Loading...
HomeMy WebLinkAboutNC0003433_Table 6-7 Input Parameters and Values for CD Flow Equation NEW_20160229TABLE 6-7 INPUT PARAMETERS AND VALUES FOR CONVECTIVE -DISPERSIVE FLOW EQUATION BASED UPON CAPE FEAR DATA CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Value 1956, 1963, 1985° Ash Parameter Nomenclature Source of Value 1970 Ash Basin Basins Began Sluicing Ash - 1956 1985 CSA Ceased Sluicing - 1977 2012 CSA Duration of Source Term t° 22 28 Calculated Mean values from Ash Source Concentration c ° 3,783 boron, 3,330 boron Pore Wells (pg/L) 5.77 thallium (Exceedances Only) 2015 Lowest Provisional Background Background Concentration c; 52 boron, Concentrations or (pg/L) 0.1 thallium Detection Limits for Not Detected Values Seepage Velocity (ft/yr) vs=ki/ne 16 Calculated average across the site Dispersivity (ft) a 20 0.1*2000 Dispersion (ft2/yr) D = ays 320 Calculated Distribution Coefficient Kd 0.5v- boron, 26 thallium Graziano et a/.,2015 (ml/g) Time from Introduction t Varies To capture the length of Constituent (years) of plume Distance from Boundary x 250 1000/600* Measured (ash basin of Ash Basin (feet) to body of water) Calculated Concentration c(x,t) As shown pg/L Calculated. Prepared by: KDB Checked by: DGN Notes: 'Three models were considered for the 1985 ash basin: groundwater moving radially toward three discharge locations: Branch A, Shaddox Creek, and Cooling Water Effluent Channel. *250 (toward Cape Fear River), 1000 (toward Shaddox Creek and Cooling Water Effluent Channel), 600 (Branch A) Graziano et al., 2015 used 1.0 for boron. In order to more accurately demonstrate the movement of Boron and align with field data, the value for Kd was changed to 0.5. The 1978 ash basin was not considered for this model due to insufficient input values. P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\20.EG_CAP\CAP Part 2\Tables\Final\Table 6-7 Input Parameters and Values for CD Flow Equation NEW.docx Page 1 of 1