2 a f b ¢' Y a 0 M N N ~/ s~~oo Ga~1~~~~ NOTES: 1. Baseline stationing is based. on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. Alf utilities shall be field located by the contractor prior to construction activity. Approximate Location of Fuil Depth Pavement Reconstruction Verify With CO Prior to Construction 650+07 12" CMP _-----~; a care xroauarmu ' ~ POSTi 0 BO% 0 0 ~, Pulbut at Sta 652+50 ~.„,,, F Add 1 1/2" of Aggregate a ~ ~ ~ Base Course c, r Limits of Raving 0 f w ut - o<< _ ~ ~~ ~-~.~_ -- rr~- ~~„„ F _~~ T__-__~__-_____ ~~ r n U Q v JQ ''T V) U 651+03 24"CMP Pullout at Sta 653+00 Mifl and Overlay per Typical Section Maintain Existing Curb Reveal Remove Tresh Can Pad Sta 653+98, Instal! 12 LF Type 1 Waterway Cherokee REG STATE PROJECT SHEEI N0. SE NC PRA-GRSM 1B19 A-C.7 Gat/inbur 9 +~ o 0 ~~\ ~ 0 ~ a~~ ~~ ~ ~ -'~ ~~ ~ ~~ ~~~ ~~ W~~ aaw~w _`,` b ~~~~ v ,~~\ '~~ ` ~C .._`~` ~~, ~ U \~~\ tD ~~ ~ ~~ ~' Gatlinburg ~C ~I y O~ M b v +~ 0 ao tD ° ~ "~"' ~- _; -~, ~~ ~~ '~--._ NOTES, 1. Baseline stationing is based on wheel measurements. along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction. a N M N 0 a 679+19 18"CMP Clean Pipe .-- Cherokee ~ -------~ d n tD V 0 T n U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DMS10N GREAT SMOKY MOUNTAINS NATIONAL NEWFOUND GAP ROAD - 1819 SCHEDULE A LINE GRAPH Station 659+00 to Staton 687+50 o so' ~~' NPS PML' C n L 674+95 36"CMP Clean Pipe 666+00 8'x10' RCBC z!~ Gh~ 7 m w .~~~ } i o ~ •'"~~~ ,i i~ /~ i~ i i~ i -" ~ i ~_~ 672+46 ~ 24"CMP ~~ " NEWFOUND ~ ~A~' f 684+34 24"CMP Clean Pipe Grout Headwall /Pipe Connection LT and RT Grout Void Under Headwall LT Ln ~0 N n Pullout at Sta 673+00 Add 11/2" ofAggregate Base Course 689+40 Remove 5 LF 4"PVC Plpe Install 8 LF Type Z Waterway 691+17 14"CMP Pullout at Sta. 695+50 Add i ~ ", ofAggregate Base Course ~`~' ---wry ~^~,.~~~~~,' i~ i i ~~ E~F°`/ ~P/~ / N , ~~ s;~a MILE 26 69Z+08 18"CMP instal! Plpe Liner 43 LF-i8" Grout Headwall /Pipe Connection RT NOTES; a a h M N 8 C M Gatlinburg Pullout at Sta 688+00 Mll! and Overlay per rypica/ Section Maintain Existing Curb Revea! Remove and Reset 41 LF Stone Curb, Sta 687+26 Remove and Reset 9 LF Stone Curb, Sta 689+40 Place Aggregate Topsail, See ryplcal Section Remove 7Ydsh Can Pad 0 rn ~0 -F--_~~ _---®.~ 1. Baseline stationing is based on wheel measurements along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet, 2. Utility locations are based upon field surveys and utility records. All utilities shall be field located by the contractor prior to construction activity. Approximate Location of Full Depth Pavement Reconstruction Verify With CO Prior to Construction 0 0 n i ~~ ~ q Ci Q v O O C Ch~ L __ ...- REG STATE ~.... ,~ ~~ ~ I \ `~~ Z ~-~-~' `~ ~' ~' ~~ 1= ;; 0 a a U Q Q' ti m N °z 4 Q F U ^~\\ ~] Y 4 M V ~i 0 0 i Approximate Location of Full Depth Pavement Reconstruction statlon Boa+oo co statlon axe+3o Verify With CO Priar to Construction ° NI REG STATE PROJECT SNO~ SE NC PRA•GRSM 1819 A-S.3 FHWA STRUCNRE NUMBER 5460.093R a H H 0 Q M L. Exist reinforcing Nate: Mechanical splice shall have -~ a minimum of?''1"clearall around 4 splice to allow for good coverage of / t ri l ~ r ma e a s, rePa u c Mechanical splices (typ.) a v.c ~ cN Added reinforcing to match -~ ~ `' c size of existing reinforcement iv is REINFORCING SPLICING AS RE UIRED N.T S. Add reinf. steel as directed