Loading...
HomeMy WebLinkAbout19970524 Ver 2_DCM Permit_20150202Permit Class NEW STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission 'Permit for X Major Development in an Area of Environmet pursuant to NCGS I I3A -118 Permit Number 16 -15 FEB 1, 2 2015 Excavation and/or filling pursuant to NCGS 113 -229 Issued to The Bluffs HOA c/o Tom Bell, PO Box 10188,Goldsboro, NC 27532 Authorizing development in - Carteret County ad*. to Bo ue Sound at 4869 South Shore Drive, in Morehead City . as requested in the permittee's application dated - 11/11/14. including the attached worknlan drawings (1) dated 4/26/14 This permit, issued on February 2 2015 is subject to compliance with'the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action, or may cause the permit to be null and void. Marina 1) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2) Unless'specifical'ly altered herein, this permit authorizes only the reconfiguration of the previously authorized marina facility and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. the authority of the Secretary of DENR of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee