Loading...
HomeMy WebLinkAbout19970694 Ver 1_Complete File_20080723IT 0694 s BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 919/851-4422 ¦ FAX 919/851-8968 July 23, 2008 N.C. Dept. of Environment and Natural Resources Division of Water Quality Attn: Ms. Cyndi Karoly, Supervisor 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Delivered to Division of Water Quality on July 23, 2008 Received by: Print Name: Subject: Colonial Grand at Wakefield Apartments DWQ Project #970694 Dear Ms. Karoly: D r ? ? IEJI. 2 ltl(1 LL'v` YCI1 C ?.d?:A.i?1 WLANDS AND S'fO4tM`A` t L ti{AN In your letter dated August 27, 2007 (DWQ Project #97-0694v3), you requested that "a valid approval letter from the appropriate local government indicating that the proposed activity has an approved SMP and indicating under which state stormwater program the approval has been granted, and one copy of the approved SMP, including plan details, calculations and other supporting information" be submitted to your office for your records. The following information is enclosed in response to your August 27 letter: • One copy of the August 27, 2007 letter from DWQ to Colonial Realty, LP concerning the required Stormwater Management Plan (SMP) approval letter from the local municipality. • One copy of the City of Raleigh Stormwater Management Plan approval letter for the Colonial Grand at Wakefield dated July 27, 2008. Please note that the approval letter indicates that "no disturbance of the Neuse River Buffer will be permitted on the above referenced projects until the City of Raleigh receives verification of approval and issuance of buffer permit(s) by NCDWQ." There are no wetland impacts or Neuse River Buffer impacts proposed for this project. • One copy of the approved construction drawings pertaining to the Stormwater Management Plan including the Cover Sheet and sheets C3.1, C3.4, C3.5 and C3.6. • One copy of the "Design Calculations for Wet Detention `Basin Nos. 1 and 2 for Water Quality and Pre/Post-Development Stormwater Attenuation". It is my understanding that submittal of the enclosed information satisfies NCDWQ's submittal requirements and that construction of the proposed project may proceed based on the approved Stormwater Management Plan. Please call me if you have any questions or comments or if you need additional' information concerning this matter. Very truly yours, BASS, NIXON & KENNEDY, INC. David L. Dunn, PE CC: David White, Colonial Properties Trust 2 Fwa n Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Colccn H. Sullins, Director Division of Water Quality August 27, 2007 DWQ Project # 97-0694v3 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Colonial Realty, LP Attn: Mark Barker 2977 Crouse Lane Burlington, NC 27215 Subject Property: Colonial Grand at Wakefield Apartments Richland Creek [030402, 27-21, NSW, C] STORMWATER DUPLICITY NOTICE Dear Mr. Barker: y ;' 7 i t JU 3 HllO dYa TLAND9 NN11 STOR%#.'Vv 1TcR 3:t! N(., i This memo is to inform you that the Division of Water Quality (DWQ) has initiated a major change in the review and approval of Stormwater Management Plans (SMPs) submitted as part of the 401 Certification application process. This change affects your proposed project, 97-0694v3. Previously, development activities that require a 401 Certification and also have impervious surface coverage equal to or greater than 30 percent have been required to submit a SMP for review and approval by DWQ staff as part of the 401 application process.* Previously, the DWQ review and approval of the SMP was in addition to any local government review and approval of the SMP that was required under a state-mandated stormwater program (see list below). In an effort to maximize the use of limited staff resources at the state and local levels as well as to streamline the permitting process, a new policy is now in effect. From now on, SMPs that have been approved by a local government as part of that local government's implementation of a state- mandated stormwater control program, will not require additional stormwater approval from the DWQ for the issuance of the 401 Certification. For the purpose of this policy, local approval of the SMP under the following state stormwater programs shall satisfy the stormwater requirement for receiving a 401 Certification: - Water Supply Watershed II, III, and IV - Local Implementation of the NPDES Phase 2 Program - Universal Stormwater Management Program - Nutrient Sensitive Waters (NSW) Stormwater Program - Randleman Lake Water Supply Watershed Stormwater Program. * Note: Under the renewal of the NC General Certifications, it has been proposed to lower the impervious surface threshold to 24% when the new General Certifications are expected to go into effect on October 15, 2007. Dix 401 OversightiLxpress Review Permitting Unit N hCaro r'?aturnina ly 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786! FAX 919-733-68931 Internet: blip:' h2o rn.statc.n? u. ncnctl?n<ls An Fqual Opportunity!Attirmative Action Employer - 50% Recycled! 10% Post Consumer Paper Mr. MarK barkcr Page 2 of 2 August 27, 2007 From now on, 401 Applications for proposed activities that exceed the impervious surface threshold and are within a local jurisdiction that is implementing a state stormwater program must either submit Item I or Item 2 below. 1. A valid approval letter from the appropriate local government indicating that the proposed activity has an approved SMP and indicating under which state stormwater program the approval has been granted, and one copy of the approved SMP, including plan details, calculations and other supporting information. OR If the necessary local approval of the SMP has not yet been obtained at the time of 401 Application, the application should indicate that a SMP has been, or will be, submitted for local government approval. The applicant should indicate the local government that approval is being requested from, and indicate under which state stormwater program the activity will be covered. Any 401 Certification approved under this scenario shall be conditioned so that the proposed impacts shall not commence until such time that the appropriate local approval has been granted. 401 Applications for proposed activities that exceed the impervious surface threshold but are not within a local j urisdiction that is implementing a state stormwater program must include a complete SMP for DWQ review and approval. Notwithstanding this new policy, the Director of the DWQ reserves the right to review individual stormwater management plans on a case-by-case basis in order to ensure that a proposed activity will not violate water quality standards. Additionally, the DWQ Director reserves the prerogative to provide continents to local governments of special provisions that may need to be incorporated into locally- reviewed SMPs in order to provide an enhanced level of protection to sensitive watersheds or to provide an enhanced level of stormwater control on unusual projects. This new policy does not affect the DWQ's authority and responsibility to review 401 Applications for avoidance and minimization of all impacts to surface waters and wetlands. In addition, the DWQ will retain the authority and responsibility to review projects for impacts to protected riparian buffers in areas where buffer protection has not been locally delegated. Please direct questions regarding this new policy to Ian McMillan at 919-7154631 ian.mcntillan iuncmail.net or Annette Lucas at 919-715-3425 or annette.lucasicricu Cyndi Karoly, Sup rvisor 401 Oversight/Express Review Permitting Unit CBKlrnj cc: Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files rilename: 97-0694v3ColonialGrandatWakefieldApartments(Wake)_S W_Duplicity_Notice OF R,, bS ?N CA1? City of Raleigh Public Works Stormwater Engineers Date: July 7, 2008 To: North Carolina Division of Water Quality/401 Section 512 N. Salisbury St. Raleigh NC, 27604 (919) 733-5083 1617 Mail Service Center Raleigh, NC 27699 Re: Stormwater Management Plan approval by City of Raleigh To Whom It May Concern: The stormwater management plan (SMP) for Colonial Grand at Wakefield (GH-3-07) (Transaction # 197942) has been reviewed and approved by the City of Raleigh for compliance with our stormwater requirements. This approval is for the purpose and design that you show in the above referenced plans. If the SMP changes this approval is voided and the applicant will be required to request a new approval letter. No disturbance of the Neuse River Buffer will be permitted on the above referenced projects until the City of Raleigh receives verification of approval and issuance of buffer permit(s) by NCDWQ. Should you have any questions, please contact me at (919) 516-2155. Lisa S. Booze, CFM City of Raleigh Public Works/Stormwater Management POB 590 Raleigh, NC 27602-0590 email: lisa.booze@ci.raleigh.nc.us phone: (919)-516-2155 FAX: (919)-516-2681 219 Fayetteville St. PO Box 590, Raleigh, NC 27602 Voice (919) 516-2155 fax(919)516-2681 1 BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 919/851-4422 ¦ FAX 919/851-8968 COLONIAL GRAND AT WAKEFIELD APARTMENTS RALEIGH, NORTH CAROLINA DESIGN CALCULATIONS FOR WET DETENTION BASIN NOS. 1 AND 2 FOR WATER QUALITY AND PRE/POST-DEVELOPMENT STORMWATER ATTENUATION PREPARED BY BASS, NIXON AND KENNEDY, INC. JULY 14, 2007 t 7 i1IS1d7 BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 919/851-4422 ¦ FAX 919/851-8968 COLONIAL GRAND AT WAKEFIELD APARTMENTS RALEIGH, NORTH CAROLINA WET DETENTION BASINS ' DESIGN CALCULATIONS July 14, 2007 k The following calculations are for the design of the wet detention basins for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. The wet detention basins are designed as stormwater BMP's for nitrogen reduction as well as to provide stormwater attenuation for the 2-year and 10-year, 24-hour storms. The Stormwater Best Management Practices dated April, 1999 by NCDENR (Section 1.0 - Wet Detention Basins) and the City of Raleigh Stormwater Management Design Manual dated January, 2002 were used for design of the wet detention basins. The stormwater basins are designed to provide 85% TSS removal as required by the 401 approval from the N.C. Division of Water Quality (DWQ). There are two wet detention basins proposed for the site: wet detention basin No. 1 is located on the south side of the site and wet detention basin No. 2 is located on the north side of the site. The area draining to wet detention basin No. 1 is less than 10.0 acres; consequently, basin No. 1 provides for a 10% TN removal rate (same as for a dry detention basin). The area draining to wet detention basin No. 2 is greater than 10.0 acres; consequently, basin No. 2 provides for a 25% TN removal rate per the City of Raleigh Stormwater Design Manual. The following summarizes design information for the two basins: Wet Detention Basin No. 1 The following summarizes the design calculations for wet provide stormwater treatment for Nitrogen reduction as well so that the site Q2 and Q10 post-development discharge development discharge: ' • Determine Surface Area Required for Permanent Pool Drainage Area = 6.9 acres ' Impervious Area = 4.3 acres Percent Impervious = 62.3% Set Permanent Pool Level at 267.50 Feet , ' Colonial Grand - Stormwater Calcs. detention basin No. 1 to as stormwater attenuation does not exceed the pre- 7114/2007 See Appendix A for the water quality pond design information using excel spreadsheet. Summary of Design for Wet Detention Basin No. 1 The wet detention basin will need to provide stormwater attenuation so that the post-development runoff for the 2-year and 10-year, 24-hour storms does not exceed the pre-development runoff. Set the top of the riser above the temporary pool elevation to provide additional storage for stormwater detention: Top of Basin Embankment = 271.00 Ft. Set Top of Emergency Spillway = 269.60 Ft. Set Top of Riser = 269.20 Ft. Set Temporary Pool = 268.32 Ft. +/- Set Invert of 2" Dia. Drawdown Pipe (Perm. Pool) = 267.50 Ft. Set Basin Invert = 262.00 Ft. • Calculate the Q2/Q10 Pre- and Post-Developed Discharge The following summarizes the pre- and post-developed Q2 and Q10 discharge for the area draining to water quality basin No. 1: Drainage Area = 6.9 Acres Pre-Dev. Composite C = 0.20 Post-Dev. Composite C = 0.70 Intensity (2-year) = 5.76 In/Hr Intensity (10-year) = 7.22 In/Hr Intensity (100-year) = 9.72 In/Hr Use the Rational Equation to calculate the Q2, Q10 and Q100 pre- and post- developed discharge for the area draining to water quality basin No. 1: Pre-Developed Discharge Q2 = 7.9 cfs Q10 = 10.0 cfs Q100 = 13.4 cfs Post-Developed Discharge Q2 = 27.8 cfs Q10 = 34.9 cfs Q100 = 46.9 cfs Minimum Attenuation Required Q2 = 19.9 cfs Q10 = 24.9 cfs Colonial Grand - Stormwater Calcs. 2 7/14/2007 • Summary of Stormwater Routing Calculations: Q2 Discharge into Basin Q2 Discharge out of Basin 27.8 CFS 4.5 CFS < 7.9 CFS Okay Q10 Discharge into Basin Q10 Discharge out of Basin Q2 Waterlevel Q10 Waterlevel Q100 Waterlevel 34.9 CFS = 8.4 CFS < 10.0 CFS Okay 269.41 Feet 269.56 Feet = 269.79 Feet See Appendix B for Wet Detention Basin No. 1 routing calculations using PondPack computer software by Haestad Methods. Wet Detention Basin No. 2 The following summarizes the design calculations for wet detention basin No. 2 to provide stormwater treatment for Nitrogen reduction as well as stormwater attenuation so that the site Q2 and Q10 post-development discharge does not exceed the pre- development discharge: ' Determine Surface Area Required for Permanent Pool Drainage Area = 11.3 acres ' Impervious Area = 6.9 acres Percent Impervious = 61.1% Set Permanent Pool Level at 275.00 Feet, See Appendix C for the water quality pond design information using excel spreadsheet. ' Summary of Design for Water Quality Basin No. 2 ' The wet detention basin will need to provide stormwater attenuation so that the post-development runoff for the 2-year and 10-year, 24-hour storms does not exceed the pre-development runoff. Set the top of the riser above the temporary ' pool elevation to provide additional storage for stormwater detention: ' Top of Basin Embankment _ 282.00 Ft. Set Top of Riser 279.50 Ft. Set Temporary Pool = 276.44 Ft. +/- Colonial Grand - Stormwater Calcs. 3 7/14/2007 Set Invert of 2.5" Dia. Drawdown Pipe (Perm. Pool) = 275.00 Ft. Set Basin Invert = 269.50 Ft. • Calculate the Q2/Q10 Pre- and Post-Developed Discharge The following summarizes the pre- and post-developed Q2 and Q10 discharge for the area draining to water quality basin No. 2: Drainage Area = 11.3 Acres Pre-Dev. Composite C = 0.20 Post-Dev. Composite C = 0.70 Intensity (2-year) = 5.76 In/Hr Intensity (10-year) = 7.22 In/Hr Intensity (100-year) = 9.72 In/Hr Use the Rational Equation to calculate the Q2 and Q10 pre- and post-developed discharge for the area draining to water quality basin No. 2: Pre-Developed Discharge Q2 = 13.0 cfs Q10 = 16.3 cfs Q100 = 22.0 cfs Post-Developed Discharge Q2 = 45.6 cfs Q10 = 57.1 cfs Q100 = 76.9 cfs Minimum Attenuation Required Q2 = 32.6 cfs Q10 = 40.8 cfs • Summary of Stormwater Routing Calculations: Q2 Discharge into Basin = 45.6 CFS Q2 Discharge out of Basin = 0.7 CFS < 13.0 CFS Okay Q10 Discharge into Basin Q10 Discharge out of Basin Q2 Waterlevel Q10 Waterlevel Q100 Waterlevel Top of Dam Colonial Grand - Stormwater Calcs. 4 57.1 CFS 2.3 CFS < 16.3 CFS Okay ' 279.51 Feet 279.57 Feet ' = 279.80 Feet 282.00 Feet 7/14/2007 ' See Appendix D for Wet Detention Basin No. 2 routing calculations using PondPack computer software by Haestad Methods. ' Summary of Overall Site Q2/Q10 Pre- and Post-Developed Discharge • Calculate the Q2 and Q10 pre- and post-developed discharge for the overall site. The following summarizes the pre- and post-developed Q2 and Q10 discharge for the overall site: ' Overall Site Area = 26.5 Acres Pre-Dev. Composite C = 0.20 Post-Dev. Composite C = 0.60 (for overall site) Intensity (2-year) = 5.76 In/Hr Intensity (10-year) = 7.22 In/Hr Use the Rational Equation to calculate the Q2 and Q10 pre- and post-developed ' discharge for the overall site: Pre-Developed Discharge t Q2 = 30.5 cfs Q10 = 38.3 cfs ' Post-Developed Discharge without Stormwater Attenuation Q2 91.6 cfs Q10 = 114.8 cfs ' Attenuation Required Q2 = 61.1 cfs ' Q10 = 76.5 cfs • Summarize the Q2 and Q10 attenuation provided by Water Quality Basin Nos. 1 and 2 from the above information and attached routing calculations: ' Water Quality Basin No. 1 Q2 Inflow = 27.8 cfs ' Q2 Outflow = 4.5 cfs Attenuation Provided for 2-Year Storm = 23.3 cfs Q10 Inflow = 34.9 cfs Q10 Outflow = 8.4 cfs Attenuation Provided for 10-Year Storm = 26.5 cfs Water Quality Basin No. 2 Q2 Inflow = 45.6 cfs Colonial Grand - Stormwater Calcs. 5 7/14/2007 Q2 Outflow = 0.7 cfs Attenuation Provided for 2-Year Storm = 44.9 cfs Q10 Inflow = 57.1 cfs Q10 Outflow = 2.3 cfs Attenuation Provided for 10-Year Storm = 54.8 cfs Total Q2 Attenuation Provided = Minimum Q2 Attenuation Req'd = Total Q10 Attenuation Provided = Minimum Q10 Attenuation Req'd = 23.3 cfs + 44.9 cfs 68.2 cfs 61.1 cfs < 68.2 cfs Okay 26.6 cfs + 54.8 cfs 81.4 cfs 76.5 cfs < 81.4 cfs Okay Colonial Grand - Stormwater Calcs. 6 7/14/2007 1 0 APPENDIX A - u n SUMMARY OF WATER QUALITY BASIN DESIGN CALCULATIONS FOR WET DETENTION BASIN NO. 1 USING EXCEL SPREADSHEET Colonial Grand - Stormwater Calcs. 