Loading...
HomeMy WebLinkAbout19970893 Ver 4_Stormwater Info_20070907• • • Stormwater Plan Design Calculations: Structural &Non-Structural Measures Shotwell Landfill, Inc. Construction and Demolition Landfill Expansion Wake County, North Carolina Prepared For: Shotwell Landfill, Inc. 4724 Smithfield Road Wendell, North Carolina Prepared By: Richardson Smith Gardner & Associates, Inc. -... 14 N. Boylan Avenue Raleigh, North Carolina 27603 August 2007 r~ U • SHOTWELL LANDFILL, INC. C&D LANDFILL STORMWATER PLAN DESIGN CALCULATIONS: STRUCTURAL &NON-STRUCTURAL MEASURES TABLE OF CONTENTS Page • • 1.0 OVERVIEW ...........................................................1 2.0 EXISTING SITE CONDITIONS .......................................... 1 3.0 SITE SOILS INFORMATION ............................................ 1 4.0 DESIGN GUIDELINES AND PROCEDURES .............................. 1 5.0 RUNOFF CALCULATIONS ............................................. 2 5.1 Pre-Developed Conditions ........................................... 2 5.2 Post-Developed Conditions .......................................... 2 6.0 STORMWATER CONTROL MEASURES ................................. 2 6.1 Extended Dry Detention Basin ....................................... 2 6.2 Drainage Channels .................................................3 6.3 Droplnlets .......................................................3 6.4 Level Spreaders ...................................................3 6.5 Final Cover Drainage Features ........................................ 3 6.6 Vegetative Stabilization ............................................. 4 6.7 Other Measures ...................................................4 7.0 WATER QUALITY EFFICIENCY ........................................ 4 TABLES Table 1 Summary of Calculations ...................................... 5 FIGURES Figure 1 Pre-Developed Condition Figure 2 Post-Developed Condition -Option 1 (Selected Option) APPENDICES Appendix A Stormwater Calculations Appendix B Revegetation Plan Shotwell Landfill, Inc. Stormwater Plan Calculations July 2007 TABLE OF CONTENTS Page TOC-1 • SHOTWELL LANDFILL, INC. C&D LANDFILL STORMWATER PLAN DESIGN CALCULATIONS: STRUCTURAL &NON-STRUCTURAL MEASURES 1.0 OVERVIEW The Shotwell Landfill plans to address the expansion of the existing Shotwell C&D Landfill located off of Smithfield Road (S.R. 2233) near Shotwell. The construction and operation of this expansion will require the use of a number of structural and non-structural stormwater control measures to be employed in order to protect water quality. This document discusses these measures and their design based on the proposed area development plans. 2.0 EXISTING SITE CONDITIONS Existing ground surface elevations vary from El. 270 (feet) within the northeast corner of the property to about El. 195 within the southwest portion of the site. Topographically, the site is a broad dissected ridge, generally sloping to the southwest. The site lies within the Neuse River drainage basin. Shotwell landfill lies approximately 0.5 miles from the Wake and Johnston County line. The nearest water body is an unnamed tributary of Marks Creek located on the site southwest of the C&D landfill area. Marks Creek is located approximately 1.5 miles from the site. • 3.0 SITE SOILS INFORMATION The native surficial soils at the site fall under the categories of Cecil Sandy Loam (CeB2) and Appling Sandy Loam (ApB, ApB2, ApC, ApC2 & ApD) according to the GIS Website for Wake County. Generally, this series varies from sandy loam (surficial area) to clay loam to loam with depth. Based on the permeability of the surficial sandy loam, a hydrologic soil group (HSG) "B" is considered for purposes of runoff calculations. 