Loading...
HomeMy WebLinkAbout19970893 Ver 5_EEP Receipt_20160705From: Cara Conder <cconder@res.us> Sent: Tuesday, July 05, 2016 12:00 PM To: Burdette, Jennifer a; Anna Reusche (areusche@anglerenvironmental.com) (areusche@anglerenvironmental.com) Subject: Mitigation Credit Transfer Certificates Buffer - Shotwell Landfill Attachments: Transfer Certificate Arrington Bridge II DWR (Shotwell Landfill) 070516.pdf; Transfer Certificate Rudolph DWR (Shotwell Landfill) 070516.pdf, Transfer Certificate Buffalo Branch DWR (Shotwell Landfill) 070516.pdf, Neuse Buffer Bank Credit Ledger (BB Preservation Buffer) 070516.pdf, Neuse Buffer Bank Credit Ledger (Buffalo Branch Buffer) 070516.pdf, Neuse Buffer Bank Credit Ledger (ABII Buffer) 070S16.pdf,- Neuse Buffer Bank Credit Ledger (Rudolph Buffer) 070516.pdf, Transfer Certificate Forrest Creek DWR (Shotwell Landfill) 070516.pdf, Forrest Creek Buffer Credit Ledger 070516.pdf, Transfer Certificate Ezell DWR (Shotwell Landfill) 070516.pdf, Transfer Certificate Cedar Grove DWR (Shotwell Landfill) 070516.pdf, Transfer Certificate Hatley DWR (Shotwell Landfill) 070516.pdf; Upper Neuse Bank (Hatley buffer) 070516.pdf,- 70516.pdf;Upper UpperNeuse Bank (Cedar Buffer) 070516.pdf; Upper Neuse Bank (Ezell buffer) 070516.pdf Jennifer and Anna, Please find attached the Mitigation Credit Transfer Certificates and corresponding buffer credit ledgers showing the offset for the Shotwell Landfill project (7 bank sites were debited and there are 8 credit ledgers). For this transaction RES provided 210,393.12 square feet of buffer credits. Please let me know if you need anything else. Thanks, Cara Cara Conder I Credit Sales Coordinator I Resource Environmental Solutions, L1 -C 302 Jefferson Street, Suite 110 ( Raleigh, NC 27605 Direct: 919.209.1052 1 Cell: 843.446.2312 Mitigation i ser Certificate Prepared by Environmental Banc & Exchange, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Cedar Grove Bank Parcel ID: DWR Project # 2011-0720v2 Riparian Buffer Credits Purchased: 64,049.70 (ft') 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Upper Neuse Riparian Buffer and Nutrient Bank (Cedar Grove Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft'. The Cedar Grove Site is providing 64,049.70 ft' of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 Mitigation Credit Transfer Certificate Prepared by EBX-NEUSE I, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Buffalo Branch Bank Parcel ID: DWR Project # 2014-0704v2 Riparian Buffer Credits Purchased: 48,621.60 (ft') r 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Neuse Riparian Buffer and Nutrient Bank (Buffalo Branch Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft'. The Buffalo Branch Site is providing 36,773.20 ft2 of restoration buffer mitigation and 11,848.40 preservation buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 Mitigation Credit s Certificate Prepared by EBX-NE USE 1, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Rudolph Bank Parcel ID: DWR Project # 2010-0408 Riparian Buffer Credits Purchased: 988.97 (ft') 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Neuse Riparian Buffer and Nutrient Bank (Rudolph Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft'. The Rudolph Site is providing 988.97 ft2 of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or econder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC e 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 r Mitigation er Certifica Prepared by EBX-NE USE I, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Arrington Bridge