7 7/14/2007 Water Quality Retention Calculations Project Name: Colonial Grand at Wakefield - Wet Detention Basin No. 1 ' Date: July 14, 2007 Determine Surface Area Required for Permanent Pool: ' Drainage Area (ac): 6.9 Impervious Area (ac): 4.3 Percent Impervious: 62.3% Perm. Pool Depth (ft): 3 SA/DA @ 60% 2.4 (from Table 1.1 of NCDENR's Stormwater BMP manual) SA/DA @ 70% 2.88 (from Table 1.1 of NCDENR's Stormwater BMP manual) ' Interpolated SA/DA: 2.51 Req. Surface Area (so: 7,548 (at permanent pool elevation) ' Perm. Pool Elevation: 267.50 Provided Surface Area (so: 17,492 OK - Surface area requirement met Provided Storage (cf): 53,953 Check Hydraulic Depth (ft): 3.08 OK - Hydraulic depth requirement met Calculate the Volume Required to Treat the First Flush: Rainfall to Treat: 1 inch(es) ' Runoff Coefficient (Rv) = 0.05 + 0.009`(% Impervious) Runoff Coefficient (Rv): 0.61 in/in Runoff Volume (V) = Rainfall ` (Rv) " (Drainage Area) Runoff Volume (V): 15,300 CF Calculate the Depth Required for the Temporary Pool: Perm. Pool Elevation: 267.50 Provided Surface Area (so: 17,492 (at permanent pool elevation) Provided Storage (cf): 53,953 Volume Req. for Temp. Pool (CF): 15,300 (this amount required above Perm. Pool) Total Volume Req Temp & Perm(CF): 69,253 El. Of Temp. Pool Between: 268.00 and 269.00 El. Of Temp. Pool: 268.32 Depth of Temp. Pool (ft): 0.82 measured from perm. Pool elevation Determine the Orifice Size for 2-5 Day Drawdown: Orifice Invert Elevation: 267.50 Elevation of Temp. Pool: 268.32 Orifice Diameter (in): 2.00 Use the orifice equation to determine flow and drawdown time: Orifice Equation: Q = C * A i (2gh)^0.5 Volume to Draw Down (CF): 15,300 Flow for 2-Day Drawdown (CFS): 0.089 Flow for 5-Day Drawdown (CFS): 0.035 0.6 g g (SF/s): 32.2 h (ft): 0.368 (average driving head to centerline of orifice) A (so: 0.0218 Solve Orifice Equation for Q (CFS): 0.064 Drawdown Time (Days): 2.78 OK - Drawdown between 2 and 5 days. 1 1 1 1 1 c N U t ? c c C) W Q O O d) O ? M O ? O ti O O O O ' ? ?- f? to Ln Lf? C7 M d) 0 0 0 0 Q N N M ? 'IT to LO 0 0 0 0 Q -- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W Q N O ? N M ::r LA Co 1, 00 0 0 ? N M ? r r r r N W 0 0 0 0 0 0 0 O 0 O a) a) a) a) M Lo Lo Lo O Lo O N Ln V J Q ~ N 0 0 M O ti LO O 0 N 0 CO LO N ti lt "t "t ? ... 00 _ CN (Y) LO O 4) N > LO ? N M ? (0 OD O M > > > > 0 0 0 0 W 0 0 0 0 0 0 0 0 M LLo 0 0 0 Ln Ln 0 O O H 0 0 N It It 0) VI- 0) -LO CN P, ? O 0 O 0 O 0 O 0 J c O `- O P- C %4 I t 0 > LO I? 00 O M r. 0 N N N W C7 o o 0 0 m 0 m 0 m 0 0 Q W U. m 4 00 O o N (14 o N o M 0 0 0 0 W Cl) •.? 0 0 N 15 RT M 0) N d? LA u N » I? 0 0 0 0 > Q L Lr) N 00 0 m N 0 N Cf Q N N N Q W N < N ? N 00 Cr 00 r ? M ? ? CN ? M ? Lr) N ? LO C%4 CO d 't O O Q LL „ r' LA :* to N iZ : a r LA r 0) K- ? N CO N Ln N > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 , 0 , 0 0 0 0 0 0 0 0 0 J N M KT M W N, 00 0, O r N M 1::T LA N N N N N N N N N N N N N N r c N O IL 0 LO M O O) c N O O M c a? c m E a) a 0 o .r o E Q •a a) a) m? c c •? Cc U C O .? U a) 4- Q W O N U 0 O E r r _N .Q co 0 2 0 0 0 0 0 0 0 0 0 a o 0 0 o 0 0 o 0 0 N M O M W 0 O CO I- N 1l- N O CD N f- C) N 0 ",t 0 Cfl 0 1- 0 CA 0 - N ",t (q O O c0 N O M Cn O M M N 0 ? 0 CO 0 M 0 O ?- ? M ? CO ? M ? O ? M 0 LO 0 rl- 0 M 0 O ? N ? LO ?- O ? ?- N L a 7 O Lr) M 0 LO M Cb 0 O O M ? Cn 0 0 7 T M O a 0 0 0 0 r N N c a? c cu E O M O I- LO O r- r- w O ? x ? 0 I` 0 O 0 N E H O N M N O N O CA CA 00 co M M O co O ,It 0 r- 0 O ? O N It N N M O C? L') fl- 0 It M M N O O O It m M O M It 1l M O O N N N Cl) CO O 3 O 2 o 0 0 0 0 0 0 0 0 0 0 o o 0 0 o o 0 0 ? N M ? Cf) O ? C70 O 0 a) U L O co APPENDIX B - SUMMARY OF ROUTING CALCULATIONS FOR WET ' DETENTION BASIN NO. 7 FOR THE Q2, Q10 AND Q100 STORMS USING PONDPACK ' COMPUTER SOFTWARE BY HAESTAD METHODS 1 Colonial Grand - Stormwater Calcs. 8 7/14/2007 Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- 1 1 0 1 1 COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q2 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc t PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A...... 2-Year SCS Unit Hyd. Summary .............. 3.01 **************s******** POND VOLUMES **::******************* POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.05 ********:***:****s***** POND ROUTING *********************** POND 1 OUT 2-Year Pond Routing Summary ............... 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event in Type RNF File RNF ID ------------ 2-Year ------ ---------------- -------- 3.6000 Synthetic Curve SCSTYPES ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID ----------------- Type Event ac-ft Trun hrs ---- ------ ---------- -- --------- cfs ft ac-ft -------- -------- --------- BASIN D.A. AREA 2 1.571 11.9000 27.81 *DISCHARGE PT 1 JCT 2 1.425 12.1500 4.48 POND 1 IN POND 2 1.571 11.9000 27.81 POND 1 OUT POND 2 1.425 12.1500 4.48 269.41 2.104 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q2 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Storm Tag Name = 2-Year Page 2.01 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 62180250GA84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 ' Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 2-Year Event: 2 yr ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 2-Year SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.6000 in ' Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear ' HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ HYG File - ID - BASIN D.A. 2-Year Tc (Min. Tc) = .0833 hrs ' Drainage Area = 6.900 acres Runoff CN= 92 -------------------------------------------- -------------------------------------------- Computational Time Increment = 01111 hrs ' Computed Peak Time 11.9175 hrs Computed Peak Flow 28.56 cfs ' Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output 27.81 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ID:None Selected CN = 92 Area = 6.900 acres S = .8696 in 0.2S = .1739 in Cumulative Runoff ------------------- 2.7325 in 1.571 ac-ft HYG Volume... 1.571 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: None Selected) ' Computational Incr, Tm = .01111 hrs = 0. 20000 Tp Unit Hyd. Shape Fact or = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) ' Receding/Rising, Tr/ Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.85 cfs ' Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Vol: Elev-Area Name.... POND 1 Page 4.01 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 1 Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (acres) ---------- - (acres) ---------------- (ac-ft) ---------- (ac-ft) ------------- ----------- 262.00 ---------- - ----- .1180 .0000 .000 .000 264.00 ----- .1788 .4421 .295 .295 266.00 ----- .2577 .6512 .434 .729 268.00 ----- .4498 1.0480 .699 1.427 270.00 ----- .5379 1.4796 .986 2.414 271.00 ----- .5968 1.7013 .567 2.981 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 1 1 1 Type.... Outlet Input Data Page 5.01 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 262.00 ft Increment = .50 ft Max. Elev.= 271.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Stand Pipe SP ---> CV 269.200 271.000 Orifice-Circular OR ---> CV 267.500 271.000 Culvert-Circular CV ---> TW 261.500 271.000 Weir-Rectangular WR ---> TW 269.600 271.000 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 , Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS I - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID = SP Structure Type = Stand Pipe ----------------- # of Openings ------------- = 1 ------ Invert Elev. = 269.20 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 267.50 ft Diameter = .1700 ft Orifice Coeff. _ .600 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 ' Type.... Outlet Input Data Page 5.03 Name.... OUTLET ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW ' OUTLET STRUCTURE INPUT DATA ' Structure ID = CV Structure Type = Culvert-Circular ------------------------------------ No. Barrels 1 Barrel Diameter 1.5000 ft Upstream Invert 261.50 ft Dnstream Invert = 260.50 ft ' Horiz. Length 100.00 ft Barrel Length 100.01 ft Barrel Slope = .01000 ft/ft ' OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entrance loss) ' Kb .018213 (per ft of full flow) Kr .5000 (reverse entrance loss) HW Convergence = .001 +/- ft ' INLET CONTROL DATA ... Equation form 1 Inlet Control K = .0098 ' Inlet Control M 2.0000 Inlet Control c .03980 Inlet Control Y .6700 T1 ratio (HW/D) = 1.155 ' T2 ratio (HW/D) 1.302 Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. ' Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, ' interpolate between flows at T1 & T2... At T1 Elev = 263.23 ft --> Flow = 7.58 cfs At T2 Elev = 263.45 ft --> Flow = 8.66 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Outlet Input Data Page 5.04 ' Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA ' Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 269.60 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Composite Rating Curve Name.... OUTLET Page 5.05 ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETEN TION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW ' ***** COM POSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- - Elev. Q ----- TW El -- Converge ev Error ------------------------- ft cfs ft +/-ft Contributing Structures -------- 262.00 ------- - .00 ----- Free -- ----- Outfall -------------------------- (no Q: SP,OR,CV,WR) 262.