HomeMy WebLinkAboutTechnology Canter North Carolina Department of Environmental Quality
Division of Water Resources
Pat McCrory Donald R. van der Vaart
Governor Secretary
September 29,2015
Town of Holly Springs
Attn:Daniel Colavito
128 South Main Street
Holly Springs,NC 27540
Subject: Buffer Determination
NBRRO#15-398
Wake County
Determination Type:
Buffer Call Isolated or EIP Call
❑Neuse(15A NCAC 2B.0233)
❑Tar-Pamlico(15A NCAC 2B.0259) ®Ephemeral/Intermittent/Perennial Determination
❑.
Jordan(15A NCAC 2B.0267) Isolated Wetland Determination
❑
Project Name: Technology Center
Location/ Property is located SW of the intersection of Green Oaks
Directions: Parkway and Holly Springs New Hill Rd in Holly Springs,
NC. A small portion of the property is located east of Green
Oaks Parkway.
Subject Stream: UT to Utley Creek Cape Fear River Basin
Determination Date: September 22,2015 Staff: James Graham
Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section http://portal.nedenr.org/web/wq/aps
1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200
Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159
An Equal Opportunity 1 Affirmative Action Employer—Made in part by recycled paper
September 25, 2015
Technology Center
Wake County
Page 2
Feature/Flag EAVP* Start@ Stop@ Soil USGS
Survey To o
A E throughout X
B I SBO1 X
C P throughout X X
D E throughout X X
E I throughout X
F E throughout X
Pond Isolated X X
•E/I/P-Ephemeral intermittent/PerennW
Explanation: The feature(s) listed above has or have been located on the Soil
Survey of Wake County,North Carolina or the most recent copy of the USGS
Topographic map at a 1:24,000 scale. Each feature that is checked"Not Subject"
has been determined not to be a stream or is not present on the property. Features
that are checked"Subject"have been located on the property and possess
characteristics that qualify it to be a stream. There may be other streams located
on your property that do not show up on the maps referenced above but, still may
be considered jurisdictional according to the US Army Corps of Engineers and/or
to the Division of Water Resources(DWR).
This on-site determination shall expire five(5)years from the date of this letter.
Landowners or affected parties that dispute a determination made by the DWR or
Delegated Local Authority may request a determination by the Director. An appeal
request must be made within sixty(60)days of date of this letter or from the date the
affected party(including downstream and/or adjacent owners) is notified of this letter. A
request for a determination by the Director shall be referred to the Director in writing c/o
Karen Higgins,DWR WeBSCaPe Unit, 1650 Mail Service Center,Raleigh,NC 27699.
This determination is final and binding unless, as detailed above, you ask for a hearing or
appeal within sixty(60) days.
September 25,2015
Technology Center
Wake County
Page 3
The owner/future owners should notify the Division of Water Resources(including
any other Local,State,and Federal Agencies) of this decision concerning any future
correspondences regarding the subject property(stated above). This project may
require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the Division of Water Resources (Central Office)at(919)-807-6300,and
the US Army Corp of Engineers (Raleigh Regulatory Field Office) at(919)-554-
4884.
If you have questions regarding this determination,please feel free to contact
James Graham at(919) 791-4256.
Res ctfully,
gOJ!1
Danny Smi Supervisor
Water Quality Section
Raleigh Regional Office
cc: RRO/SWP File Copy
Sean Clark
SEPI Engineering and Construction
1025 Wade Ave.
Raleigh,NC 27606
�t,rc ���r
'To �v►�is is-s�ti
ti
300 ZS:Z\,
300 NFW H1LL-RDA �;
NC4L Y SpRiNCs-
4Q0
rainage D
and Pond D _
1
I ,
Drainage C
cc
CC
� cu
350
i
1/ 0
--=-IT_t7
Parcel Boundary
so
MAP LOCATION
USGS MAP
Technology Center
Town of Holly Springs, NC N
SEPI Project # EN 15.039.00
USGS Topography, 2013
FIGURE 1
�� ..
CHATHAM WAKE
O
SEPI
LEE JOHNSTON
HARNETT
Apex, NC Quadrangle
Se tember10,2015
0 375 70 1,500 2,250
E N G I N E E R I N G 6
CONSTRUCTION
Feet