Loading...
HomeMy WebLinkAbout20071884 Ver 1_Application_20071107~~ ~`c?:fib ~ f ~ N°~ ~ ~~ " e ~$GjEo '"V : r ~ S ~~~7,J`f,~Q~`,(/ ef;~~. 'yCJj,. '9.rC ~, ~,,:~' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR LYNDO TIPPETT SECRETARY November 1, 2007 U.S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, N.C. 27889-1000 071884 Attention: Bill Biddlecome Subject: Request for a NW 14 permit for shoulder widening and turn lane construction on SR 1306 (Forest Park Rd) in Pasquotank County. The North Carolina Department of Transportation is requesting a NW 14 permit for riprap placement and shoulder widening at one location in an unnamed tributary to Knobb Creek on SR 1306 (Forest Park Rd) in Pasquotank County. The PCN form, vicinity map, and permit drawings are included with this letter. If you need any additional information or have any questions concerning this project please call me at 252-482-7977. Sincerely, Clay Willis Division One Environmental Officer Jerry Jennings, P.E. Division One Engineer~j~ ~~ " / Cc:Garcy Ward, DWQ Sonja Gregory, DWQ Office Use Only: Form Version March OS 20071 884 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or"tv/.~".) I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information 1. Owner/Applicant Information Name: Clav Willis. NCDOT Division 1 Environmental Officer Mailing Address: 113 Airport Drive Suite 100 Edenton NC 27932 Telephone Number:_ (252) 482-7977 Fax Number: (252) 482-8722 E-mail Address: tcwillis a~dot.state.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Updated l l/1/2005 Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1306 (Forest Park Rd) turn lane, shoulder widening. Pasquotank County 2. T.I.P. Project Number or State Project Number (NCDOT Only): 31630 3. Property Identification Number (Tax PIN): 4. Location County: Pasquotank County Nearest Town: Elizabeth City Subdivision name (include phase/lot number): Directions to site (include road numbers/names, landmarks, etc.): Travel North on US 17 from Edenton until reaching_the Perpguimans /Pasquotank County Line. Continue on US 17 Business and travel approximately 5 miles to SR 1306 (Forest Park Rd). Turn left on 1306 and travel 275 feet to project. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 36.289714°N 76.262778°W 6. Property size (acres): 0.4 acres 7. Name of nearest receiving body of water: Unnamed tributary to Knobbs Creek 8. River Basin: Pasquotank River Basin (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Updated 1 l / 1 /2005 Page 6 of 13 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Commercial residential area with surroundings creek and wetlands. 10. Describe the overall project in detail, including the type of equipment to be used: Widening and adding a turn lane Riprap will be extended over toward the ends of existing pipes to gain approximately 3 to 4 feet of additional shoulder. Proper fill will be used to brin rg oad to existing hei t Heavy equipment used will be an excavator backhoe and dump trucks. 11. Explain the purpose of the proposed work: The wider shoulder will allow for the installation of a turn lane allowing for safer public travel. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. roject, along with corp- struction schedulesyy~~. A COE NW 18 w//as issued in Januar~~7y 2004. --~e~~ ~~ -o~ AT ~i,Jf1 ni~ ~_1:'1~'ti/- 11'0 o/a~'Oa~ GIG...- !Ar~/"~'k- ~ _ V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for Updated 1 l / 1 /2005 Page 7 of 13 wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: This project will have 226 sa. ft of stream impacts resulting from placement of rprap towards ends of existing pipes and 0.046 acres of wetland impacts frompermanent shoulder fill. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, eenarately list impacts clue to hnth stnlcture and flondin>?. N/A Located within Distance to Area of Wetland Impact Type of Wetland 100-year Nearest Impact Site Number Type of Impact (e.g., forested, marsh, Floodplain Stream (acres) (indicate on map) herbaceous, bog, etc.) ( es/no) (linear feet) Site 1 Perm. Shoulder fill Riverine wetland yes 5 0.02 Site 2 Perm. Shoulder fill Riverine wetland Yes 5 0.02 Site 3 Perm. Shoulder fill Riverine wetland Yes 5 0.006 Total Wetland Impact (acres) 0.046 3. List the total acreage (estimated) of all existing wetlands on the property: 0.052 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acrea>7e. multiply leneth X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Stream Width Length Impact (indicate on ma) Intermittent? Before Im act (linear feet) (acres) Site 1 Unnamed tributary Riprap Fill Perennial 25 Feet 0 0.0026 to Knobbs Creek Site 2 Unnamed tributary Riprap fill Perennial 22 feet 0 0.0026 to Knobbs Creek Total Stream Impact (by length and acreage) 0 feet 0.0052 Updated 11 / I /2005 Page 8 of 13 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. None Open Water Impact Site Number (indicate on map) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.0052 Wetland Impact (acres): 0.046 Open Water Impact (acres): Total Im act to Waters of the U.S. (acres) 0.0512 Total Stream Impact (linear feet): 0 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USAGE. 8. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: Updated 11/1/2005 Page 9 of 13 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Additional length will not be added to existing,pipes. This will reduce permanent impacts to the stream by usin>; existing pipes and extending riprap to the ends of the pipes The turn lanes were designed to improve safet-y turning in and out of the intersection for traffic to the adjacent school. Minimization was taken into account during the design process VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. .Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o. enr.state. nc.us/ncwetlands/strnigide.html. Updated 11/1/2005 Page 10 of 13 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Wetland impacts will be mitigated through the NCEEP program. We have sent in a request for 0.046 acres of riverine wetland impacts for mitigation. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wry/index.htin. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0.046 Amount ofNon-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a Updated l l/1/2005 Page 11 of 13 map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (s uare feet) Miti ation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss Stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Impervious acreage will increase by 0.065 acres. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. There is no sewage disposal associated with this project. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No Updated 11/1/2005 Page 12 of 13 If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http:/!h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~~M'" /f Applicant/Agent's Si ature D t (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated 11/V2005 Page 13 of 13 Pasqu~t~r~~ C®~r~ty S~ 13~~6 Forest Park R~~ t~ ern lanA R chni ilriPr eniirlPninn uSGs Qv~~ i ' f - .~ I` a_ _ - (y~ _ \\. ~~ ~ ~ -- _____._., 4.___. 14 J~e~'.t ~` 3;' ~ I '`.' ~ ~ 9~'t^.3~{~J11'ii.,,~ m I -E~.~. ~ - ,'» ~ , I .' :r •41 ! ~. Z'U~ (~O ..... .4 ~ ~` j-~ ~ 1 G f \ ~~,m ~ A { - ~~, aty.~., h~R~CIK i(~~ °P~`e C.¢Rtralr~ .d ,l '~I ~~ 1~ 33~ ~~+~."ar.~ ~'T#ar~i ~}, item ,~ '~ spy t ~~ `„ _r F ~ t .. ,~ _) I . .7` I i ,° o b;; labs ,~'. °yi`. a°! 1 ~:.. ~ ~* s ,~ ~ `~~ ;. ~ a~~~ ~ 7 ~ ~_.~~` I ~ ~~ Iron _~ ~~ w Soma»t :~ ~ 14 f~t3 f ' ~ ~ ~. . ~. Drt'P-n ~ehapa4 ~' ~ ;~ ~~'~ I •qf- ,, R ~ .~~~;.d l e i ! I r j~~ :. ~ .; i- ~11h~~mnrle~ - ~.. „ ~ j~. " S Acuden c' ~ ~ ,., as I , x `"; b ~ ~ ;~o ~, 3. =1 ~ ~~ - 0 0.25 0.5 1 Miles ~ ~, ~ f f f I f f f I .~ WBS 31630 FOREST PARK RD.(SR 1306) IMPACT AREA 1 STORY FRAME SHED SfICaM 7i}e1 o~~n wuiw ~~,~,~ts ,II~Fs~,f1~ t ~ovri eno~f of ~i~9tg STREAM ~ i~i CONCRET ~__-- - _ 12" RCP STA. 11+00 ~--7/, ------IJA' 18"RC~/ ~ /~ s;+~ 3./ Wetinn~ Z.n~aCl a~a sti.ft jiTF ~ A w~ru4N~ rn~,pa~,i ~~0 g~. ~~~ PROPOSED IMPACT LIMITS TIE TO EXISTING GROUND /~ AT RW ~ ~~_ EDGE OF EXISTING PAVEMENT 60' I ~ I 1 _ I_ STA.1 ~ I I I ~ ~ni TIE TO EXISTING GROUND STREAM ll AT RW PROPOSED IMPACT LIMITS S~"~ea m 5; ~ ~ d~ A SITE 2 G~rJP,, ~/~tn j p/ Z~ru t5 WETLA1Jb SMP~G.T- uaft~ ~5~ ~. ~~, ove/tats of ~;~re5 RW CL RW 60.00' 17.50' PROPOSED EDGE OF PAVE ENT\ A ~ 6.00' PROPOSED TOP OFSHOULDER --.~~ '~' ~'0 ~ ~ , ~ EDGE OF STING PAVEMENT TIE TO EXISTING GROUND AT RW SCALE 1 "=20'