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 263.00 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 263.50 264.00 .00 .00 Free Free Outfall Outfall (no Q: SP,OR,CV,WR) (no Q: SP,OR,CV,WR) 264.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 265.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 265.50 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 266.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 266.50 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 267.00 267.50 .00 .00 Free Free Outfall Outfall (no Q: SP,OR,CV,WR) (no Q: SP,OR,CV,WR) 268.00 .07 Free Outfall OR,CV (no Q: SP,WR) 268.50 .10 Free Outfall OR,CV (no Q: SP,WR) 269.00 269.20 .13 .14 Free Free Outfall Outfall OR,CV (no Q: SP,WR) OR,CV (no Q: SP,WR) 269.50 6.34 Free Outfall SP,OR,CV (no Q: WR) 269.60 9.69 Free Outfall SP,OR,CV (no Q: WR) 270.00 44.78 Free Outfall SP,CV,WR (no Q: OR) ' 270.50 99.53 Free Outfall SP,CV,WR (no Q: OR) 271.00 172.43 Free Outfall SP,CV,WR (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 ' Name.... POND 1 OUT Tag: 2-Year Event: 2 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q2 ANALYSIS - 7-14-07).PPW I Storm... TypeII 24hr Tag: 2-Year LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - POND 1 IN 2-Year Outflow HYG file = NONE STORED - POND 1 OUT 2-Year Pond Node Data = POND 1 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 267.50 ft Starting Volume = 1.216 ac-fit Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 27.81 cfs at 11.9000 hrs Peak Outflow = 4.48 - cfs at 12.1500 hrs ----------------------- ---- Peak --------------- Elevation = ---------- 269.41 ft Peak Storage = 2.104 ac-ft MASS BALANCE (ac-ft) ----- ------------- + Initial Vol -------- = 1.216 + HYG Vol IN = 1.571 - Infiltration = .000 - HYG Vol OUT = 1.425 - Retained Vol = 1.360 Unrouted Vol = -.003 ac-ft (.180% of Inflow Volume) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 2-Year... 3.01 ----- 0 ----- OUTLET... 5.01, 5.05 ----- P ----- POND 1... 4.01, 6.01 ----- R ----- Raleigh... 2.01 ----- W ----- Watershed... 1.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:20:04 Date: 07/14/2007 0 1 1 1 1 n 1 Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE -------------------------- -------------------------- COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q10 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A...... 10-Yea SCS Unit Hyd. Summary .............. 3.01 ***s***:*************** POND VOLUMES *********************** POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.05 ******s**************:* POND ROUTING *****s***************** POND 1 OUT 10-Yea Pond Routing Summary ............... 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event in Type RNF File RNF ID ------------- ------------ 10-Yea ------ 5.3800 ------------ Synthetic Cu ---- -------- rve SCSTYPES --- TypeII 24hr MAS TER NETWORK SUMMARY SCS U nit Hydrogra ph Method (*Node=Ou tfall; +Node =Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ------ ID ----------- Type Event ---- ------ ac-ft ---------- Trun hrs -- --------- cfs ft ac-ft -------- -------- --------- BASIN D.A. AREA 10 1.928 11.9000 34.86 *DISCH ARGE PT 1 JCT 10 1.789 12.1000 8.41 POND 1 IN POND 10 1.928 11.9000 34.86 POND 1 OUT POND 10 1.789 12.1000 8.41 269.56 2.182 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q10 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Storm Tag Name = 10-Yea Page 2.01 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.3800 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 ' Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 10-Yea Event: 10 yr ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 10 Yea t SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 5.3800 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = R?\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ HYG File - ID BASIN D.A. 10-Yea Tc (Min. Tc) = .0833 hrs Drainage Area = 6.900 acres Runoff CN= 81 -------------------------------------------- -------------------------------------------- Computational Time Increment = .01111 hrs ' Computed Peak Time 11.9175 hrs Computed Peak Flow 36.11 cfs ' Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output 34.86 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA 1 ID:None Selected CN = 81 Area = 6.900 acres S = 2.3001 in 0.2S = .4600 in Cumulative Runoff ------------------- 3.3526 in 1.928 ac-ft HYG Volume... 1.928 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: None Selected) ' Compu tational Incr, Tm = .01111 hrs = 0. 20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) ' Reced ing/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.85 cfs ' Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total 1 unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Vol: Elev-Area Page 4.01 Name.... POND 1 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 1 Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) ------- (acres) ---------------- (ac-ft) ---------- (ac-ft) ------------- ----------- 262.00 --------------- ----- .1180 .0000 .000 .000 264.00 ----- .1788 .4421 .295 .295 266.00 ----- .2577 .6512 .434 .729 268.00 ----- .4498 1.0480 .699 1.427 270.00 ----- .5379 1.4796 .986 2.414 271.00 ----- .5968 1.7013 .567 2.981 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Outlet Input Data Page 5.01 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 262.00 ft Increment = .50 ft Max. Elev.= 271.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Stand Pipe SP ---> CV 269.200 271.000 Orifice-Circular OR ---> CV 267.500 271.000 Culvert-Circular CV ---> TW 261.500 271.000 Weir-Rectangular WR ---> TW 269.600 271.000 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 i Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS I - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID = SP Structure Type ----------------- = Stand Pipe ------------- ------ # of Openings = 1 Invert Elev. = 269.20 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000. Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 267.50 ft Diameter = .1700 ft Orifice Coeff. _ .600 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 ' Type .... Outlet Input Data Page 5.03 Name .... OUTLET ' File .... R:\2006JOB5\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET D ETENTION BASIN 1 (Q10 ANALYSIS - 7-14-0 7).PPW OUTLET STRUCTURE INPUT DATA Structure ID = CV ' Structure Type = Culvert-C ircular ------ ' ----------------------------- No. Barrels 1 Barrel Diameter 1.5000 - ft Upstream Invert 261.50 ft Dnstream Invert = 260.50 ft ' Horiz. Length 100.00 Barrel Length 100.01 ft ft Barrel Slope = .01000 ft/ft ' OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entran ce loss) ' Kb .018213 Kr .5000 (per ft of full (reverse entran flow) ce loss) HW Convergence .001 +/- ft ' INLET CONTROL DATA ... Equation form 1 Inlet Control K = .0098 Inlet Control M = 2.0000 ' Inlet Control c .03980 Inlet Control Y .6700 T1 ratio (HW/D) = 1.155 ' T2 ratio (HW/D) 1.302 Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. ' Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, ' int At erpolate between flows at T1 & T2... T1 Elev = 263.23 ft --- > Flow = 7.58 cfs At T2 Elev = 263.45 ft --> Flow = 8.66 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Outlet Input Data Page 5.04 ' Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA , Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 269.60 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 ' Type.... Composite Rating Curve Name.... OUTLET Page 5.05 ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ----- --- Converge -------- ----------------- ' Elev. Q TW Elev Error ft cfs ft +/-ft Contribu ting Structures -------- 262.00 ------- .00 ----- Free --- ----- Outfall --------- (no Q: ----------------- SP,OR,CV,WR) 262.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 263.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 263.50 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 264.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 264.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 265.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 265.50 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 266.00 .00 Free Outfall (no Q: SP,OR,CV,WR) 266.