January 8, 2008
Mr. David Baker
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
080082
Subject: Regional General Permit #31
Bridge # 104, SR 2776
Buncombe County, NC
Deaz Mr. Baker:
I have enclosed a plan sheet with erosion control, PCN application for RGP #31 and a
vicinity map relative to the bridge replacement project on SR 2776, Buncombe County,
NC.
We propose to replace an existing wooden bridge (20'x20') with a lazger bridge
(28'x30'). A 50 feet long impervious dike will be needed for the construction of new
footings/abutments for the new bridge. Traffic will be maintained on an off-site detour.
Construction activities will be conducted from dry work azeas whenever possible.
Existing channel morphology will be maintained upstream and downstream of the bridge.
Riparian vegetation will be reestablished along disturbed areas associated with project.
Trantham Creek, which varies from approximately 6 to 10 feet wide, is a "Class C -
Trout" creek with riffle/pool habitats, large stone/graveUcobble/sand substrate, and
bed/bank features.
No federally listed species (threatened or endangered) or critical habitats will be affected
by the proposed project.
By copy of this letter, we request the North Cazolina Wildlife Resources Commission
Coordinator, to comment directly to the Corps concerning the permit request.
Mr. David Baker
Page -2 Bridge #104 Buncombe County
January 8, 2008
Erosion control measures will be employed from the "Erosion and Sedimentation Control
Guidelines for Division Maintenance Operations" and reviewed by Mr. Ed Ingle,
Roadside Environmental Field Operations Engineer.
By copy of this letter, I am forwarding four (4) copies of the application package to Brian
Wrenn, NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike
Parker, NC DWQ Asheville Regional Office for review and comment. Please charge the
application fee of $240.00 to WBS element # 13B.201111. Please forward comments
directly to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
p ~1~-
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: J. J. Swain, Jr., P.E.
Garry L. Moore
David McHenry
Brian Wrenn
Mike Parker
Ed Ingle
Office Use Only:
USACE Action ID No.
DWQ No.
20080082
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N%A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
®401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: GP 31
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII.
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: J J Swain Jr P E Division Engineer
Mailing Address: NC Department of Transportation
P.O. Box 3279
Asheville NC 28802
Telephone Number: 828-251-6171 Fax Number: 828-251-6394
E-mail Address: rdbryan(a~dot state nc us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.) N/A
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Page 1 of 9
Form Version !larch 0~
Fax Number:
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion.
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Bridge #104, SR 2776
2. T.I.P. Project Number or State Project Number (NCDOT Only): 13B.201111
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Buncombe Nearest Town: Fairview
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers/names, landmarks, etc.): Take US 74A east toward
Fairview. Turn left onto SR 2800 and go 1.22 miles then turn right onto SR 2776 Go 0.5
mile and Bridge 104 is just past intersection of SR 2780 Wrights Cove Road.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum):
Bride 104 35.53977° N 82.40515° W
6. Property size (acres): 0.1
7. Name of nearest receiving body of water: Trantham Creek Class C -Trout)
8. River Basin: French Broad
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Page 2 of 9
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The site is an existing brid eg_ on a paved road. Surrounding
properties are wooded. pasture and residential.
10. Describe the overall project in detail, including the type of equipment to be used: Division
of Highways plans to replace Bridge 104 with a lar eg r bridge. The new structure will be ~8'
x 38' bridge. The new abutments will be behind the existing abutments Only temporary
impacts associated with dewaterina are required. Traffic will be maintained on an off-site
detour during construction. The equipment to be utilized includes an excavator crane and
trucks.
11. Explain the purpose of the proposed work: Division of Highwayplans to replace the
bride with a lar er bridge A permit is required to construct temporary impervious dikes to
allow for footing/abutment excavation and construction The new structure will re wire no
fill within jurisdictional waters.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along ~-ith
construction schedules. N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future plans.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts.
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Page 3 of 9
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: We propose to construct temporary
impervious dikes (jersey barriers and sandba walls)to allow for replacement of a bridge with
an aluminum arch. The impervious dike will be approximately 50 feet in length..
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams.
separately list imnacts due t~ h~th structure and flnndina
Wetland Impact
Site Number
(ir~dicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
( es/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
N/A
~~. .