by CO Barshal! be placed adjacent to existing bar with rnver required by AASHTO Sawcut joint at rl ht Abrasively blast surfaces of the existing g reinf, steel and conc. lmmedlatety after angles to existing surface blasting coat all exposed surfaces of the exist. reinf. steel with a corrosion protective coating. A: Minimum of 8"exposed unoxldlzed reinforcement 8: Area of partial section loss C: Area extending into bottom slab (See Detail A) D: Area of rnmp/ete section loss (5t7% or greater) 16 DETAiL A -REPAIR EXTENDING INTO BOTTOM SLAB SHOWN N.T.S. (Repair shown extending Into bottom slab) Existing surface - Existing reinforcement- Detail A ~ . . ~ ~ . ' ~ . NOTES (COMPLETE SECTION REPAIR); i. The purpose of this repair is to make full section repairs of all loose, delaminated or other unsound concrete and surface clean(ng or replacing reinfordng steel for the 3-cell box at Sta: 555+50. 2, This repair may be used on all areas with more than 50% of concrete secton loss. 3. Where significant amounts of reinforcing steel have been lost from contusion the CO will determine if addition reinforcement is required. 4. Temporary shoring shall be provided prior to beginn(ng concrete removal where structural Integrity Is compromised. Contractor shall Identified areas requiring temporary shoring and shall be verified by CO. 5. Contractor shall divert stream into cell(s) not being repaired. Before the stream is diverted back into the repaired cell(s) collect all debris from the repair so that it does not get into the stream and all repair patches have cured to fc = 3000 ps(, (2 day minimum). 6. Locations where these repairs are required will be identified in the field by the Contractor after the stream diversion and shall be verified by the CO. Typically, this Is a more than 50% section loss. lifts may be required at deeper repair depths areas. 'The CO shall be contacted for non-standard wnditions. 7. Sawcut along edges of existing concrete to be repaired. Sawcuts shall be a minimum of 1/2 "deep, but no greater than a depth of the cover minus 1/8 " to avoid cutting existing reinfordng steel unless it is to be removed. Sawcuts shall be made at right angles to the surface, 8. Where there is a crack or control joint through an area to be repaired, rout the credo or control joint suffidently to Insert a plastlc strip that will mark the path, Repair and trowel each side of the joint separetely. After the repair mortar has cured, rout and seal in accoMance with joint type. 9. Remove damaged concrete from surface. Sound rnncrete shall also be removed to maintain minimum depth requirements. Care shall be taken not to damage existing .reinforcing steel. Existing reinforcing steel shall not be removed unless removal is approved by CO. 10. Protect sawcuts to avoid damage to edges. Damaged edges shall receive a second sawcut beyond the damaged area. Concrete between original and second sawcut shall be removed. 11. Remove bond inhlbltlng material from existing reinfordng sleet and concrete by oilfree, abrasive, dry blasting. Abrasive dry blasting shall remove dirt, concrete slurry, loosely bonded aggregates, corrosion, and corrosion products from the repair area. Blow clean with oil free compressed air. 12, Use Sika Armatec 110 Epo Cem to coat exposed reinforcing steel and SlkaTdp 111 Plus Mortar for repair or equivalent materials. Follow manufacturer. recommendations for • temperature conditions, mixing practices, and all other placement requirements. 