Loading...
HomeMy WebLinkAboutNC0001422_Sutton Accelerated Remediation Summary_20160502L. V. Sutton Electric Plant Proposed Accelerated Remediation for Offsite Groundwater Impacts 1.0 Background A Notice of Regulatory Requirement (NORR) was issued by NCDENR on June 9, 2015 requiring Duke Energy to take action to control and prevent further migration of coal ash contaminants along the east side of the L.V. Sutton Plant (Sutton Plant). A Groundwater Mitigation and Monitoring Plan was submitted to NCDENR on July 9, 2015 outlining the proposed plan to address the NORR. A Settlement Agreement (Agreement) dated September 29, 2015 between NCDEQ (formerly known as NCDENR) and Duke Energy requires Duke Energy to implement accelerated remediation along the eastern Sutton Plant property boundary where data indicates ash basin related constituent concentrations above 2L Standards have migrated off-site. As part of the Agreement, the NORR dated June 9, 2015 was withdrawn. The Agreement requires Duke Energy to implement accelerated remediation at the Sutton Plant on the following terms and conditions specifically related to the off-site groundwater impacts: • Extraction wells will be used to pump groundwater to arrest the off-site extent of the migration. • Groundwater will be pumped and treated as needed to meet regulatory standards and the treated groundwater will be routed to the ash basin or the discharge canal. • The extraction and treatment system will be installed as soon as practicable following receipt of all permits and approvals from NCDEQ and is in addition to other Coal Ash Management Act (CAMA) obligations. • Extraction wells shall remain operational until it is demonstrated, subject to NCDEO's written concurrence that off-site groundwater impacts have been remediated to 2L Standards and there is no reasonable potential for future off-site migration. 2.0 Scooe The following steps are recommended: • Conduct an aquifer/pump test to evaluate site-specific physical properties of the aquifer and obtain data for the extraction well system design. (Status —The 3 -day pump test is scheduled to be completed in March 2016 pending receipt of permits.) • Provide extraction and treatment system design to NCDEQ for review and approval. • Due to NPDES Permit limits the construction of an ash basin dewatering treatment system is required. (Status — Construction of the ash basin dewatering treatment system is currently underway and expected to be completed later in 2016.) • Potentially 1.3 MGD of groundwater could be generated from the proposed extraction system. Treatment through the dewatering system is the most practical approach to handling extracted groundwater. In addition to the groundwater modeling required by CAMA, additional groundwater modeling simulations using supplemental extraction wells may be pertormed to improve recovery of impacted groundwater near the ash basins. These supplemental extraction wells would be located between the ash basin and the east property boundary. 3.0 Challenges Challenges include obtaining permits or modifications to existing permits and working in coordination with other ongoing Site construction/remediation activities. February 17, 2016 1 of 3 L. V. Sutton Electric Plant Proposed Accelerated Remediation for Offsite Groundwater Impacts Permits required • Schedule is dependent on ash basin dewatering treatment system • Approval of action from NCDEQ DWR • NCDEQ recovery well permits • Erosion &Sediment Control permit • Modification to the State Stormwater Permit (applies to coastal counties) • Potential New Hanover County building/electrical permits (remediation compound) Construction/Remediation System Challenges • Working around landfill construction activities • Working around ash loading activities • Working around construction of dredging water treatment system • Power to pumping system area • Long term discharge location (Discharge canal, cooling pond or Cape Fear River) 4.0 Figure Figure 1: Sutton Plant February 17, 2016 2 of 3 �. ' � � _:{� . r _. • =� � �,• ; ,� I �� . � t �, :1+� -. • =� � y a� � �.�I •_ r i-��^°• s .... ._ _,. �±,',-�j 2L'�.'r } X61 {�� , �'jr1 �,� • zi r,� =�' . � � -: , �>�- �,-;� fir;__. _ v ti.F �r�fi �' i �'T'''. E.r. � p��_i ,ti � �-:tom � �� �:,s"..,, _��:,I �,a,��-} 1 • ; :,.Sr 1 . � ���� -• ,;� • s' - - � � ;' ,. _ — � F ,y+•� '�: ����'�� stn '� �' �. lr,. _ �'� _ .� � � y Y t R�r. — - 6. _ „� > _ _ i i K L. V. Sutton Electric Plant Proposed Accelerated Remediation for Offsite Groundwater Impacts 5,0 Conceptual Schedule Task Description Estimated Length of Time Estimated Completion Date Aquifer Pump Test System Installation 1 week 3/14/16 Aquifer Test and Reporting 4 weeks 4/15!2016 Extraction System Engineering Design 6 weeks 5/27/2016 Extraction System NCDEQ Approval 6 weeks 7/8/2016 Extraction System Bidding/Contractor Selection 4 weeks 8/5/2016 Extraction System Installation 16 weeks 1 1125/2 0 1 6 Completion of Ash Basin Dewatering Treatment System (currently underway) 48 weeks 12/4/2016 Extraction System Start Up and Testing 4 weeks 12/23/2016 Extraction System Certification Report (Final Submittal to NCDEQ) 8 weeks 2/17/2017 February 17, 2016 3 of 3