Loading...
HomeMy WebLinkAboutNC0005363_CAP_2_TABLES_20160201TABLE 2-1 POTENTIAL VERTICAL GRADIENTS BETWEEN HYDROSTRATIGRAPHIC UNITS DECEMBER 2015 W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Well ID Date Depth to Water (TOC) Water Level Elevation (feet MSL) Center of Screen Elevation) (Feet MSL) Vertical z Gradient (foot per foot) Directionz BW -01 12/14/2015 6.93 135.89 127.00 - - CW -01 12/14/2015 4.11 112.73 104.70 - - CW -02 12/14/2015 4.73 108.68 100.70 - - CW -03 12/14/2015 4.58 114.50 106 - - MW -01 12/14/2015 12.72 136.47 165.50 - - MW -02 12/14/2015 2.37 112.85 88.00 0.0222 Downward MW -03 12/14/2015 3.01 112.51 103.30 - - MW -04 12/14/2015 4.38 109.52 86.00 0.0039 Downward MW -05 12/14/2015 3.74 109.58 101.40 - - MW -06 12/14/2015 3.59 108.43 102.70 - - MW -07 12/14/2015 2.74 109.87 77.85 0.0579 Downward MW -08S 12/15/2015 Dry <137 142.40 MW -08I 12/14/2015 29.18 132.12 102.94 - - MW -08D 12/14/2015 51.91 109.74 68.20 0.6442 Downward MW -33S 12/14/2015 - NM 119.90 - - MW -33I 12/14/2015 - NM 84.30 - - MW -33D 12/14/2015 - NM 58.70 - - MW -44S 12/14/2015 Dry <130 135.50 - - MW -41I 12/15/2015 6.41 119.92 97.30 - MW -41D 12/16/2015 18.16 108.18 48.30 0.2396 Downward ABMW-01 12/14/2015 19.68 134.93 119.73 - - MW-44SA 12/14/2015 23.49 131.08 111.81 0.4861 - MW -44I 12/14/2015 23.43 130.97 100.50 0.0097 - MW -44D 12/14/2015 47.08 106.86 69.30 0.7728 Downward MW -49I 12/14/2015 22.99 122.58 95.98 - - MW -49D 12/14/2015 37.20 108.20 63.80 0.4469 Downward MW -52 12/14/2015 - NM 92.20 - - MW -53I 12/14/2015 3.96 113.06 87.77 - - MW -53D 12/14/2015 9.39 107.63 62.00 0.2107 Downward MW -54D 12/14/2015 11.56 102.15 46.60 - - MW -55I 12/14/2015 2.83 109.05 90.88 - - MW -55D 12/14/2015 8.76 103.10 44.36 0.1279 Downward PZ -01 12/14/2015 - NM 123.10 - - PZ -02 12/14/2015 - NM 118.90 - - PZ -03 12/14/2015 - NM 115.00 - - AW -01S 12/14/2015 12.11 119.53 111.80 - - AW -01I 12/14/2015 14.94 116.67 85.08 0.1070 Downward AW -01D 12/14/2015 22.21 109.36 62.32 0.3212 Downward AW -02S 12/14/2015 11.57 116.96 106.37 - - AW -02I 12/14/2015 17.35 110.91 84.71 0.2793 Downward AW -02D 12/14/2015 20.96 107.36 69.77 0.2376 Downward AW -03S 12/14/2015 4.09 108.78 101.42 - - AW -03I 12/14/2015 4.42 108.78 94.66 0.0000 Neither AW -03D 12/14/2015 6.44 106.62 65.90 0.0751 Downward BW -02S 12/14/2015 8.18 132.15 119.43 - - BW -02I 12/14/2015 9.13 130.71 83.34 0.0399 Downward BW -02D 12/14/2015 28.97 111.03 67.80 1.2664 Downward BW -03S 12/14/2015 4.53 105.74 98.66 - - BW -03I 12/14/2015 4.21 105.83 92.59 0.0148 Downward BW -03D 12/14/2015 1.18 108.72 64.19 0.1018 Downward OW -01 12/14/2015 Dry <134.7 139.20 - - OW -03 12/14/2015 Dry <135.2 140.20 - - OW -08 12/14/2015 Dry <137.9 142.90 - - OW -09 12/14/2015 - 124.50 - - OB -01 12/14/2015 - NM 94.50 - - OB -02 12/14/2015 - NM 94.60 - - 11 Prepared by: KDB Checked by: TCP 'Middle of screen 2Vertical gradients calculated for Lower Yorktown and Pee Dee wells only NM: Not Measured P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-1 Potential Vertical Gradients Between Hydrostratigraphic Units Page 1 of 1 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Analytical Parameter pH Water Level Temp Spec Coed DO ORP Eh Turbidity Ferrous Iron Alkalinity Aluminum Aluminum Aluminum Antimony Antimony Antimony Arsenic Arsenic Arsenic Barium Barium Barium Beryllium Beryllium Beryllium Bi carbonate Alkalinity Boron Boron Boron Cadmium Cadmium Cadmium DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1 u) TOT Reporting Units S.U. ft Deg C u/cm mg/I mV mV NTUs mg/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE NE NE NE NE 1* NE NE 10 NE NE 700 NE NE 4* NE NE NE 700 NE NE 2 Sample ID Sample Collection Date Field Parameters Analytical Results ASH PORE WATER ABMW-01 03/05/2015 7.0 17.41 21 1063 0.14 -141 64 13.7 6.5 230 23 NA 602 <1 NA <1 1030 NA 1300 291 NA 307 <1 NA <1 220 6050 NA 6220 <1 NA <1 ABMW-01 06/04/2015 6.9 20.10 21 1109 0.49 -239 -34 4.84 3 240 27 NA 52 <1 NA <1 1520 NA 1710 562 NA 611 <1 NA <1 240 5560 NA 5800 <1 NA <1 ABMW-01 08/19/2015 6.7 22.95 23 1013 0.46 -72.3 132.7 5 NM NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ABMW-01 09/29/2015 6.7 23.54 23 985 0.8 -86 119 5.14 NM NA 28 24 99 <1 <1 <1 1360 1290 1500 345 337 373 <1 <1 <1 NA 4210 4170 4470 <1 <1 <1 MW -44S 06/08/2015 6.9 20.24 26 1866 0.4 -237 -32 3.51 5.5 880 53 NA 48 <1 NA <1 894 NA 933 1400 NA 1420 <1 NA <1 880 2830 NA 2620 <1 NA <1 MW -44S 08/19/2015 7.1 26.08 24 906 5.3 210 415 4.6 NM NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA PZ -01 06/09/2015 6.3 1 4.70 1 21 213 0.2 -14 191 0.9 2.5 75 5 NA 23 <1 NA <1 6.13 NA 6.77 40 NA 41 <1 NA <1 75 473 NA 474 <1 NA <1 PZ -01 09/29/2015 6.2 5.64 24 1084 2.6 -33 172 7.03 NM NA 13 10 49 <1 <1 <1 18.8 17.8 23.1 224 219 215 <1 <1 <1 NA 1970 1940 1880 <1 <1 <1 PZ -02 06/09/2015 6.4 3.97 20 738 0.48 -97 108 11.4 <0.5 180 8 NA 450 <1 NA <1 431 NA 652 97 NA 100 <1 NA <1 170 2320 NA 2310 <1 NA <1 PZ -03 06/09/2015 6.5 6.20 23 1186 1 -21 184 9.04 3.5 240 8 NA 321 <1 NA <1 1.69 NA 3.58 44 NA 44 <1 NA <1 240 3570 NA 3290 <1 NA <1 SURFICIAL AW -015 03/03/2015 4.5 11.64 16 46 3.46 196 401 4.88 <0.5 <10 148 NA 301 <1 NA <1 <1 NA <1 7 NA 6 <1 NA <1 <10 <50 NA <50 <1 NA <1 AW -015 06/02/2015 4.7 12.95 21 30 2.79 210 415 2.68 NM <10 48 NA 106 <1 NA <1 <1 NA <1 <5 NA <5 <1 NA <1 <10 <50 NA <50 <1 NA <1 AW -025 03/03/2015 4.1 10.23 14 615 1.82 11 216 5.31 3.5 <10 31100 NA 34400 <1 NA <1 <1 NA 1.02 23 NA 22 10.2 NA 10.3 <10 130 NA 130 1.92 NA 1.85 AW -02S DUP 03/03/2015 4.1 10.23 14 615 1.82 11 216 5.31 3.5 <10 30000 NA 34100 <1 NA <1 <1 NA <1 23 NA 23 10.9 NA 10 <10 134 NA 138 1.97 NA 1.92 AW -025 06/03/2015 3.6 12.59 19 695 1.22 326 531 0.81 3 <10 31200 NA 32100 <1 NA <1 <1 NA <1 21 NA 20 9.77 NA 9.86 <10 121 NA 117 1.86 NA 1.89 AW -02S 09/29/2015 3.5 13.28 24 870 0.4 375 580 3.36 NM NA 44400 43400 43900 <1 <1 <1 1.06 1.07 1.11 22 23 23 14.2 13 14.2 NA 161 161 165 3.24 3.07 3.16 AW -035 03/04/2015 5.8 3.16 24 121 3.88 -2 203 217 <0.5 11 76 NA 14500 <1 NA <1 <1 NA <1 6 NA 27 <1 NA <1 11 <50 NA <50 <1 NA <1 AW -03S 06/04/2015 5.8 5.12 20 136 0.6 -76 129 23 3.5 31 230 NA 1730 <1 NA <1 4.7 NA 4.97 8 NA 10 <1 NA <1 31 <50 NA <50 <1 NA <1 AW -035 09/30/2015 5.7 7.35 24 94 0.4 -98 107 9.87 NM NA 49 759 775 <1 <1 <1 3.44 3.97 3.7 <5 6 5 <1 <1 <1 NA <50 <50 <50 <1 <1 <1 BW -01 03/09/2015 4.1 4.55 14 179 1.34 327 532 2.88 NM NA NA NA NA NA NA <1 NA NA <1 NA NA 63 NA NA NA NA NA NA <50 NA NA <1 BW -01 06/02/2015 4.4 8.18 17 147 0.1 108 313 4.86 0.75 <5 1560 NA 1900 <1 NA <1 <1 NA <1 55 NA 56 <1 NA <1 <5 65 NA 67 <1 NA <1 BW -01 DUP 06/02/2015 4.4 8.18 17 147 0.1 108 313 4.86 0.75 <5 NA NA 1860 NA NA <1 NA NA <1 NA NA 57 NA NA <1 <5 NA NA 67 NA NA <1 BW -01 10/14/2015 4.2 8.78 19 756 0.3 244 449 0.46 NM <5 NA NA 1170 NA NA <1 NA NA <1 NA NA 69 NA NA <1 <5 NA NA 70 NA NA <1 BW -01 112/02/2015 4.2 6.87 18 213 1.03 331 536 6.01 0 <10 3920 3860 4100 <1 <1 <1 <1 <1 <1 82 81 81 <1 <1 <1 <10 53 53 62 <1 <1 <1 BW -025 03/06/2015 6.3 5.01 10 240 0.1 -80 126 216 2 87 182 NA 11800 <1 NA <1 1.41 NA 2.39 21 NA 38 <1 NA <1 86 <50 NA <50 <1 NA <1 BW -025 06/04/2015 NM NM NM NM NM NM NM NM NM NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA BW -025 06/05/2015 5.1 9.85 18 86 0.3 -92 113 >1000 NM 21 160 NA 57400 <1 NA <1 1.13 NA 3.93 14 NA 96 <1 NA <1 21 <50 NA <50 <1 NA <1 BW -025 09/30/2015 5.0 14.10 22 66 2.1 21 226 29 NM NA 232 234 1650 <1 <1 <1 <1 <1 <1 26 26 27 <1 <1 <1 NA <50 <50 <50 <1 <1 <1 BW -025 12/02/2015 9.8 8.33 18 62 0.4 120 325 34.6 1.5 <10 245 226 2050 <1 <1 <1 <1 <1 <1 27 27 31 <1 <1 <1 <10 <50 <50 <50 <1 <1 <1 BW -035 03/05/2015 5.4 3.40 18 112 1 0.25 1 41 246 114.3 4.5 1 <10 168 NA 712 <1 NA <1 <1 NA <1 20 NA 19 <1 NA <1 <10 I <50 NA <50 <1 NA <1 BW -035 06/03/2015 5.5 5.62 19 99 0.4 -108 97 19.5 3 10 170 NA 749 <1 NA <1 <1 NA <1 19 NA 20 <1 NA <1 10 <50 NA <50 <1 NA <1 BW -035 09/30/2015 5.2 7.38 22 84 0.3 58 263 7.89 NM NA 176 865 678 <1 <1 <1 <1 <1 <1 15 16 17 <1 <1 <1 NA <50 <50 <50 <1 <1 <1 BW -035 12/02/2015 5.3 3.94 18 99 0.33 7 212 5.14 NM <10 178 179 284 <1 <1 <1 <1 <1 <1 19 19 19 <1 <1 <1 <10 <50 <50 <50 <1 <1 <1 CW -01 03/09/2015 5.9 3.69 13 138 0.31 35 240 7.58 NM NA NA NA NA NA NA <1 NA NA <1 NA NA 34 NA NA NA NA NA NA <50 NA NA <1 CW -01 06/02/2015 5.5 5.44 19 105 0.46 -107 98 9.14 1.5 22.8 274 NA 626 <1 NA <1 <1 NA <1 26 NA 27 <1 NA <1 22.8 <50 NA <50 <1 NA <1 CW -01 10/14/2015 5.7 4.30 20 129 0.4 45 250 3.75 NM 21 NA NA 517 NA NA <1 NA NA 1.34 NA NA 38 NA NA <1 21 NA NA <50 NA NA <1 CW -01 12/01/2015 6.6 4.10 17 150 0.2 1-145 60 9.9 1 41 28 27 228 <1 <1 <1 <1 <1 <1 38 37 40 <1 <1 <1 41 <50 <50 <50 <1 <1 <1 CW -02 03/09/2015 7.4 4.52 13 270 0.69 244 449 2.21 NM NA NA NA NA NA NA <1 NA NA <1 NA NA 20 NA NA NA NA NA NA <50 NA NA <1 CW -02 DUP 03/09/2015 7.4 4.52 13 270 0.69 244 449 2.21 NM NA NA NA NA NA NA <1 NA NA <1 NA NA 20 NA NA NA NA NA NA <50 NA NA <1 CW -02 06/02/2015 7.4 5.86 18 268 0.52 -235 -30 1.61 <0.5 120 69 NA 10 <1 NA <1 <1 NA <1 21 NA 21 <1 NA <1 120 <50 NA <50 <1 NA <1 CW -02 10/14/2015 7.2 4.92 20 282 0.4 52 257 0.98 NM 121 NA NA 10 NA NA <1 NA NA <1 NA NA 26 NA NA <1 121 NA NA <50 NA NA <1 CW -02 DUP 10/14/2015 7.2 4.92 20 282 0.4 52 257 0.98 NM 121 NA NA 11 NA NA <1 NA NA <1 NA NA 26 NA NA <1 121 NA NA <50 NA NA <1 CW -02 12/02/2015 7.5 4.71 18 267 0.6 -30 175 1 1.55 ND 120 <5 <5 9 1<1 <1 <1 <1 <1 <1 22 1 22 21 1 <1 <1 <1 120 <50 <50 <50 <1 <1 <1 CW -03 103/09/2015 6.2 3.99 14 456 3.83 226 431 4.72 NM NA NA NA NA NA NA <1 NA NA <1 NA NA 89 NA NA NA NA NA NA 130 NA NA <1 CW -03 06/02/2015 6.5 6.97 20 295 0.4 -79 126 3.34 0.5 67.1 66 NA 31 <1 NA <1 <1 NA <1 53 NA 53 <1 NA <1 167.1 <50 NA <50 <1 NA <1 CW -03 10/14/2015 6.4 7.78 20 201 0.3 6 211 1.05 NM 87.4 NA NA 58 NA NA <1 NA NA <1 NA NA 32 NA NA <1 87.4 NA NA <50 NA NA <1 CW -03 12/02/2015 7.0 4.73 18 200 1.5 -33 173 3.1 ND 83 <5 <5 26 <1 <1 <1 <1 <1 <1 31 30 30 <1 <1 <1 82 <50 <50 <50 <1 <1 <1 MW -01 06/05/2015 4.0 17.88 17 44 2.03 206 411 3.43 <0.5 <10 232 NA 265 <1 NA <1 <1 NA <1 9 NA 9 <1 NA <1 <10 <50 NA <50 <1 NA <1 MW -01 12/01/2015 4.6 17.72 19 40 2.27 246 451 3.59 0 <10 191 197 208 <1 <1 <1 <1 <1 <1 9 9 10 <1 <1 <1 QO <50 <50 <50 <1 <1 <1 MW -03 06/05/2015 6.5 3.77 20 516 0.2 -189 16 1 4.76 3.25 180 5 NA 179 <1 NA <1 5.37 NA 5.39 88 NA 94 <1 NA <1 180 783 NA 791 <1 NA <1 MW -03 112/01/2015 7.0 3.20 1 18 1 495 0.6 -72 133 9.1 NM 180 <5 <5 155 <1 <1 <1 4.44 4.25 3.95 80 79 81 <1 <1 <1 180 463 432 418 <1 <1 <1 MW -05 06/09/2015 4.9 4.71 19 273 0.53 1 35 240 4.9 4 15 55 NA 72 <1 NA <1 2.33 NA 2.48 15 NA 16 <1 NA <1 1 15 250 1 NA 247 <1 NA <1 MW -05 12/01/2015 5.1 3.78 17 167 0.24 241 446 13 4.5 <10 59 62 368 <1 <1 <1 1.06 1.12 2.41 13 14 14 <1 <1 <1 <10 93 93 96 <1 <1 <1 MW -06 06/09/2015 6.7 6.12 18 375 0.2 -103 102 1.9 4.5 94 24 NA 43 <1 NA <1 2.19 NA 2.38 57 NA 62 <1 NA <1 94 100 NA 108 <1 NA <1 MW -06 12/01/2015 5.8 3.61 17 763 0.84 45 250 8.98 0 36 99 106 106 <1 <1 <1 <1 <1 <1 115 116 117 <1 <1 <1 36 609 633 616 <1 <1 <1 MW -06 DUP 12/01/2015 5.8 3.61 17 763 0.84 45 250 8.98 0 36 109 100 112 <1 <1 <1 <1 1.05 <1 116 1 115 117 <1 <1 <1 36 640 615 636 <1 <1 <1 MW -33S 06/08/2015 5.0 6.88 20 170 0.2 30 235 1 4.12 1 7 <10 530 NA 707 <1 NA <1 <1 NA <1 32 NA 33 <1 NA <1 <10 <50 NA <50 <1 NA <1 MW-44SA 06/04/2015 6.2 23.27 21 997 0.68 -105 100 16.1 3 220 37 NA 856 <1 NA <1 61.6 NA 74.4 178 NA 196 <1 NA <1 220 1580 NA 1620 <1 NA <1 MW -445A 12/02/2015 6.4 23.10 19 1054 0.64 147 352 7.7 3 210 27 19 150 <1 <1 <1 89.2 92.7 89 167 178 166 <1 <1 <1 210 1490 1 1530 1.520 <1 I <1 <1 P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 1 of 6 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Analytical Parameter Calcium Carbonate Alkalinity Chloride Chromium (Hexavalent) Chromium Chromium Chromium Cobalt Cobalt Cobalt Copper Copper Copper Iron Iron Iron Lead Lead Lead Magnesium Manganese Manganese Manganese Mercury Mercury Mercury Methane Molybdenum TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS Reporting Units mg/I mg/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I SSA NCAC 02L Standard NE NE 250 NE NE NE 10 NE NE 1* NE NE 1000 NE NE 300 NE NE 15 NE NE NE 50 NE NE 1 NE NE Sample ID Sample Collection Date Analytical Results ASH PORE WATER ABMW-01 03/05/2015 130 110 53 NA <1 NA 1.22 <1 NA <1 <1 NA 6.42 11900 NA 12500 <1 NA <1 24.8 284 NA 289 <0.05 NA <0.05 660 255 ABMW-01 06/04/2015 142 <10 52 NA <1 NA <1 <1 NA <1 <1 NA <1 13300 NA 13400 <1 NA <1 26.2 388 NA 405 <0.05 NA <0.05 1500 212 ABMW-01 08/19/2015 NA NA NA 0.005 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ABMW-01 09/29/2015 100 NA NA NA <1 <1 <1 <1 <1 <1 <1 <1 <1 12100 12600 12000 <1 <1 <1 20.6 272 274 285 <0.05 <0.05 <0.05 M2 NA 141 MW -44S 06/08/2015 128 <10 26 NA <1 NA <1 2.78 NA 3.35 <1 NA <1 26500 NA 30800 <1 NA <1 60.7 760 NA 760 <0.05 NA <0.05 6900 17.3 MW -44S 08/19/2015 NA NA NA 0.147 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA PZ -01 06/09/2015 27.4 <10 9.2 NA <1 NA <1 <1 NA <1 <1 NA <1 2600 NA 2950 <1 NA <1 4 180 NA 188 <0.05 NA <0.05 38 3.03 PZ -01 09/29/2015 159 NA NA NA <1 <1 <1 <1 <1 <1 <1 <1 <1 9840 9360 10300 <1 <1 <1 21 272 262 275 <0.05 <0.05 <0.05 NA 6.11 PZ -02 06/09/2015 86.4 <10 28 NA 11 NA <1 1.39 NA 1.62 <1 NA <1 4000 NA 5780 <1 NA <1 10.8 365 NA 377 <0.05 NA <0.05 280 67.6 PZ -03 06/09/2015 78.8 <10 65 NA <1 NA <1 <1 NA <1 <1 NA 11 4110 NA 4810 <1 NA <1 12.2 28 NA 28 10.05 NA 10.05 110 2.66 SURFICIAL AW -015 03/03/2015 1.73 <10 1.8 NA <1 NA <1 <1 NA <1 <1 NA <1 99 NA 283 <1 NA <1 0.548 13 NA 13 <0.05 NA <0.05 <10 <1 AW -015 06/02/2015 1.42 <10 2.3 0.016 <1 NA <1 <1 NA <1 <1 NA <1 <10 NA 12 <1 NA <1 0.526 <5 NA <5 <0.05 NA <0.05 <10 <1 AW -025 03/03/2015 38.1 <10 4.8 NA 15 NA 16.6 71.9 NA 65.1 87 NA 84.2 13800 NA 10900 2.3 NA 2.22 7.71 954 NA 859 <0.05 NA <0.05 69 <1 AW -02S DUP 03/03/2015 38.5 <10 6.2 NA 14.3 NA 15.3 76 NA 70.3 88.1 NA 87.1 16100 NA 13600 2.49 NA 2.4 8.56 1040 NA 940 <0.05 NA <0.05 56 <1 AW -025 06/03/2015 42.2 <10 5.9 0.011 5.11 NA 5.48 61.1 NA 61.6 73.2 NA 76.3 7410 NA 7750 3.56 NA 3.52 8.82 951 NA 982 <0.05 NA <0.05 40 <1 AW -02S 09/29/2015 68.6 NA NA NA 5.61 5.55 6.46 109 104 109 119 116 119 8120 7090 10500 6.12 6.04 6.18 11.3 1250 1220 1270 <0.05 <0.05 <0.05 NA <1 AW -035 03/04/2015 2.07 <10 12 NA <1 NA 3.52 <1 NA <1 <1 NA 1.05 61 NA 4800 <1 NA 1.69 0.592 22 NA 39 <0.05 NA 0.06 <10 4.03 AW -03S 06/04/2015 2.25 <10 14 0.02 <1 NA 1.36 <1 NA <1 <1 NA <1 15900 NA 17000 <1 NA <1 0.914 56 NA 57 <0.05 NA <0.05 60 <1 AW -035 09/30/2015 1.2 NA NA NA <1 4.75 <1 <1 <1 <1 <1 <1 <1 11300 11700 11900 <1 1.76 <1 0.521 24 25 24 <0.05 M2 <0.05 <0.05 NA <1 BW -01 03/09/2015 NA NA 13 NA NA NA <5 NA NA NA NA NA <5 NA NA 162 NA NA 1.14 NA NA NA 10 NA NA <0.05 NA NA BW -01 06/02/2015 5.13 <5 7.1 0.017 1.32 NA <5 <1 NA <1 <1 NA <5 141 NA 253 <1 NA 1.1 2.6 25 NA 24 <0.05 NA <0.05 30 <1 BW -01 DUP 06/02/2015 5.16 <5 7.1 NA NA NA <5 NA NA <1 NA NA <5 NA NA 231 NA NA 1.05 2.59 NA NA 25 NA NA <0.05 NA NA BW -01 10/14/2015 5.75 <5 6.2 NA NA NA <5 NA NA <1 NA NA <5 NA NA 39 NA NA 1.13 2.25 NA NA 32 NA NA 10.05 NA NA BW -01 112/02/2015 5.03 <10 19 0.056 2.06 2.09 2.2 <1 <1 <1 <1 1.03 <1 100 96 313 1.86 1.85 2.22 2.3 36 36 35 <0.05 <0.05 <0.05 QO <1 BW -025 03/06/2015 44.2 <10 7.8 NA <1 NA 8.61 <1 NA <1 <1 NA 2.16 1500 NA 2570 <1 NA 7.85 0.669 27 NA 31 <0.05 NA 0.17 140 1.09 BW -025 06/04/2015 NA NA NA 0.04 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA BW -025 06/05/2015 4.08 <10 7 0.04 <1 NA 25.9 <1 NA <1 <1 NA 8.05 1670 NA 6420 <1 NA 42.1 0.535 14 NA 25 <0.05 NA 0.78 130 1.48 BW -02S 09/30/2015 3.87 NA NA NA <1 <1 1.54 <1 <1 <1 <1 <1 <1 2000 2030 2150 <1 <1 1.09 0.526 18 18 19 <0.05 <0.05 0.07 NA <1 BW -025 12/02/2015 2.79 <10 7.2 0.063 <1 <1 1.42 <1 <1 <1 <1 <1 <1 1040 987 1240 <1 <1 1.66 0.559 14 14 15 <0.05 <0.05 <0.05 75 <1 BW -035 03/05/2015 3.15 <10 16 NA 1.47 NA 1.98 <1 NA <1 <1 NA <1 5110 NA 5240 <1 NA <1 1.39 46 NA 46 <0.05 NA <0.05 640 <1 BW -035 06/03/2015 3.1 <10 13 0.034 1.52 NA 2.18 <1 NA <1 <1 NA <1 4190 NA 4490 <1 NA <1 1.44 41 NA 40 <0.05 NA <0.05 510 1 <1 BW -035 09/30/2015 2.4 NA NA NA 1.24 1.74 1.71 <1 <1 <1 <1 <1 I <1 3020 3070 3210 1 <1 <1 <1 1.01 31 31 33 <0.05 <0.05 I <0.05 NA <1 BW -035 12/02/2015 3.02 <10 16 0.049 1.54 1.48 1.44 <1 <1 <1 <1 <1 <1 4080 4030 4100 <1 <1 <1 1.45 37 37 36 <0.05 <0.05 <0.05 560 <1 CW -01 03/09/2015 NA NA 3.8 NA NA NA <5 NA NA NA NA NA <5 NA NA 2310 NA NA <1 NA NA NA 39 NA NA <0.05 NA NA CW -01 06/02/2015 11.1 <5 3.5 NA <1 NA <5 <1 NA <1 <1 NA <5 1960 NA 2020 <1 NA <1 0.728 36 NA 36 <0.05 NA <0.05 530 <1 CW -01 10/14/2015 12.8 <5 3.9 NA NA NA <5 NA NA <1 NA NA <5 NA NA 2200 NA NA <1 0.851 NA NA 45 NA NA <0.05 NA NA CW -01 12/01/2015 20.6 <10 4.6 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 1020 1050 1620 <1 <1 <1 0.813 38 39 38 <0.05 <0.05 <0.05 93 <1 CW -02 03/09/2015 NA NA 4.4 NA NA NA <5 NA NA NA NA NA <5 NA NA 65 NA NA <1 NA NA NA <5 NA NA 10.05 NA NA CW -02 DUP 03/09/2015 NA NA 4.4 NA NA NA <5 NA NA NA NA NA <5 NA NA 65 NA NA <1 NA NA NA <5 NA NA <0.05 NA NA CW -02 06/02/2015 50.7 <5 4.6 NA <1 NA <5 <1 NA <1 <1 NA <5 360 NA 384 <1 NA <1 1.23 10 NA 10 <0.05 NA <0.05 84 1.11 CW -02 10/14/2015 52.7 <5 7.3 NA NA NA <5 NA NA <1 NA NA <5 NA NA 65 NA NA <1 1.27 NA NA <5 NA NA <0.05 NA NA CW -02 DUP 10/14/2015 51.8 <5 7.4 NA NA NA <5 NA NA <1 NA NA <5 NA NA 65 NA NA <1 1.25 NA NA <5 NA NA 10.05 NA NA CW -02 12/02/2015 49.2 <10 4.5 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 17 14 97 <1 <1 <1 1.21 <5 <5 <5 <0.05 <0.05 <0.05 26 <1 CW -03 03/09/2015 NA NA 60 NA NA NA <5 NA NA NA NA NA <5 NA NA 96 NA NA <1 NA NA NA 29 NA NA <0.05 NA NA CW -03 06/02/2015 40.8 <5 19 NA <1 NA <5 <1 NA <1 <1 NA <5 858 NA 1010 <1 NA <1 1.64 46 NA 46 <0.05 NA <0.05 220 <1 CW -03 10/14/2015 36.8 <5 4.5 NA NA NA <5 NA NA <1 NA NA <5 NA NA 727 NA NA <1 1.01 NA NA 26 NA NA <0.05 NA NA CW -03 12/02/2015 35.1 <10 5.7 <0.03 <1 <1 <1 <1 <1 <1 <1 1.02 <1 134 144 295 <1 <1 <1 1.02 16 17 11 <0.05 <0.05 <0.05 37 <1 MW -01 06/05/2015 1.09 <10 2.1 NA <1 NA <1 <1 NA <1 <1 NA <1 <10 NA 323 <1 NA <1 1.26 10 NA 10 <0.05 NA <0.05 <10 <1 MW -01 12/01/2015 1.01 <10 2.4 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 <10 <10 66 <1 <1 <1 1.23 9 9 8 <0.05 <0.05 <0.05 <10 <1 MW -03 06/05/2015 76.5 <10 24 NA <1 NA <1 <1 NA <1 1.18 NA <1 2040 NA 2390 <1 NA <1 4.39 59 NA 63 <0.05 NA <0.05 820 <1 MW -03 12/01/2015 81.7 <10 20 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 1080 1030 1540 <1 <1 <1 3.02 46 46 44 <0.05 <0.05 <0.05 600 <1 MW -05 06/09/2015 2.08 <10 41 0.016 <1 NA <1 1.05 NA 1.06 1.11 NA <1 11700 NA 11.7001 <1 NA <1 1.83 24 NA 23 <0.05 NA <0.05 45 <1 MW -05 12/01/2015 2.61 <10 8.7 <0.03 <1 <1 1.25 1.58 1.72 1.56 <1 1.83 <1 13200 12600 14900 <1 <1 <1 1.29 27 27 26 <0.05 <0.05 <0.05 11 <1 MW -06 06/09/2015 55 <10 22 NA <1 NA <1 <1 NA <1 2.23 NA <1 12000 NA 12700 <1 NA <1 1 1.68 39 NA 39 <0.05 NA <0.05 150 1.39 MW -06 12/01/2015 93.2 <10 44 <0.03 <1 <1 <1 1.23 1.42 1.34 <1 <1 <1 4200 3810 4360 <1 <1 <1 8.82 165 176 217 <0.05 <0.05 <0.05 20 <1 MW -06 DUP 12/01/2015 94.3 <10 44 <0.03 <1 <1 <1 1.38 1.27 1.21 <1 <1 <1 3840 4160 4420 <1 <1 <1 8.85 187 163 190 <0.05 <0.05 <0.05 24 <1 MW -33S 06/08/2015 15.6 <10 3.9 0.014 <1 NA 1.06 1.67 NA 1.74 <1 NA <1 6300 NA 6780 <1 NA <1 1.3 72 NA 73 <0.05 NA 10.05 420 <1 MW-44SA 06/04/2015 175 <10 51 0.037 <1 NA 2.71 2.89 NA 3.15 <1 NA 1.34 3370 NA 4430 <1 NA <1 9.28 163 NA 172 10.05 NA 10.05 57 6.72 MW-44SA 12/02/2015 187 <10 56 <0.03 <1 <1 <1 2.01 1.58 2.12 <1 <1 <1 6300 6500 6630 <1 <1 <1 10.3 209 214 208 <0.05 10.05 <0.05 37 9.21 P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 2 of 6 Analytical Reporting Uni 15A NCAC 02L Standar Sample ID Sample Collection Date ASH PORE WATER ABMW-01 03/05/2015 ABMW-01 06/04/2015 ABMW-01 08/19/2015 ABMW-01 09/29/2015 MW -44S 06/08/2015 MW -445 08/19/2015 PZ -01 06/09/2015 PZ -01 09/29/2015 PZ -02 06/09/2015 PZ -03 06/09/2015 SURFICIAL AW -015 03/03/2015 AW -01S 06/02/2015 AW -025 03/03/2015 AW -02S DUP 03/03/2015 AW -025 06/03/2015 AW -02S 09/29/2015 AW -035 03/04/2015 AW -03S 06/04/2015 AW -035 09/30/2015 BW -01 03/09/2015 BW -01 06/02/2015 BW -01 DUP 06/02/2015 BW -01 10/14/2015 BW -01 12/02/2015 BW -025 03/06/2015 BW -025 06/04/2015 BW -025 06/05/2015 BW -025 09/30/2015 BW -025 12/02/2015 BW -035 03/05/2015 BW -035 06/03/2015 BW -035 09/30/2015 BW -035 12/02/2015 CW -01 03/09/2015 CW -01 06/02/2015 CW -01 10/14/2015 CW -01 12/01/2015 CW -02 03/09/2015 CW -02 DUP 03/09/2015 CW -02 06/02/2015 CW -02 10/14/2015 CW -02 DUP 10/14/2015 CW -02 12/02/2015 CW -03 03/09/2015 CW -03 06/02/2015 CW -03 10/14/2015 CW -03 12/02/2015 MW -01 06/05/2015 MW -01 12/01/2015 MW -03 06/05/2015 MW -03 12/01/2015 MW -05 06/09/2015 MW -05 12/01/2015 MW -06 06/09/2015 MW -06 12/01/2015 MW -06 DUP 12/01/2015 MW -33S 06/08/2015 MW-44SA 06/04/2015 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Molybdenum Molybdenum Nickel Nickel N�TO Nitrate Potassium Selenium Selenium Selenium Sodium Strontium Strontium Strontium 1 5280 210 Thallium Thallium Thallium Total Total Total Vanadium Vanadium Vanadium Zinc Zinc NA 243 2.95 NA 3.34 (as N) 18.5 <1 NA <1 46.4 6010 NA Sulfate Sulfide <0.1 <0.2 NA Dissolved Solids Organic Carbon Suspended Solids 30 0.778 NA 0.885 <5 NA DIS (0.1 u) TOT DIS DIS (0.1 u) TOT DIS DIS (0.1u) TOT TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) ug/I ug/I ug/I ug/I ug/I mg- /L mg/I ug/l ug/I ug/I mg/1 ug/l ug/I ug/I mg/I mg/I ug/1 ug/I ug/I mg/I mg/I mg/I ug/I ug/I ug/I ug/I ug/I NE NE NE NE 100 10 NE NE NE 20 NE NE NE NE 250 NE NE NE 0.2* 500 NE NE NE NE 0.3* NE NE 0.044 145 <1 NA <1 120 13700 NA 13600 0.22 <0.1 <0.2 Analytical Results <0.2 1100 1.5 6 6.21 NA 9.24 <5 NA NA NA NA NA NA 270 2.05 NA 2.53 0.012 15.5 1 '1 NA <1 50 1 5190 NA 1 5280 210 1 <2 <0.2 NA <0.2 1 660 3.9 <5 0.455 NA 1.99 <5 NA NA 243 2.95 NA 3.34 <0.01 18.5 <1 NA <1 46.4 6010 NA 6410 190 <0.1 <0.2 NA <0.2 670 4.1 30 0.778 NA 0.885 <5 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 135 152 1.99 1.9 2.14 NA 17.8 <1 <1 <1 50.5 4400 4350 4650 NA NA <0.2 <0.2 <0.2 NA NA NA 1.25 1.12 1.21 <5 <5 NA 20.3 10.4 NA 11 0.044 145 <1 NA <1 120 13700 NA 13600 0.22 <0.1 <0.2 NA <0.2 1100 1.5 6 6.21 NA 9.24 <5 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3.34 <1 NA <1 <0.01 5.04 <1 NA <1 5.34 991 NA 997 26 <0.1 <0.2 NA <0.2 140 0.732 <5 <0.3 NA <0.3 <5 NA 6.33 6.81 1.43 1.5 1.58 NA 12.2 <1 <1 <1 45.3 5710 5680 5610 NA NA <0.2 <0.2 <0.2 NA NA NA <0.3 <0.3 0.355 <5 <5 NA 68.9 9.99 NA 11.3 0.108 13 <1 NA <1 47 3520 NA 3560 190 10.2 <0.2 NA <0.2 470 2.3 9 <0.3 NA 0.449 <5 NA NA 3.65 22.3 NA 20.9 0.056 12.9 <1 NA <1 121 2770 NA 2520 230 <0.1 <0.2 NA <0.2 690 4.8 9 <0.3 NA 0.95 7 NA NA <1 1.14 NA 2.04 1.5 0.425 <1 NA I<1 1.42 10 NA 9 16 1<0.1 <0.2 NA <0.2 1 25 0.379 <5 <0.3 NA 1<0.3 8 NA NA <1 <1 NA <1 0.814 0.272 <1 NA <1 1.14 7 NA 7 4.4 <0.1 <0.2 NA <0.2 <25 0.247 <5 <0.3 NA <0.3 '5 NA NA <1 150 NA 140 1.1 1.54 1.56 NA 1.81 4.44 246 NA 241 500 <0.1 <0.2 NA <0.2 520 0.903 6 <0.3 NA 0.34 396 NA NA <1 156 NA 149 1 1.61 1.62 NA 1.42 4.6 252 NA 250 600 <0.1 <0.2 NA <0.2 540 0.85 5 <0.3 NA <0.3 427 NA NA <1 129 NA 130 1.9 1.74 1.45 NA 1.53 4.39 269 NA 268 710 <0.1 0.228 NA 0.237 500 0.98 <5 <0.3 NA <0.3 386 NA <1 <1 213 207 M4 216 NA 2.27 3.09 2.9 2.95 6.46 369 368 386 NA NA 0.377 0.367 0.364 NA NA NA <0.3 <0.3 0.405 595 599 NA <1 <1 NA 1.46 <0.01 0.481 <1 NA <1 20.3 11 NA 20 14 <2 <0.2 NA <0.2 240 50 87 <0.3 NA 3.99 <5 NA NA <1 1.06 NA <1 0.052 0.227 <1 NA <1 11.3 20 NA 20 1.1 0.178 <0.2 NA <0.2 80 7.3 17 1.94 NA 2.65 <5 NA <1 <1 <1 2.1 <1 NA 0.19 <1 <1 <1 6.49 10 11 10 NA NA <0.2 <0.2 <0.2 NA NA NA 1.21 7.95 2.04 <5 <5 NA NA NA NA <5 NA NA NA NA <1 NA NA NA NA 51 NA NA NA <0.2 130 NA NA NA NA NA NA NA NA <1 <1 NA <5 1.4 13 1.46 NA 1.42 3.14 29 NA <1000 47 '0.1 <0.2 NA <0.2 87 6.7 6 4.02 NA 5.09 <5 NA NA <1 NA NA <5 1.4 13.2 NA NA 1.38 3.19 NA NA <1000 48 NA NA NA <0.2 97 NA 5 NA