H Bank Parcel ID: DWR Project # 2008-1473v4 Riparian Buffer Credits Purchased: 9,714.05 (ft') 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Neuse Riparian Buffer and Nutrient Bank (Arrington Bridge II Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.1.2 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft'. The Arrington Bridge Il Site is providing 9,714.05 ft' of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, !1 4� Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 Mitigation re it Transfer Certificate Prepared by Environmental Banc & Exchange, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Hatley Bank Parcel ID: DWR Project # 2011-0720v4 Riparian Buffer Credits Purchased: 10,364.60 (ft') 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Upper Neuse Riparian Buffer and Nutrient Bank (Hatley Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft'. The Hatley Site is providing 10,364.60 ft' of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 • Raleigh, NC 27605 Mitigation li Transfer Certificate Prepared by Environmental Banc & Exchange, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Ezell Bank Parcel ID: DWR Project # 2011-07200 Riparian Buffer Credits Purchased: 299.20 (ft'-) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Upper Neuse Riparian Buffer and Nutrient Bank (Ezell Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft2. The Ezell Site is providing 299.20 ft2 of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or econder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC • 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 Ty Mitigation Credit Transfer Certificate Prepared by EBX-EM, LLC July 5, 2016 Mr. David King Shotwell Landfill, Inc. P.O. Box 576 Garner, NC 27529 Forrest Creek Bank Parcel ID: DWR Project # 2008-0229 Riparian Buffer Credits Purchased: 76,355.00 (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Shotwell Construction and Demolition Landfill Expansion (DWR Project #97-0893v5) You have elected to fulfill your permitted buffer mitigation requirements for the Shotwell Construction and Demolition Landfill Expansion project by paying into the Forrest Creek Buffer Bank (Forrest Creek Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 210,393.12 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #97-0893v5 and is 265,530.00 ft2. The Forrest Creek Site is providing 76,355.00 ft2 of buffer mitigation for this project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, Cara S. Conder Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator Angler Environmental — Anna Reusche Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 W o 0 M-trsul'l a 1-8-1-1 W W U U Z Z D M N v o co v v v OcoOvov,v ro o r o n r V Q LL V O O cD � O O m V N O O OJ r m O c0 O 07 d am LL N 0.0 n OO O O O cOcyy O N Oi El N N O h CliM V V' to O a O a y C) O N Q a N O Iq IR LL. V r O O N M M M M N d (D d (D m y m 0 N N N 0 N -.0 0 No 0 0 0 0 0 V O O O O O O O O 12 E N 0 p V N V N O O N m m c E v £ ti w 0 o c= l= X W O NZ d' m y3 N N N N m d (7 N W Z N W O pml L L Uof N N N N �Zu,Em m N N N U N w N m d U U o U U U Y r o To iii Y ri Y v @ C I- m d L m m p d 0 Of Z C Z a U m W E Z O `o O v U U Z U Z J � L U e m C L N a' v N N ..00.0 N <2 M h �2 0 00000 i2 cp cp N N (O nol4N1� N N NN 151�Q O d m � N C m Z F Y Z Q M Z d O_v Q.