4.0 DESIGN GUIDELINES AND PROCEDURES The design of stormwater control measures for the site was conducted based on guidelines and procedures as set forth in the following references: 1. HydroCAD Software Solutions, LLC (2004), HydroCAD Stormwater Modeling S s Owner's Manual -Version 7, Chocorua, NH. North Carolina Division of Land Resources (1988 and 1993 Update), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. 3. North Carolina Division of Water Quality (July 2005) Undated Draft Manual of Stormwater Best Management Practices, (Public Comment Version), Raleigh, NC. 4. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. Shotwell Landfill, Inc. Stormwater Plan July 2007 Page 1 • detention basins must provide a temporary water quality pool (for smaller storms), and be able to effectively handle the flow from a larger design storm through a peak attenuation storage zone. Extended dry detention basin must be stabilized within 14 days after the end of construction; in the form of final vegetation or by temporary stabilization until the vegetation becomes established. If an extended dry detention basin is used during construction as a sediment basin, the basin must be cleaned out, graded, and vegetated within 14 days of completion of construction. The extended dry detention basins were modeled using the HydroCAD computer program and a spreadsheet was used to verify the design requirements. Forebays are provided to capture sediment and minimize clean-out problems. A small permanent pool at the outlet orifice is provided for all seven (7) basins. The riprap linings on all channels have been extended through the forebays of each basin to provide energy dissipation. 6.2 Drainage Channels Drainage channels will be used as required to route runoff toward the detention basins. Where practical, drainage channels will be designed as vegetated channels, complying with NCDENR grass swale criteria, in order to enhance water quality. The design of drainage channels will be further evaluated as a part of the landfill final cover design, not to exceed flow design condition presented in this plan. 6.3 Drop Inlets • Weir-type drop inlets will be used in the perimeter drainage channel to route flows toward one of the detention basins. The design of drop inlets will be further evaluated as a part of the landfill final cover design, not to exceed flow design condition presented in this plan. 6.4 Level Spreaders Level spreaders will be used at the outlet of extended dry detention basins to spread the concentrated water over a wide area so that erosion of the vegetated buffer will not occur. As per the January 2007 level spreader design guidelines by DWQ, level spreaders are designed based on runoff calculations using a rainfall intensity of 1"per hour. Time-dated digital photos of existing buffer conditions for level spreader installation are attached in Appendix A -Section 5.0 with level spreader worksheets. 6.5 Final Cover Drainage Features Final cover drainage features will include gravel collectors (rain gutters) and/or diversion berms placed every 30 to 50 vertical feet along the landfill side slopes. Flow from the rain gutters and/or diversion berms will be directed to a down pipe or down chute. Down pipes or chutes will be used to carry flows from diversion berms and/or rain gutters to the bottom of final cover slopes. Down pipes will be outleted to energy dissipating structures (precast energy dissipaters, drop inlets, stone structures, etc.) at the base of each slope. The design