HomeMy WebLinkAboutU-2579BA sediment loss
Wanucha, Dave
From:Euliss, Amy
Sent:Wednesday, July 6, 2022 3:55 PM
To:Wanucha, Dave; Chapman, Amy
Cc:Guy, Jeremy M; Suggs, Phillip H; Ogburn, Randall E
Subject:U-2579BA sediment loss
Attachments:IMG_2844.jpg
Amy/Dave,
The U-2579BA project received 1.92 inches of rain (on MPE site) in a thunderstorm yesterday afternoon. We had a
sediment loss into Smith Creek. Some of the material is from the stream but the bulk of what is shown in the picture is
from a failure in the Erosion Control measure. A few 5-gallon buckets of sediment remain in the channel, plus what is on
the bank. It will be removed from the stream by hand and the floodplain will be cleaned up as much as practicable. Let
me know if you need anything further.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1