+ � 9 d C O M m o Q V rL N N N pp tea` dog? a a UW. S w u z-a Z m m m o O N D O 9 R O Q O 0 0 O N y IL add w0 ave w�_ 10mo Z N m y J R O m F W O W W 7 Z m X In W /2\ EBX Upper Neuse Riparian & Buffer Bank Hatley Site, HUC 03020201 Buffer Credit Ledger Date last updated: 07/05/16 DWR Bank Parcel Project #2011-0720v4 As -Built Credit Total: 310,838 square feet Total Credits Released to Date: 264,212.30 square feet Crediis--e-rease –aTAv—ailable to –Creaits De6lied/Sold from Bank Bank Buffer Credit Balance Transaction Number Date Purchaser Name or UMBI Task qaTp!eted I Project Name HUC of Project Square Feet Acres Square Feet Acres Square Feet Acres Local Gov't Requiring 1 8/14/2013 Tasks 1, 2, 3, and 7: Credits Released 170,960.90 3.92 170,960.90 3.92 2 10/18/13 Task 4: Credits Released 31,083.80 0.71 202,044.70 4.64 3 8/14/14 NCDENR DENR EEP Contract #6126 03020201 119,109.70 2.73 82,935.00 1.90 DWR 4 10/6/14 City of Durham West Street Sewer Outfall Repair 03020201 78,816.00 1.81 4,119.00 0.09 DWR 5 12/3/14 Task 5: Credits Released 0.71 35,202.80 0.81 6 12/4/14 NCDENR-EEP DENR EEP Contract #6126 03020201 .31,083.80 31,083.00 0.71 4,119.80 0.09 DWR 7 2/12/15 West Street Sewer Outfall Re air -Credited per DWR audit 2-12-15 78,816.00 1.81 82,935.80 1.90 DWR 8 3/9/15 Weatherspoon & Voltz LLP I Pine Plaza Drive Roadway 03020201 40,180.00 0.92 42,755.80 0.98 DWR 9 10/1/15 SAS Institute Inc. I Research Drive Extension - SAS Institute 03020201 39,234.00 0.90 3,521.80 0.08 DWR 10 10/13/15 Task 6: Credits Released 31,083.80 0.71 34,605.60 0.79 11 4/4/16 City of Raleigh Chester Road Sewer Realignment 03020201 16,650.0017,955.60 0.41 DWR 12 7/5/16 Shotwell Landfill, Inc. Shotwell Landfill Expansion 03020201 10,364.60 Ln 7,591.00 0.41 DWR 1 343,028.30 335,437.30 7,591.00 *Credits shown are only for mitigation credits approved by the LIMBI, BPDP, and As -Built EX, LLC Upper Neuse Riparian & Buffer Bank Ezell Site, HUC 03020201 Buffer Credit Ledger Date last updated: 07/05/16 DWR Bank Parcel Project #2011-0720v3 As -Built Credit Total: 328,337 square feet Revised Mitigation Credits: 584,358 square feet Total Credits Released to Date: 438,268.50 square feet ICredits Release d/Availabl re its Debited/Sold from F I Bank 6-iOT Bank Buffer Credit Balance Transaction Number Date Purchaser Name or UMBI Task Complete I Project Name HUC of Project Square Feet Acres _ Square Feet Acres Square Feet Acres Local Gov't Requiring 1 5/3/2013 Tasks 1, 2, and 7: Credits Released 147,751.65 3.39 147,751.65 - 3.39 2 6/18/13 Task 3: Credits Released 32,833.70 0.75 180,585.35 4.15 3 7/25/13 H.J. Morris Construction, Inc. 8103 Dreamy Way 03020201 2,938.50 0.07 177,646.85 4.08 DWQ 4 8/2/13 City of Raleigh Marsh Creek Interceptor 03020201 50,777.00 1.17 126,869.85 2.91 DWQ 5 9/11/13 Town of Knightdale Smithfield Road Sidewalk Improvements 03020201 4,392.00 0.10 122,477.85 2.81 DWR 6 10/3/13 Kotis Holdings, LLC Kotis Garner Development 03020201 7,406.00 0.17 115,071.85 2.64 D . IAIR 7 10/28/13 John and Lindsay Bayer I Bayer Fire Truck Turnaround 03020201 1,250.00 0.03 113,821.85 2.61 DWR 8 10/28/13 John and Lindsay Bayer 1 526 Oakland Dr., Raleigh NC 03020201 6,940.50 0.16 106,881.35 2.45 DWR 9 10/28/13 Transfer of Nitrogen Credits from Ezell Bank per 10-28-13 DWR Letter 136,778.40 3.14 243,659.75 5.59 DWR 10 10/28/13 Nutrient Conversion Credit Release 4,033.15 0.09 247,692.90 5.69 DWR 11 11/1/13 Task 4: Credits Released 58,435.80 1.34 306,128.70 7.03 12 12/10/13 City of Raleigh - Richland Creek Sewer Rehabilitation 03020201 152,040.00 3.49 154,088.70 3.54 DWR 13 2/25/14 E&A Development, Inc. Corbin Creek Woods 03020201 3,081.00 0.07 151,007.70 3.47 Orange County 14 8/14/14 NCDENR DENR EEP Contract #6125 03020201 77,137.00 1.77 73,870.70 1.70 DWR 15 11/24/14 Task 5: Credits Released 58,435.80 