Loading...
HomeMy WebLinkAboutKitchin Property Development PAT MCCRORY Governor C%1P1m115 DONALD R. VAN DER VAART Secretary Water Resources ENVIRONMENTAL QUALITY S. JAY ZIMMERMAN Director February 2,2016 TDK,LLC Attn: Gordon Poulsen 414 Forsyth St. Raleigh,NC 27605 Subject: Buffer Determination Letter NBRRO#16-018 Wake County Determination Type: Buffer Intermittent/Perennial Neuse(15A NCAC 2B .0233) 12 Tar-Pamlico(15A NCAC 26.0259) ❑ Intermittent/Perennial Determination(where local buffer ordinances apply) ❑Jordan(15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Kitchin Property Development Address/Location: 3313 Burlington Mills Road;Wake Forest Stream(s): Tributaries to Smith Creek Determination Date: January 20,2016 Staff: Cherri Smith Stream E/I/P* Not Subject Subject Start@ Stop@ Soil USGS Survey Topo SA P X Pond** X X SD P X DWQ flag Not evaluated X past 100-year floodplain SE X—not present on X the ground SF P X Pond Not evaluated X X past 100-year floodplain SG X—not present on X the ground SH X—not subject X within project area *E/I/P=Ephemeral/Intermittent/Perennial **Pond is off project area but buffers may extend onto project area. Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200 Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159 Kitchin Property Wake County January 28,2016 Page 2 of 2 Explanation: The stream(s)listed above has been located on the most recent published NRCS Soil Survey of Wake County,North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked"Not Subject"has been determined to not be at least intermittent or is not present. Streams that are checked"Subject"have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty(60)days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR—401&Buffer Permitting Unit;1617 Mail Service Center;Raleigh,NC 27699-1617. If sending via delivery service(UPS,FedEx,etc.):Karen Higgins;DWR—401&Buffer Permitting Unit;512 N.Salisbury Street;Raleigh,NC 27604. This determination is final and binding unless,as detailed above,unless an appeal is requested within sixty (60)days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers(Raleigh Regulatory Field Office)at(919)-554-4884. If yo ve questions regardin • rmination,please feel free to contact Cherri Smith at(919)791-4251. 0S. cerel , & V7V Danny Smith Supervisor,W er Quality Regional Operations Center cc: RRO DWR File Copy Sam Beavans;Mulkey Engineers and Consultants;6750 Tryon Rd.;Cary,NC 27518 N 13 P—a-c) -* i( - C L % pC2 . � AHeB H eC Pro�ep- {y - HeC2 �. ,.�•D , Wm .r 5E: New Wwc d _ 2 ApB2 spa 5 b• s� HeC2 HeB2 8 C j 82 Y� u { .. % �ddpP