Loading...
HomeMy WebLinkAboutFW_ R-2247EB Silt Loss_Final 7_14 Wanucha, Dave From:Euliss, Amy Sent:Thursday, July 14, 2022 7:46 AM To:Chapman, Amy; Wanucha, Dave Cc:Librandi, Nicholas C Subject:FW: R-2247EB Silt Loss_Final 7_14 Attachments:Permit Site 14 2.jpeg; Permit Site 14 3.jpeg; Permit Site 14.jpeg; Permit Site 15.jpeg; Permit Site 15D.jpeg; Permit Site 16 CWD.jpeg; Permit Site 16 Outlet.jpeg; Upstream of Permit Site 16.jpeg Here are the cleanup pictures for R-2247EB. I reviewed on site yesterday and thought all looked fine. Let me know if you have any questions. From: Librandi, Nicholas C <nclibrandi@ncdot.gov> Sent: Wednesday, July 13, 2022 11:29 AM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov> Subject: RE: R-2247EB Silt Loss Amy, Attached are the follow up clean up pictures to be passed along. The names of the photos are the location. One of the pictures is slightly upstream of Permit site 16 where we have offsite material coming into the project. Thank you, Nicholas Librandi Assistant Resident Engineer Division 9 Winston-Salem Construction-1 Office 336 293 9610 office nclibrandi@ncdot.gov 403 Polo Rd Winston-Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chapman, Amy <amy.chapman@ncdenr.gov> Sent: Wednesday, July 6, 2022 9:56 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A 1 <sajones8@ncdot.gov> Subject: RE: R-2247EB Silt Loss Thanks Amy! From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Wednesday, July 6, 2022 9:05 AM To: Chapman, Amy <amy.chapman@ncdenr.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov> Subject: RE: R-2247EB Silt Loss Amy C., Here are the pictures for the losses on R-2247EB. We got another round of very heavy rain yesterday evening, so the cleanup is probably going to take a little longer than usual. We’ll follow up with clean up photos once they are finished. Amy E. From: Chapman, Amy <amy.chapman@ncdenr.gov> Sent: Tuesday, July 5, 2022 1:51 PM To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov> Subject: RE: R-2247EB Silt Loss Ok, thanks for the update. From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Tuesday, July 5, 2022 1:40 PM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov> Subject: FW: R-2247EB Silt Loss Amy/Dave We had a short duration, heavy rain event on the R-2247EB project Saturday night. Crews were back to work today after the holiday weekend and completed their required NPDES walk through for the project. The following sites had sediment losses into jurisdictional waters. They have been directed to start clean up. Amy From: Librandi, Nicholas C <nclibrandi@ncdot.gov> Sent: Tuesday, July 5, 2022 1:30 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov> Subject: R-2247EB Silt Loss Amy, 2 We had silt loss following a 2.22” rain event over the weekend. Permit site 14 lost approximately 7, 5 gal buckets after a SDO at the outlet failed and material entered the outlet channel. Repairs are on going and clean up is under way of the silt. Permit site 15D lost approximately 5, 5 gal buckets of silt and 57 stone after a SDO at the old JS failed and material entered the stream. Repairs are ongoing and cleanup is under way of the silt and stone. Permit site 16 lost approximately 4 CY after a SDO failed and material entered the CWD on the west side of the JS on the inlet side and a SDO failure on the outlet side. Repairs have been made to the SDOs and clean up is under way of the silt. Thank you, Nicholas Librandi Assistant Resident Engineer Division 9 Winston-Salem Construction-1 Office 336 293 9610 office nclibrandi@ncdot.gov 403 Polo Rd Winston-Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3