HomeMy WebLinkAboutNC0003433_Fig 6-16 Concentration Boron and Thallium_20160229U
10,000
1,000
J
0 500 1000 1500 2000 2500 3000 3500
Time Since Plant Start Up (yrs)
Comparative Value*=700 ug/L Comparative Value**=0.2 ug/L
Notes:
Assumes Seepage Velocity = 16 ft/yr
* = 2L Standard
** = IMAC Standard
Kd = Distribution Coefficient
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
tip PHONE 864-421-9999
DRAWN BY K www
PROJECT MANAGEREC. SUTTELL DATE: FEBRUARY
LAYOUT
FILE PATH: P \Duke Energy Pro,— 10261103. Cape Fear Ash Basin
GW Assessment Plan\20 EG_CAP\CAP Part 2 ,g—s
Thallium, Kd=26 mL/g Boron, Kd=0.5 mL/g
FIGURE 6-16
CONCENTRATION OF BORON AND
THALLIUM AT EDGE OF
CAPE FEAR RIVER
CAPE FEAR STEAM ELECTRIC PLANT
MONCURE, NORTH CAROLINA 27559