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 267.00 .00 Free Outfall (no Q: SP,OR,CV,WR) ' 267.50 .00 Free Outfall (no Q: SP,OR,CV,WR) 268.00 .07 Free Outfall OR,CV ( no Q: SP,WR) 268.50 .10 Free Outfall OR,CV ( no Q: SP,WR) 269.00 .13 Free Outfall OR,CV ( no Q: SP,WR) ' 269.20 .14 Free Outfall OR,CV ( no Q: SP,WR) 269.50 6.34 Free Outfall SP,OR,CV (no Q: WR) 269.60 9.69 Free Outfall SP,OR,CV (no Q: WR) 270.00 44.78 Free Outfall SP,CV,WR (no Q: OR) ' 270.50 99.53 Free Outfall SP,CV,WR (no Q: OR) 271.00 172.43 Free Outfall SP,CV,WR (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 ' Name.... POND 1 OUT Tag: 10-Yea Event: 10 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q10 ANALYSIS - 7-14-07).PPW I Storm... TypeII 24hr Tag: 10-Yea LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - POND 1 IN 10-Yea Outflow HYG file = NONE STORED - POND 1 OUT 10-Yea Pond Node Data = POND 1 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 267.50 ft Starting Volume = 1.216 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 34.86 cfs at 11.9000 hrs Peak Outflow = 8.41 cfs at 12.1000 hrs ------ ----- Peak -------------- Elevation = ---------- 269.56 ------------------ ft Peak ----- ----- Storage = -------------- -------------- 2.182 ---------- ---------- ac-ft ------------------------ ------------------------ MASS BALANCE (ac-ft) -------------------- + Initial Vol = ------ 1.216 + HYG Vol IN = 1.928 - Infiltration = .000 - HYG Vol OUT = 1.789 - Retained Vol = 1.351 Unrouted Vol = -.003 ac-ft (.156% of Inflow Volume) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 1 1 1 1 1 1 1 Appendix A Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 10-Yea... 3.01 ---- 0 ----- OUTLET... 5.01, 5.05 ----- P ----- POND 1... 4.01, 6.01 ----- R ----- Raleigh... 2.01 ----- W ----- Watershed... 1.01 A-1 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:15:51 Date: 07/14/2007 Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE -------------------------- -------------------------- COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q100 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A...... 100-Ye SCS Unit Hyd. Summary .............. 3.01 ********s************** POND VOLUMES *********************** POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.05 **************s******** POND ROUTING *********s************* POND 1 OUT 100-Ye Pond Routing Summary ............... 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event in Type RNF File RNF ID ---- ------------ ------ ---------------- 100-Ye 8.0000 Synthetic Curve SCSTYPES TypeII 24hr 1 1 1 1 1 1 1 1 1 1 1 1 MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Storage Node ID -------------- Type --- ---- Event ------ ac-ft Trun -------- BASIN D.A. AREA 100 2.593 *DISCHARGE PT 1 JCT 100 2.458 POND 1 IN POND 100 2.593 POND 1 OUT POND 100 2.458 2.302 Max Qpeak Qpeak Max WSEL Pond hrs --------- cfs ft ac-ft -------- -------- ------- 11.9000 46.90 12.0500 26.33 11.9000 46.90 12.0500 26.33 269.79 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/Z007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 1 Q100 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Page 2.01 Storm Tag Name = 100-Ye ----------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 100-Ye Event: 100 yr ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 100-Ye SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 8.0000 in ' Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear ' HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ HYG File - ID = - BASIN D.A. 100-Ye Tc (Min. Tc) = .0833 hrs Drainage Area = 6.900 acres Runoff CN= 70 ' Computational Time Increment .01111 hrs Computed Peak Time 11.9175 hrs Computed Peak Flow 48.81 cfs ' Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output = 46.90 cfs -------------------------------------------- ' DRAINAGE AREA ------------------- ' ID:None Selected CN 70 Area 6.900 acres S = 4.2045 in ' 0.2S = .8409 in Cumulative Runoff ------------------- 4.5102 in ' 2.593 ac-ft HYG Volume... 2.593 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: None Selected) Computational Incr, Tm = .01111 hrs = 0.20000 Tp ' Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp 1.6698 (solved from K = .7491) ' Unit peak, qp = 93.85 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Vol: Elev-Area Name.... POND 1 Page 4.01 File.... R:\2006JOBS \06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS , - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 1 Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) --- (acres) ----------------- (ac-ft) --------- (ac-ft) ------------- ----------- 262.00 ------------------- ----- .1180 .0000 .000 .000 264.00 ----- .1788 .4421 .295 .295 266.00 ----- .2577 .6512 .434 .729 268.00 ----- .4498 1.0480 .699 1.427 270.00 ----- .5379 1.4796 .986 2.414 271.00 ----- .5968 1.7013 .567 2.981 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 5/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (7860 Compute Time: 10:23:59 Date: 07/14/2007 Type.... Outlet Input Data Page 5.01 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 262.00 ft Increment = .50 ft Max. Elev.= 271.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < --- > Forward and Revers e Both Allowed Structure No. Outfall E1, ft - - E2, ft -------- ----------------- - Stand Pipe --- SP ---> ------- CV -------- 269.200 271.000 Orifice-Circular OR ---> CV 267.500 271.000 Culvert-Circular CV ---> TW 261.500 271.000 Weir-Rectangular WR ---> TW 269.600 271.000 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 ' Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANA LYSIS - 7-14-07).PPW , OUTLET STRUCTURE INPUT DATA , Structure ID = SP , Structure Type = Stand Pipe ------------- ---------------- # of Openings ------- = 1 ' Invert Elev. = 269.20 ft Diameter = 4.0000 ft Orifice Area 12.5664 sq.ft Orifice Coeff. _ .600 , Weir Length 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 ' Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 , Structure ID = OR ' Structure Type = Orifice-Circular --------------- ---------------- # of Openings ----- = 1 Invert Elev. = 267.50 ft ' Diameter = .1700 ft Orifice Coeff. _ .600 S/N: 621 802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 ' Type.... Outlet Input Data Name.... OUTLET Page 5.03 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA ' Structure ID = CV Structure Type = Culvert-Circular ------------------------------------ No. Barrels 1 Barrel Diameter 1.5000 ft Upstream Invert 261.50 ft Dnstream Invert = 260.50 ft Horiz. Length _ 100.00 ft Barrel Length 100.01 ft Barrel Slope = .01000 ft/ft ' OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entrance loss) Kb .018213 (per ft of full flow) Kr .5000 (reverse entrance loss) HW Convergence = .001 +/- ft ' INLET CONTROL DATA ... Equation form 1 Inlet Control K = .0098 ' Inlet Control M 2.0000 Inlet Control c .03980 Inlet Control Y .6700 T1 ratio (HW/D) = 1.155 ' T2 ratio (HW/D) 1.302 Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, ' interpolate between flows at T1 & T2... At T1 Elev = 263.23 ft --> Flow = 7.58 cfs At T2 Elev = 263.45 ft -- >' Flow = 8.66 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Outlet Input Data Page 5.04 ' Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 269.60 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Composite Rating Curve Name.... OUTLET Page 5.05 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- 262.00 ------- .00 262.50 .00 263.00 .00 263.50 .00 264.00 .00 264.50 .00 265.00 .00 265.50 .00 266.00 .00 266.50 .00 267.00 .00 267.50 .00 268.00 .07 268.50 .10 269.00 .13 269.20 .14 269.50 6.34 269.60 9.69 270.00 44.78 270.50 99.53 271.00 172.43 Notes ------ -- Converge ------- ------------------ TW El ev Error ft +/-ft Contrib uting Structures -- ------- ------ Free -- ----- Outfall -------- (no Q: -------- - SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall (no Q: SP,OR,CV,WR) Free Outfall OR,CV (no Q: SP,WR) Free Outfall OR,CV (no Q: SP,WR) Free Outfall OR,CV (no Q: SP,WR) Free Outfall OR,CV (no Q: SP,WR) Free Outfall SP,OR,C V (no Q: WR) Free Outfall SP,OR,C V (no Q: WR) Free Outfall SP,CV,W R (no Q: OR) Free Outfall SP,CV,W R (no Q: OR) Free Outfall SP,CV,W R (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 Name.... POND 1 OUT Tag: 100-Ye Event: 100 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 1 (Q100 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 100-Ye LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - POND 1 IN 100-Ye Outflow HYG file = NONE STORED - POND 1 OUT 100-Ye Pond Node Data = POND 1 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 267.50 ft Starting Volume = 1.216 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 46.90 cfs at 11.9000 hrs Peak Outflow = 26.33 ---- cfs at 12.0500 hrs ----------------------- ----- Peak -------------- Elevation = ------- 269.79 ft Peak Storage = 2.302 ac-ft MASS BALANCE (ac-ft) ------ ------------- + Initial Vol ------- = 1.216 + HYG Vol IN = 2.593 - Infiltration = .000 - HYG Vol OUT = 2.458 - Retained Vol = 1.348 Unrouted Vol = -.003 ac-ft (.118% of Inflow Volume) S/N: 62180250GA84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 Appendix A Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 100-Ye... 3.01 ----- 0 ----- OUTLET... 