Loading...
HomeMy WebLinkAboutHinton Oaks Industrial Park (North)ROY COOPER Governor EL"ETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Wake Stone Property Company Bose Bratton 6821 Knightdale Blvd., PO Box 190 Knightdale, NC 27545 NORTH CAROLINA Environmental Quality July 19", 2022 Subject: Buffer Determination Letter NBRRO #22-284 Wake County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B .0714) ❑ Tar -Pamlico (15A NCAC 2B .0734) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Address/Location: Stream(s): Hinton Oaks Industrial Park 0 Hinton Oaks Blvd Beaverdam Creek ��QE North Carolina Department of Environmental Quality I Division of Water Resources Q§ Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 pm.e�e��.fm�mgei a�.mr Hinton Oaks Industrial Park (North) Wake County 7/ 19/2022 Page 2 of 3 Determination Date: 7/19/2022 Staff: Josh Brigham Stream Feature E/1/P(1) Not (2) Subject Subject Start@ Stop@ Soil Survey USGS To o A X Subject at flag per NBRRO 19-222 X X* B X X DWR Flag at E X approximately Off project X 35.809337, boundary -78.512760 eaverdam Creek X Subject throughout X X (I) E = Ephemeral, I = Intermittent, P = Perennial, NP —Not Present, NE = Not Evaluated (2) Refers to State riparian buffer rules only. Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements. *Field verified as not crossing the property as shown on the USGS topo map. Explanation: The stream(s)/pond(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each feature that is checked "Not Subject' has been determined to not be an intermittent stream, perennial stream, a pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer rules. There may be other streams located on the property that do not show up on the maps referenced above and are therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 02B and may be considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski; DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Paul Wojoski; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. DNorth Carolina Department of Environmental Quality I Division of Water Resources E Q :> 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 a �.o-�rtm wwN Hinton Oaks Industrial Park (North) Wake County 7/ 19/2022 Page 3 of 3 If you have questions regarding this determination, please feel free to contact Josh Brigham at (919) 791-4251. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office, Division of Water Resources, NCDEQ cc: Laserfiche Consultant via e-mail, Bob Zarzecki, S&EC, PA, bzarzecki@sandec.com North Carolina Department of Environmental Quality I Division of Water Resources �D 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NarrN N4 �' 919.707.9000 r r ' u Lk nrVrt iu- r --------------- _ •. :' r _ _�� .. , - I L .� I;.R, s m1�,� d.�wr ,lrh}ldSrfrr,"' IN Jd 'r L i IN�.- .. �, L U. P` _ •�a•-• . p ry ti IY Hinton Oaks Industrial Park (North) Wake County, NC-DWR Project # 22-284 NRCS Soil Survey Sheet 51 60Base Map provided by S&EC Wake Co., NC 1970 locations are approximate Legend: and are provided for refer M' -project boundary ence only���' Hinton Oaks Industrial Park (North) Wake County, NC-DWR Project # 22-284 o� f� f Ake (, j( hnson USGS Topographical Map SigTga Base Map provided bySUC Legend:„ Locations are approximate -Project boundary and are provided for refer- - UV ence only Qtavn