13, Dampen the area to be repaired so that the pores of the concrete are filled with water. Remove any ponding or glistening water on the surface. 14. Work a scrub coat of the mixed material Into the substrate to ensure intimate contact and establish bond. Complete repair while the scrub coat is still wet and trowel to the desired finish. 15. Follow manufacturer recommendations on application depths and number of lifts. -- i6. If an equivalent mortar or reinforcing steel protection coating is chosen, material data Q confirming equivalency shall be submitted for approval % ~, i ~ Sawcut joint at right ! ~ m ~ ~° `o angles to existing surface Q ~~, A; Mln/mum of 8"exposed unoxldlzed reinforcement . ; ~ 8: Area of partial section loss --- • • C.• Area extending into bottom slab (See Detail AJ us. DEPAarMENr of TRANSPOaTanoN D: Area of complete section loss (50% orgreater) FEDERAL HIGHwar ADMINISTRATION EASTERN FEDERAL (ANDS HIGHWAY DIVISION - GREAT SMOKY MOUNTAINS NATIONAL NEWFOUND GAP ROAD - iB19 _lA COMPLETE SECTION LOSS WITH LESS THAN 50% ORIGINAL AREA U N.T.S. (Repair shown completely in wall) COMPLETE SECTION REPAIR ~~ 0 0 0 e m y °o e Y N M L Begin Project Begih Schedule A Sta. 549+00 Tie to Existing Pavement Marking 0 4" Single Solid N White Striping ~ Gatlinburg ~-~--~ =- 4" Double Solid Yellow Striping a Gatlinburg ~ a Collins Cherokee ~ Creek Sta 554+68 LT ~ ,` ~ Sta 557+23 LT N +41 +85 ~ ,t,,,..- -....._,..,~_ _ _,_~,.,._.,,~ e ~~ ~ +OS 4" Double Solid Yellow Striping 0 4" Single Solid White Striping 2" Stop Bar o o ~ i `" ~ +i j~ ~ ~ SPEED ~ 't ~M~ Sta 557+47 RT Ca I I (ns 4" Double Solid ~ I Sta 556+11 RT ~ Creek Yellow Striping i w ,~ Sta 552+36 RT e u4 ~~ u ~a STOP CLOSED Sta 554+81 RT ply GA7F Limit of Project Sta 554+68 RT Tle to Existing Pavement Marki ng NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform TrefFc Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. ,~~~` h vQ .~. ~~ ~ Che_~~ 1 fat/inb4 i J n s D D Y n :I W ~e L Oi ,d ti Q ql m F ~_ m ti f Q N H 0 M 8 C Oq NOTES: 1. Baselii along the left side edge of pavement; The pavemeht has been measured and PK nails every 500 feet. 2. All striping shah be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, 3. Signs shown reflect existing slgns and.layout, proposed informational signs shall follow sign schedules, yellow Striping _ -l L REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA{,RSM 1819 A-T.3 "~ Chem ~ 4" Single Solid N White Striping h WATCH o 3 Q o ~ FOR ~ v ~ SW 582+16 LT LraDi iCE ~ FLIP DOWN ~ ~ STA 587+t)1 LT + ~ ~" ~ o n ~, h ~ a~ N m rt E 2 4" Double Solid Sta 586+88 RT Yeliow Striping MILE MARKER L Gatlin6urq SEE DETAIL E621-A ~--~-- Cherokee Gatl~ ~ -~ I ~,, vI ti avi ~ o ~ Q ' y vo'i ~ 4" Single Solid ~ y White Striping ~ I ~ V) Q. a~ na~am o-eu 1 ~ -cam °' t U1 a~ ~ i ~ O i ~ LD lf~ ~ 3 C '~~ ~ C i = ~ \ U i ~ \ `0 4" Double Solid ~ '- NOTES: Yeliow Striping j 1, Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement us. DEPARTMENroFTRANSPORrAIION has been measured and PK nails every 500 feet, FEDERALHIGHwnrADMINISrRATION EASTERN FEDERAL LANDS HIGHWAY DNtSION t 2, All striping shall be in accordance with the Manual on GREAT SMOKY MOUNTAINS. NATIONAL PARK Uniform Traffic Control Devices (MUTCD) latest edition. NEWFOUND GAP ROAD - 1819 3. Signs shown reflect existing signs and layout, proposed SCHEDULE A " informational signs shall follow sign schedules, SIGNING AND MARKING Station 577+50 to Station 605+50 w~y'ar ~ ~~~ S~k In Poet V NPS PMIS NO.: 090563 L F Q M h M 0 °o REG STATE PROJECT SHEET TOTAL N0. SHEETS SE NC PRA-GRSM 1B19 A•T.4 Gatli~b~rg M k Q v ''~ Y7 v c U L v a~ .