5.01, 5.05 ----- P ----- POND 1... 4.01, 6.01 ----- R ----- Raleigh... 2.01 ----- W ----- Watershed... 1.01 A-1 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:23:59 Date: 07/14/2007 1 G' 0 L ' APPENDIX D ' SUMMARY OF ROUTING CALCULATIONS FOR WET ' DETENTION BASIN NO.2 FOR THE Q2, Q10 AND Q100 STORMS USING PONDPACK ' COMPUTER SOFTWARE BY HAESTAD METHODS 1 Colonial Grand - Stormwater Calcs. 10 7/14/2007 Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 2 Q2 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Table of Contents Table of Contents i ********************** MASTER SUMMARY ******************:*** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A....... 2-Year SCS Unit Hyd. Summary .............. 3.01 ********************:** POND VOLUMES *********************** POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.04 *****s:********s*s****s POND ROUTING *****s***************:* SED. BASIN 2 OUT 2-Year Pond Routing Summary .............. 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 1 1 1 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event in Type RNF File RNF ID ------------ 2-Year ------ ---------------- -------- 3.6000 Synthetic Curve SCSTYPES ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ------ ID ----------- Type Event ac-ft Trun hrs ---- ------ ---------- -- --------- cfs ft ac-ft -------- -------- --------- BASIN D.A. AREA 2 2.573 11.9000 45.55 *DISCH ARGE PT 3 JCT 2 2.155 18.4000 .66 SED. BASIN 2 IN POND 2 2.573 11.9000 45.55 SED. BASIN 2 OUT POND 2 2.155 18.4000 .66 279.51 3.173 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 2 Q2 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Storm Tag Name = 2-Year Page 2.01 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 2-Year Event: 2 yr File.... R:1200610BS106678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 2-Year SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.6000 in ' Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear ' HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ HYG File - ID - BASIN D.A. 2-Year Tc (Min. Tc) = .0833 hrs ' Drainage Area = 11.300 acres Runoff CN= 92 -------------------------------------------- -------------------------------------------- Computational Time Increment = .01111 hrs ' Computed Peak Time 11.9175 hrs Computed Peak Flow 46.78 cfs ' Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output 45.55 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ID:None Selected CN = 92 Area = 11.300 acres S = .8696 in 0.2S = .1739 in Cumulative Runoff ------------------- 2.7325 in 2.573 ac-ft HYG Volume... 2.573 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: None Selected) ' Compu tational Incr, Tm = .01111 hrs = 0. 20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) ' Reced ing/Rising, Tr/ Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 153.70 cfs ' Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Vol: Elev-Area Page 4.01 , Name.... POND 1 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 2 Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) ---------------- --- (acres) ----------------- (ac-ft) --------- (ac-ft) ------------- ------------ 270.00 - - ----- .1037 .0000 .000 .000 272.00 ----- .1584 .3903 .260 .260 274.00 ----- .3106 .6908 .461 .721 276.00 ----- .4158 1.0858 .724 1.445 278.00 ----- .5019 1.3745 .916 2.361 280.00 ----- .5971 1.6464 1.098 3.459 282.00 ----- .7101 1.9584 1.306 4.764 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (E L2-ELI) * (Areal + Areal + sq.rt. (Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incre mental volume between EL1 and EL2 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Outlet Input Data Page 5.01 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 270.00 ft Increment = .50 ft Max. Elev.= 282.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Weir-Rectangular WR ---> TW 280.500 282.000 Stand Pipe SP ---> CV 279.500 282.000 Orifice-Circular OR ---> CV 275.000 282.000 Culvert-Circular CV ---> TW 269.500 282.000 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 ' Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS I - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 280.50 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = SP Structure Type = Stand Pipe ----------------- # of Openings ------------- = 1 ------ Invert Elev. = 279.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 275.00 ft Diameter = .2080 ft Orifice Coeff. _ .600 S/N: 62180250GA84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Outlet Input Data Page 5.03 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW ' OUTLET STRUCTURE INPUT DATA ' Structure ID = CV Structure Type = Culvert-Circular ------------------------------------ ' No. Barrels 1 Barrel Diameter 1.5000 ft Upstream Invert 269.50 ft Dnstream Invert = 264.00 ft Horiz. Length 150.00 ft Barrel Length 150.10 ft Barrel Slope - .03667 ft/ft ' OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entrance loss) Kb .018213 (per ft of full flow) Kr .5000 (reverse entrance loss) HW Convergence .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.142 T2 ratio (HW/D) = 1.288 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 271.21 ft ---> Flow = 7.58 cfs At T2 Elev = 271.43 ft ---> Flow = 8.66 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 5/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 ' Type.... Composite Rating Curve Name.... OUTLET Page 5.04 ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW ' ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ------- ------------------ Elev. Q TW El ev Error ft cfs ft +/-ft Contrib uting Structures -------- 270.00 ------- .00 ------ Free -- ----- Outfall -------- (no Q: ------------------ WR,SP,OR,CV) 270.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.50 .00 Free Outfall (no Q: WR,SP,OR,CV) ' 274.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 274.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 275.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 275.50 .10 Free Outfall OR,CV (no Q: WR,SP) 276.00 .15 Free Outfall OR,CV (no Q: WR,SP) 276.50 .19 Free Outfall OR,CV (no Q: WR,SP) 277.00 .23 Free Outfall OR,CV (no Q: WR,SP) ' 277.50 .25 Free Outfall OR,CV (no Q: WR,SP) 278.00 .28 Free Outfall OR,CV (no Q: WR,SP) 278.50 .30 Free Outfall OR,CV (no Q: WR,SP) ' 279.00 .32 Free Outfall OR,CV (no Q: WR,SP) 279.50 .34 Free Outfall OR,CV (no Q: WR,SP) 280.00 13.69 Free Outfall SP,OR,C V (no Q: WR) 280.50 26.68 Free Outfall SP,CV (no Q: WR,OR) ' 281.00 58.95 Free Outfall WR,SP,C V (no Q: OR) 281.50 117.56 Free Outfall WR,SP,C V (no Q: OR) 282.00 193.33 Free Outfall WR,SP,C V (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 I Name.... SED. BASIN 2 OUT Tag: 2-Year Event: 2 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q2 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 2-Year LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - SED. BASIN 2 IN 2-Year Outflow HYG file = NONE STORED - SED. BASIN 2 OUT 2-Year Pond Node Data = SED. BASIN 2 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 275.00 ft Starting Volume = 1.056 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 45.55 cfs at 11.9000 hrs Peak Outflow = .66 cfs at 18.4000 hrs -------- ---- Peak --------------- Elevation = ----------- 279.51 --------------- ft Peak ---- ---- Storage = --------------- --------------- 3.173 ----------- ----------- ac-ft ----------------------- ----------------------- MASS BALANCE (ac-ft) ------------- + Initial Vol ------------- = 1.056 + HYG Vol IN = 2.573 - Infiltration = .000 - HYG Vol OUT = 2.155 - Retained Vol = 1.474 Unrouted Vol = -.001 ac-ft (.024% of Inflow Volume) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 Appendix A Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 2-Year... 3.01 ----- 0 ----- OUTLET... 5.01, 5.04 ----- P ----- POND 1... 4.01 ----- R ----- Raleigh... 2.01, 6.01 ----- W ----- Watershed... 1.01 A-1 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:34:14 Date: 07/14/2007 ' Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW ' Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE COLONIAL GRAND AT WAKEFIELD APARTMENTS ' WET DETENTION BASIN NO. 2 Q10 ROUTING CALCULATIONS ' The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 ' post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater ' calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the ' discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Table of Contents Table of Contents i **********:*********** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A....... 10-Yea SCS Unit Hyd. Summary .............. 