of the final cover drainage features will be further evaluated as a part of the landfill final cover design, not to exceed flow design condition presented in this plan. • Shotwell Landfill, Inc. Stormwater Plan July 2007 Page 3 • • • 6.6 Vegetative Stabilization Vegetative stabilization will consist of grassing disturbed areas of the site with suitable grasses per NC Division of Land Quality recommendations. The selected grass types will be chosen based on the desire for limited maintenance. Other than the initial fertilization to establish an acceptable stand of grass, the use of fertilizers is anticipated to be minimal. The design of vegetative stabilization will be further evaluated as a part of the landfill final cover design, not to exceed flow design condition presented in this plan. 6.7 Other Measures Other stormwater control and erosion and sedimentation control measures to be used during construction activities at the site may include silt fencing, temporary diversions, temporary sediment traps, filter berms, etc. The design of other measures will be further evaluated as a part of the landfill final cover design, not to exceed flow design condition presented in this plan. 7.0 WATER QUALITY EFFICIENCY The updated Draft Manual of Stormwater Best Management Practices (BMP) by NCDENR (Ref. 3) was used to determine efficiency for water quality BMPS. BMPs may need to be arranged in series to achieve pollutant reduction goals. Linear addition of BMP efficiencies is not allowed. The overall efficiency of the system is determined by the type and order of BMP arrangement. The overall Efficiency E of a combination of BMPS in series is computed as follows: E = A + B -((A x B)/100) Where, E =Overall Efficiency A =Efficiency of the First or Upstream BMP B =Efficiency of the Second or Downstream BMP The overall Efficiency (E) of TSS removal for all BMPs was found to be 89.8%, exceeding the required TSS efficiency of 85% (Attachment A). In this calculation, individual BMP efficiency was taken from Table 1.1, Ref. 3. See note on calculation sheets regarding efficiency of BMPs. Additionally, NCDWM regulations require more conservative design standards in comparison to the rule. For instance, the minimum required design storm is the 25 year-24 hour event which results in no outflow during the 1" storm required in DWQ's BMP manual for the extended dry basins proposed in this project. This will provide 100% settling efficiency and the highest water quality. Shotwell Landfill, Inc. July 2007 Stormwater Plan Page 4 • TABLE 1 : RUNOFF CALCULATIONS • • Pre-Developed Condition Discharge Point (As shown in HydroCAD Model) Peak discharge rate (cfs) for 1"/hour Storm Event Peak discharge rate (cfs) for 10-Year Storm Event Existing Ditch -1 Dc 0 25 Existing Ditch -2D 0 21 Existing Ditch -3D 0 7.4 Existing Ditch -4D 0 29 Total Runoff 0 82.4 Post-Developed Condition Discharge Point (As shown in HydroCAD Model) Peak discharge rate (cfs) for 1"/hour Storm Event Peak discharge rate (cfs) for 10-Year Storm Event Extended Dry Detention Basin-1 0 4.3 Extended Dry Detention Basin-2 0 10.6 Extended Dry Detention Basin-3 0 2.2 Extended Dry Detention Basin-4 0 2.0 Extended Dry Detention Basin-5 0 2.1 Extended Dry Detention Basin-6 0 5.0 Extended Dry Detention Basin-7 0 2.6 Total Runoff 0 28.8 Shotwell Landfill, Inc. July 2007 Stormwater Plan Page 5 • Figures ~ ~ ~ 4 N ,: W ® E ` r ~ S a ~, s yy .