~ ~,. v C U 0 N 4" Single Solid white striping 4" Double Solid Yellow Striping Gat~lin~9 NOTES; 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2, All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. O ~`1 U1 4" Double Solid Yellow Striping N V) ~~-on 4" Double Solid White Striping +21 ~ +07 ~ +57 ~ caw ~~~ 1 ~_ ~. 0 4" Single Solid ~ ~ White Striping Cher~~ 3 m 76 ~• fD F+ lJ1 'i v; 0) n Cherokee ~ _----- r ~ r/r ~ Z f ~ 7 W O a n) BARRICADE ' R AHEAD ( ~ J y FLIP DOWN Sta 633+00 RT U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION EAT SMOKY MOUNTAINS NATIONAL NEWFOUND GAP ROAD - 1819 SCHEDULE A SIGNING AND .MARKING Station 605+50 to Station 633+50 ~xo, ,~, NPS PMTS z F 0 0 F i i i i 4" Single Solid 4" Double Solid White Striping 4" Double Solid White Striping ~ Yellow Striping o n M ~ pt ~ ? +90 +82 m +07 '~~ ~ +58 ~ Gatlinburg w ~ ~ ~ ,~" . ~.,~~ ~ " ~----- ~ ~b ~ resu ai w va Q' ~ V ~~ ~ v ~ rr ~ N 4" Single Solid White Striping ~ Sta 639+71 RT ® MILE MARKER J l0~ X Ch a ~ ' SEE DETAIL E621-A ~b \ ~oke Sta 636+16 RT ~} ~ P Sta 639+00 RT ~~ ~. i i i i i i i i ~ NOTES; 1. Baseline stationing is based on wheel measurements ~, along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet. ` 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, c 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4 V n y -1 z-~~ L s ~oo 3 ° M d n V~~,C _/ o ~ 8 Qks c O ~~tin ~~ 3 /~a -v, s Sta 647+68 RT REMOVE Sta 648+08 RT NOTES; 1. Baseline stationing Is based on wheel measurements ~ along the left side edge of pavement, The pavement has been measured and PK nails every 500 feet, 2. All striping shall be in accordance with the Manual on t Uniform Traffic Control Devices (MUTCD) latest edition. I 3, Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules, ;I S Limit of Project T1e to Existing Pavement Marking t~ Cherokee Gatlinburg b j STA 651+68 RT Sta 654+37 LT n ale Solid Q Striping ~ +84 W O ---- --- b ~l C U \_ .Cherokee ---~ ON GATE Sta 650+35 LT ROAD ICE CLOSED AND SNOW ON GATE Sta 650+35 LT ~4" Double Solid / Yellow Striping ~'~ 4" Single Solid White Striping -1 Sta 659+t79 LT ~~ ~~ 4" Single Solid Yellow Striping 4".Single Skip Yellow Striping Gat\r9 b h e° 0 ~~ 0 ~ ~~ th ~\ C ~~ ~,, C S 0 n d 4 R n GatlinbUrg +., v v ;~ n h ~ O ~ ............. O .... ~ ^ e~-- .. _ " .... ~ ~ . ~ b ~ C ~'-, +~ ~~ ~° NOTES: 1, Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2; All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition, 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. FLIP DOWN Sta 662+10 LT 4" Single Solid White Striping 664+09 LT H tp 65 4" Single Solid White Striping 4" Double Solid Yellow Striping J O REG STATE PROTECT SHEET TOTAL _ N0. SHEETS SE NC PRA-GRSM 1619 A-T.7 cheroKee 3 d S ~co ••' w 0 0 ui R Cherokee 0 4" Double Solid ~ Yellow Striping tD ~ M~I m n c~ N " V t O R D y U.S: DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMIMSTRATiON EASTERN FEDERAL IANDS HIGHWAY DIVISION 'SMOKY MOUNTAINS NATIONAL PARK NEWFOUND GAP ROAD -1819 SCHEDULE A SIGNING AND MARKING Station 659+00 to Station 687+50 9® Sole M 1be! NPS PMTS NO.: 090563 C u° Q a m a 0 0 e ti k i F e M h M j o i i m 0 N q n L ~ Gatlinburg 4" Double Solid 4" Single Solid White Striping White Striping 0 r+30 ~ ~~TY~~ Sta 687+78 RT NOTES: 1. Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement has been measured and PK nails every 500 feet. 2. All striping shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest edition. 3. Signs shown reflect existing signs and layout, proposed informational signs shall follow sign schedules. 4" Double Solid Yellow Striping S - ~~~~ ~;w~ 1~ R~~µ 7~ 18 Sp 692+65 RT MILEMARKER SEE DETAIL E62i-A ROCK ~ 0 n Sta 699+57 LT I. e L Ql 0 N v 35 MPH Sta 701+79 RT Che~ ~5 PM NO.: 90563 ~,...... ,v,w„, a1 ~, { 1\ ~~~a ~1 ~~ dl \1 11 1 ~1 1 11 11 11 111 a~ 1 1~ 1 1~A o STOP 1 ~~ A 1 1C Sta 000+29 LT r~ ~ 1 a ~' 0 1 1 Limit of Schedule A Sta 000+50 Tie to Existing Pavement Marking 12" Stop Bar ~ n 1 , 4" Single Sopd White Striping '~ 4" Single Solid ~ ~ e ~~; ~ ; ~~ ~ ~ ~ r~ ~ Tow String ~ _ J White Striping ~ ~-''~ ~ -8-~~._._.---~~ ___ % Road ~~ } , ~ ,___ ~ Horse Camp + ~ ~ ,... Sta 713+85 LT +23 35 +7S ~ MPH ("~'''3 4" Double Solid ~~ 4 Single Solid ti Sta 7i5t80 LT ~~ Yellow Stri in P 9 White Striping 4" Double Solid Yellow Striping. ~ ,,~0 1C V 7 h 0 N 3d~ ~~. 7~ O~ kO O s~ ~~ e~t9 v ~ a~~~~ G r~ 0 SPEED Xh Ch LIMIT 1~~ ~~'p~ G, Tow String 45. P Road Horse Camp Sta 715+30 RT r Sta 704+49 RT w~ ~~ NOTES: 1. Baseline stationing is based on wheel measurements U.S. DEPA PEOErwi The pavement avement e of ed id l ft h ~R" ~ . , p g e s along t e e has been measured and PK nails every 500 feet, GREAT SMOKY NEWFOL 2. All striping shall be in accordance with the Manual on S Uniform Traffic Control Devices (MUTCD) latest edition. SIGNIP 3, Signs shown reflect existing- signs and layout, proposed swno~ informational signs shall follow sign schedules. a C ~" -1 L REG STATE PROJECr SHEET TOTAL N0: SHEETS SE NC PRA•GRSM 1819 A•T.10 Cherokee 4"Double Solid -----~ White Strip/ng ~ 4" Double Solid to 4 ° Single Solid v Yellow Striping ^ White Striping ~~* O +20 +i0 `Y N +96 +44 ~ ~ 4"Single Solid -- '- - O White Striping O ~ ~ n 3 ~~ +~ ~ ,~ to of b~r9 0 6ati~n ~ to R p =~ K, cdri. r~2 /~6G9 ~r\y5 ~ ~ ~~ /~ End Schedule A ~X / `~ Sta 743+00 nj \ Tie to Existing ~ ~aa 4"DoubleSo6d PavementMarking G~~~~ White Striping ~a 4"Single Solid /~ White StrrpJng ~"~ ~ Cherokee o /~° w ~ U U J NOTES; ~ L Baseline stationing is based on wheel measurements along the left side edge of pavement. The pavement us: DEPARTMENT oFTRANSPORTAnoN has been measured and PK nails every 500 feet. FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDSAIGHWAY DMSION 2. All striping shall be in accordance with the Manual on GREAT SMOKY MOUNTAINS NATIONAL PARK Uniform Traffic Control Devices (MUTCD) latest edition. NEWFOUND GAP ROAD - SB19 3. Signs shown reflect existing signs and layout, proposed SCHEDULE A informational signs shall follow sign schedules. SIGNING AND MARKING Station 716+BD to Statlan 743+00 ~~ sale x rte NPS PHIS NO.: 090563 GENERAL NOTES: 1, Obtain approval from CO of final location and spacing of signs and devices. 2, See details 635-2, 635-6, 635-10 and E635-14 for additional traffic control details, 3, Cover all conflicting signs during construction operations while using details 635-2, 635-6, 635-10 and E635-14. 