Loading...
HomeMy WebLinkAboutNC0003433_Fig 6-16 Concentration Boron and Thallium_20160229U 10,000 1,000 J 0 500 1000 1500 2000 2500 3000 3500 Time Since Plant Start Up (yrs) Comparative Value*=700 ug/L Comparative Value**=0.2 ug/L Notes: Assumes Seepage Velocity = 16 ft/yr * = 2L Standard ** = IMAC Standard Kd = Distribution Coefficient 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 tip PHONE 864-421-9999 DRAWN BY K www PROJECT MANAGEREC. SUTTELL DATE: FEBRUARY LAYOUT FILE PATH: P \Duke Energy Pro,— 10261103. Cape Fear Ash Basin GW Assessment Plan\20 EG_CAP\CAP Part 2 ,g—s Thallium, Kd=26 mL/g Boron, Kd=0.5 mL/g FIGURE 6-16 CONCENTRATION OF BORON AND THALLIUM AT EDGE OF CAPE FEAR RIVER CAPE FEAR STEAM ELECTRIC PLANT MONCURE, NORTH CAROLINA 27559