~ ~" ~' l ~ ~ ~ ~ ~ . ~ `~ ~ ~ < '~' ~ f ,~ ~ ~ .; 3~"' ~ ~t ~ . A' Y ~'1 ; . yy T ~ . b 7 7 ~ .V .V ,~ ~ a # r'?' a 0 m W ~, ~ - O ~ , . + ~ r ~ ~ O N * ~ N t h. N O + 2 ~ j d ~ r, t U 4 ~ ~ REFERENCES ~j~ 1. PROPERTY LINE FROM SURVEY DATED NOVEMBER 19, 2005 BY SURVEYING ~° SOLUTIONS, P.C. PROPERTY LINES NOT SURVEYED PROVIDED BY WAKE COUNTY Sp G.LS. DEPARTMENT, G.LS. MAPPING FILES. '., ~ 2. WAKE COUNTY GEOGRAPHIC 1NFDRMAiION SYSTEM; AERIAL PHOTOGRAPHS AND ~,` `x TOPOGRAPHY FROM WAKE COUNTY GIS DEPARTMENT, DATED 1999, 'Y ~ ~t ~'` ` '~ ~ ~ r' ` ~ ~ xa W U _ ~ ((~~~ kys ~ I R ~~ S 1, a ~ ',N7~ r ~ F w: ~z ~~~ •~ i ~' ,' O N 0 s 0 0 m WgyJ r 0 d 0 0 c~ t~ }' ~ \ a ~~ ~~ N ,_, ` ~ ` ~~ s I i EXTENDEq~'~R~' ETENTION BASIN-5 ~ J \ ~ `~ ~i PZ-8 \ U ~ 0 ~ \ ~ '+ ~ -- Pz-~ ~ - \~ \ z ~ ~ ~ ~ `~ \ LADED DRY ,l p N110N I I \~` B SIN-1 ~ ~ \ ~ ~~ ~~ 1 __^ ~ _ ~ / \ ~ ~ ~ W ~ I ~ P1-~ / \ \ ~ W ~ ~ ~i \ ~ . __ ~ 9A ` . 1 ~ ~ N ~ ~ / i N N ~ Q Z O J ~ 1 . ~ ~ m ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ I ~ 1 `~ ~ m XTENDED .\ ~ ~ ~ ~- EXTENDED RY ~ - _ DETENTION g DRY ~ -z BASIN-4 ETENTION ~. J' i cn - ~ - - ~ o I ~ I _ - - EXTENDED DR DETEN110N BASIN- ~ ~ Z o I 1 ~ ~ w-3a - ~ p ~Z ' -- -- --- ----- -- - o J~ + EXTENDED D E D TENDED DRY REFERENCES TENTION ~- Q ° W ~ DETENTION B 1. PROPERTY LINE FROM SURVEY DATED NOVEMBER 19, 2D05 BY SURVEYNG SIN-Z SOLUTIONS, P.C. PROPERTY LINES NOT SURI~EYED REFERENCE WAKE COUNTY GIS PT GI M P S Z ~ Z J Q W BARN-1 . ING FILE . DE S AP 2. OVERALL 9TE BASE TOPOGRAPHY PRONDED BY GEODATA CORP., BASED ON w J (~ a AEPoAL SURVEY DATED DECEMBER 13 2005 PHASE 1 TOPOGRAPHY ALONG ROAD . , PROVIEDED BY BRENNAN LAND SURVEYING, BASED ON FIELD SURVEY DATED W Q O Z W MARCH 29, 2006 TOPOGRAPHY OUTSIDE OF AERIAL SURVEY LIMITS REFERENCES NCDOT qS DEPT., CONTOUR ELEVATION DATA DATED MARCH 2005. ~ ~ W O 3, COORDINATE SYSTEM IS STATE PLANE GRID (NAD 63). 4. WETLAND AND STREAM DELINEATION PERFORMED BY CAROLINA ECOSYSTEMS, INC. ° ° ~ 0 300' B00' AND SURVEYED 8Y BLACKBURN CONSULTING ENGINEERRJG, U.S. ARMY CORPS OF ENgNEERS HAS FIELD INSPECTED 1HE DELINEATION AND VERIFICATION IS PENDING ~ O THE CORP'S INIERPRETAl10N OF U.S. VS RAPANOS SUPREME COURT DECIgON. ~ 4 . Appendix A Calculations • • SHOTWELL LANDFILL, INC. C&D LANDFILL STORMWATER PLAN APPENDIX A: STORMWATER CALCULATIONS. TABLE OF CONTENTS 1.0 HydroCAD Analysis for Pre-Developed Condition 1.1 10-Year 24-Hour Storm Event 1.2 1 "/ Hour Storm Event 2.0 HydroCAD Analysis for Post-Developed Condition 2.1 25-Year 24-Hour Storm Event 1 2.2 10-Year 24-Hour Storm Event 2.3 1 "/ Hour Storm Event 3.0 Impervious Areas Calculations • 4.0 Extended Dry Detention Basin Worksheets 4.1 Basin Calculations 4.2 TSS Removal Efficiency Calculations 4.3 Sediment Storage Calculation 5.0 Level Spreader Worksheets & Digital Photos of Existing Buffer Conditions. 6.0 High Flow Bypass Structure Design Shotwell C&D Landfill Stormwater Plan July 2007 APPENDIX A: TABLE OF CONTENTS Page TOC-1 Hydro-CAD Calculations For Pre-Developed Conditions • 10-year - 24 hour Storm Event • 1 "/ hour Storm Event • • 0-Year 24-Hour Storm Event • • ~ ~ f4 ~ 1B (new Subcat) 1 q ;> ;~ 1B 1A I __4Dc ~-___--- ----_-~__-_ ___-----~- - ~, i ~-_ -- _. ~~ _ . _ _ _ _~_ - - -- .--1 Da ExiStingn Ditch - ` • i •'' <<~ ~ ~ Farm Pond `, .,.. , j Existing Ditch - r' i .~~ ~r 1 Db ~~ - ;:;'Existing Ditch • 3 r" - - •~ .~ a I ~ Dc ` - «• • i I Existing Dj~ch, __~• _-_ ' "`' - .. _--_ _ 3D Existing Ditch ~S /•. ~s' • ~~ ~ , ` .. ~`•: ~• R ~-~ ,~,~ ~~ rf :` ~'~. ~ ~~ ~` ~ ! ~5i . ~ 2', ~ .- ~, ~= ' e • ~ ~~• s ., _ --" --Y,-: . ;`. 