Loading...
HomeMy WebLinkAbout20030147 Ver 2_Other Documents_20150901��IIIIII DUKE ENERGY. September 1, 2015 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street N. E. Washington, DC 20426 Re: Duke Energy Progress, Inc. Yadkin -Pee Dee Hydroelectric Project (FERC No. 2206) License Article 406 — Recreation Flow Release Plan Dear Secretary Bose: I ;R _A . A. � Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 On August 21, 2015, Duke Energy Progress, Inc. (Duke Energy) informed the Federal Energy Regulatory Commission (Commission) of a potential drawdown of Lake Tillery that could result from the implementation of the Recreation Flow Release Assessment Study (Study) for the Yadkin -Pee Dee Hydroelectric Project (Project). Duke Energy had requested Commission approval to temporarily exceed the 1.5 -foot drawdown allowed by the New License over August 28 -30, 2015 in order to complete this study. This letter serves as notification to the Commission that this variance from the requirements of the New License was not necessary. Duke Energy effectively began the study with the elevation of Lake Tillery at 278.0 feet (0.2 feet below full pond elevation) which allowed the flow releases to be made within the 1.5 -foot drawdown allowed by the New License. The study concluded on August 30, 2015 and the lowest reservoir elevation achieved during the study was 277.5 feet (0.7 feet below full pond). Thank you for your consideration. Questions can be directed to Tami Styer at (704) 382 -0293 (Tami.Stver(a),Duke- Ener�4v.com). Sincerely, f r Jeffrey G. Lineberger, P.E. Director, Water Strategy and Hydro Licensing Duke Energy cc: Mark Carter — FERC Atlanta Regional Office Karen Higgins — NC DWR Fred Tarver — NC - DENR Jennifer Burdett — NC DWR John Crutchfield — Duke Energy George Galleher - Duke Energy David Scott - Duke Energy Phil Fragapane - Duke Energy Tami Styer — Duke Energy Yadkin -Pee Dee Comprehensive Settlement Agreement Stakeholders Pj