From:Euliss, Amy
Sent:Wednesday, July 6, 2022 9:05 AM
To:Chapman, Amy; Wanucha, Dave
Cc:Librandi, Nicholas C; Marciniak, Katherine J; Jones, Scott A
Subject:RE: R-2247EB Silt Loss
Attachments:Site 16 Outlet to Site 15B.jpg; Site 16 Inlet.jpg; Site 16 Inlet CWD.jpg; Site 15D Stream
Tie.jpg; Site 15D SDO.jpg; Site 15D Old JS.jpg; Site 14.jpg; Site 14 3.jpg; Site 14 2.jpg
Amy C.,
Here are the pictures for the losses on R-2247EB. We got another round of very heavy rain yesterday evening, so the
cleanup is probably going to take a little longer than usual. We’ll follow up with clean up photos once they are finished.
Amy E.
From: Chapman, Amy <amy.chapman@ncdenr.gov>
Sent: Tuesday, July 5, 2022 1:51 PM
To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A
<sajones8@ncdot.gov>
Subject: RE: R-2247EB Silt Loss
Ok, thanks for the update.
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Tuesday, July 5, 2022 1:40 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov>
Cc: Librandi, Nicholas C <nclibrandi@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A
<sajones8@ncdot.gov>
Subject: FW: R-2247EB Silt Loss
Amy/Dave
We had a short duration, heavy rain event on the R-2247EB project Saturday night. Crews were back to work today after
the holiday weekend and completed their required NPDES walk through for the project. The following sites had
sediment losses into jurisdictional waters. They have been directed to start clean up.
Amy
From: Librandi, Nicholas C <nclibrandi@ncdot.gov>
Sent: Tuesday, July 5, 2022 1:30 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Jones, Scott A <sajones8@ncdot.gov>
Subject: R-2247EB Silt Loss
Amy,
1
We had silt loss following a 2.22” rain event over the weekend. Permit site 14 lost approximately 7, 5 gal buckets after a
SDO at the outlet failed and material entered the outlet channel. Repairs are on going and clean up is under way of the
silt.
Permit site 15D lost approximately 5, 5 gal buckets of silt and 57 stone after a SDO at the old JS failed and material
entered the stream. Repairs are ongoing and cleanup is under way of the silt and stone.
Permit site 16 lost approximately 4 CY after a SDO failed and material entered the CWD on the west side of the JS on the
inlet side and a SDO failure on the outlet side. Repairs have been made to the SDOs and clean up is under way of the silt.
Thank you,
Nicholas Librandi
Assistant Resident Engineer
Division 9
Winston-Salem Construction-1 Office
336 293 9610 office
nclibrandi@ncdot.gov
403 Polo Rd
Winston-Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2