2D - e ~, ,.' ~ "~ "' ('Existing Ditch ~~ . ~' f~ ~ ' Subcat` ',Reach'. Pond Link Shotwell Pre-Development Rev 3 Type 1124hr 10 Year Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 1 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 1A: 1A Runoff = 15.02 cfs @ 12.32 hrs, Volume= 1.635 af, Depth> 1.01" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 10 Year Rainfall=5.49" Area (ac) CN Description 6.740 48 Brush, Good, HSG B 0.730 82 Dirt roads, HSG B 7.840 55 Woods, Good, HSG B 4.080 55 Woods. Good. HSG B 19.390 54 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.6 300 0.0270 0.2 Sheet Flow, Meadow Grass: Dense n= 0.240 P2= 3.64" 2.5 520 0.0460 3.5 Shallow Concentrated Flow, Unpaved Unpaved Kv= 16.1 fps 1.0 420 0.0620 7.1 25.03 TrapNee/Rect Channel Flow, Natural Channel Bot.W=5.00' D=0.55' Z= 2.5 '/' Top.W=7.75' n= 0.030 • 32.1 1,240 Total Subcatchment 1 B: 1 B Runoff = 26.56 cfs @ 12.27 hrs, Volume= 2.511 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 10 Year Rainfall=5.49" Area fac) CN Description 1.520 48 Brush, Good, HSG B 2.630 82 Dirt roads, HSG B 19.460 55 Woods. Good. HSG B 23.610 58 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 160 0.0310 0.2 Sheet Flow, meadow/brush Grass: Short n= 0.150 P2= 3.64" 15.9 140 0.0710 0.1 Sheet Flow, Forest/brush Woods:,Light underbrush n= 0.400 P2= 3.64" 1.7 500 0.0920 4.9 Shallow Concentrated Flow, forest/brush Unpaved Kv= 16.1 fps 28.8 800 Total • Shotwell Pre-Development Rev 3 Type 11 24-hr 10 Year Rainfall=5.49" • Prepared by G.N.Richardson and Associates, Inc. Page 2 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 2: 2 Runoff = 21.46 cfs @ 12.33 hrs, Volume= 2.369 af, Depth> 1.01" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 10 Year Rainfall=5.49" Area (acl CN Description 11.800 48 Brush, Good, HSG B 1.000 85 Gravel roads, HSG B 0.900 89 Paved roads w/open ditches, HSG B 14.400 55 Woods. Good. HSG B 28.100 54 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.2 300 0.0370 0.2 Sheet Flow, Meadow Grass: Dense n= 0.240 P2= 3.64" 4.0 680 0.0310 2.8 Shallow Concentrated Flow, Forest Unpaved Kv= 16.1 fps 3.3 920 0.0280 4.6 35.54 TrapNee/Rect Channel Flow, Natural Channel Bot.W=5.00' D=0.66' Z= 10.0'/' Top.W=18.20' n= 0.030 • 32.5 1,900 Total Subcatchment 3: 3 Runoff = 7.41 cfs @ 12.52 hrs, Volume= 1.022 af, Depth> 1.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 10 Year Rainfall=5.49" Area (ac) CN Description 11.500 55 Woods, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.0 300 0.0270 0.1 Sheet Flow, Forest/brush Woods: Light underbrush n= 0.400 P2= 3.64" 0.8 200 0.0600 3.9 Shallow Concentrated Flow, Forest/brush Unpaved Kv= 16.1 fps 2.4 640 0.0410 4.5 12.24 TrapNee/Rect Channel Flow, Natural Channel Bot.W=5.00' D=0.39' Z= 5.0 'P Toq.W=8.90' n= 0.030 46.2 1,140 Total U Shotwell Pre-Development Rev 3 Type 11 24-hr 10 Year Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 3 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC ,7/27/2007 Subcatchment 4: (new Subcat) Runoff = 29.66 cfs @ 12.40 hrs, Volume= 3.661 af, Depth> 0.95" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 10 Year Rainfall=5.49" Area (ac) CN Description 1.200 98 20.000 48 Brush, Good, HSG B 25.200 55 Woods, Good. HSG B 46.400 53 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 37.1 1,300 0.0476 0.6 Lag/CN Method, Reach 1 Da: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth > 0.82" for 10 Year event Inflow = 26.56 cfs @ 12.27 hrs, Volume= 2.948 of Outflow = 25.58 cfs @ 12.40 hrs, Volume= 2.911 af, Atten= 4%, Lag= 7.9 min • Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 1.8 fps, Min. Travel Time= 4.4 min Avg. Velocity = 1.0 fps, Avg. Travel Time= 8.2 min Peak Depth= 0.78' @ 12.32 hrs Capacity at bank full= 2,507.85 cfs Inlet Invert= 222.00', Outlet Invert= 214.00' 10.00' x 6.00' deep channel, n= 0.070 Sluggish weedy reaches w/pools