NA 5.02 NA NA NA <1 NA NA <5 2.2 18 NA NA 1.65 2.86 NA NA 28 59 NA NA NA 0.302 96 NA <5 NA NA 2.98 NA NA 11 <1 1.24 <1 1.22 0.682 14.8 1.29 1.05 1.5 11.9 40 40 40 57 <1 0.551 <0.2 <0.2 130 12 29 5.16 5.08 6.81 13 14 NA 1.32 <1 NA 2.17 <0.01 2.07 <1 NA 1.67 6.26 134 NA 146 9.1 <0.5 <0.2 NA <0.2 280 23 31 3.29 NA 18.4 <5 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA I NA I NA NA 3.64 <1 NA 2.9 0.032 0.599 <1 NA 5.54 11.6 17 NA 39 8.5 <1 <0.2 NA <0.2 520 9.1 <125 2.35 NA 47.3 <5 NA <1 <1 <1 <1 <1 NA 0.554 <1 <1 <1 4.33 19 19 19 NA NA <0.2 0.26 <0.2 NA NA NA 1.56 1.42 4.08 <5 <5 <1 <1 <1 <1 <1 <0.01 0.568 <1 <1 <1 4.34 17 17 18 7.5 <0.1 <0.2 <0.2 <0.2 62 3 9 1.85 1.66 4.42 <5 <5 NA <1 <1 NA <1 0.015 1.17 <1 NA '1 10 21 NA 21 5.3 <0.5 <0.2 NA <0.2 69 7.2 41 2.8 NA 3.44 6 NA NA <1 <1 NA <1 0.01 1.19 <1 NA <1 8.75 21 NA 21 9.1 0.466 <0.2 NA <0.2 75 6.8 <5 3.01 NA 3.68 <5 NA <1 <1 <1 1.32 <1 NA 1.14 <1 <1 <1 7.46 16 16 16 NA NA <0.2 <0.2 <0.2 NA NA NA 2.62 3.2 3.44 <5 <5 <1 <1 <1 <1 <1 <0.01 1.19 <1 <1 <1 9.78 21 21 21 7.5 0.15 <0.2 <0.2 <0.2 74 0.832 <5 2.47 2.67 2.63 <5 <5 NA NA NA NA <5 NA NA NA NA <1 NA NA NA NA 15 NA NA NA <0.2 83 NA NA NA NA NA NA NA NA <1 <1 NA <5 0.01 1.06 <1 NA <1 6.12 67 NA <1000 14 1.14 <0.2 NA <0.2 71 3.6 <5 0.785 NA 1.29 <5 NA NA <1 NA NA <5 <0.023 1.23 NA NA <1 7.55 NA NA 82 22 NA NA NA <0.2 66 NA 8 NA NA 0.834 NA NA <1 <1 <1 <1 <1 0.014 0.888 <1 <1 <1 4 112 113 119 16 0.467 <0.2 <0.2 <0.2 83 1.6 <5 <0.3 0.402 0.513 <5 13 NA NA NA NA <5 NA NA NA NA <1 NA NA NA NA 9.8 NA NA NA <0.2 150 NA NA NA NA NA NA NA NA NA NA NA <5 NA NA NA NA <1 NA NA NA NA 9.8 NA NA NA <0.2 160 NA NA NA NA NA NA NA NA 1.09 <1 NA <5 0.169 0.507 <1 NA <1 3.54 206 NA '1000 9.9 <0.2 <0.2 NA <0.2 170 0.168 <5 10.3 NA <0.3 <5 NA NA 1.46 NA NA <5 0.52 0.67 NA NA <1 4.24 NA NA 215 7.4 NA NA NA <0.2 160 NA <5 NA NA 0.769 NA NA NA 1.36 NA NA <5 0.52 0.669 NA NA <1 4.29 NA NA 216 7.4 NA NA NA <0.2 160 NA <5 NA NA 0.765 NA NA <1 <1 <1 1.02 <1 0.048 0.526 <1 <1 <1 3.37 202 200 208 11 <0.1 <0.2 <0.2 <0.2 170 0.216 <5 0.346 0.323 0.306 <5 <5 NA NA NA NA <5 NA NA NA NA <1 NA NA NA NA 85 NA NA NA <0.2 280 NA NA NA NA NA NA NA NA <1 <1 NA <5 0.012 0.798 <1 NA <1 11.8 225 NA <1000 32 <0.1 <0.2 NA <0.2 170 1.4 <5 0.468 NA 0.636 <5 NA NA <1 NA NA <5 <0.023 0.719 NA NA <1 3.49 NA NA 191 3.7 NA NA NA <0.2 110 NA <5 NA NA 0.323 NA NA <1 <1 <1 1 2.84 <1 0.016 0.644 <1 <1 <1 4.39 190 185 187 5.5 <0.1 1 <0.2 <0.2 <0.2 120 0.604 <5 10.3 <0.3 0.338 <5 <5 NA <1 <1 NA <1 1.2 1.07 <1 NA <1 1.41 9 NA 9 5 <0.1 <0.2 NA <0.2 <25 0.449 <5 10.3 NA <0.3 <5 NA <1 <1 <1 <1 <1 1.1 1.13 <1 <1 <1 1.44 9 9 8 5.6 <0.1 <0.2 <0.2 <0.2 <25 0.489 <5 <0.3 <0.3 <0.3 <5 7 NA <1 1.06 NA <1 0.02 3.44 <1 NA <1 21.2 671 NA 688 1 36 '0.1 <0.2 NA <0.2 310 1 3.3 5 0.343 NA 0.663 13 NA <1 <1 <1 1.23 <1 0.016 2.23 <1 <1 <1 12.9 579 577 559 44 <0.1 <0.2 <0.2 <0.2 300 2.2 8 <0.3 <0.3 0.675 <5 <5 NA <1 <1 NA <1 0.015 0.242 <1 NA <1 38.9 25 NA 24 50 <0.2 <0.2 NA <0.2 150 1.1 <5 10.3 NA 0.467 <5 NA <1 <1 <1 1.64 <1 0.021 0.224 <1 <1 <1 14.7 26 27 26 60 <0.1 0.746 <0.2 <0.2 71 1.1 7 <0.3 <0.3 3.63 <5 6 NA 1.64 <1 NA <1 0.027 1.37 <1 NA <1 13 320 NA 330 46 '0.1 1<0.2 NA <0.2 230 2.2 11 10.3 NA 0.448 <5 NA <1 <1 1.62 1.82 1.55 0.023 9.66 <1 <1 <1 36.2 1540 1550 1450 270 <0.1 <0.2 <0.2 0.56 510 3.7 <5 0.324 0.344 1 0.41 <5 <5 <1 <1 1.61 1.77 1.02 0.033 10 <1 <1 <1 36.7 1550 1530 1500 280 <0.1 0.231 <0.2 0.206 530 3.7 <5 0.43 0.358 1 0.342 <5 <5 NA <1 <1 NA 1.11 0.036 1.92 <1 NA <1 3.17 66 NA 66 50 0.978 <0.2 NA <0.2 120 8.3 <5 1.48 NA 1.5 <5 NA NA 7.47 1.08 NA 1.87 0.116 4.49 <1 NA <1 34 1990 NA 2050 230 '0.5 <0.2 NA <0.2 690 3.7 18 1.42 NA 3.8 49 NA 3.28 8.21 <1 <1 <1 <0.01 4.14 <1 <1 <1 35.9 2030 1 2140 2080 1 270 <0.2 <0.2 <0.2 <0.2 750 4.3 19 1.74 1.7 2.09 <5 <5 Zinc II ug/III P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 3 of 6 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Analytical Parameter PN Water Level Temp Spec Cond DO ORP Eh Turbidity Ferrous Iron Alkalinity Aluminum Aluminum Aluminum Antimony Antimony Antimony Arsenic Arsenic Arsenic Barium Barium Barium Beryllium Beryllium Beryllium Bi carbonate Alkalinity Boron Boron Boron Cadmium Cadmium Cadmium DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT Reporting Units S.U. ft Deg C u/cf OS mg/I mV mV NTUs mg/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE NE NE NE NE 1* NE NE 10 NE NE 700 NE NE 4* NE NE NE 700 NE NE 2 Sample ID Sample Collection Date Field Parameters Analytical Results LOWER YORKTOWN AW -01I 03/03/2015 6.4 14.56 18 82 0.2 89 294 5.03 4.5 23 13 NA 108 <1 NA <1 <1 NA <1 24 NA 24 <1 NA <1 23 <50 NA <50 <1 NA <1 AW -01I 06/02/2015 6.4 15.83 22 85 0.4 -174 31 4.36 2.7 26 11 NA 58 <1 NA <1 <1 NA <1 24 NA 29 <1 NA <1 26 <50 NA <50 <1 NA <1 AW -02I 04/02/2015 7.2 18.21 21 267 0.48 15 220 14.8 <0.5 70 <5 NA 123 <1 NA <1 <1 NA <1 41 NA 41 <1 NA <1 69 <50 NA <50 <1 NA <1 AW -021 06/03/2015 7.1 19.26 20 289 0.96 -142 63 38.3 <0.5 88 <5 NA 260 <1 NA <1 <1 NA <1 39 NA 40 <1 NA <1 87 <50 NA <50 <1 NA <1 AW -03I 03/04/2015 7.0 3.70 16 252 0.72 44 249 6.97 <0.5 87 <5 NA 318 <1 NA <1 <1 NA <1 16 NA 17 <1 NA <1 87 <50 NA <50 <1 NA <1 AW -03I 06/04/2015 6.7 5.30 19 239 0.3 -103 102 2.63 >7 75 12 NA 114 <1 NA <1 6.54 NA 6.14 22 NA 23 <1 NA <1 75 <50 NA <50 <1 NA <1 BW -02I 03/05/2015 7.0 7.18 1 11 1 291 0.29 1 -73 1 132 89.9 1 1 110 1 53 NA 2730 <1 NA <1 1.37 NA 1.8 21 NA 26 <1 NA <1 110 <50 NA <50 <1 NA <1 BW -021 06/04/2015 7.3 10.11 18 285 0.16 -115 90 413 <0.5 130 24 NA 18300 <1 NA <1 1.12 NA 3.89 19 NA 53 <1 NA 1.19 130 <50 NA <50 <1 NA <1 BW -02I 09/30/2015 7.7 13.48 21 295 0.2 -201 4 9.99 NM NA 48 14400 3140 <1 <10 <1 <1 <10 1.01 21 60 26 <1 <10 <1 NA <50 <500 <50 <1 <10 <1 BW -02I 12/02/2015 7.3 9.22 18 296 0.1 -52 153 710 NM 140 76 70 37600 <1 <1 <1 1.5 1.36 6.5 15 14 81 <1 <1 2.11 140 55 53 74 <1 <1 <1 BW -03I 03/04/2015 5.8 3.01 18 92 0.09 -20 186 58.3 5.5 22 44 NA 1460 <1 NA <1 5.84 NA 9.07 25 NA 31 <1 NA <1 22 <50 NA <50 <1 NA <1 BW -031 06/03/2015 5.7 5.27 19 67 0.1 -96 109 20.7 2.5 24 32 NA 224 <1 NA <1 <1 NA <1 19 NA 19 <1 NA <1 24 <50 NA <50 <1 NA <1 BW -03I 12/02/2015 5.5 3.59 18 76 0.88 -5 200 24.5 1 16 48 47 330 <1 <1 <1 <1 <1 <1 19 19 20 <1 <1 <1 16 <50 <50 <50 <1 <1 <1 MW -02 06/05/2015 7.5 3.04 22 1 298 0.26 1 -140 1 65 15.5 1 0.5 110 <5 NA 449 <1 NA <1 <1 NA <1 42 NA 57 <1 NA <1 110 <50 NA <50 <1 NA <1 MW -02 12/01/2015 7.6 2.46 18 289 1.4 64 269 3.79 0 110 <5 <5 38 <1 <1 <1 <1 <1 <1 42 41 44 <1 <1 <1 110 <50 <50 <50 <1 <1 <1 MW -04 06/05/2015 6.0 4.84 18 667 0.38 51 256 2.45 <0.5 95 <5 NA 61 <1 NA <1 <1 NA <1 82 NA 86 <1 NA <1 95 1600 NA 1640 <1 NA <1 MW -04 09/29/2015 5.9 6.40 21 675 1.8 176 381 1.77 NM NA <5 5 121 <1 <1 <1 <1 <1 <1 77 79 85 <1 <1 <1 NA 1620 1690 1720 <1 <1 <1 MW -04 DUP 09/29/2015 5.9 6.40 21 675 1.8 176 381 1.77 NM NA 8 <5 67 <1 <1 <1 <1 <1 <1 78 78 84 <1 <1 <1 NA 1660 1660 1710 <1 <1 <1 MW -04 12/01/2015 6.3 4.35 19 760 1.42 119 324 6.5 0 120 <5 <5 56 <1 <1 <1 <1 <1 <1 80 87 79 <1 <1 <1 120 1890 1990 1830 <1 <1 <1 MW -07 06/08/2015 7.4 5.39 19 363 0.4 -232 -27 3.97 1.2 140 <5 NA 15 <1 NA <1 <1 NA <1 52 NA 52 <1 NA <1 140 <50 NA <50 <1 NA <1 MW -07 12/02/2015 7.2 2.73 19 1 314 0.59 1 68 1 273 2.2 11 130 <5 NA 9 <1 NA <1 <1 NA <1 42 NA 42 <1 NA <1 130 <50 NA <50 <1 NA <1 MW -081 06/04/2015 5.3 29.32 20 844 0.45 -86 119 16.6 1 65 44 NA 510 <1 NA <1 8.42 NA 9.88 42 NA 43 <1 NA <1 65 1080 NA 1080 <1 NA <1 MW -08I 09/29/2015 6.2 31.69 25 630 0.8 120 325 1.71 NM NA 27 56 117 1.2 <1 3.95 9.91 19.8 7.09 76 60 84 <1 <1 <1 NA 791 1040 737 <1 <1 <1 MW -081 12/01/2015 5.5 29.26 19 803 1.56 -37 168 6.58 1.5 58 45 47 133 <1 <1 <1 10 10.8 10.7 40 41 40 <1 <1 <1 58 1070 1080 1070 <1 <1 <1 MW -331 06/09/2015 6.9 7.05 19 887 0.2 -70 135 1.26 NM 230 13 NA 72 <1 NA <1 <1 NA <1 75 NA 75 <1 NA <1 230 <50 NA <50 <1 NA <1 MW -41I 12/02/2015 7.6 6.40 18 306 0.2 -116 89 7.4 0.5 120 <5 <5 116 <1 <1 <1 <1 <1 <1 33 33 39 <1 <1 <1 120 <50 <50 <50 <1 I<1 <1 MW -44I 06/03/2015 7.3 23.75 20 451 0.32 -204 1 6.19 0.5 170 <5 NA 42 <1 NA <1 <1 NA <1 48 NA 47 <1 NA <1 170 <50 NA <50 <1 NA <1 MW -44I 12/01/2015 7.3 23.40 19 478 0.32 1 6 1 211 5.57 1 0.25 180 9 8 42 <1 <1 <1 <1 <1 <1 50 50 50 <1 <1 <1 180 <50 <50 <50 <1 <1 <1 MW -491 06/09/2015 6.9 23.49 22 979 0.38 -210 -54.82 3 300 10 NA 77 <1 NA <1 <1 NA <1 80 NA 81 <1 NA <1 300 3370 NA 3400 <1 NA <1 MW -491 12/02/2015 6.9 23.04 20 991 0.52 4 209 2.29 3.75 290 <5 7 43 <1 <1 <1 <1 <1 <1 79 79 77 <1 <1 <1 290 3380 3380 3360 <1 <1 <1 MW -53I 06/01/2015 7.8 5.17 20 305 0.2 -301 -96 3.99 1.5 110 66 NA 112 <1 NA <1 <1 NA <1 45 NA 48 <1 NA <1 110 <50 NA <50 <1 NA <1 MW -551 08/19/2015 6.2 5.14 20 521 0.19 118 323 1 NM 130 <5 NA 9 <1 NA <1 <1 NA <1 56 NA 58 <1 NA <1 130 498 NA 498 <1NA <1 MW -55I 12/01/2015 6.7 2.85 18 647 0.2 -62 143 7.1 NM 180 <5 <5 147 <1 <1 <1 <1 <1 <1 69 68 67 <1 <1 I <1 180 756 748 745 <1 <1 <1 PEE DEE AW -01D 03/03/2015 9.3 21.86 15 179 0.31 32 237 3.08 <0.5 56 22 NA 46 <1 NA <1 <1 NA <1 21 NA 21 <1 NA <1 52 <50 NA <50 <1 NA <1 AW -01D 06/02/2015 8.3 22.88 23 169 0.2 -188 17 1.23 0.5 57 38 NA 13 <1 NA <1 <1 NA <1 28 NA 29 <1 NA <1 57 <50 NA <50 <1 NA <1 AW -02D 03/03/2015 8.7 20.68 12 324 0.36 -75 131 17.6 <0.5 87 13 NA 115 <1 NA <1 <1 NA <1 46 NA 70 <1 NA <1 85 <50 NA <50 <1 NA <1 AW -02D 06/03/2015 7.8 21.68 21 321 0.36 -228 -23 4.47 <0.5 100 9 NA 35 <1 NA <1 <1 NA <1 52 NA 54 <1 NA <1 100 <50 NA <50 <1 NA <1 AW -03D 03/04/2015 8.3 5.51 17 258 0.14 -294 -89 7.34 0.5 110 28 NA 98 <1 NA <1 <1 NA <1 21 NA 20 <1 NA <1 110 <50 NA <50 <1 NA <1 AW -03D 06/04/2015 7.5 6.04 19 261 0.28 -118 87 2.9 1 120 8 NA 80 <1 NA <1 <1 NA <1 27 NA 28 <1 NA <1 120 <50 NA <50 <1 NA <1 BW -020 03/05/2015 12.5 27.82 10 3609 1.14 -31 174 4.55 1 <0.5 530 1650 NA 1810 <1 NA <1 1.21 NA <1 131 NA 121 <1 NA <1 15 <50 NA <50 <1 NA <1 BW -02D 06/03/2015 11.5 28.63 20 1040 0.4 -257 -52 2 <0.5 190 1200 NA 1080 1.01 NA <1 <1 NA 1.01 47 NA 50 <1 NA <1 <10 <50 NA <50 <1 NA <1 BW -03D 03/05/2015 7.2 1.08 17 182 0.22 -111 94 6.19 0.5 77 <5 NA 66 <1 NA <1 <1 NA <1 49 NA 51 <1 NA <1 76 <50 NA <50 <1 NA <1 BW -03D 06/03/2015 7.3 2.41 19 193 0.1 -251 -46 2.3 2 84 <5 NA 23 <1 NA <1 <1 NA <1 46 NA 45 <1 NA <1 84 <50 NA <50 <1 NA <1 BW -03D 12/02/2015 7.3 1.00 18 191 0.2 -115 90 0.48 1 87 <5 6 7 <1 <1 <1 <1 <1 <1 52 50 52 <1 <1 <1 87 <50 <50 <50 <1 <1 <1 BW -03D DUP 12/02/2015 7.3 1.00 18 191 0.2 -115 90 0.48 1 82 <5 <5 6 <1 <1 <1 <1 <1 <1 51 51 50 <1 <1 <1 82 <50 <50 <50 <1 <1 <1 MW -53D 06/01/2015 6.9 10.01 19 276 0.72 -137 68 7.31 <0.5 110 63 NA 25 <1 NA <1 <1 NA <1 46 NA 49 <1 NA <1 110 <50 NA <50 <1 NA <1 MW -54D 06/08/2015 6.9 11.09 19 253 0.35 -19 186 3.52 <0.5 120 <5 NA 63 <1 NA <1 <1 NA <1 48 NA 46 <1 NA <1 120 <50 NA <50 <1 NA <1 MW -SSD 06/05/2015 7.0 8.37 18 252 0.38 -197 8 2.95 1.3 110 <5 NA 41 <1 NA <1 <1 NA <1 39 NA 39 <1 NA <1 110 <50 NA <50 <1 NA <1 MW -551) 12/01/2015 7.3 1 9.00 18 252 0.6 -96 109 9.1 0.5 120 <5 NA 62 <1 NA <1 <1 NA <1 36 NA 37 <1 NA <1 120 <50 NA <50 <1 NA <1 Prepared by: BER Checked by: TCP Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013 Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cord = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. my = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 4 of 6 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Analytical Parameter Calcium Carbonate Alkalinity Chloride chromium (Hexavalent) Chromium Chromium Chromium Cobalt Cobalt Cobalt Copper Copper Copper Iron Iron Iron Lead Lead Lead Magnesium Manganese Manganese Manganese Mercury Mercury Mercury Methane Molybdenum TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS Reporting Units mg/l mg/I mg/I ug/l ug/l ug/l ug/I ug/I ug/l ug/I ug/I ug/l ug/l ug/l ug/I ug/I ug/I ug/I ug/l mg/I ug/I ug/I ug/I ug/1 ug/I ug/I ug/I ug/I 15A NCAC 02L Standard NE NE 250 NE NE NE 10 NE NE 1* NE NE 1000 NE NE 300 NE NE 15 NE NE NE 50 NE NE 1 NE NE Sample ID Sample Collection Date Analytical Results LOWER YORKTOWN AW -01I 