Total Wetland Impact (acres) N/A
3. List the total acreage (estimated) of all existing wetlands on the property: 0.0
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear .footprint for both the original and relocated streams
must he included- Tn calrnlatP arraaaP mnltinly lPnnth X width then ~ivirlA by d2 S((1
Stream Impact
Number
indicate on ma
( )
Stream Name ..
Type of Impact Perennial or
~
Intermittent. Average
Stream Width
Before Im act Impact
Length
(linear feet) Area of
Impact
(acres)
Bridge 104 Trantham Creek ImTem'ooraDike perennial g, 50 0.009?
Bridge 104 Trantham Creek Bridge Perennial 8, 0 0
Page 4 of 9
Total Stream Impact (by length and acreage) ~0 0.009
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma)
Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody Area of
(lake, pond, estuary, sound, bay, Impact
ocean, etc.) (acres)
N/A
.~ ~'
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
Page 5 of 9
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. The existing bridge must be
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o. enr.state. nc.us/ncwetl ands/strmgide.htm 1.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
Page 6 of 9
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
The proiect has no permanent impacts to jurisdictional waters and therefore no miti ation
should be required. DOT will restore channel dimensions to offset the minor impacts
associated with the placement of temporary impervious dikes during construction
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc us/wrplindex htm. If use of the NCEEP is pro osed _ le_
check the appropriate box on page five and provide the following information-~
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) - N/A
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Page 7 of 9
1. Will the project impact protected riparian buffers identified within I SA NCAC 2B .0233
(Neuse), 1 SA NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 1 ~A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
~one* I Impact Multiplier Required
(square feet) Mitigation
I 3 (2 for Catawba)
2 1.5
Total
* Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone l .
mitigation is required, please discuss what type of mitigation is proposed (i.e.
~n of Property, Riparian Buffer Restoration /Enhancement, or Payment into th
n Buffer Restoration Fund). Please attach all appropriate information as identif
15A NCAC 2B .0242 or .0244, or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. No significant change in impervious area.
Stormwater will be diverted through settlin>; basins or grass lined buffers prior to entering the
streams.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility-.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application? Yes ^ No
Page 8 of 9
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our ~vebsite at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
- It is the applicant's responsibility to submit the application sufficiently in advance_.. - _ iced ~ -
construction dates to allow processing time for these permits. However, an appltcJ" ay
~;r _..:,;- -.. choose to list constraints associated with construction or sequencing that may impos ~~_~ -~.-~_~ :~..,;:
-;.work schedules (e.g., draw-down schedules for lakes, dates associated with Endan" ~ -
t~- hreatened Species, accessibility problems, or other issues outside of the applicant's co _ ~ -~ _
-..~ - ith re and to hazardous s ill basins the road is not classified as an arterial route
ardous s ill basins are not re uired. -~>
~ „` 1 8' s o0
Appli nt/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 9 of 9
{
~ ~~~ ~
~~.,,_.~ ~ ~ & ,r
.~ ..
~.
.`
'*s. r
~~
!i
iJ,
~,~ ,
~: ~ `tip ~
~j ~ `~~ ~~,, ~ ~~h u C
`~,.
~._.,.t i r{ ~ t ~ ~ .. ~{.
~-~ ,~ ~ 1
~~ ~ t} '~ ~~ ~ ~ i~~`~f
~ ~~ ~ f ~,,F~ ~ ,~ ,- /
~' , ,/' f- ~ ~~
~~~ ~~
f 6
~-R
' ~
~ ~ - - ~ ~-
{_
...~... ~~- ~._ 1 f
r~' ~~ ~.
',; ' ,~ ~
~ fQ f
* L ~1~
1
~,:
~~
~.
~ ..W
~ ~ ~ ,.
i
r -. ~, ~ ~ •~ tip ~ ~' * ~ r /~
y
'~ .~,,, +''/' ?~ ~ "' -~ ,..,,~~~ .1 ~..~~" ~ 'fit e
.~
" ~ .~
-~ r
x `~ ?~ -err
.~..,,,,,,~ ,. !t_ ~,... _.. '
~t t- W ~-.,,.,~., ....-.,.,„~„r,.~.....~,
:'
~. f ~ ~ ~ ;~' ~ ~~O
+r'`~ 4..y ~, j ,,,~a~° ~,~.;ynr..'..rasa'ryr~°`~J, ~~.n .rl! ? •~' ~ 1 ~, ~ rJ``~~+
~...~'(~ ~ .++^^' a ~ ~ a 7771 ~ ,~ ~ ~~*.~~5„4 ,~ 7
~~ ~wkS 5 Sk ''_ ~y~~ j { ~ y ~
.l .dam ^~ fi fl~ ~ ~ ~ ~/ `'"n.. ~ 5A"~ ~a\`f..~`~
.. ` ~ .....~ dam, 1 ~.P`~4„w ~.~r..
