Loading...
HomeMy WebLinkAboutWQC 3693Water Quality Certification N°. #3693 GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR U.S. ARMY CORPS OF ENGINEERS REGIONAL PERMIT NUMBER 198200030 (TVA, OR FERC REGULATED PUBLIC UTILITIES) AND REGIONAL PERMIT 198200079 ICOE LAKE AND RESERVOIR MAINTENANCE, REPAIR AND CONSTRUCTION ACTIVITIES) AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES- Water Quality Certification Number 3693 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15A NCAC 2H, Section .0500 and 15A NCAC 2B .0200 for the discharge of fill material to waters and wetland areas as described in the Wilmington District's Regional (General) Permit Number 198200030 and Regional Permit Number 198200079 and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 2B .0200. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter set forth. Activities which require approval by the US Army Corps of Engineers under either of these Regional Permits, but do not result in fill, dredging or excavation of waters or wetlands (such as docks, piers or boathouses), do not require written approval from the Division of Water Quality as long as they comply with all other conditions of this General Certification. Activities that do result in fill, dredging or excavation of waters or wetlands under this Water Quality Certification, require written approval from the Division of Water Quality. Projects that have received a Notice of Violation from the Division of Land Resources and/or the Division of Water Quality are required to submit a complete application and receive written approval to use this Water Quality Certification regardless of the proposed impact amount to streams, wetlands, and waters. Any impacts to streams and/or buffers in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application [in accordance with 15A NCAC 2B .0200]), unless the activities are listed as "EXEMPT" from these Rules- In accordance with North Carolina General Statute Section 143-215.3D(e), any requirement for written approval fora 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Conditions of Certification: No Impacts Beyond the Thresholds Authorized by this General Certification No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the thresholds established for use of this Certification, beyond the footprint of the impacts authorized in the written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: Water Quality Certification No. 3693 Water Quality Certification N°. #3693 a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNA's), Trout (Tr), SA, WS-I, WS-II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supersede all other sediment and erosion control requirements. 3. No Sediment and Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 4. Construction Moratoriums and Coordination All moratoriums established by NC Wildlife Resources Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries (DMF), or National Marine Fisheries Service (NMFS) to protect trout, anadromous fish, or other aquatic species must be obeyed. All work within the twenty-five (25) designated trout counties, or identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS, NMFS, and/or DMF personnel. 5. Riparian Area Protection (Buffer) Rules Activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse, Tar-Pamlico, Catawba, or Randleman (or any other basin with buffer rules), shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .020233, .0259, .0250 and .0243, and shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All buffer rule requirements, including diffuse flow requirements, must be met. For sites with buffer rules in effect at the time of application, forested vegetation removed from buffer areas for construction access purposes shall be re-established within the next growing season following construction of the project. Water Quality Certification No. 3693 2 Water Quality Certification N°. #3693 6. Water Supply Watershed Buffers The 30-foot wide vegetative buffer (low-density development) or the 100-foot wide (high- density development) shall be maintained adjacent to all perennial waters except for allowances as provided in the Water Supply Watershed Protection Rules [15A NCAC 2B .0212 through .0215]. 7. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life/fish kills. 8. Rip-rap shall be installed waterward of bulkheads installed in freshwater lakes to ensure protection of aquatic habitat. Construction over wetlands shall be elevated at least three (3) feet above any wetlands, and floating structures shall not rest periodically on the bottom. 9. Piers and boat houses shall be constructed to provide for storage and removal of sewage rather than allowing raw waste or other sewage to be disposed directly into surface waters. 10. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit the project. 11. If an environmental document is required under NEPA or SEPA, then this General Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse. 12. For activities requiring written approval, additional site-specific conditions may be added to the approval letter in order to ensure compliance with all applicable water quality and effluent standards. 13. When written authorization is required for use of this certification, upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC, 27699-1650. 14. This General Certification shall expire three (3) years from the date of issuance of the approval letter from the Division or on the same day as the expiration date of the corresponding Regional Permit 198200030 or 198200079. The conditions in effect on the date of issuance of Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration date of this Certification. If the construction process for approved activities will overlap the expiration and renewal date of the corresponding 404 Permit and the Corps allows for continued use of the 404 Permit, then the General Certification shall also remain in effect without requiring re-application and re-approval to use this Certification for the specific impacts already approved. Water Quality Certification No. 3693 Water Quality Certification N°. #3693 15. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this General Certification for the project and may result in criminal and/or civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: November 1, 2007 DIVISION OF WATER QUALITY By Coleen H. Sullins Director History Note: Water Quality Certification Number 3693 replaces Water Quality Certification (WQC) Number 3373 issued on March 18, 2002, Water Quality Certification (WQC) Number 3492 issued on December 31, 2004, and Water Quality Certification (WQC) Number 3639 issued on March 19, 2007. This WQC is rescinded when the Corps of Engineers re-authorizes these Regional General Permits or when deemed appropriate by the Director of the Division of Water Quality. Water Quality Certification No. 3693 4