03/03/2015 7.85 <10 3.8 NA <1 NA <1 <1 NA <1 <1 NA <1 6100 NA 6600 <1 NA <1 0.829 97 NA 98 <0.05 NA <0.05 24 <1 AW -01I 06/02/2015 7.95 <10 3.6 NA <3 NA <1 <1 NA <1 <1 NA <1 7590 NA 8400 <1 NA <1 0.823 139 NA 146 <0.05 NA <0.05 270 <1 AW -02I 04/02/2015 43.9 <10 5.9 NA <1 NA <1 <1 NA <1 <1 NA <1 19 NA 276 <1 NA <1 1.35 53 NA 53 <0.05 NA <0.05 <10 3.38 AW -021 06/03/2015 48.4 <10 5.2 NA <1 NA <1 <1 NA <1 <1 NA <1 140 NA 863 <1 NA <1 1.26 72 NA 73 <0.05 NA <0.05 14 3.14 AW -03I 03/04/2015 40.9 <10 12 NA <1 NA <1 <1 NA <1 <1 NA <1 19 NA 308 <1 NA <1 1.01 158 NA 164 <0.05 NA <0.05 <10 2.52 AW -03I 06/04/2015 31 <10 10 NA <1 NA <1 <1 NA <1 <1 NA <1 5110 NA 5650 <1 NA <1 0.968 576 NA 632 <0.05 NA <0.05 120 4.6 BW -02I 03/05/2015 50.4 <10 1 4.6 NA <1 NA 7.08 <1 NA <1 <1 NA <1 764 NA 2090 <1 NA 1.29 0.827 29 NA 35 <0.05 NA <0.05 65 10.5 BW -021 06/04/2015 45.6 <10 4.4 NA <1 NA 30.8 <1 NA 1.31 <1 NA 2.56 908 NA 7850 <1 NA 1 8.99 0.841 28 NA 50 <0.05 NA 0.1 1 710 15.1 BW -02I 09/30/2015 42.8 NA NA NA <1 47.8 7.81 <1 <10 <1 <1 <10 <1 71 3280 882 <1 10 1.63 0.852 18 <50 22 <0.05 <0.05 <0.05 NA 6.96 BW -02I 12/02/2015 45.3 <10 4.8 0.44 3.02 2.46 67 <1 <1 2.63 <1 <1 5.43 841 758 12600 <1 <1 20.9 1.05 26 26 64 <0.05 <0.05 0.23 1900 7.6 BW -03I 03/04/2015 9.25 <10 9.2 NA <1 NA 2.78 <1 NA <1 <1 NA <1 4700 NA 5790 <1 NA <1 0.39 58 NA 60 <0.05 NA <0.05 620 <1 BW -031 06/03/2015 7.67 <10 5.8 NA <1 NA 1.16 <1 NA <1 2.24 NA <1 2600 NA 2280 <1 NA <1 0.341 26 NA 21 <0.05 NA <0.05 660 <1 BW -03I 12/02/2015 6.23 <10 11 0.047 <1 <1 1.18 <1 <1 <1 <1 <1 <1 2100 2030 2200 <1 <1 <1 0.389 20 19 19 <0.05 <0.05 <0.05 710 <1 MW -02 06/05/2015 53.1 <10 1 5.5 NA <1 NA <1 <1 NA <1 <1 NA <1 260 NA 2530 <1 NA <1 1.11 26 NA 38 <0.05 NA <0.05 42 <1 MW -02 12/01/2015 51.8 <10 5.8 <0.03 Ml <1 <1 <1 <1 <1 <1 <1 <1 <1 240 241 597 <1 I<1 <1 1.12 19 20 25 <0.05 <0.05 <0.05 1 28 <1 MW -04 06/05/2015 69 <10 57 NA <1 NA <1 4.36 NA 6.25 <1 NA <1 23 NA 167 <1 NA <1 3.37 530 NA 576 <0.05 NA 0.28 40 <1 MW -04 09/29/2015 64.5 NA NA NA <1 <1 <1 5.17 5.18 6.77 <1 <1 <1 42 41 172 <1 <1 <1 3.58 529 545 597 <0.05 M2 <0.05 M2 <0.05 NA <1 MW -04 DUP 09/29/2015 62.7 NA NA NA <1 <1 <1 5.11 5.29 6.77 <1 <1 <1 42 42 153 <1 <1 <1 3.47 540 527 591 <0.05 <0.05 <0.05 NA <1 MW -04 12/01/2015 73.8 <10 59 <0.03 1.53 1.41 5.35 3.99 4.09 6.57 <1 1.11 <1 57 58 163 <1 <1 <1 3.72 463 470 483 <0.05 <0.05 <0.05 15 <1 MW -07 06/08/2015 63.3 <10 4.8 0.023 <1 NA <1 <1 NA <1 <1 NA <1 904 NA 909 <1 NA <1 11.4 77 1NA 73 <0.05 NA <0.05 990 2.68 MW -07 12/02/2015 51.2 <10 1 4 <0.03 <1 NA <1 <1 NA <1 <1 NA <1 581 NA 635 <1 NA <1 1.16 36 NA 35 <0.05 NA <0.05 1300 1.58 MW -081 106/04/2015 106 <10 46 0.03 <1 NA 2.29 <1 NA <1 <1 NA 1.26 1300 NA 1880 <1 NA <1 9.15 145 NA 147 <0.05 NA <0.05 1400 <1 MW -08I 09/29/2015 75.8 NA NA NA 2.24 1.72 2.67 <1 <1 <1 1.36 <1 12.7 422 766 229 <1 <1 <1 6.58 76 141 58 <0.05 <0.05 <0.05 NA 16.2 MW -081 12/01/2015 95.4 <10 46 <0.03 <1 <1 1.06 <1 <1 <1 <1 <1 1.25 1230 1220 1290 <1 <1 <1 9.28 138 140 136 <0.05 <0.05 <0.05 590 <1 MW -331 06/09/2015 198 <10 7.9 NA <1 NA <1 <1 NA <1 <1 NA <1 7380 NA 7770 <1 NA <1 1.89 112 NA 115 <0.05 NA <0.05 96 <1 MW -41I 12/02/2015 57.1 <10 10 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 343 329 1390 <1 <1 <1 1.06 22 23 26 <0.05 <0.05 <0.05 170 <1 MW -44I 06/03/2015 89.1 <10 12 NA <1 NA <1 <1 NA <1 <1 NA <1 392 NA 450 <1 NA <1 1 1.25 32 1NA 31 <0.05 NA <0.05 130 <1 MW -44I 12/01/2015 91.8 <10 1 14 <0.03 <1 I<1 <1 <1 <1 <1 <1 <1 <1 455 419 469 <1 <1 <1 1.35 33 33 32 <0.05 <0.05 <0.05 60 <1 MW -491 06/09/2015 142 <10 71 NA <1 NA <1 <1 NA <1 <1 NA <1 5790 NA 6420 <1 NA <1 6.24 107 NA 111 <0.05 NA <0.05 2300 3.37 MW -491 12/02/2015 143 <10 71 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 6000 5740 6400 <1 <1 <1 5.93 108 110 108 <0.05 <0.05 <0.05 3300 3.78 MW -53I 06/01/201547.9 <10 6.4 NA <1 NA <1 <1 NA <1 <1 NA <1 1580 NA 2660 <1 NA <1 0.905 28 NA 31 <0.05 NA <0.05 240 <1 MW -551 08/19/2015 64.7 <10 50 NA <1 NA <1 1.73 NA 1.61 9.8 NA <1 58 NA 70 1.03 NA <1 2.1 61 NA 63 <0.05 NA <0.05 27 <1 MW -55I 12/01/2015 91.4 <10 51 <0.03 <1 <1 I<1 <1 <1 <1 <1 1.21 <1 542 509 655 <1 <1 <1 2.73 1 56 55 1 53 1 <0.05 <0.05 <0.05 22 <1 PEE DEE AW -01D 03/03/2015 26.6 <10 3.6 NA <1 NA <1 <1 NA <1 <1 NA <1 <10 NA 77 <1 NA <1 0.378 <5 NA <5 <0.05 NA <0.05 49 5.85 AW -01D 06/02/2015 26 <10 3.8 NA <1 NA <1 <1 NA <1 <1 NA <1 147 NA 349 <1 NA <1 0.744 32 NA 33 <0.05 NA <0.05 72 4.3 AW -02D 03/03/2015 68.4 <10 2.5 NA <1 NA <1 <1 NA <1 <1 NA <1 <10 NA 77 <1 NA <1 1.12 <5 NA 5 <0.05 NA <0.05 420 1.4 AW -02D 06/03/2015 54.4 <10 2.2 NA <1 NA <1 <1 NA <1 <1 NA <1 26 NA 57 <1 NA <1 1.17 11 NA 12 <0.05 NA <0.05 280 1.34 AW -03D 03/04/2015 46.1 <10 3.2 NA <1 NA <1 <1 NA <1 <1 NA <1 438 NA 613 <1 NA <1 1.07 74 NA 77 <0.05 NA <0.05 <10 1.76 AW -03D 06/04/2015 46.9 <10 3.1 NA <1 NA <1 <1 NA <1 <1 NA <1 1850 NA 2050 <1 NA <1 1.06 86 NA 88 <0.05 NA <0.05 27 <1 BW -02D 03/05/2015 352 380 1 3.1 NA 22.3 NA 24.5 <1 NA <1 1.15 NA 1.27 <10 NA 17 <1 NA <1 0.007 <5 NA <5 <0.05 NA <0.05 12 5.65 BW -02D 06/03/2015 55.4 100 4.4 NA 1.33 NA 1.32 <1 NA <1 5.53 NA <1 <10 NA <10 1.16 NA <1 0.232 <5 NA <5 <0.05 NA <0.05 19 6.27 BW -03D 03/05/2015 29.2 <10 3 NA <1 NA <1 <1 NA <1 <1 NA <1 599 NA 721 <1 NA <1 1.04 29 NA 31 <0.05 NA <0.05 15 <1 BW -03D 06/03/2015 27.7 <10 3.2 NA <1 NA <1 <1 NA <1 <1 NA <1 998 NA 1090 <1 NA <1 1.02 40 NA 41 <0.05 NA <0.05 120 1.63 BW -03D 12/02/2015 30 <10 3.3 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 1.47 1330 1320 1550 <1 <1 <1 1.11 37 38 39 <0.05 <0.05 <0.05 190 <1 BW -03D DUP 12/02/2015 28.9 <10 3.4 <0.03 <1 <1 <1 <1 <1 <1 <1 <1 <1 1360 1360 1360 <1 <1 <1 1.07 38 38 36 <0.05 <0.05 <0.05 170 <1 MW -53D 06/01/2015 46.5 <10 4.7 NA <1 NA <1 <1 NA <1 <1 NA <1 331 NA 724 <1 NA <1 1.03 25 NA 27 <0.05 NA <0.05 28 <1 MW -540 06/08/2015 46.5 <10 3.3 NA <1 NA <1 <i NA <1 <1 NA <i 212 NA 269 <1 NA <1 1.18 25 NA 23 <0.05 NA <0.05 88 <I MW -SSD 06/05/2015 44.8 <10 3.2 NA <1 NA <1 <1 NA <1 <1 NA <1 1460 NA 1570 <1 NA <1 1.07 36 NA 37 <0.05 NA <0.05 52 <1 MW -55D 12/01/2015 44.2 <10 3.4 <0.03 <1 NA <1 <1 NA <1 <1 NA <1 1000 NA 1370 <1 NA <1 1.11 32 NA 37 <0.05 NA <0.05 23 <1 Prepared by: BER Checked by: TCP Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013 Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cond = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. my = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 5 of 6 TABLE 2-2 2015 GROUNDWATER ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Analytical Parameter Molybdenum Molybdenum Nickel Nickel Nickel Nitrate (as N) Potassium Selenium Selenium Selenium Sodium Strontium Strontium Strontium Sulfate Sulfide Thallium Thallium Thallium Total Dissolved Solids Total Organic Carbon Total Suspended Solids Vanadium Vanadium Vanadium Zinc Zinc Zinc DIS (0.1u) TOT DIS DIS (0.1u) TOT TOT DIS DIS (0.1u) TOT TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT DIS DIS (0.1u) TOT Reporting Units ug/I ug/I ug/I ug/I ug/I mg-N/L mg/I ug/l ug/I ug/I mg/I ug/I ug/I ug/I mg/I mg/I ug/I ug/I ug/I mg/I mg/I mg/I ug/I ug/l ug/I ug/I ug/l ug/1 15A NCAC 02L Standard NE NE NE NE Soo 10 NE NE NE 20 NE NE NE NE 250 NE NE NE 0.2* 500 NE NE NE NE 0.3* NE NE 1000 Sample ID Sample Collection Date Analytical Results LOWER YORKTOWN AW -01I 03/03/2015 NA 1.33 <1 NA <1 <0.01 1.1 <1 NA <1 1.45 48 NA 48 3.8 <0.5 <0.2 NA <0.2 30 3.3 8 <0.3 NA 0.41 <5 NA 20 AW -01I 06/02/2015 NA 1.01 <1 NA <1 0.018 0.85 <1 NA <1 1.19 48 NA 50 3.2 <0.2 <0.2 NA <0.2 53 1.1 <5 <0.3 NA <0.3 <5 NA <5 AW -02I 04/02/2015 NA 3.56 <1 NA <1 <0.01 1.57 <1 NA <1 4.92 224 NA 229 8.3 <0.1 <0.2 NA <0.2 160 1.9 6 <0.3 NA 0.442 6 NA <5 AW -021 06/03/2015 NA 3.03 <1 NA <1 <0.01 1.46 <1 NA <1 4.67 260 NA 257 38 <0.1 <0.2 NA <0.2 170 1.3 20 <0.3 NA 0.637 <5 NA 9 AW -03I 03/04/2015 NA 2.61 <1 NA <1 0.199 0.226 <1 NA <1 4.76 136 NA 138 2.9 <0.5 <0.2 NA <0.2 130 4.7 7 <0.3 NA 0.7 <5 NA <5 AW -03I 06/04/2015 NA 4.81 <1 NA <1 0.195 0.257 <1 NA <1 4.92 124 NA 131 3.5 0.12 <0.2 NA <0.2 110 1.9 it <0.3 NA 0.392 <5 NA <5 BW -02I 03/05/2015 NA 11 <1 I NA <1 <0.01 4.92 3.24 NA 3.16 12.2 1 217 NA 229 13 <2 <0.2 NA <0.2 200 8.4 <5 1.45 NA 8.88 10 NA 7 BW -021 06/04/2015 NA 12.5 <1 NA 2.88 0.021 2.11 <1 NA 1.09 19 216 NA 255 2.1 <0.5 <0.2 NA <0.2 440 8.2 200 2.05 NA 36.6 6 NA 19 BW -02I 09/30/2015 15.7 9.33 <1 <10 <1 NA 5.76 <1 <10 <1 15.5 225 249 233 NA NA <0.2 <2 <0.2 NA NA NA 1.79 61.4 11.4 <5 <50 <5 BW -02I 12/02/2015 7.01 12.8 <1 1.02 6.03 0.05 1.44 <1 <1 2.08 30.4 191 189 272 0.26 <4 <0.2 <0.2 <0.2 970 9.8 180 7.83 6.06 79 <5 <5 29 BW -031 03/04/2015 NA 1.08 <1 NA <1 <0.02 0.812 <1 NA <1 5.09 47 NA 51 0.41 <0.1 <0.2 NA <0.2 86 4.8 23 1.67 NA 5.69 5 NA 6 BW -031 06/03/2015 NA <1 <1 NA <1 <0.01 0.877 <1 NA <1 4.28 48 NA 41 0.12 <0.1 <0.2 NA <0.2 57 2.5 5 1.31 NA 2.46 15 NA <5 BW -03I 12/02/2015 <1 <1 <1 <1 <1 I<0.01 0.908 <1 <1 <1 6.07 36 36 36 0.89 <0.2 <0.2 <0.2 <0.2 1 72 0.395 1 9 1.88 1.83 2.57 <5 <5 <5 MW -02 06/05/2015 NA <1 <1 NA <1 0.027 1.08 <1 NA <1 2.99 284 NA 300 24 <0.1 <0.2 NA <0.2 170 0.53 11 <0.3 NA 0.304 <5 NA <5 MW -02 12/01/2015 <1 <1 <1 <1 <1 0.016 1.09 <1 <1 <1 2.87 284 283 289 25 <0.1 <0.2 <0.2 0.44 <25 0.538 <5 <0.3 <0.3 <0.3 <5 <5 <5 MW -04 06/05/2015 NA <1 1.47 NA 1.48 <0.01 2.44 <1 NA <1 60.2 391 NA 403 140 <0.2 0.301 NA 0.352 400 1.1 <5 <0.3 NA <0.3 12 NA 11 MW -04 09/29/2015 <1 <1 1.43 1.6 1.76 NA 2.35 <1 <1 <1 63.4 342 356 367 NA NA 0.556 0.436 0.509 NA NA NA <0.3 <0.3 0.382 <5 <5 <5 MW -04 DUP 09/29/2015 <1 <1 1.47 1.55 1.58 NA 2.34 <3 <1 <1 63.8 345 353 361 NA NA 0.328 0.308 0.411 NA NA NA <0.3 <0.3 0.48 <5 7 5 MW -04 12/01/2015 <1 <1 5.13 4.49 4.67 0.047 2.68 <1 <1 <1 59.8 450 475 423 150 <0.2 0.33 <0.2 0.316 440 1.2 <5 <0.3 <0.3 0.374 <5 8 6 MW -07 06/08/2015 NA 2.74 <1 NA <1 1 0.413 1.73 <1 NA I<1 10.2 332 NA 333 29 <0.1 <0.2 NA <0.2 240 2.1 <5 <0.3 NA <0.3 <5 NA <5 MW -07 12/02/2015 NA 1.53 <1 NA <1 <0.01 1.34 <1 NA <1 9.49 269 NA 278 20 <0.1 <0.2 NA <0.2 190 1.3 <5 <0.3 NA <0.3 <5 NA <5 MW -08I 06/04/2015 NA <1 <1 NA 1.12 <0.01 13.3 <1 NA <1 45.1 1220 NA 1220 250 0.636 <0.2 NA <0.2 560 4.7 8 2.81 NA 3.64 23 NA 31 MW -08I 09/29/2015 6.42 27.7 3.11 3.48 3.46 NA 15.5 <1 <1 1.29 34.9 965 1130 973 NA NA <0.2 <0.2 0.254 NA NA NA 3.05 4.83 2.4 13 7 21 MW -081 12/01/2015 <1 <1 <1 1.45 <1 0.018 12.5 <1 <1 <1 43.8 1200 1210 1160 310 0.434 <0.2 <0.2 <0.2 540 0.567 <5 3.12 3.06 3.44 <5 <5 <5 MW -331 06/09/2015 NA <1 <1 NA <1 0.019 0.844 <1 NA <1 6.79 1060 NA 1080 220 <0.1 <0.2 NA <0.2 620 2 16 <0.3 NA <0.3 <5 NA <5 MW -41I 12/02/2015 <1 <1 <1 2.75 <1 <0.01 0.666 <1 <1 <1 2.8 308 310 317 18 <0.2 <0.2 <0.2 <0.2 190 0.585 9 1 <0.3 <0.3 0.432 <5 <5 <5 MW -44I 06/03/2015 NA <1 <1 NA <1 I<0.01 1.63 <1 NA <1 4.68 488 NA 476 32 <0.1 1<0.2 NA <0.2 280 1.6 5 <0.3 NA 0.542 <5 NA <5 MW -44I 12/01/2015 <1 <1 <1 <1 <1 <0.01 1.41 <1 <1 <1 4.68 503 507 499 45 <0.1 0.278 <0.2 <0.2 290 1.8 6 <0.3 0.424 0.446 13 <5 <5 MW -491 06/09/2015 NA 3.37 1.49 NA 1.7 0.04 6.01 <1 NA <1 64.6 736 NA 749 90 <0.2 <0.2 NA <0.2 600 5.4 15 0.372 NA 0.422 <5 NA <5 MW -491 12/02/2015 3.45 3.33 2.7 1.57 1.7 <0.01 6.09 <1 <1 <1 64.2 737 740 717 97 <0.1 <0.2 <0.2 <0.2 610 5.7 15 0.362 <0.3 <0.3 <5 <5 <5 MW -53I 06/01/2015 NA <1 <1 NA <1 <0.01 6.37 <1 NA <1 8.81 265 NA 275 27 <0.1 <0.2 NA <0.2 180 0.808 9 <0.3 NA <0.3 7 NA <5 MW -551 08/19/2015 NA <1 <1 NA <1 0.044 0.935 <1 NA <1 34 345 NA 354 45 <0.1 <0.2 NA <0.2 290 1 <5 <0.3 NA <0.3 14 NA <5 MW -SSI 12/01/2015 <1 <1 1.28 1.62 1.29 <0.01 1.15 <1 <1 <1 32.1 510 505 499 61 <0.2 0.226 <0.2 <0.2 370 0.999 8 <0.3 <0.3 0.463 <5 <5 <5 PEE DEE AW -01D 03/03/2015 NA 6.01 <1 NA <1 <0.01 1.83 <1 NA <1 7.66 141 NA 142 20 <0.1 <0.2 NA <0.2 96 2.9 <5 0.531 NA 0.648 <5 NA <5 AW -01D 06/02/2015 NA 4.59 <1 NA <1 <0.01 1.45 <1 NA <1 4.83 142 NA 146 18 0.162 <0.2 NA <0.2 110 0.48 <5 <0.3 NA <0.3 <5 NA <5 AW -02D 03/03/2015 NA 1.39 <1 NA <1 <0.01 4.51 <1 NA <1 7.2 311 NA 490 61 <0.1 <0.2 NA <0.2 210 1.2 45 1.26 NA 1.53 <5 NA <5 AW -02D 06/03/2015 NA 1.24 <1 NA <1 0.012 4.83 <1 NA <1 7.66 329 NA 340 53 <0.2 <0.2 NA <0.2 210 0.798 21 <0.3 NA 0.317 <5 NA 10 AW -03D 03/04/2015 NA 2 <1 NA <1 <0.01 2.36 <1 NA <1 3.19 226 NA 227 2 <0.1 <0.2 NA <0.2 150 3.2 6 0.46 NA 0.85 <5 NA <5 AW -03D 06/04/2015 NA <1 <1 NA <1 <0.01 1.6 <1 NA <1 2.7 233 NA 237 0.7 <0.1 <0.2 NA <0.2 150 2.3 6 <0.3 NA <0.3 <5 NA <5 BW -02D 03/05/2015 NA 5.95 <1 NA <1 <0.01 5.52 1.35 NA 1.4 8.56 1210 NA 1100 3.8 <0.1 <0.2 NA <0.2 740 32 27 3.88 NA 4.75 <5 NA 73 BW -02D 06/03/2015 NA 4.99 <1 NA <1 <0.01 12.7 <1 NA <1 8.45 458 NA 454 7.2 <0.1 <0.2 NA <0.2 240 7.6 <5 20 NA 19.3 16 NA <5 BW -03D 03/05/2015 NA <1 <1 NA <1 <0.01 1.54 <1 NA <1 6.94 153 NA 157 0.53 <0.5 <0.2 NA <0.2 110 0.975 6 <0.3 NA <0.3 7 NA 11 BW -03D 06/03/2015 NA 2.05 <1 NA <1 <0.01 1.62 <1 NA <1 7.32 153 NA 156 0.21 <0.1 <0.2 NA <0.2 120 2.3 <5 <0.3 NA <0.3 <5 NA <5 BW -03D 12/02/2015 <1 <1 <1 <1 <1 <0.01 1.53 <1 <1 <1 7.27 161 161 164 <0.1 <0.1 <0.2 <0.2 <0.2 110 1.1 <5 <0.3 <0.3 <0.3 <5 <5 <5 BW -03D DUP 12/02/2015 <1 <1 <1 <1 <1 <0.01 1.49 <1 <1 <1 7.26 162 163 156 <0.1 <0.1 <0.2 <0.2 <0.2 140 0.938 <5 <0.3 <0.3 <0.3 <5 <5 <5 MW -53D 06/01/2015 NA <1 <1 NA <1 <0.01 1.41 <1 NA <1 1 5.4 1 255 NA 263 14 <0.1 <0.2 1 NA <0.2 1 170 1 0.716 9 <0.3 NA <0.3 <5 NA <5 MW -54D 06/08/2015 NA <1 <1 NA <1 0.014 1.47 <1 NA <1 3.19 254 NA 247 <0.1 <0.1 <0.2 NA <0.2 160 0.877 71 <0.3 NA <0.3 <5 NA <5 MW -55D 06/05/2015 NA <1 <1 NA <1 0.03 1.3 <1 NA <1 2.81 233 NA 234 0.12 <0.1 <0.2 NA <0.2 140 0.797 5 <0.3 NA <0.3 <5 NA <5 MW -55D 12/01/2015 NA <1 <1 NA <1 0.023 1.33 <1 NA <1 2.82 230 NA 231 0.36 <0.1 <0.2 NA <0.2 140 0.753 8 <0.3 NA <0.3 6 NA 15 Prepared by: BER Checked by: TCP Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013 Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cond = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. my = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-2 2015 Groundwater Analytical Results.xlsx Page 6 of 6 TABLE 2-3 2015 HEXAVALENT CHROMIUM ANALYTICAL RESULTS W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared by: BER Checked by: MST Notes: 0 - Bold highlighted concentration indicates exceedance of the North Carolina Department of Health and Human Services from North Carolina Department of Environmental Quality Memorandum, November 4, 2015. DUP = Duplicate S.U. = Standard Unit my = millivolts ug/I = microgram per liter < = concentration not detected at or above the reporting limit NE = Not established NA = Not analyzed M3 = Matrix spike recovery was high; the associated laboratory control spike was acceptable P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-3 2015 Hexavalent Chromium Analytical Results.xlsx Page 1 of 1 Analytical Parameter Chromium (Hexavalent) Cr(VI) Speciation Analytical Method US EPA 218.7 Brooks Rand IC -ICP -DRC -MS Reporting Units ug/I ug/I NC DHHS Health Screening Level 0.07 0.07 Sample ID Sample Collection Date Analytical Results ASH PORE WATER ABMW-01 08/19/2015 NA 0.005 MW -44S 08/19/2015 NA 0.147 SURFICIAL AW -01S 06/02/2015 NA 0.016 AW -02S 06/03/2015 NA 0.011 AW -03S 06/04/2015 NA 0.02 BW -01 06/02/2015 NA 0.017 BW -01 12/02/2015 0.056 NA BW -02S 06/04/2015 NA 0.04 BW -02S 12/02/2015 0.063 NA BW -03S 06/03/2015 NA 0.034 BW -03S 12/02/2015 0.049 NA CW -01 12/01/2015 <0.03 NA CW -02 12/02/2015 <0.03 NA CW -03 12/02/2015 <0.03 NA MW -01 12/01/2015 <0.03 NA MW -03 12/01/2015 <0.03 NA MW -05 06/09/2015 NA 0.016 MW -05 12/01/2015 <0.03 NA MW -06 12/01/2015 <0.03 NA MW -06 DUP 12/01/2015 <0.03 NA MW -33S 06/08/2015 NA 0.014 MW-44SA 06/04/2015 NA 0.037 MW-44SA 12/02/2015 <0.03 NA LOWER YORKTOWN BW -02I 12/02/2015 _ (1.44M- NA BW -03I 12/02/2015 0.047 NA MW -02 12/01/2015 <0.03 M1 NA MW -04 12/01/2015 <0.03 NA MW -07 06/08/2015 NA 0.023 MW -07 12/02/2015 <0.03 NA MW -08I 06/04/2015 NA 0.03 MW -08I 12/01/2015 <0.03 NA MW -41I 12/02/2015 <0.03 NA MW -441 12/01/2015 <0.03 NA MW -49I 12/02/2015 <0.03 NA MW -55I 12/01/2015 <0.03 NA PEE DEE BW -03D 12/02/2015 <0.03 NA BW 03D DUP 12/02/2015 <0.03 NA MW -SSD 12/01/2015 <0.03 NA Prepared by: BER Checked by: MST Notes: 0 - Bold highlighted concentration indicates exceedance of the North Carolina Department of Health and Human Services from North Carolina Department of Environmental Quality Memorandum, November 4, 2015. DUP = Duplicate S.U. = Standard Unit my = millivolts ug/I = microgram per liter < = concentration not detected at or above the reporting limit NE = Not established NA = Not analyzed M3 = Matrix spike recovery was high; the associated laboratory control spike was acceptable P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-3 2015 Hexavalent Chromium Analytical Results.xlsx Page 1 of 1 TABLE 2-4 2015 SURFACE WATER AND SEEP ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared by: BER Checked by: RLP Notes: - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Human Health (consumption of organisms), April 2015. 0 - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Ecological, April 2015. 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013. Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cord = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. MV = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-4 2015 Surface Water and Seep Analytical Results Page 1 of 2 Analytical Parameter pH Temp Spec Coed DO ORP Eh Turbidity Alkalinity Aluminum DIS Aluminum TOT Antimony DIS Antimony TOT Arsenic DIS Arsenic TOT Barium DIS Barium TOT Beryllium DIS Beryllium TOT ei- Carbonate Alkalinity Boron DIS Boron TOT Cadmium DIS Cadmium TOT Calcium TOT Carbonate Alkalinity Chloride Chromium DIS Chromium TOT Cobalt DIS Cobalt TOT Copper DIS Copper TOT Fluoride Iron Iron Lead Lead DIS TOT DIS TOT Reporting Units S.U. Deg C umh s mg/I mV mV NTUs mg/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I mg/I mg/I mg/I ug/I ug/I ug/I ug/I ug/I ug/I mg/l ug/I ug/I ug/I ug/I 15A NCAC 028 EPA Human Health 5-9 NE NE NE NE NE 50 NE NE 8000 NE 640 NE 10 NE 200000 NE NE NE NE NE NE NE NE NE NE NE NE 4 4 NE NE NE NE NE NE NE 15A NCAC 0213 EPA Ecological 6.5-9 NE NE 5 NE NE 50 NE NE 87 NE NE 150 NE NE NE 6.5 NE NE NE NE 0.15 NE NE NE 230 11 NE NE 2.7 NE NE NE NE 0.54 NE 15A NCAC 02L Standa rd 6.5-8.5 NE NE NE NE NE NE NE NE NE NE 1* NE 10 NE 700 NE 4* NE 700 700 NE 2 NE NE 250 NE 10 1 1* NE 1000 2 300 300 NE 15 Sample ID Sample Collection Date Field Parameters Analytical Results ASH PORE WATER S-01 6.0 16 2435 3.72 17 NM 14 18 156 416 <1 <1 1.17 2.5 28 30 <1 <1 18 116 114 <1 <1 7.47 <10 10 <1 <1 <1 <1 <1 <1 NA 767 2900 <1 <1 S-01 6.6 27 332 0.35 -91 114 29.8 110 48 4700 <1 <10 6.43 21.1 65 114 <1 <10 110 717 697 <1 <10 32.5 <10 17 <1 <10 <1 <10 <1 <10 NA 970 9410 <1 10.1 S-01 6.5 16 131 5.6 294 499 7.34 18 NA 1220 NA <1 NA 7.25 NA 32 NA NA 18 NA 183 NA <1 10.7 <10 12 NA 1.34 NA NA NA 1.68 <0A NA 5480 NA 2.41 5-02 M04/23/2015 6.9 16 13099 0.5 -225 NM OOR 98 14 137 <1 <1 28.7 204 111 122 <1 <1 98 1030 985 <1 <1 58,6 <10 15 <1 <1 <1 <1 <1 <1 NA 10700 31800 <1 <1 5-02 6.4 18 887 2.5 20 225 253 '10 NA 7010 NA <1 NA 1160 NA 84 NA NA <10 NA 1710 NA <1 120 <10 31 NA 1.71 NA NA NA 3.88 <1 NA 124000 NA 12.2 5-03 6.5 12 686 4.37 -9 NM 2.87 190 <5 14 <1 <1 68.5 174 98 101 <1 <1 190 1630 1620 <1 <1 85.3 <10 27 <1 <1 <1 <1 <1 <1 NA 334 1430 <1 <1 5-03 09/30/2015 6.8 26 861 1.6 -37 168 152 150 6 82 <1 <1 29.4 382 126 1 151 <1 I <1 150 2190 2200 <1 <1 121 <10 29 <1 <1 3.74 449'- 1 <1 <1 NA 2300 19700 <1 <1 5-03 11/17/2015 6.7 16 853 2.9 174 379 74.6 180 NA 119 NA <1 NA 684 NA 143 NA NA 180 NA 2100 NA <1 118 <10 32 NA <1 NA NA NA <1 <1 NA 10300 NA <1 S -03A 04/24/2015 7.4 13 13 0.25 -264 NM 4.31 180 <5 9 <1 <1 88.9 116 94 96 <1 <1 180 1430 1460 <1 <1 77.8 <10 25 <1 <1 <1 <1 <1 <1 NA 807 1170 <1 <1 S -03A 09/30/2015 7.0 26 880 1.5 -23 182 20 220 <5 36 <1 <1 76.2 777 138 160 <1 <1 220 2070 2070 <1 <1 110 <10 29 <1 <1 1.28 1.34 <1 <1 NA 565 13000 <1 <1 S -03B 04/24/2015 7.3 13 999 0.47 -276 NM 6.39 210 <5 41 <1 <1 86.7 1530 97 121 <1 <1 210 1740 1850 <1 <1 92.6 <10 28 <1 <1 <1 <1 <1 <1 NA 453 13200 <1 <1 5-09 08/19/2015 6.2 27 589 1.9 -14 191 92.7 NA NA 572 NA <1 NA 4.41 NA 95 NA NA NA NA 990 NA <1 NA NA 20 NA <1 NA NA NA <1 <0.1 NA 21300 NA <1 5-09 11/17/2015 6.5 16 259 7.7 285 490 16.8 51 NA 99 NA <1 NA 1.63 NA 53 NA NA 51 NA 422 NA <1 29.3 <10 15 NA <1 NA NA NA <1 <0.5 NA 1440 NA <1 S -09A 04/23/2015 6.5 17 5443 7.02 -51 NM 21.3 41 76 458 <1 <1 1.14 3.16 46 48 <1 <1 41 332 327 <1 <1 23.9 <10 13 <1 <1 1.73 2.04 <1 <1 NA 1950 4600 <1 <1 S -09A 09/30/2015 6.8 25 638 5.5 -26 180 13.8 83 11 52 <1 <1 1.13 1.4 89 89 <1 <1 83 1490 1470 <1 <1 83.5 <10 30 <1 <1 1.4 1.44 <1 <1 NA 811 1490 <1 <1 5-10 04/23/2015 6.9 27 20489 0.97 -111 NM OOR 350 <5 66000 <1 <1 6.63 230 170 1950 <1 <10 350 2630 2990 <1 1.27 270 <10 43 <1 67.4 <1 32.1 <1 166 NA 24 1610000 <1 161 5-10 09/30/2015 7.3 27 963 0.3 -223 -18 '1000 370 9 407 <1 <1 I6i. 1910 143 228 <1 <1 370 2400 2360 <1 <1 141 <10 39 <1 <1 <1 <1 <1 <1 NA 5400 56200 <1 <1 5-10 11/17/2015 6.9 17 887 1.7 -25 180 120 330 NA 520 NA <1 NA 82.2 NA 189 NA NA 330 NA 2480 NA <1 110 <10 46 NA <1 NA NA NA 1.99 0.16 NA 15100 NA <1 5-11 08/19/2015 6.6 35 792 1.1 -90 115 173 NA NA 2810 NA <10 NA 236 NA 251 NA NA NA NA 1930 NA <10 NA NA 53 NA <10 NA NA NA <10 0.16 NA 56400 NA <10 5-11 11/17/2015 6.3 21 682 3.4 3 208 20.4 180 NA 2070 NA <1 NA 118 NA 162 NA NA 180 NA 1090 NA <1 47 <10 52 NA 2.01 NA NA NA 2.43 <0.1 NA 72500 NA 1.15 5-12 08/19/2015 7.4 35 611 1.5 -53 152 119 NA NA 2710 NA <10 NA 149 NA 270 NA NA NA NA 2300 NA <10 NA NA 41 NA <10 NA NA NA <10 0.29 NA 36900 NA <10 5-12 11/17/2015 5.6 19 249 6.78 173 378 51.9 56 NA 45 NA <1 NA <1 NA 78 NA NA 56 NA 532 NA <1 17.1 <10 23 NA <1 NA NA NA <1 <0.1 NA 1160 NA <1 5-13 08/19/2015 7,6 36 715 3.2 60 265 128 NA NA 7700 NA <10 NA 130 NA 240 NA NA NA NA 2900 NA <10 NA NA 48 NA <10 NA NA NA <10 0.28 NA 31600 NA <10 5-13 11/17/2015 4.2 18 429 21.2 132 337 92 68 NA 720000 NA <10 NA 151 NA 2080 NA NA 68 NA <10000 NA <10 151 <10 34 NA 306 NA NA NA 323 0.12 NA 3030000 NA 328 5-14 08/19/2015 6.7 28 685 2.7 -47 158 28.7 NA NA 75 NA <1 NA <1 NA 118 NA NA NA NA 3090 NA <1 NA NA 39 NA <1 NA NA NA <1 <0.1 NA 21900 NA <1 5-14 11/17/2015 6.6 17 624 1 17 222 40 150 NA 87 NA <1 NA <1 NA 99 NA NA 150 NA 2370 NA <1 51.9 <10 32 NA <1 NA NA NA <1 0.12 NA 35000 NA <1 S -14A 11/17/2015 6.8 19 631 3.6 81 286 10.4 170 NA 114 NA <1 NA 82.5 NA 168 NA NA 160 NA 1280 NA <1 56.3 <10 20 NA <1 NA NA NA 4.04 0.65 NA 7040 NA <1 5-16 j 08/19/2015 7.7 22 620 7.2 12 217 9.25 NA NA 154 NA <1 NA 1 n92 NA NA NA NA 1250 NA <1 NA NA 28 NA <1 NA NA NA <1 <0A NA 867 NA <1 5-16 11/17/2015 7.2 15 386 9.8 211 416 8.86 52 NA 287 NA <1 NA 1.92 NA 58 NA NA 52 NA 649 NA <1 40.5 <10 19 NA <1 NA NA NA <1 <0.5 NA 2400 NA <1 SURFACE WATER 5-05 04/23/2015 6.8 16 1357 5.9 -34 NM 1.47 220 <5 13 <1 <1 4.08 14.5 91 93 <1 <1 220 1910 1900 <1 <1 90.7 <10 32 <1 <1 <1 <1 <1 <1 NA 182 975 <1 <1 5-05 11/17/2015 3.3 14 1027 2.76 500 705 1.9 <10 NA 1860 NA <1 NA 4.96 NA 66 NA NA <10 NA 2150 NA <1 80.2 <10 41 NA <1 NA NA NA 4.18 <1 NA 3780 NA <1 5-06 08/19/2015 6.2 29 149 1.23 18 223 NA NA 15400 NA <10 NA 12.2 NA 81 NA NA NA NA <50 NA <10 NA NA 9.7 NA <10 NA NA NA 10.9 <0.1 NA 28900 NA <10 5-06 11/17/2015 5.8 18 97 6.6 462 667 41.5 <10 NA 4250 NA <1 NA 11 NA 60 NA NA <10 NA <50 NA <1 3.13 <10 6.3 NA 1.9 NA NA NA 1.74 <0.1 NA 46800 NA 1.4 5-07 04/23/2015 6.3 18 962 7.5 48 NM 3.02 <10 27 61 <1 <1 <1 <1 46 47 <1 <1 <10 <50 <50 <1 <1 2.22 <10 3.6 <1 <1 <1 <1 <1 <1 NA 194 617 <1 <1 5-07 DUP 04/23/2015 6.3 18 962 7.5 48 NM 3.02 <10 25 63 <1 <1 <1 1.12 46 47 <1 <1 <10 <50 <50 <1 <1 2.26 <10 3.7 <1 <1 <1 <1 <1 <1 NA 167 620 <1 <1 5-07 09/30/2015 7.0 24 472 3.6 -17 188 8.67 <10 17 38 <1 <1 <1 <1 31 32 <1 <1 <10 <50 <50 <1 <1 1.65 <10 4.5 <1 <1 <1 <1 <1 <1 NA 251 665 <1 <1 5-07 DUP 09/30/2015 7.0 24 472 3.6 -17 188 8.67 <10 17 66 <1 <1 <1 1.22 30 35 <1 <1 <10 <50 <50 <1 <1 1.62 <10 4.5 <1 <1 <1 <1 <1 <1 NA 259 810 <1 <1 5-07 