t ~ fr ._ , \ j
+' ~ t~ ~
lJ ~~ C!/v+ _ ~ ~_
~ ; ~ ~ ~`
r }
• ~
.,. * t 'A 1X , l
° ~,.-~ . ~ ++ 'g fir' f l
Name: OTEEN Location: 035.5403706° N 082.4056462° W
Date: 1/8/2008 Caption: Bridge #104, SR 2776
Scale: 1 inch equals 1000 feet Buncombe County, NC
"~~ r~ ~
~ ~~ ~ ~ ti
'~'~..
Figure 1. Bridge 103, SR 2776, Trantham Creek, Buncombe County, NC.
N . C . DEPARTMENT OF TR:AN SPORTATION
DIVISION OF HIGHWAYS
BRIDGE REPLACEMENT SURVEY
SUBJECT: Buncombe Co. Bridge # 104 Replacement
LOCATION: Begin at the intersection of SR 2780 Wrights Cove Road and SR
2776 Old Fort Road and continue in an easterly direction for a total distance of 150 feet
to the Buncombe Co. bridge #104.
WURK TYPE: Replace Bridge and Erosion Control
COUNTY: Buncombe
DATE: 12-12-07
NOTES: R/W Varies
V~ater: Trantham Creek
Water: Class C; Trout PREPARED BY: Troy Wilson
Varies
RIGHT OF WAY
cEN~rERLnvE
,,
' 6' 10' ~ 10' 4' 3'
ASPHALT ;PAVEMENT
SHOULDER ~ 3HOULDER
DITCH
• • • • •
MAX SLOPE
FILL 1 i~: l
CUT 1:1
• 7/
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVENTIONAL SYMBOLS
Culvert ----------------------------------------------------------
Fence -------------------- -----------------------------------
Guardrail -------------------------------------------------------
Stream or Body of Water ----------------~__~___~__
Flow Arrow ----------------------------------------------------
Spring __~~___--- -- ---_- ---- -- --
Exist. Pole ----------------------------------------------------
Exist. Power Pole ------------------------------------------
Exist. Telephone Pole --------------------------~______~
Exist. Joint Use Pole --------------------------------------
Telephone Pedestal -------==----=-------------~_~_______
Cable TV Pedestal ----------------------=------------------
Exist. Water Valve -----------------------------------------
Sewer Clean Out --------------------------------------------
Power Manhole ----------------______~__~_____~_~_~_
Water Manhole ----------------------------------------------
Light Pole -----------------------------------------------------
Gas Valve _---__~------------------------------------------
Telephone Manhole
Power Transformer --------------~---------------------------
Sanitary Sewer Manhole ----- ---------------~_______
Storm Sewer Manhole ------------------------------------
Water~ Line -~----------
Property Line
Property Line Symbole ' ----_~___~________~_____________
Exist. Iron Pin ---------------- -----------------------------
Property Monument ---------------__~___M______________
Well --------------------------------------------------------------
~---~
-x-x-x-
.. ~ ae.
r
O~•:.~
•
i
-i-
-~-
a
® --
Q
O
0
0
Q.
0
O
w
- .
STATE OF NORTH. CAROLINA
DIVISION OF HIGHWAYS
ERasION SYMBOLS
STD # DESCRIPTION
245.03 TEMPORARY S1LT DITCH
-----------------------------
-------- .... -_
----- _TSa ------._
245.05
TE1VlPORARY DIVERSION.----=--------------------•------
893,01 -_----------
...,_._..
TEMP~?RARY SILT FE1~tCE -------------------------------------------=- ,~~
_ TD --.__.~
~„
890.05 -- TEMPORARY SLOPE .DRAIN WITH EARTH -BERM -------•.--_._... :.~
245.Oi
•
SILT BASIN ~ TYPE A ----------------------------
----
245.02 ------------------------------•
-
~
-
SILT BASIN TYPE B --------------------------- -O
_
892.04 -
------
TEMPO --------••-----------------.
