HomeMy WebLinkAbout3405 Golder Heather Drive NIZ PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Water Resources
S. JAY ZIMMERMAN
ENVIRONMENTAL QUALITY
Director
July 14,2016
Frances Borzi and Alicia Rahall
3405 Golden Heather Dr.
Durham,NC 27712
Subject: Buffer Determination Letter
NBRRO#16-229
Durham County
Determination Type:
Buffer Intermittent/Perennial
® Neuse (15A NCAC 2B .0233)
❑Tar Pamlico (15A NCAC 2B .0259) ® Intermittent/Perennial Determination (where local buffer
ordinances apply)
El Jordan (15A NCAC 2B .0267)
(governmental and/or interjurisdictional
projects)
Project Name: 3405 Golden Heather Drive
Address/Location: (same as above)
Stream(s): Tributary to the Eno River
Determination Date: July 14,2016 Staff: Cherri Smith
Stream Not Subject Subject Start@ Stop@ Soil USGS
Survey Topo
A X—not
mapped/ephemeral ,
B* X—intermittent X X
*Stream B is on adjacent property with address 3147 Rose of Sharon Road. Start of stream not
evaluated since greater than 100 feet from property at 3405 Golden Heather Drive.
Explanation: The stream(s)listed above has been located on the most recent published NRCS Soil Survey of
Durham County,North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale.
Each stream that is checked"Not Subject"has been determined to not be at least intermittent or is not present.
Streams that are checked"Subject"have been located on the property and possess characteristics that qualify it to be
at least an intermittent stream. There may be other streams located on the property that do not show up on the maps
referenced above but may be considered jurisdictional according to the US Army Corps of Engineers.
This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director. An
appeal request must be made within sixty(60)days of date of this letter. A request for a determination by the
Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps
1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200
Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159
3405 Golden Heather Dr.
Durham County
July 14,2016
Page 2 of 2
Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins;
DWR—401&Buffer Permitting Unit;1617 Mail Service Center;Raleigh,NC 27699-1617. If sending via
delivery service(UPS,FedEx,etc.):Karen Higgins;DWR—401&Buffer Permitting Unit;512 N.Salisbury
Street;Raleigh,NC 27604.
This determination is final and binding unless,as detailed above,unless an appeal is requested within sixty
(60)days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers(Raleigh Regulatory Field Office)at(919)-554-4884.
If you ve questions regarding ' ermi 'on,please feel free to contact Cherri Smith at(919)791-4251.
Si erely
Danny Smith
Supervisor, ater Quality Regional Operations Center
cc: RRO DWR File Copy
r
044'
Lima
I
Al
N13R40 #- (�- aP-�
5t4, 3:JeA-
f1y11,2016
3506 \\ f \ 2916
\
3505 \ 2918
3504 ' \
2515
3503
r �
3502 613,01 2917
i
r S (� 2919
350 3308
No+- Sujc�e4.
2 S21
3 41T, ti
E-6
3402
Q 3306 `
3002 y ',
3004 °a `
\
33N
G►ada� 1 ` -
3147
3305 2 4
\ c;.
5 L
1 �
3005 3003
5
3201 .O'ci G*-
4127
6
3118
7
5
421
4205
N
W
1
3120 s
1:2,257
0 0.0175 0.035 0.07 mi
0 0.03 0.06 0.12 km
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRC/
Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), Mapmylndia
OpenStreetMap contributors, and the CIS User Community
Information depicted hereon is for reference purposes only and is compiled from thebest available sources. The City of Durham/Durham County assumes no responsibility for errors arising from use ormisuse of this n