Side Slope Z-value= 10.0 'P Top Width= 130.00' Length= 480.0' Slope= 0.0167 'P Reach 1 Db: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth > 0.81" for 10 Year event Inflow = 25.58 cfs @ 12.40 hrs, Volume= 2.911 of Outflow = 24.90 cfs @ 12.47 hrs, Volume= 2.890 af, Atten= 3%, Lag= 4.6 min Routing by Stor--Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 3.1 fps, Min. Travel Time= 2.4 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 4.6 min Peak Depth= 0.53' @ 12.43 hrs Capacity at bank full= 1,944.06 cfs Inlet Invert= 214.00', Outlet Invert= 206.00' • 10.00' x 4.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 10.0 'P Top Width= 90.00' Length= 440.0' Slope= 0.0182 'P Shotwell Pre-Development Rev 3 Type 11 24-hr 10 Year Rainfall=5.49" Prepared by G. N. Richardson and Associates, Inc. Page 4 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 1Dc: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth > 0.81" for 10 Year event Inflow = 24.90 cfs @ 12.47 hrs, Volume= 2.890 of Outflow = 24.52 cfs @ 12.50 hrs, Volume= 2.884 af, Atten= 2%, Lag= 1.5 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 3.9 fps, Min. Travel Time= 0.7 min Avg. Velocity = 2.0 fps, Avg. Travel Time= 1.4 min Peak Depth= 0.44' @ 12.48 hrs Capacity at bank full= 2,708.59 cfs Inlet Invert= 206.00', Outlet Invert= 200.00' 10.00' x 4.00' deep channel, n= 0.035 Side Slope Z-value= 10.0 'P Top Width= 90.00' Length= 170.0' Slope= 0.0353 '/' Reach 2D: Existing Ditch Inflow Area = 28.100 ac, Inflow Depth > 1.01" for 10 Year event Inflow = 21.46 cfs @ 12.33 hrs, Volume= 2.369 of Outflow - 21.33 cfs @ 12.35 hrs, Volume= 2.366 af, Atten= 1%, Lag= 1.4 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 4.2 fps, Min. Travel Time= 0.6 min Avg. Velocity = 2.4 fps, Avg. Travel Time= 1.1 min Peak Depth= 0.83' @ 12.34 hrs Capacity at bank full= 965.22 cfs Inlet Invert= 236.00', Outlet Invert= 233.00' 2.00' x 4.00' deep channel, n= 0.030 Side Slope Z-value= 5.0 '/' Top Width= 42.00' Length= 160.0' Slope= 0.0188 'P Reach 3D: Existing Ditch Inflow Area = 11.500 ac, Inflow Depth > 1.07" for 10 Year event Inflow = 7.41 cfs @ 12.52 hrs, Volume= 1.022 of Outflow = 7.38 cfs @ 12.55 hrs, Volume= 1.020 af, Atten= 0%, Lag= 1.8 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 3.7 fps, Min. Travel Time= 1.0 min Avg. Velocity = 2.2 fps, Avg. Travel Time= 1.7 min Peak Depth= 0.46' @ 12.53 hrs Capacity at bank full= 12,439.41 cfs Inlet Invert= 226.00', Outlet Invert= 220.00' • 2.00' x 10.00' deep channel, n= 0.030 Side Slope Z-value= 5.0'P Top Width= 102.00' Length= 220.0' Slope= 0.0273 '/' Shotwell Pre-Development Rev 3 Type 11 24-hr 10 Year Rainfall=5.49" Prepared by G. N. Richardson and Associates, Inc. Page 5 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4Dc: Existingn Ditch Inflow Area = 46.400 ac, Inflow Depth > 0.95" for 10 Year event Inflow = 29.66 cfs @ 12.40 hrs, Volume= 3.661 of Outflow = 29.01 cfs @ 12.50 hrs, Volume= 3.630 af, Atten= 2%, Lag= 6.4 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 5.2 fps, Min. Travel Time= 3.5 min Avg. Velocity = 2.7 fps, Avg. Travel Time= 6.8 min Peak Depth= 0.45' @ 12.44 hrs Capacity at bank full= 18,200.57 cfs Inlet Invert= 250.00', Outlet Invert= 206.00' 10.00' x 10.00' deep channel, n= 0.030 Side Slope Z-value= 5.0 'P Top Width= 110.00' Length= 1,100.0' Slope= 0.0400 'P Pond 1 P: Farm Pond • Inflow Area = 19.390 ac, Inflow Depth > 1.01" for 10 Year event Inflow = 15.02 cfs @ 12.32 hrs, Volume= 1.635 of Outflow = 2.12 cfs @ 15.16 hrs, Volume= 0.437 af, Atten= 86%, Lag= 170.4 min Primary = 2.12 cfs @ 15.16 hrs, Volume= 0.437 of Routing by Stor--Ind