Loading...
HomeMy WebLinkAboutNC0003433_Fig 3-1 Pred Loc Boron_20160229Boron Concentrations with No Action Boron Concentrations with Cap -in -Place Boron Concentrations with Excavation 2020 2045 2115 Note: Figures are from Groundwater Flow and Transport Modeling Report for Cape Fear Steam Electric Plant and Updated Simulations for Groundwater Flow and Transport for Cape Fear Steam Electric Plant (Graziano, 2016). 2020 2045 2115 410 synTerra 2020 2045 2115 FIGURE 3-1 148 RIVER STREET, SUITE 220 MODELED GROUNDWATER CONCENTRATIONS PHONEGREENVILLE,4-421- SOUTH CAROLINA29601 WITH SOURCE CONTROL MEASURES PHONE 864-421-9999 www.synterracorp.com CAPE FEAR STEAM ELECTRIC PLANT DRAWN E. NAE R: C. DATE: FEB 2016 MONCURE, NORTH CAROLINA 27559 PROJECT MANAGER: C. SUTTELL FILEPATH'. P'.\Duke Energy P.g,.. 1026\103. Cape Fear Ash Basin GW Aaseaam 1\20.EG_CAP\CAP Part 2\Figures\Fig 3-1 Paad L.. Boron