1.34 132,306.50 104 16 12/1/14 NCDENR-EEP DENR EEP Contract #6125 58,435.00 1.34 73,871.50 1.70 DWR 17 1/26/15 Hazen and Sawyer Crabtree Basin Improvements Phase 11 03020201 67,710.00 1.55 6,161.50 0.14 DWR 18 4/14/15 Wyndcroft HOA Wyndcroft 03020201 318.00 0.01 5,843.50 0.13 DWR 19 5/20/15 PW North Shore LLC North Shore Condominiums Phase 1 03020201 4,119.00 0.09 1,724.50 0.04 DWR 20 11/12/15 Pinpoint Properties Valley Springs Sewer Outfall 03020201 1 1,252.80 0.03 471.70 0.01 DWR 21 7/5/2016 Shotwell Landfill, Inc.Shotwell Landfill Expansion 03020201 299.20 0.01 172.50 0.00 DWR *Credits shown are only for mitigation credits approved by the UIVIBI, BPDP, and As -Built 1 438,268.50 1 1 438,096.00 1 1 172.50 1 1 EBX-EM, LLC FORREST CREEK MITIGATION BANK FORREST CREEK RIPARIAN BUFFER CREDIT LEDGER 6/15/2016 Transaction Potential Credits Released to Bank Credits Debited from Bank Credit Balance Number Credits Square Feet Acres Square Feet Acres Square Feet Acres Purchaser Project Contract Closing Date Date 1 2 131,600.00 131,600.00 131,600.00 131,600.00 3.02 3.02 131,600.00 263,200.00 3.02 6.04 Credit Released Credit Released 7/16/2008 7/29/2008 3 - 360.00 0.01 262,840.00 6.03 Rogers 11/13/08 4 - 12,416.00 0.29 250,424.00 5.75 Wendell Falls Development 11/25/08 5 - 9,600.00 0.22 240,824.00 5.53 Voller Properties Voller Properties 1/6/09 6 - 1,575.00 0.04 239,249.00 5.49 City of Ralegih Concourse Interceptor Project 1/8/09 7 65,800.00 65,800.00 1.51 305,049.00 7.00 Credit Released 4/24/2009 8 65,800.00 65,800.00 1.51 370,849.00 8.51 Credit Released 6/15/2009 9 10 - - 150.00 93,738.00 0.00 2.15 370,699.00 276,961.00 8.51 6.36 Town of Fuquay-Varina Rogers Town of Fuquay - Varina 6/15/09 7/22/09 11 - 62,481.00 1.43 214,480.00 4.92 City of Raleigh City of Raleigh 9/22/09 12 - 4,410.00 0.10 210,070.00 4.82 City of Raleigh City of Raleigh - Dempsey 2/10/10 13 - 15,090.00 0.35 194,980.00 4.48 City of Raleigh City of Raleigh - Commerce 3/14/10 14 65,800.00 65,800.00 1.51 260,780.00 5.99 Credit Released 3/24/2010 15 - 35,948.00 0.83 224,832.00 5.16 City of Raleigh City of Raleigh - Dunn Rd 6/1/10 16 - 6,045.00 0.14 218,787.00 5.02 City of Raleigh City of Raleigh - Poplar Creek 8/9/10 17 - 7,059.00 0.16 211,728.00 4.86 City of Raleigh City of Raleigh - Bentley Woods 8/16/10 18 - 163,772.00 3.76 47,956.00 1.10 Public Service Company of NC 10/27/10 19 65,800.00 65,800.00 1.51 113,756.00 2.61 Credit Released 1/19/2011 20 - 26,142.00 0.60 87,614.00 2.01 City of Raleigh City of Raleigh -Crabtree 9/22/11 21 - 31,152.00 0.72 56,462.00 1122,262.00 1.30 Apex-SR1444-Lufkin Road 1 9/26/11 22 65,800.00 65,800.00 1.51 2.81 Credit Released 11/22/2011 23 50,849.00 1.17 71,413.00 1.64 US Foodservice, Inc. Zebulon Expansion 2/15/12 24 3,368.60 0.08 68,044.40 1.56 City of Durham Carver Street Extension 11/21/12 11/27/12 25 40,693.50 0.93 27,350.90 0.63 WCPSS Richland Creek Elementary School 1/16/13 2/26/13 26 27,351.00 0.63 -0.10 0.00 City of Raleigh Smith Creek Interceptor Improvements 6/11/13 7/7/13 27 0.10 0.00 0.00 0.00 Credits Transferred from Cedar Grove Buffer Ledger 12/4/13 28 29 30 163,441.00 3.75 78,816.00 74,070.00 1.81 1.70 163,441.00 84,625.00 10,555.00 3.75 1.94 0.24 Buffer Credits per DWR Memo 8/9/13 (50 to 100 feet) City of Durham 1west Street Sewer Outfall Repair City of Raleigh IMitchell Mill Road Widening 2/11/15 2/13/15 8/25/15 31 65,800.00 1.51 1 76,355.00 1.75 Credit Released 2/10/16 32 76,355.001 1.75 0.00 0.00 Shotwell Landfill, Inc. Shotwell Landfill Expansion 7/5/16 Total 821,441.10 18.86 821,441.10 18.86 0.000.00