11/18/2015 6.8 17 43 8.24 265 470 2.21 <10 NA 40 NA <1 NA <1 NA 33 NA NA <10 NA <50 NA <1 1.88 <10 4.2 NA <1 NA NA NA <1 <0.1 NA 391 NA <1 5-07 DUP 11/18/2015 6.8 17 43 8.24 265 470 2.21 <10 NA 39 NA <1 NA <1 NA 33 NA NA <10 NA <50 NA <1 1.89 <10 4.2 NA <1 NA NA NA <1 <0.1 NA 369 NA <1 S-08 11/18/2015 7.2 17 47 6.7 293 498 3.04 <10 NA 73 NA <1 NA <1 NA 20 NA NA <10 NA <50 NA <1 1.84 <10 2.5 NA <1 NA NA NA <1 <0.1 NA 310 NA <1 5-15 04/23/2015 7.2 18 1342 2.7 -180 NM 38.4 240 <5 113 <1 <1 2.05 5.31 121 123 <1 <1 240 1680 1650 <1 <1 87.9 <10 28 <1 <1 <1 <1 <1 <1 NA 113 1270 <1 <1 5-15 09/30/2015 7.4 28 629 3.4 -106 99 32.4 270 7 178 <1 <1 10.2 13.5 182 185 <1 <1 270 2240 2200 <1 <1 61.7 <10 37 <1 <1 <1 <1 <1 <1 NA 39 996 <1 <1 5-15 11/17/2015 7,4 15 684 9.4 125 230 10.7 240 NA 141 NA <1 NA 6.13 NA 149 NA NA 240 NA 1600 NA <1 88.1 <10 31 NA <1 NA NA NA <1 0.27 NA 830 NA <1 5-18 11/17/2015 6.2 12 69 7 348 553 NM <10 NA 375 NA <1 NA <1 NA 22 NA NA <10 NA <50 NA <1 2.55 <10 11 NA <1 NA NA NA <1 <0.1 NA 558 NA <1 5-20 04/22/2015 5.7 18 943 1.01 17 NM 3.6 31 186 252 <1 <1 <1 <1 41 43 <1 <1 21 <50 <50 <1 <1 10.6 <10 15 <1 <1 <1 <1 <1 <1 NA 1300 1640 <1 <1 5-20 09/30/2015 6.0 23 148 0.6 23 228 12.3 46 116 156 <1 <1 <1 <1 61 64 <1 <1 45 <10 <50 <1 <1 15.9 <10 21 <1 <1 <1 <1 <1 <1 NA 768 2240 <1 <1 SW -01 04/22/2015 6.0 19 31 2.36 27 NM 4.92 25 146 193 <1 <1 1.5 1.9 48 42 <1 <1 25 54 <50 <1 <1 10.9 <10 15 <1 <1 <1 <1 <1 <1 NA 828 1050 <1 <1 SW -01 09/30/2015 6.5 24 213 0.5 -74 131 249 40 95 286 <1 <5 2.26 <5 59 64 <1 <5 40 58 60 <1 <5 14.5 <10 23 <1 <5 <1 <5 <1 <5 NA 1790 3350 <1 <5 SW -02 04/22/2015 5.1 17 882 3.6 72 NM 27.1 25 475 598 <1 <1 <1 1.02 42 43 <1 <1 25 <50 <50 <1 <1 15.5 <10 14 <1 <1 <1 <1 <1 <1 NA 749 1140 <1 1.36 Prepared by: BER Checked by: RLP Notes: - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Human Health (consumption of organisms), April 2015. 0 - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Ecological, April 2015. 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013. Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cord = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. MV = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-4 2015 Surface Water and Seep Analytical Results Page 1 of 2 TABLE 2-4 2015 SURFACE WATER AND SEEP ANALYTICAL RESULTS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared by: BER Checked by: RLP Notes: - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Human Health (consumption of organisms), April 2015. 0 - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Ecological, April 2015. 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013. Temp = Temperature Analytical Parameter Magnesium TOT Manganese DIS Manganese TOT Mercury TOT Methane Molybdenum Molybdenum Nickel Nickel TOT Nitrate (as N) Potassium TOT Selenium Selenium Sodium TOT Strontium DIS Strontium TOT Sulfate Sulfide Thallium DIS Thallium TOT Total Dissolved Solids Total Organic Carbon Total Suspended Solids Vanadium DIS Vanadium TOT Zinc DIS Zinc DIS TOT DIS DIS TOT TOT Reporting Units mg/l ug/I ug/I ug/1 ug/I ug/I ug/I ug/I ug/I mg-N/L mg/I ug/I ug/I mg/I ug/I ug/I mg/I mg/I ug/1 ug/I mg/I mg/I m9/1 ug/l ug/I ug/1 ug/1 15A NCAC 02B EPA Human Health NE NE 100 NE NE 2000 2000 NE 4600 NE NE NE 4200 NE NE 40000 NE NE NE 0.47 NE NE NE NE NE NE 26000 15A NCAC 02B EPA Ecological NE NE NE 0.012 NE NE NE 16 NE NE NE NE 5 NE NE NE NE NE NE NE NE NE NE NE NE 36 NE 15A NCA:02L Standard NE NE 50 1 NE NE NE NE 100 10 NE NE 20 NE NE NE 250 NE NE 0.2- 500 NE NE NE 0.3 * NE 1000 Sample ID Sample Collection Date Analytical Results ASH PORE WATER S-01 04/23/2015 1.99 49 57 0.0055 49 <1 <1 1.25 1.45 0.036 1.82 <1 11 7.66 171 177 9.6 <0.1 <0.2 <0.2 91 8.7 28 0.378 1.58 9 7 S-01 09/30/2015 8.93 116 189 0.00173 86 2.34 <10 1.7 <10 0.029 9.38 <1 <10 16.7 1140 1170 30 <0.1 <0.2 <2 300 10 36 0.607 8.1 5 57 S-01 11/17/2015 2.37 NA 130 0.00196 NA NA <1 NA 2.15 0.052 2.45 NA <1 9.56 NA NA 20 NA NA <0.2 68 NA 200 NA NA NA 36 S-02 04/23/2015 9.77 269 280 <0.005 47 4.69 6.25 <1 <1 0.012 8.58 <1 <1 18.5 2620 2460 100 <0.1 <0.2 <0.2 330 6.2 100 <0.3 0.58 47 138 S-02 11/17/2015 16.9 NA 457 0.000917 NA NA 66.1 NA 19.3 <0.01 12.8 NA 3.01 38.1 NA NA 740 NA NA 0.573 810 NA 120 NA NA NA 67 S-03 04/24/2015 13.3 468 527 <0.0005 11 28.7 28.9 15 17.5 0.232 10.4 <1 <1 34.8 3450 3440 120 <0.1 <0.2 <0.2 430 4.1 6 1.42 1.62 <5 9 S-03 09/30/2015 15.6 1710 2160 0.00377 <10 101 117 22.5 22.3 0.02 15.4 <1 <1 38.7 4650 4720 310 <0.1 <0.2 <0.2 620 9.1 31 0.564 0.941 6 9 S-03 11/17/2015 17 NA 725 0.000827 NA NA 92.2 NA 24.2 0.014 13.8 NA <1 43.6 NA NA 230 NA NA <0.2 610 NA 43 NA NA NA <5 S -03A 04/24/2015 12.2 722 712 <0.0005 48 18.9 20.7 14.6 17.3 0.217 10.4 <1 <1 32.5 3100 3160 120 <0.1 <0.2 <0.2 420 4 <5 1.6 1.92 89 40 S -03A 09/30/2015 16 1350 1500 0.00131 27 162 158 22.8 22.3 0.021 15.4 <1 <1 39.4 4540 4640 190 <0.1 <0.2 <0.2 590 9.4 49 0.73 1.19 <5 <5 S -03B 04/24/2015 14.2 351 401 <0.0005 25 41.2 64 15.4 16.3 0.24 11.3 <1 <1 38.5 3570 3750 120 <0.1 <0.2 <0.2 440 4 <5 1.11 1.85 <5 <5 S-09 06/19/2015 NA NA 405 <0.002 NA NA <1 NA 3.79 0.019 M2 NA NA <1 NA NA NA 120 NA NA <0.2 320 NA <50 NA NA NA 12 S-09 11/17/2015 5.1 NA 60 0.000674 NA NA 1.69 NA 1.8 0.344 5.19 NA <1 13.8 NA NA 53 NA NA <0.2 140 NA <5 NA NA NA 9 S -09A 04/23/2015 4.42 174 177 0.00287 14 3.3 3.72 3.27 3.77 0.066 4.04 <1 <1 12 659 651 50 <0.1 <0.2 <0.2 170 7.3 13 <0.3 1.43 12 11 S -09A 09/30/2015 11.7 139 138 0.000787 <10 11.3 10.8 10.4 9.64 0.108 12.5 <1 <1 35.7 2580 2560 240 <0.1 <0.2 0.369 500 4.6 <5 1.04 0.999 6 <5 S-10 04/23/2015 21.2 254 2600 <0.005 120 21.8 33.7 9.28 71.6 0.01 20.7 <1 4.57 43.6 5430 10800 130 <0.1 <0.2 2.82 550 24 17000 <0.3 43.5 <5 411 S-10 09/30/2015 15.9 349 426 0.00248 100 65.9 73.6 10.2 9.67 <0.01 20.5 <1 <1 39.9 5630 5710 110 <0.1 <0.2 <0.2 730 9.7 520 <0.3 0.953 <5 <5 S-10 11/17/2015 16.8 NA 327 0.00619 NA NA 30.7 NA 11.8 <0.01 16.9 NA <1 41.1 NA NA 90 NA NA <0.2 530 NA 150 NA NA NA <5 S-11 06/19/2015 NA NA 327 0.00466 NA NA <10 NA <10 0.016 NA NA <10 NA NA NA 0.29 NA NA <2 370 NA 190 NA NA NA 10 S-11 11/17/2015 6 NA 258 0.00204 NA NA <1 NA 1.29 0.014 3.76 NA <1 42.5 NA NA 3.4 NA NA <0.2 260 NA 110 NA NA NA 5 S-12 08/19/2015 NA NA 224 0.00151 NA NA <10 NA <10 0.055 NA NA <10 NA NA NA 4 NA NA <2 400 NA 230 NA NA NA 8 S-12 11/17/2015 5.31 NA 75 0.00124 NA NA <1 NA <1 1.5 3.35 NA <1 21.6 NA NA 15 NA NA <0.2 110 NA 9 NA NA NA <5 S-13 06/19/2015 NA NA 103 0.00449 NA NA <10 NA <10 0.02 NA NA <10 NA NA NA 24 NA NA <2 410 NA 130 NA NA NA 11 S-13 11/17/2015 41.6 NA 3480 0.00922 NA NA <10 NA 117 1.9 23.1 NA <10 42.3 NA NA 63 1 NA NA 2.28 260 NA 11000 NA NA NA <1000 S-14 08/19/2015 NA NA 252 <0.0005 NA NA <1 NA 2 0.029 NA NA <1 NA NA NA 71 NA NA 0.524 360 NA <125 NA NA NA <5 S-14 11/17/2015 7.54 NA 217 <0.0005 NA NA <1 NA 1.71 0.01 6.44 NA <1 45 NA NA 73 NA NA 0.279 320 NA 73 NA NA NA <5 S -14A 11/17/2015 7.3NA 020 0.000731 NA NA 19.7 25.3 0.023 13.6 NA 1.05 48.9 NA NA 110 NA NA 0.602 350 NA <5 NA NA NA 23 16 08/19/2015 NA N� 89 0.00158 NA NA.7NA 2.7 NA 7.41 0.083 NA NA <1 NA NA NA 200 NA NA 0.323 400 NA 9 NA NA NA <5 S-16 11/17/2015 6.64 NA 112 0.00076 NA NA 8.04 NA 5.51 0.077 6.74 NA <1 19.8 NA NA 110 NA NA <0.2 230 NA 6 NA NA NA 11 SURFACE WATER S-05 04/23/2015 13.9 32 44 <0.0005 <10 50.5 52.1 12.7 14.2 0.194 11 <1 <1 43.1 3580 3620 120 <0.1 <0.2 <0.2 450 4.1 <5 <0.3 0.618 <5 <5 S-05 11/17/2015 15.3 NA 1430 0.00134 NA NA <1 NA 18.7 0.022 14.9 NA <1 55.6 NA NA 430 NA NA 0.267 580 NA <5 NA NA NA 14 S-06 06/19/2015 NA NA 47 0.00192 NA NA <10 NA 15.2 0.027 NA NA <10 NA NA NA 11 NA NA <2 <125 NA 360 NA NA NA 94 S-06 11/17/2015 1.64 NA 71 0.00412 NA NA <1 NA 7.41 <0.01 6.41 NA <1 4.85 NA NA 25 NA NA <0.2 72 NA 72 NA NA NA 26 S-07 04/23/2015 1.04 34 35 0.00166 12 <1 <1 <1 <1 0.069 2.42 <1 <1 2.02 40 40 5.1 <0.1 <0.2 <0.2 33 2.7 13 <0.3 <0.3 24 6 S-07 DUP 04/23/2015 1.04 34 35 0.00167 14 <1 <1 <1 <1 0.177 2.41 <1 <1 2.33 40 39 5.1 <0.1 <0.2 <0.2 34 2.7 9 <0.3 0.312 13 25 S-07 09/30/2015 1 0.703 8 9 1 <0.0005 <10 I <1 <1 <1 <1 0.058 3.18 <1 <1 1 2.38 28 1 28 2 1 <0.1 <0.2 1 <0.2 39 2.8 1 6 <0.3 1 <0.3 <5 <5 S-07 DUP 09/30/2015 0.699 10 12 6.37E-04 12 <1 <1 <1 <1 0.05 M2 3.14 <1 <1 2.29 28 29 2 <0.2 <0.2 <0.2 34 3.1 <5 <0.3 <0.3 <5 <5 S-07 11/16/2015 0.933 NA 12 0.000764 NA NA <1 NA <1 0.069 2.61 NA <1 2.25 B2 NA NA 7 NA NA <0.2 <25 NA <5 NA NA NA <5 S-07 DUP 11/18/2015 0.945 NA 11 0.000878 NA NA <1 NA <1 0.072 2.62 NA <1 2.28 B2 NA NA 7 NA NA <0.2 <25 NA <5 NA NA NA <5 S-08 11/18/2015 0.361 NA 8 0.00104 NA NA <1 NA <1 0.039 0.496 NA <1 1.28 B2 NA NA 2.7 NA NA <0.2 <25 NA <5 NA NA NA <5 S-15 04/23/2015 11.7 76 78 0.00304 12 6.24 6.16 5.47 5.75 0.023 6.39 <1 <1 39 3170 3140 64 <0.1 <0.2 <0.2 410 4.3 26 <0.3 0.692 <5 <5 S-15 09/30/2015 13.2 22 32 0.000871 18 7.46 6.59 6.74 6.27 0.03 16.9 <1 <1 44.3 3300 3290 12 <0.1 <0.2 <0.2 390 6.9 14 0.568 1.11 7 <5 S-15 11/17/2015 11.8 NA 60 0.000523 NA NA 5.56 NA 5.87 0.063 12 NA <1 38.2 NA NA 74 NA NA <0.2 420 NA 10 NA NA NA 6 S-18 11/17/2015 1.16 NA 23 0.00282 NA NA <1 NA <1 0.04 M2 2.21 NA <1 6.6 NA NA 4.5 NA NA <0.2 53 NA <5 NA NA NA 14 S-20 04/22/2015 3.49 74 77 0.00138 300 <1 <1 <1 <1 0.016 5.19 <1 <1 5.4 48 49 5.6 <0.1 <0.2 <0.2 100 19 <5 0.529 0.592 <5 6 S-20 09/30/2015 4.89 89 91 <0.0005 1000 <1 <1 <1 <1 0.026 8.04 <1 <1 6.39 72 72 1.4 <0.2 <0.2 <0.2 320 23 12 <0.3 0.505 7 <5 SW -01 04/22/2015 3.54 66 69 0.00111 32 <1 <1 <1 <1 <0.01 5.04 <1 <1 5.96 105 85 5.8 <0.1 <0.2 <0.2 110 19 6 0.352 0.819 132 <5 ST -21109/30/2015 4.66 128 129 0.000944 310 <1 <5 <1 <5 0.015 6.88 <1 <5 7.33 107 107 2.8 <0.2 <0.2 <1 300 24 26 0.362 <1.5 6 75 SW -02 1 04/22/2015 1.78 38 59 0.00575 19 <1 I <1 <1 <1 0.013 1.23 <1 <1 6.63 102 102 7.1 <0.1 <0.2 <0.2 130 23 17 0.863 1.43 8 8 Prepared by: BER Checked by: RLP Notes: - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Human Health (consumption of organisms), April 2015. 0 - Bold highlighted concentration indicates exceedance of the EPA National Recommended Water Quality Criteria, Ecological, April 2015. 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 2013. Temp = Temperature S.U. = Standard Unit DO = Dissolved Oxygen Deg C = Degree Celsius ug/I = microgram per liter Spec Cord = Specific Conductance mg/I = milligrams per liter umhos/cm = micro mhos per centimeter < = concentration not detected at or above the reporting limit. MV = millivolts ORP = Oxidative Reduction Potential DUP = Duplicate NE = Not established NTU = nephelometric turbidity unit NA = Not Analyzed DIS = Dissolved TOT = Total mg-N/L = milligram nitrogen per liter * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2-4 2015 Surface Water and Seep Analytical Results Page 2 of 2 TABLE 6-1 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - EFFECTIVENESS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared By: MT Checked By: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 Alternative 1 Alternative 2 Alternative 3 Alternative 4 Effectiveness Monitored Natural phytoremediation Groundwater Groundwater Attenuation (MNA) Interceptor Trench Recovery Wells Will remedial alternative be protective Yes Yes Yes Yes of human health? When will remedial alternative be Current conditions Current conditions Current conditions Current conditions protective of human health? are protective are protective are protective are protective When will remedial alternative be Current conditions Current conditions Current conditions Current conditions protective of the environment? are protective are protective are protective are protective Has the potential remedial alternative been demonstrated effective at any Yes Yes Yes Yes similar sites? Will remedial alternative permanently remove contaminant from site? Yes Yes Yes Yes Will remedial alternative reduce the toxicity of contaminants? No No Yes Yes Yes - source control Yes - source control Yes - source control Yes - source control Will remedial alternative reduce the measures to alter measures to alter measures to alter measures to alter mobility of contaminants? site hydrology will site hydrology will site hydrology will site hydrology and reduce mobility reduce mobility reduce mobility extraction wells will reduce mobility Can the effectiveness of a potential remedial alternative be monitored, Yes Yes Yes Yes measured, and validated? Prepared By: MT Checked By: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 TABLE 6-2 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - IMPLEMENTABILITY W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 Alternative 1 Alternative 2 Alternative 3 Alternative 4 Feasibility Monitored Natural Phytoremediation Groundwater Groundwater Attenuation (MNA) Interceptor Trench Recovery Wells Are the material resources and manpower readily available to fully implement the remedial alternative in a Yes Yes Yes Yes timely manner? Does the remedial alternative require highly specialized resources and/or No No No No equipment? Is there sufficient onsite and offsite area to fully implement the remedy? Yes Yes Yes Yes Will waste materials be managed Yes Yes Yes Yes efficiently? Does the remedial alternative require any permits and can the permits be No Yes Yes Yes acquired in a timely manner? Can the remedial alternative be implemented safely? Yes Yes Yes Yes Can existing infrastructure support remedial alternative? Yes Yes Yes Yes Can the remedial alternative achieve all applicable or reasonable and Yes Yes Yes Yes appropriate requirements (ARARs)? Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 TABLE 6-3 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - ENVIRONMENTAL SUSTAINABILITY W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 Alternative 1 Alternative 2 Alternative 3 Alternative 4 Environmental Sustainability Monitored Natural Phytoremediation Groundwater Groundwater Attenuation MNA Interceptor Trench Recovery Wells No -Will sequester No - Transfer to No -Transfer to Will treatment permanently destroy No COCs tree root, stem, reactive media biomass and NPDES target constituents? and leaf tissue biomass or NPDES outfall outfall Will treatment permanently reduce Yes Yes Yes Yes target constituent toxicity? Will treatment reduce the mobility No Yes Yes Yes of target constituents? Will treatment transfer target constituents from one media to No Yes Yes Yes another? Minimal Will sequester carbon in Steel manufacturing, Rank alternatives: carbon footprint (sampling required tree root, stem and leaf construction Energy for pumps for monitoring) tissues equipment Minimal Leaf litter Moderate Moderate Rank alternatives: waste generated (monitoring sample (if collection necessary) (monitoring waste, (monitoring waste, collection waste wastewater) wastewater Use existing Composted leaves for List opportunities for recycling or monitoring wells and cattle feed Use extracted water Use extracted water beneficial reuse required CCR Rule Harvest trees for pulp for irrigation during for irrigation during monitoring wells wood with natural growing season growing season regeneration List opportunities where renewable Passive solar energy sources of energy will be used. None No external energy None None inputs required List opportunities for habitat None beyond site High habitat creation, None beyond site None beyond site restoration, enhancement, or stabilization restoration, and stabilization stabilization replacement. enhancement value Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 TABLE 6-4 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - ESTIMATED COST W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Estimated Groundwater Remediation Alternative 1 Alternative 2 Alternative 3 Alternative 4 Cost Monitored Natural Phytoremediation Groundwater Groundwater Attenuation (MNA) Interceptor Trench Recovery Wells Capital Cost $156,400 $1,423,400 $6,397,100 $1,044,400 30 -year Monitoring, Operation, and $ 2,992,200 $5,302,400 $4 663,000 $5,186,300 Maintenance Cost , Total Cost $3,148,600 $6,725,800 $11,060,100 $6,230,700 Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 TABLE 6-5 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - STAKEHOLDER ACCEPTANCE W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Stakeholder Acceptance Alternative 1 Monitored Natural Attenuation (MNA) Alternative 2 Phytoremediation Alternative 3 Groundwater Interceptor Trench Alternative 4 Groundwater Recovery Wells Good High Moderately High Robust USEPA Aesthetic value Moderate Proactive approach Public acceptance regulatory evaluation habitat creation and Long time frame but generates and technical educational benefits wastewater justification provided discharge Good Moderately High Strong technical High Moderate Proactive approach Regulatory acceptance basis (USEPA MNA Successfully applied Challenges with but generates demonstration and at similar sites implementation wastewater risk assessment) discharge Prepared by: MT Checked by: KWW P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Completed Tables 6-1 to 6-5.docx Page 1 of 1 TABLE 6-6 REMEDIAL ALTERNATIVE EVALUATION SUMMARY W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared By: KDB Checked By: MT Assumptions: 1. Source control measures are implemented to accomplish groundwater restoration 2. Costs for groundwater remedy include implementation and 30 years monitoring and maintenance P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-6 Remedial Alternative Evaluation Summary Ri.docx Page 1 of 1 Estimated Alternatives Effectiveness Implementability Environmental Groundwater Stakeholder / Feasibility Sustainability Remediation Acceptance Cost Monitored Yes, groundwater High Sound Natural Yes monitoring wells (lowest carbon $3,100,000 technical Attenuation are common footprint) basis for (MNA) approach Phytoremediation Yes Yes, if ash High $6,700,000 Predicted to removedbe positive Moderate Limited due Groundwater (energy costs to trench Interceptor Limited Limited to manufacture $11,100,000 performance Trench steel and install and long trench) time frame Groundwater Moderate Positive due Recovery Wells Yes Yes (energy costs $6,200,000 to proactive for pumps) nature Prepared By: KDB Checked By: MT Assumptions: 1. Source control measures are implemented to accomplish groundwater restoration 2. Costs for groundwater remedy include implementation and 30 years monitoring and maintenance P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-6 Remedial Alternative Evaluation Summary Ri.docx Page 1 of 1 TABLE 6-7 INPUT PARAMETERS AND VALUES FOR CONVECTIVE -DISPERSIVE FLOW EQUATION BASED UPON WEATHERSPOON DATA W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Parameter Nomenclature Value Source of Value Began Sluicing Ash - 1949 CSA Ceased Sluicing - 2011 CSA Duration of Source Term t° 63 years Calculated Source Concentration 2725 boron; Mean values from CAP Part 1, (Ng/L) c0 686 arsenic Table 1-1 Background cl 87 boron; CAP Part 1, Table 2-9 Concentration (Ng/L) 10 arsenic Hydraulic Conductivity k 520 Geomean of surficial k (ft/yr) CAP Part 1, Table 3-2 Hydraulic Gradient i 0.009 Average of gradients unaffected by basin mound CAP Part 1, Table 3-3 Effective Porosity ne 0.378 CSA Seepage Velocity (ft/yr) vs=ki/ne 12 Calculated Dispersivity (ft) a 20 1/100- 2000 Dispersion (ft2/yr) D = ovs 244 Calculated Distribution Coefficient Kd 1, 2, 4 for boron; Falta et al. (2015) used 4; 1 and 2 (ml/g) 45 for arsenic were added for comparison only Time from Introduction of t Varies To capture the length of plume Constituent (yrs) Distance from Ash Basin Boundary to Cooling Pond x 400 Measured (feet) Calculated Concentration c(x,t) As shown Calculated (Ng/L) Prepared By: KDB Checked By: DGN P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-7 Input Parameters and values for Convective -Dispersive Flow Equation.docx Page 1 of 1 TABLE 6-8 REMEDIAL ALTERNATIVE COST SUMMARY - MNA W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Monitored Natural Attenuation - 23 Wells Sampled Item Quantity Unit Unit Cost I Total Cost Source Basis for Cost Direct Capital Costs Pre -design Field Assessment 1 LS $50,000 $50,000 Similar project Ash Basin closure in place (Cost not included) Mobilization / Demobilization 1 LS $5,000 $5,000 Similar project 10 day work week Upgrade Roads/ Accessibility 1 LS $10,000.00 $10,000 Similar project Equipment Decontamination 4 EA $570.00 $2,300 Similar project Drilling and Materials (4 wells, 290' total well depth) 290 LF $84.00 $24,400 Similar project Installation of 4 replacement wells (MW -08R, MW-08IRI, MW- 44SAR, and MW-44IR) Drilling and Materials (6" outer surface casing for double -cased wells) 125 LF 1 $125.00 $15,700 Similar project Install MW -08I and MW -44I with double casing Well Development 32 HR 1 $120.00 $3,900 Similar project 8 hours development per well Installation Oversight (Geologist) 6 Day 1 $2,000.001$12,000 Similar project Indirect Capital Costs Health & Safety 5% % DCC $3,700 Similar project Bonds & Insurance 5% % DCC $3,700 Similar project Contingency 20% % DCC $14,700 Similar project Construction Management & Engineering Services 15% % DCC $11,000 Similar project Groundwater Sampling and Reporting - Years 1 - 5 Semi-annual Well Sampling - Labor and Supplies 3 Each $34,800.00 $104,400 Similar project 2 people, 5 days, 4 nights, equipment (23 wells, apprx. 5 wells per day) Semi-annual Well Sampling - Laboratory Analysis 3 Each $9,050.00 $27,150 Similar project 23 groundwater samples Validation and Report Preparation 3 Each $12,000.00 $36,000 Similar project Semi-annual report preparation Present Worth $740,600 Similar project n=5 yrs, i=4.25%, PWF=4.42 Groundwater Sampling and Reporting - Years 6 - 30 Annual Well Sampling - Labor and Supplies 2 Each $34,800.00 $69,600 Similar project 2 people, 5 days, 4 nights, equipment (23 wells, apprx. 5 wells per day) Annual Well Sampling - Laboratory Analysis 2 Each $9,050.00 $18,100 Similar project 23 groundwater samples Validation and Report Preparation 2 Each $20,000 $40,000 Similar project Annual report preparation Present Worth $1,943,600 Similar project n=5 -30, i=4.25%, PWF=15.22 Remedy Review 1 6 1 EA 1 $100,000 $600,000 Similar project Completed every five years Present Worth $308,000 Similar project n=5, 10, 15, 20, 25, 30, i=4.25%, PWF=3.08 Total Direct Capital Costs $123,300 Total Indirect Capital Costs $33,100 Total 30 Year O&M Costs (Present Worth) $2,992,200 TOTAL COST $3,148,600 Prepared by: TCP Checked by: RLP Notes: LS = Lump Sum, EA = Each, LF = Linear Foot, HR = Hour, Mo = Month, YR = Year, O&M = Operation and Maintenance, DCC = Direct Capital Cost, PWF = Present Worth Factor , n = Time, I = Interest rate (Provided by Duke Progress, LLC) Present Worth was calcualted using the Uniform Series Present Worth Factor at: http://www.ajdesigner.com/phpdiscountfactors/uniform_series_Present_worth_equation.php P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 1 of 1 TABLE 6-9 REMEDIAL ALTERNATIVE COST SUMMARY - PHYTOREMEDIATION W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Phytoremediation - 55 Acre Phytoplot Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Direct Capital Costs Preliminary Site Evaluation 1 LS $35,000 $35,000 ELM Quote Ash excavated and removed (Cost not included) Planting Plan Preparation 1 LS $12,000 $12,000 ELM Quote Engineering Design Plans and Specifications 1 LS $87,000.00 $87,000 ELM Quote Bid Documents and Bidding 1 LS $12,000.00 $12,000 ELM Quote Construction 55 AC $18,000.00 $990,000 ELM Quote Includes site preparation, planting stock, hydroseeding, tree installation, soil ammendments, etc. Installation Oversight (Geologist) 28 Day $2,000.00 $56,000 Similar project Indirect Capital Costs Health & Safety 5% % DCC $57,850.00 Similar project Bonds & Insurance 5% % DCC $57,850.00 Similar project Contingency 10% % DCC $115,700 ELM Quote Operation and