Loading...
HomeMy WebLinkAboutU-2579BA sediment loss Wanucha, Dave From:Euliss, Amy Sent:Wednesday, July 6, 2022 3:55 PM To:Wanucha, Dave; Chapman, Amy Cc:Guy, Jeremy M; Suggs, Phillip H; Ogburn, Randall E Subject:U-2579BA sediment loss Attachments:IMG_2844.jpg Amy/Dave, The U-2579BA project received 1.92 inches of rain (on MPE site) in a thunderstorm yesterday afternoon. We had a sediment loss into Smith Creek. Some of the material is from the stream but the bulk of what is shown in the picture is from a failure in the Erosion Control measure. A few 5-gallon buckets of sediment remain in the channel, plus what is on the bank. It will be removed from the stream by hand and the floodplain will be cleaned up as much as practicable. Let me know if you need anything further. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1