3.01 **s******************** POND VOLUMES *****:***************** POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.04 **********************s POND ROUTING **************s******** SED. BASIN 2 OUT 10-Yea Pond Routing Summary ............... 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 1 1 1 1 1 1 1 1 1 1 1 1 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event RNF File in RNF ID ------------ 10-Yea ---------------- -------- ------ -------- 5.3800 Synthetic Curve SCSTYPES ----- -------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ------ ID ----------- Type Event ac-ft Trun hrs ---- ------ ---------- -- --------- cfs ft ac-ft -------- -------- --------- BASIN D.A. AREA 10 3.157 11.9000 57.09 *DISCH ARGE PT 3 JCT 10 2.768 13.7000 2.30 SED. BASIN 2 IN POND 10 3.157 11.9000 57.09 SED. BASIN 2 OUT POND 10 2.768 13.7000 2.30 279.57 3.208 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 2 Q10 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Storm Tag Name = 10-Yea Page 2.01 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.3800 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 10-Yea Event: 10 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 10-Yea SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 5.3800 in ' Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear ' HYG Dir = R?\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ HYG File ID BASIN D.A. 10 Yea Tc (Min. Tc) = .0833 hrs ' Drainage Area = 11.300 acres Runoff CN= 81 -------------------------------------------- -------------------------------------------- Computational Time Increment = .01111 hrs Computed Peak Time 11.9175 hrs Computed Peak Flow 59.14 cfs ' Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output 57.09 cfs -------------------------------------------- -------------------------------------------- ' DRAINAGE AREA ------------------- ID:None Selected t CN = 81 Area = 11.300 acres S = 2.3001 in ' 0.2S = .4600 in Cumulative Runoff ------------------- ' 3.3526 in 3.157 ac-ft HYG Volume... 3.157 ac-ft (area under HYG curve) ' ***** UNIT HYDROGRAPH PARAMETERS ***** ' Time Concentration, Tc = .08330 hrs (ID: None Selected) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) ' K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) ' Unit peak, qp = 153.70 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Type.... Vol: Elev-Area Name.... POND 1 Page 4.01 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 2 Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) ---------- ------ (acres) ---------------- (ac-ft) ---------- (ac-ft) ------------- ------------ 270.00 --- -- ----- .1037 .0000 .000 .000 272.00 ----- .1584 .3903 .260 .260 274.00 ----- .3106 .6908 .461 .721 276.00 ----- .4158 1.0858 .724 1.445 278.00 ----- .5019 1.3745 .916 2.361 280.00 ----- .5971 1.6464 1.098 3.459 282.00 ----- .7101 1.9584 1.306 4.764 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (7860 Compute Time: 10:32:14 Date: 07/14/2007 Type.... Outlet Input Data Page 5.01 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 270.00 ft Increment = .50 ft Max. Elev.= 282.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Weir-Rectangular WR ---> TW 280.500 282.000 Stand Pipe SP ---> CV 279.500 282.000 Orifice-Circular OR ---> CV 275.000 282.000 Culvert-Circular CV ---> TW 269.500 282.000 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 I Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS' - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 280.50 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = SP Structure Type ----------------- = Stand Pipe ------------- ------ # of Openings = 1 Invert Elev. = 279.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 275.00 ft Diameter = .2080 ft Orifice Coeff. _ .600 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 ' Type.... Outlet Input Data Page 5.03 Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA ' Structure ID = CV Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 ' Barrel Diameter 1.5000 ft Upstream Invert 269.50 ft Dnstream Invert = 264.00 ft ' Horiz. Length 150.00 ft Barrel Length 150.10 ft Barrel Slope = .03667 ft/ft OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entrance loss) ' Kb .018213 (per ft of full flow) Kr .5000 (reverse entrance loss) HW Convergence .001 +/- ft INLET CONTROL DATA ... Equation form 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c .03980 ' Inlet Control Y .6700 T1 ratio (HW/D) = 1.142 T2 ratio (HW/D) 1.288 ' Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. ' Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ' At T1 Elev = 271.21 ft --- > Flow = 7.58 cfs At T2 Elev = 271.43 ft --> Flow = 8.66 cfs ' Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... ' Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (7860 Compute Time: 10:32:14 Date: 07/14/2007 Type.... Composite Rating Curve Name.... OUTLET Page 5.04 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETEN TION BASIN 2 (Q1 0 ANALYSIS - 7-14-07).PPW ***** COM POSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ------------------------- ' Elev. Q TW El ev Error ft cfs ft +/-ft Contributing Structures -------- 270.00 ------- .00 ------ Free -- ----- Outfall -------------------------- (no Q: WR,SP,OR,CV) 270.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 274.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 274.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 275.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 275.50 .10 Free Outfall OR,CV (no Q: WR,SP) 276.00 .15 Free Outfall OR,CV (no Q: WR,SP) 276.50 .19 Free Outfall OR,CV (no Q: WR,SP) 277.00 .23 Free Outfall OR,CV (no Q: WR,SP) 277.50 .25 Free Outfall OR,CV (no Q: WR,SP) 278.00 .28 Free Outfall OR,CV (no Q: WR,SP) 278.50 .30 Free Outfall OR,CV (no Q: WR,SP) ' 279.00 .32 Free Outfall OR,CV (no Q: WR,SP) 279.50 .34 Free Outfall OR,CV (no Q: WR,SP) 280.00 13.69 Free Outfall SP,OR,CV (no Q: WR) 280.50 26.68 Free Outfall SP,CV (no Q: WR,OR) 281.00 58.95 Free Outfall WR,SP,CV (no Q: OR) 281.50 117.56 Free Outfall WR,SP,CV (no Q: OR) 282.00 193.33 Free Outfall WR,SP,CV (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 i Name.... SED. BASIN 2 OUT Tag: 10-Yea Event: 10 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q10 ANALYSIS - 7-14-07).PPW I Storm... TypeII 24hr Tag: 10-Yea LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - SED. BASIN 2 IN 10-Yea Outflow HYG file = NONE STORED - SED. BASIN 2 OUT 10-Yea Pond Node Data = SED. BASIN 2 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 275.00 ft Starting Volume = 1.056 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 57.09 cfs at 11.9000 hrs Peak Outflow = 2.30 cfs at 13.7000 hrs ----- Peak ------------- Elevation = ----------- 279.57 ------------------------ ft Peak ----- ----- Storage = -------------- -------------- 3.208 ----------- ----------- ac-fit ----------------------- ----------------------- MASS BALANCE (ac-ft) -------------------- + Initial Vol = ------ 1.056 + HYG Vol IN = 3.157 - Infiltration = .000 - HYG Vol OUT = 2.768 - Retained Vol = 1.445 Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 1 1 1 1 1 1 Appendix A Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 10-Yea... 3.01 ----- 0 ----- OUTLET... 5.01, 5.04 ----- P ----- POND 1... 4.01 ----- R ----- Raleigh... 2.01, 6.01 ----- W ----- Watershed... 1.01 A-1 S/N: 62180250GA84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:32:14 Date: 07/14/2007 Job File: R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE -------------------------- -------------------------- COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 2 Q100 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Table of Contents Table of Contents i *:******************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Raleigh......... Design Storms ...................... 2.01 ******************** RUNOFF HYDROGRAPHS ******************** BASIN D.A....... 100-Ye SCS Unit Hyd. Summary .............. 3.01 *********************** POND VOLUMES *********************** POND 1.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.04 *****:************ss*s* POND ROUTING *********************** SED. BASIN 2 OUT 100-Ye Pond Routing Summary ............... 6.