RARY ROCK SILT ;CHECK TYPE A --------------•-- . ®. .
895.10
..,.
-----.._.
TE1N1'O '
. RARY ROCK SILT `CHECK TYPE B ---------•-•-----••
-
~
.892.01 .._....
-•-.
~
TEMPORARY ROCK SEDIMENT DAlv1 TYPE A -----•---•--• . ~
.
892,02
- •-.-.--.
~ ~ ~
TEMP4RARY.~ ROCK SEDIMENT DAM . ~;YPE B
~ ~ .
.~
897.01 ,.~
ROCK PIPE INLET PROTECTION -._....._.':
894.01 .,_._,.,•_-
~ ~'~
ROCK SILT SCREEN -------------------------
245,44 ~ __
-- _
S~'iLL11~G BASIN
------- -----------
.
~
-
.
.
----•------- -•-
... ...._ ....:......._ -®
.,
_. SPECIAL SEDIMEla1T :CONTPtOL FENCE
868.01 _
I Rip RAP.: ~ •--- --------------- ~;~---------=------._......-•---- ---- ;:.
,;
RR_ ~
~„
', _
-
' DITCH LINER --•--=-------_-
..
ENYIRONME.NTALLY SENSITIVE AREk------------- ~~ `
~,~
PIPE O ~`;,
UTLET ENERGY DISSAPATOR ........................
..............•
EROSIO
N .CONTROL MATTING ........:................... .,}.
....... EcM
FIflER GLASS ROYIN~G -----------•--------------
- -
---•---
------- .... FGR
SILT CHECK ~ DAM TYR8-,4 ...........:...............................•----------
SILT CHECK DAtvt 'fYf~--g=. --•-------------------------- ~...............---
. -
~~
Erosion Control Schedule
• Install erosion control measures according to plans in all outlets and
at other discharge points after clearing but before grubbing.
• Clear and clean outfall ditches leaving side slopes at an angle that
can be retained by vegetation. These areas will require stage
seeding and mulching.
• Begin grading of roadway ditches. Place erosion control measures
along roadway ditches as grading progresses and conditions allow.
• Seed and mulch all disturbed areas as soon as any phase of grading
is completed.
• (Note there are 21 calendar days to complete seeding and
mulching).
• Clean out and / or rework all temporary erosion control measures
after any significant rainfall event (within 24 hours or as otherwise
needed). These measures should be maintained until a permanent
vegetative cover is established.
Wet Pipe Installation Schedule
• Install erosion control devices and measures.
• Dewater work area.
• Remove material. and existing pipe while limiting, as much as
possible, material and sediment from entering the stream and / or
.escaping from the project.
• Prepare pipe foundation while taking care to limit, as much as
possible, material and sediment from entering the stream and / or
escaping from the project. Where possible new grade should be
below the existing streambed (follow specifications). If needed,
bedding material will be clean stone (especially in trout and' HQW
waters).
• Place new pipe and compact fill.
• Install slope protection on outlet and inlet ends of pipe. Also
complete installation of erosion control measures and perform
maintenance as needed on existing measures.
• Establish permanent vegetation as soon as possible.
50-0 f
Buncombe County Bridge #104 Vicinity Map - SR 2776 Old Fort Road
~ ~~~
_ - - - ;r.
i! ~ ' ~"k ' '~~ .y
• n'Ji
1~_.='~~ ~ ~`
--. ~ Imo.
h~r~~ ~~
'- . +S~ I'C.~'~- it
Buncombe County Bridge # 104 ~ ff ~,~ ~.
., ~'~. I : ~~. ,.
.~~ .y~ ~ ~ ~ ~ I
~ ., f r ,br
_.
.. -~~_
yyg _
~ ~+
y ~ ~ f l
. d
.-~",r`-
I
I _ .. ____ -
_
'-`_', _
r'
r.'
~ ~
818
~' _
~ .t
-
,
~••
- ~ ~ _h . ~
`..
2 .r..
+ `~
1 _:
i 4 ``'_.
?° T~4 ~ T~F ~:,,
~,
~~ ~ -
11 I'j~ .....,