4. Place variable message signs/changeable message signs at locations shown on the Traffic Control Map, and as directed by the CO. Coordinate message text on the variable message signs through the .CO. The contractor is responsible for the variable message signs 24 hours a day, including the inputting/changing the message and maintenance of signs. 5. No work on the entire project shall be permitted on weekends or holidays or during the month of October. Holidays shall include alf National legal holidays and Good Friday and weekends will begin at Noon on Friday and end at 8;00 AM on Monday, No work shall be done the entire week after Easter Sunday. No work shall be done on the Friday after Thanksgiving, and no work shall be done from December 23, through January 2. 6, The pavement depth differential between lanes of traffic shall not exceed 1 1/2 " when opened to traffic. 7. A maximum of 2 one-lane dosures will be allowed at any one time for Schedule A. A maximum of 4 one-lane closures will be allowed at any one time for entire project (Schedule A and Options). Do not stop traffic for more than 10 minutes at each one-lane closure setup. NEWFOUND GAP ROAD: The Contractor shall reconstruct Newfound Gap Road and related parking areas/pullouts while applying the following: 1. Maintain two-way, two-lane traffic throughout the daytime from June 15 to August 15. 2, Daytime hours are defined as from 8:00 AM to 9:00 PM. 3, Maintain two-way, one lane traffic using Flaggers throughout the nighttime and daytime except as noted above in General Note #5 and Newfound Gap Road note: #1. All work, except final surfacing, can be done at night with appropriate lighting plan as approved by the CO. Final surfacing must be accomplished during daylight hours. 4. Work on existing roadside pullouts and parking areas maybe performed during daytime operations provided it does not encroach into the travel way, and must be completed in a timely manner, Work on a pullout or parking area is considered complete when it is open for use. Do not close mare than two pullout and parking areas simultaneously. (Pullout Sta 564+50 to 573+00, Pullout Sta 617+50, Pullout Sta 635+00, Pullout Sta 652+50, Pullout Sta 653+00, Pullout Sta 673+00, Pullout Sta 688+00, Pullout Sta 695+50, Pullout Sta 723+50). 0 F 0 u 0 0 0 a 5. Ten day written notice shall be given to the CO and NPS prior to any work at any trailhead parking area. In order to alert visitors parking at trailheads, advance signing is required a minimum of 72-hours prior to beginning construction activities for each traiihead parking areaJpullout (Pullout Sta 653+00.) 6, Contractor may use the Mingus Mill Parking Area as Staging area during construction activities. Do not close more than one-half of the parking area to visitors and maintain through access at all times. L __ c s~ n 0 t Y i 3 N NOT TO SCALE i. Obtain approval from CO of final location and spacing of signs and devices. 2. Low shoulder signs shall be placed at intervals specified by the CO in both directions on Newfound Gap Road. 3. Signs 1, 3, and 4 shall be mounted with Type B .warning lights and warning flags. TRAFFIC WARNING LEGEND blaming Light, Type B, With blaming Flags PVM .Portable Variable Message Sign ROAD ~ WORK AHEAD ~ END ROAD WORK ROAD WORK 0 NEXT 4 MILES EXPECT DELAY`. LOW ® SHOULDE PMIS .. 63 -1