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 1 1 1 1 1 1 1 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID STORMS.RNQ Raleigh Total Depth Rainfall Return Event in ---------------- -------- RNF File -----RNF ID ------------ ------ -------- -------- 100-Ye 8.0000 Synthetic Curve SCSTYPES TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Storage Node ID -------------- Type --- ---- Event ------ ac-ft Trun ---------- BASIN D.A. AREA 100 4.247 *DISCHARGE PT 3 JCT 100 3.869 SED. BASIN 2 IN POND 100 4.247 SED. BASIN 2 OUT POND 100 3.869 3.343 Max Qpeak Qpeak Max WSEL Pond hrs --------- cfs ft ac-ft -------- -------- --------- 11.9000 76.80 12.4500 8.48 11.9000 76.80 12.4500 8.48 279.80 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... Design Storms Name.... Raleigh File.... C:\HAESTAD\PPKW\RAINFALL\STORMS.RNQ Title... COLONIAL GRAND AT WAKEFIELD APARTMENTS WET DETENTION BASIN NO. 2 Q100 ROUTING CALCULATIONS The following calculations are the routing calculations for the Colonial Grand at Wakefield Apartments in Raleigh, North Carolina. Wet Detention Basin Nos. 1 and 2 are designed to provide 85% TSS removal as required by the NCDWQ and also to reduce the Q2 and Q10 post-developed discharge to less than or equal to the Q2 and Q10 pre-developed discharge for each point of discharge as required by the City of Raleigh. The basins are also designed to pass the Q100 storm without overtopping the dam. The site stormwater calculations were performed using the Rational Method. The attached routing calculations were performed using the SCS methodology. The SCS curve number was manipulated so that the discharge for the respective storm will equal the discharge based on the Rational Equation. DESIGN STORMS SUMMARY Design Storm File,ID = STORMS.RNQ Raleigh Storm Tag Name = 100-Ye Page 2.01 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... SCS Unit Hyd. Summary Page 3.01 Name.... BASIN D.A. Tag: 100-Ye Event: 100 yr File.... R:\2006JOBS\066780001CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS ' - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW Storm... TypeII 24hr Tag: 100-Ye SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 8.0000 in ' Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL ' CALCS\ HYG File - ID = - BASIN D.A. 100-Ye Tc (Min. Tc) = .0833 hrs ' Drainage -Area -=-11300-acres --Runoff -CN=-70- Computational Time Increment = .01111 hrs Computed Peak Time 11.9175 hrs Computed Peak Flow 79.94 cfs Time Increment for HYG File = .0500 hrs ' Peak Time, Interpolated Output = 11.9000 hrs Peak Flow, Interpolated Output = 76.80 cfs -------------------------------------------- -------------------------------------------- ' ---DRAINAGE AREA -------- ---- ID:None Selected CN = 70 Area = 11.300 acres S = 4.2045 in ' 0.2S = .8409 in Cumulative Runoff ------------------- 4.5102 in 4.247 ac-ft HYG Volume... 4.247 ac-ft (area under HYG curve) ' ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: None Selected) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) ' K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 153.70 cfs ' Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... Vol: Elev-Area Name.... POND 1 Page 4.01 File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS' - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW Title... Wet Detention Basin No. 2 Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) ----------- (sq.in) (acres) ---------------------- (acres) ----------------- (ac-ft) --------- (ac-ft) ------------- 270.00 ----- .1037 .0000 .000 .000 272.00 ----- .1584 .3903 .260 .260 274.00 ----- .3106 .6908 .461 .721 276.00 ----- .4158 1.0858 .724 1.445 278.00 ----- .5019 1.3745 .916 2.361 280.00 ----- .5971 1.6464 1.098 3.459 282.00 ----- .7101 1.9584 1.306 4.764 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 ' Type.... Outlet Input Data Page 5.01 Name.... OUTLET ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIO NAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW ' REQUESTED POND WS ELEVATIONS: Min. Elev.= 270.00 ft ' Increment = .50 ft Max. Elev.= 282.00 ft OUTLET CONNECTIVITY ' ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- - Weir-Rectangular WR ---> TW 280.500 -------- 282.000 ' Stand Pipe SP --- > CV 279.500 282.000 Orifice-Circular OR --> CV 275.000 282.000 Culvert-Circular CV ---> TW 269.500 282.000 ' 1 TW SETUP, DS Channel S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... Outlet Input Data Page 5.02 , Name.... OUTLET File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS I - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. WR Weir-Rectangular ---------------- 1 280.50 ft 30.00 ft 3.000000 Weir TW effects (Use adjustment equation) Structure ID = SP Structure Type ----------------- = Stand Pipe ------------- ------ # of Openings = 1 Invert Elev. = 279.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 275.00 ft Diameter = .2080 ft Orifice Coeff. _ .600 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 r Type.... Outlet Input Data Name.... OUTLET Page 5.03 ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW r OUTLET STRUCTURE INPUT DATA r Structure ID = CV Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 r Barrel Diameter 1.5000 ft Upstream Invert 269.50 ft Dnstream Invert = 264.00 ft ' Horiz. Length 150.00 ft Barrel Length 150.10 ft Barrel Slope .03667 ft/ft OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 (forward entrance loss) Kb = .018213 (per ft of full flow) r Kr .5000 (reverse entrance loss) HW Convergence .001 +/- ft r INLET CONTROL DATA ... Equation form 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c .03980 Inlet Control Y .6700 T1 ratio (HW/D) = 1.142 r T2 ratio (HW/D) 1.288 Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. ' Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 271.21 ft --- > Flow = 7.58 cfs At T2 Elev = 271.43 ft --> Flow = 8.66 cfs r Structure ID = TW Structure Type = TW SETUP, DS Channel r ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... ' Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance .01 ft Max. HW tolerance = .01 ft Min. Q tolerance .10 cfs Max. Q tolerance = .10 cfs r S/N: 62180250GA84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... Composite Rating Curve Name.... OUTLET Page 5.04 ' File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW ' ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ------- ------------------ ' Elev. Q TW Elev Error ft -------- cfs ------- ft ------ +/-ft -- ----- Contrib -------- uting Structures ------------------ 270.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 270.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 271.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 272.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 273.50 .00 Free Outfall (no Q: WR,SP,OR,CV) ' 274.00 .00 Free Outfall (no Q: WR,SP,OR,CV) 274.50 .00 Free Outfall (no Q: WR,SP,OR,CV) 275.00 .00 Free Outfall (no Q: WR,SP,OR,CV) t 275.50 .10 Free Outfall OR,CV (no Q: WR,SP) 276.00 .15 Free Outfall OR,CV (no Q: WR,SP) 276.50 .19 Free Outfall OR,CV (no Q: WR,SP) 277.00 .23 Free Outfall OR,CV (no Q: WR,SP) ' 277.50 .25 Free Outfall OR,CV (no Q: WR,SP) 278.00 .28 Free Outfall OR,CV (no Q: WR,SP) 278.50 .30 Free Outfall OR,CV (no Q: WR,SP) 279.00 .32 Free Outfall OR,CV (no Q: WR,SP) 279.50 .34 Free Outfall OR,CV (no Q: WR,SP) 280.00 13.69 Free Outfall SP,OR,C V (no Q: WR) 280.50 26.68 Free Outfall SP,CV (no Q: WR,OR) 281.00 58.95 Free Outfall WR,SP,C V (no Q: OR) 281.50 117.56 Free Outfall WR,SP,C V (no Q: OR) 282.00 193.33 Free Outfall WR,SP,C V (no Q: OR) S/N: 621802506A84 Bass Nixon & Kennedy Inc ' PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Type.... Pond Routing Summary Page 6.01 I Name.... SED. BASIN 2 OUT Tag: 100-Ye Event: 100 yr File.... R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\WAKEFIELD APARTMENTS - WET DETENTION BASIN 2 (Q100 ANALYSIS - 7-14-07).PPW I Storm... TypeII 24hr Tag: 100-Ye LEVEL POOL ROUTING SUMMARY HYG Dir = R:\2006JOBS\06678000\CALCULATIONS\PONDPACK\RATIONAL CALCS\ Inflow HYG file = NONE STORED - SED. BASIN 2 IN 100-Ye Outflow HYG file = NONE STORED - SED. BASIN 2 OUT 100-Ye Pond Node Data = SED. BASIN 2 Pond Volume Data = POND 1 Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 275.00 ft Starting Volume = 1.056 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 76.80 cfs at 11.9000 hrs Peak Outflow = 8.48 cfs at 12.4500 hrs ------- ----- Peak -------------- Elevation = ----------- 279.80 ---------------- ft Peak Storage = 3.343 ac-ft MASS BALANCE (ac-ft) ------------- + Initial Vol ------------- = 1.056 + HYG Vol IN = 4.247 - Infiltration = .000 - HYG Vol OUT = 3.869 - Retained Vol = 1.434 Unrouted Vol = -.000 ac-ft (.008% of Inflow Volume) S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- B ----- BASIN D.A. 100-Ye... 3.01 ----- 0 ----- OUTLET... 5.01, 5.04 ----- P ----- POND 1... 4.01 ----- R ----- Raleigh... 2.01, 6.01 ----- W ----- Watershed... 1.01 S/N: 621802506A84 Bass Nixon & Kennedy Inc PondPack Ver. 7.5 (786c) Compute Time: 10:38:11 Date: 07/14/2007