Loading...
HomeMy WebLinkAbout20052161 Ver 1_Other Documents_20070119\NA 1C G January 19, 2007 Mr. J. B. Setzer, P.E. Division Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Alan W. Klimek, P.E. Director Division of Water Quality Subject: Inspection NCSR 1537A (Rich Mountain Road) DWQ Project No. 052161 Transylvania County Dear Mr. Setzer: On January 17, 2007, I visually inspected the construction work on NCSR 1537A (Rich Mountain Road) in Transylvania County. The construction work seemed to be completed except for paving the roadway. The culvert at Station 25+40 appeared to have been installed properly. Also, the erosion and sedimentation control structures and vegetative covering and mulching appear to be working properly. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828.296.4500. Sincerely, w /0' 6c4- Michael R. Parker Environmental Specialist Attachment cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office k/t a'?) Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources N `thCarolina Noatimally North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper ,I* 0 DWQ Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: January 17, 2007 County: Transylvania Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 052161 NW Permit #: T#: Project Name Location of Project: I NCSR 1537-A Rich Mountain Road Approximately 0.51 mile west of the intersection of US Highway 276 and NCSR 1536 west of Cedar Mountain in Transylvania County Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch ? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited r f' Name of Waterway(s): DWQ Site Visits for DOT Pro*ects Background Info Cannon Creek Basin/ Subbasin: FBR 01 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB XClass C ?ORW X?Trout ?WS-III ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch ?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: Authorized Stream Impacts: Additional comments: ?0 -1/10th acre ?1/3rd to 1.0 acre X< 150 linear feet ?1/11th to 1/3rd acre ?> 1.0 acre ?> 150 linear feet Inspection on January 17, 2007. Project is completed except for paving. Culvert appears to be installed correctly. There is no head cutting on inlet end. The outlet is slightly perched but probably due to bedrock, otherwise, downstream looks good. Sediment and erosion control devices look good. All bare areas appear to have been seeded and mulched.