Maintenance Operation and Maintenance Costs 55 AC $2,000.00 $110,000 ELM Quote Tree thinning, weeding, replanting, leaf collection, pesticide application, mowing Present Worth $1,845,800 Similar project n=30 yrs, i=4.25%, PWF=16.78 Remedy Review 1 6 EA 1 $100,000 $600,000 Similar project Completed every five years Present Worth $308,000 Similar project n=5, 10, 15, 20, 25, 30, i=4.25%, PWF=3.08 Total Direct Capital Costs $1,192,000 Total Indirect Capital Costs $231,400 Total 30 Year O&M Costs (Present Worth) $2,153,800 Effectiveness Monitoring 30 Years (Table 6-7) $3,148,600 TOTAL COST $6,725,80011 Prepared by: TCP Checked by: RLP Notes: LS = Lump Sum, AC = Acre, O&M = Operation and Maintenance, DCC = Direct Captial Cost, PWF = Present Worth Factor , n = Time, I = Interest rate (Provided by Duke Progress, LLC) Present Worth was calcualted using the Uniform Series Present Worth Factor at: http://www.ajdesigner.com/phpdiscountfactors/uniform_series_present_worth_equation.php P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 1 of 1 TABLE 6-10 REMEDIAL ALTERNATIVE COST SUMMARY - INTERCEPTOR TRENCH W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Interceptor Trench Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Direct Capital Costs Extraction System Pre -design Field Assessment 1 LS $75,000 $75,000 Similar project Ash Basin closure in place (Cost not included) Mobilization / Demobilization 2 LS $5,000 $10,000 Similar project 10 day work week Upgrade Roads/ Accessibility 1 LS $20,000.00 $20,000 Similar project Concrete 12,000 Cy $43.96 $527,520 RS Means 3/4" to 1-1/2" Pump 1 EA $1,050.00 $1,050 RS Means propylene body, housing and impeller, 22 GPM, 1/3 HP, 40' head Underground Electric 4,000 LF $10.00 $40,000 Similar project Trench Excavation 12,000 CY $3.61 $43,400 RS Means bulk, dragline, excavate and load on truck Sheet Piling 120,000 SF $24.85 $2,982,000 RS Means 38 psf, 25' excavation, extract and salvage, excludes wales Public Sanitary Utility Sewerage Piping 100 LF $2.30 $300 RS Means HDPE Corrugated Type S, 4" diameter Geotextile Subsurface Drainage 7,500 Sy $1.95 $14,700 RS Means filtration fabric laid in trench, polypropylene Storm Drain Manhole (6' diameter x 4' depth) 1 Ea $2,850.00 $2,850 RS Means precast concrete Storm Drain Manhole (6' diameter x from 4' to 40') 36 VLF $615.01 $22,140 RS Means precast concrete Installation Oversight (Geologist and Equipment) 15 Day $2,000.00 $30,000 Similar project Treatment System - Holding Tank Mobilization / Demobilization 1 LS $10,000.00 $10,000 Similar project Upgrade Roads/ Accessibility 1 LS $10,000.00 $10,000 Similar project Site Prep, Foundation, Electrical, Security 1,600 SF $80.00 $128,000 Similar project 40' x 40' area for site prep Instrumentation and Controls, Equilization Tank, Piping, and Valves 1 LS $40,000.00 $40,000 Similar project Discharge System - Surface Water Obtain NPDES Permit 1 LS $40,000.00 $40,000 Similar project Mobilization / Demobilization 1 LS $10,000.00 $10,000 Similar project Effluent Pipe (Trenching, backfilling, and surface restoration) 1,000 FT $18.00 $18,000 Similar project Transfer Pumps 2 LS $10,000.00 $20,000 Similar project Casing Pipe for Road Crossings 3 EA $3,000.001 $9,0001 Similar project Road and Driveway Restoration 150 Sy $20.00 $3,000 Similar project P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 1 of 2 TABLE 6-10 REMEDIAL ALTERNATIVE COST SUMMARY - INTERCEPTOR TRENCH W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Interceptor Trench Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Indirect Capital Costs Remedial Design 1 LS $150,000 $150,000 Health & Safety 5% % DCC $199,100 Similar project Bonds & Insurance 5% % DCC $199,100 Similar project Contingency 30% % DCC $1,194,600 Similar project Construction Management & Engineering Services 15% 1 % DCC 1 $597,3001 Similar project Annual Operating and Maintenance Operator 12 Mo $4,400.00 $52,800 Similar project 80 hours per month Treatment System Sampling 52 WK $300.00 $15,600 Similar project Analysis Miscellaneous Repairs 1 YR $3,000.00 $3,000 Similar project Present Worth $1,198,100 Similar project n=30 yrs, i=4.25 %, PWF=16.78 New Equipment (Years 10 & 20) Replacement Pump 1 I LS 1 $7,600 $7,600 RS Means Present Worth $8,300 Similar project n=10&20, 1=4.25%, PWF=1.09 Remedy Review 6 EA 1 $100,000 $600,000 Similar project Completed every five years Present Worth $308,000 Similar project n=5, 10, 15, 20, 25, 30, i=4.25%, PWF=3.08 Total Direct Capital Costs $4,057,000 Total Indirect Capital Costs $2,340,100 Total 30 Year O&M Costs (Present Worth) $1,514,400 Effectiveness Monitoring 30 Years (Table 6-7) $3,145,600 TOTAL COST $11,060,100 Prepared by: TCP Checked by: RLP Notes: LS = Lump Sum, EA = Each, FT = Foot, LF = Linear Foot, SF = Square Foot, SY = Square Yard, HR = Hour, WK = Week, Mo = Month, YR = Year, O&M = Operation and Maintenance, DCC = Direct Captial Cost, PWF = Present Worth Factor , n = Time, I = Interest rate (Provided by Duke Progress, LLC) Present Worth was calcualted using the Uniform Series Present Worth Factor at: http://www.ajdesigner.com/phpdiscountfactors/uniform_series_Present_Worth_equation.php P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 2 of 2 TABLE 6-11 REMEDIAL ALTERNATIVE COST SUMMARY - EXTRACTION WELLS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Extraction Well System Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Direct Capital Costs Extraction System Pre -design Field Assessment 1 LS $75,000 $75,000 Similar project Ash Basin closure in place (Cost not included) Mobilization / Demobilization 1 LS $5,000 $5,000 Similar project 10 day work week Upgrade Roads/ Accessibility 1 LS $20,000.00 $20,000 Similar project Effluent Pipe and Underground Electrical (Materials and trenching/backfill 3,500 FT $24.87 $87,100 Similar project Pumps and Well Head Equipment 4 EA $13,170.00 $52,700 Similar project Submersible pump; controller, valves, electrical, etc., installed Equipment Decontamination (Including decontamination pad) 4 LS $710.00 $2,900 Similar project 3 hrs per well Drilling and Materials (4 wells, 10" diameter, 30' depth) 120 LF $174.00 $20,900 Similar project rotary drilling with split spoon samples at 5' intervals Well Development 32 HR $120.00 $3,900 Similar project 8 hours development per well Installation Oversight (Geologist and Equipment) 24 Day $2,000.00 $48,000 Similar project 6 days per well Treatment System - Holding Tank Mobilization / Demobilization 1 LS $10,000.00 $10,000 Similar project Upgrade Roads/ Accessibility 1 LS $10,000.00 $10,000 Similar project Site Prep, Foundation, Electrical, Security 1,600 SF $80.00 $128,000 Similar project 40' x 40' area for site prep Instrumentation and Controls, Equilization Tank, Piping, and Valves 1 LS $40,000.00 $40,000 Similar project Discharge System - Surface Water Obtain NPDES Permit 1 LS $40,000.00 $40,000 Similar project Mobilization / Demobilization 1 LS $10,000.00 $10,000 Similar project Effluent Pipe (Trenching, backfilling, and surface restoration) 1,000 FT $18.00 $18,000 Similar project Transfer Pumps 2 LS $10,000.00 $20,000 Similar project Casing Pipe for Road Crossings 3 EA $3,000.00 $9,0001 Similar project Road and Driveway Restoration 150 Sy $20.00 $3,000 Similar project P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 1 of 2 TABLE 6-11 REMEDIAL ALTERNATIVE COST SUMMARY - EXTRACTION WELLS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Extraction Well System Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Indirect Capital Costs Remedial Design 1 LS $150,000 $150,000 Health & Safety 5% % DCC $26,500.00 Similar project Bonds & Insurance 5% % DCC $26,500.00 Similar project Contingency 30% % DCC $158,600 Similar project Construction Management & Engineering Services 15% 1 % DCC 1 $79,3001 Similar project Annual Operating and Maintenance Operator 12 Mo $4,400.00 $52,800 Similar project 80 hours per month Treatment System Sampling 52 WK $300.00 $15,600 Similar project Analysis Miscellaneous Repairs 1 YR $30,000.00 $30,000 Similar project Present Worth $1,651,200 Similar project n=30 yrs, i=4.25%, PWF=16.78 New Equipment (Years 10 & 20) Extraction Well Pumps 16 LS $750 $12,000 Similar project Well Replacements 1 LS $20,000 $20,000 Similar project Transfer Pumps 4 EA $10,000 $40,000 Similar project Present Worth $78,500 Similar project n=10&20, 1=4.25%, PWF=1.09 Remedy Review 6 EA 1 $100,000 $600,000 Similar project Completed every five years Present Worth $308,000 Similar project n=5, 10, 15, 20, 25, 30, i=4.25%, PWF=3.08 Total Direct Capital Costs $603,500 Total Indirect Capital Costs $440,900 Total 30 Year O&M Costs (Present Worth) $2,037,700 Effectiveness Monitoring 30 Years (Table 6-7) $3,148,600 TOTAL COST $6,230,700 Prepared by: TCP Checked by: RLP Notes: LS = Lump Sum, EA = Each, FT = Foot, LF = Linear Foot, SF = Square Foot, SY = Square Yard, HR = Hour, WK = Week, Mo = Month, YR = Year, O&M = Operation and Maintenance, DCC = Direct Captial Cost, PWF = Present Worth Factor , n = Time, I = Interest rate (provided by Duke Progress, LLC) Present Worth was calcualted using the Uniform Series Present Worth Factor at: http://www.ajdesigner.com/phpdiscountfactors/uniform_series_Present_worth_equation.php P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 2 of 2 TABLE 9-1 PROPOSED GROUNDWATER MONITORING PARAMETERS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC PARAMETER I RL JUNITS IMETHOD FIELD PARAMETERS H NA SU Field Water Quality Meter Specific Conductance NA µS/Cm Field Water Quality Meter Temperature NA oC Field Water Quality Meter Dissolved Oxyqen NA mq/L Field Water Quality Meter Oxidation Reduction Potential NA mV Field Water Quality Meter Turbidity NA NTU Field Water Quality Meter INORGANICS Aluminum 0.005 mq/L EPA 200.7 or 6010C Arsenic 0.001 mq/L EPA 200.8 or 602OA Barium 0.005 mg/L EPA 200.7 or 6010C Boron 0.05 mq/L EPA 200.7 or 6010C Chromium 0.001 mq/L EPA 200.7 or 6010C Cobalt 0.001 mg/L EPA 200.8 or 602OA Iron 0.01 mg/L EPA 200.7 or 6010C Lead 0.001 mq/L EPA 200.8 or 602OA Manqanese 0.005 mq/L EPA 200.7 or 6010C Thallium (low level) 0.0002 mq/L EPA 200.8 or 6020A Vanadium (low level) 0.0003 mq/L EPA 200.8 or 6020A RADIONUCLIDES Radium 226 1 pCi/L EPA 903.1 Modified Radium 228 3 pCi/L EPA 904.0/SW846 9320 Modified Uranium (233, 234, 236, 238) Varies by isotope µg/l_ SW846 3010A/6020A ANIONS/CATIONS Alkalinity (as CaCO3) 20 mg/L SM 2320B Bicarbonate 20 mq/L SM 2320 Calcium 0.01 mq/L EPA 200.7 Carbonate 20 mq/L SM 2320 Chloride 0.1 mq/L EPA 300.0 or 9056A Magnesium 0.005 mg/L EPA 200.7 Potassium 0.1 mq/L EPA 200.7 Sodium 0.05 mq/L EPA 200.7 Sulfate 0.1 mq/L EPA 300.0 or 9056A Total Dissolved Solids 25 mg/L SM 2540C Total Suspended Solids 2 m L SM 2450D Prepared by: RBI Checked by: RLP Notes• 1. Select constituents will be analyzed for total and dissolved concentrations. NA indicates not applicable. P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 9-1 Proposed Groundwater Monitoring Parameters.xlsx Page 1 of 1 TABLE 9-2 PROPOSED MONITORING WELL LOCATIONS W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Monitoring Well ID Geologic Unit Monitored BW -02S Surficial BW -02I Lower Yorktown BW -03S Surficial BW -03I Lower Yorktown BW -03D Pee Dee AW -03S Surficial AW -03I Lower Yorktown MW -01 Surficial MW -02 Lower Yorktown MW -03 Surficial MW -04 Lower Yorktown MW -05 Surficial MW -06 Surficial MW -07 Lower Yorktown MW -08R Surficial MW-08IR Lower Yorktown MW -41I Lower Yorktown MW-44SAR Surficial MW-44IR Lower Yorktown MW -53I Lower Yorktown MW -55I Lower Yorktown MW -55D Pee Dee Prepared by: JHG Checked by: BER NOTE: Data for groundwater samples collected from NPDES compliance monitoring program will also be used in the MNA effectiveness monitoring evaluation P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 9-2 Proposed Groundwater Monitoring Locations.xlsx Page 1 of 1