Loading...
HomeMy WebLinkAbout19970722 Ver 1_More Info Received_19970905or DAVIS - MARTIN - POWELL & ASSOCIATES, ENGINEERING LAND PLANNING • SURVEYING 218 GATEWOOD AVENUE • SUITE 102 - HIGH POINT, NC 27262 PHONE (910) 886-4821 • FAX(910)886-4468 September 4, 1997 INC. l sF,o c u ?? se F P Re: Piedmont Triad Regional Water Authority Randleman Reservoir Wetland Impact Mitigation Mr. Peter Coldwell, Environmental Specialist Department of Environment, Health & Natural Resources Division of Water Quality Environmental Sciences Branch 4401 Reedy Creek Road Raleigh, NC 27607 Dear Pete: We appreciate your review comments on the preliminary development sketches of the four (4) wetland mitigation sites being considered for development by the Piedmont Triad Regional Water Authority. The comments contained in this review letter along with your conversation with Eddie MacEldowney of our office will be most helpful as these preliminary documents are advanced to detailed mitigation plans. The Authority is committed to purchase approximately 40 acres along Reddicks Creek at the golf course. This is necessary to comply with their committed buffer requirements. Since this site is available, it is the Authority's desire to include it as a mitigation site though it may not be too cost effective and, as you noted, will be mostly constructed wetlands. .y We also concur with your observation that an additional 10 to 15 acre site should be considered to 71C yield the required 120 acres ± mitigation. Since there appears to be some concern regarding the experience level of those providing this service for the Authority, I would like to advise you of the members of the team assembled to provide these mitigation design services for this project: • Davis-Martin-Powell & Associates as prime Civil-Environmental Consultant. • Mr. Glen Simpson, Soil Scientist, on site soil evaluations. • Engineering Consulting Services, Ltd., Soil and Environmental Scientists, Wetland delineation and assistance with mitigation planning • Patton Zucchino, Landscape Architecture, Development of Wetland Planting Plans. r ? Mr. Peter Coldwell, Environmental Specialist Department of Environment, Health & Natural Resources Division of Water Quality September 4, 1997 Page -2- We feel that the experience of this project team is well qualified to implementing this mitigation plan. If you have any suggestions which would strengthen this team or enhance the ability to meet the requirements of this mitigation, we would appreciate your comments. We look forward to advancing this mitigation planning and effecting the required ratio of wetland creation/restoration required by this 120 acre ± impact. With best personal regards, I remain, Very truly yours, DAVIS-MARTIN-POWELL & ASSOCIATES 4v., JI// Charles E. Powell, P.E. CEP/res c: Mr. John Dorney Mr. John Kime Ms. Andrea Spangler Mr. Eddie MacEldowney File