method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Peak Elev= 236.07' @ 15.16 hrs Surf.Area= 0.700 ac Storage= 1.200 of Plug-Flow detention time= 301.7 min calculated for 0.437 of (27% of inflow) Center-of-Mass det. time= 192.1 min (1,037.4 - 845.3 ) Volume Invert Avail.Storage Storage Description #1 234.00' 1.200 of Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 234.00 0.500 0.000 0.000 236.00 0.700 1.200 1.200 Device Routing Invert Outlet Devices #1 Primary 236.00' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.11 cfs @ 15.16 hrs HW=236.07' (Free Discharge) 'L1=Broad-Crested RectangularVVeir (V1/eir Controls 2.11 cfs @ 0.6 fps) • • 1 "/Hour Storm Event • • Shotwell Pre-Development Rev 3 Type 11 24-hr 1'%hour Rainfall=1.00" • Prepared by G.N.Richardson and Associates, Inc. Page 1 HydroCAD® 7.10 stn 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Sul~atchment 1A: 1A Runoff = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 1"/hour Rainfall=1.00" Area (ac) CN Description 6.740 48 Brush, Good, HSG B 0.730 82 Dirt roads, HSG B 7.840 55 Woods, Good, HSG B 4.080 55 Woods. Good. HSG B 19.390 54 Weighted Average • Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.6 300 0.0270 0.2 Sheet Flow, Meadow Grass: Dense n= 0.240 P2= 3.64" 2.5 520 0.0460 3.5 Shallow Concentrated Flow, Unpaved Unpaved Kv= 16.1 fps 1.0 420 0.0620 7.1 25.03 TrapNee/Rest Channel Flow, Natural Channel Bot.W=5.00' D=0.55' Z= 2.5 '/' Top.W=7.75' n= 0.030 32.1 1,240 Totat Subcatchment 1 B: 1 B Runoff = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 1 "/hour Rainfall=1.00" Area (ac) CN Description 1.520 48 Brush, Good, HSG B 2.630 82 Dirt roads, HSG B 19.460 55 _ Woods, Good, HSG B 23.610 58 Weighted Average Tc Length Slope Velocity Capacity Description __ (min) (feet) (ft/ft) (ft/sec) (cfs) 11.2 160 0.0310 0.2 Sheet Flow, meadow/brush Grass: Short n= 0.150 P2= 3.64" 15.9 140 0.0710 0.1 Sheet Flow, Forest/brush Woods: Light underbrush n= 0.400 P2= 3.64" 1.7 500 0.0920 4.9 Shallow Concentrated Flow, forest/brush Unpaved Kv= 16.1 fps 28.8 800 Total • Shotwell Pre-Development Rev 3 Type 11 24hr 1'%hour Rainfall=1.00" • Prepared by G.N.Richardson and Associates, Inc. Page 2 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 2: 2 Runoff = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 1"/hour Rainfall=1.00" Area (ac) CN Description 11.800 48 Brush, Good, HSG B 1.000 85 Gravel roads, HSG B 0.900 89 Paved roads w/open ditches, HSG B 14.400 55 Woods. Good. HSG B 28.100 54 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.2 300 0.0370 0.2 Sheet Flow, Meadow Grass: Dense n= 0.240 P2= 3.64" 4.0 680 0.0310 2.8 Shallow Concentrated Flow, Forest Unpaved Kv= 16.1 fps 3.3 920 0.0280 4.6 35.54 TrapNee/Rect Channel Flow, Natural Channel Bot.W=5.00' D=0.66' Z= 10.0 'P Top.W=18.20' n= 0.030 • 32.5 1,900 Total Subcatchment 3: 3 Runoff = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type II 24-hr 1"/hour Rainfall=1.00" Area_(ac) CN Description 11.500 55 Woods, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.0 300 0.0270 0.1 Sheet Flow, Forest/brush Woods: Light underbrush n= 0.400 P2= 3.64" 0.8 200 0.0600 3.9 Shallow Concentrated Flow, Forest/brush Unpaved Kv= 16.1 fps 2.4 640 0.0410 4.5 12.24 TrapNee/Rect Channel Flow, Natural Channel Bot.W=5.00' D=0.39' Z= 5.0 '/' Top.W=8.90' n= 0.030 46.2 1,140 Total Shotwell Pre-Development Rev 3 Type 11 24-hr 1'%hour Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 3 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 4: (new Subcat) Runoff = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Type 1124-hr 1 "/hour Rainfall=1.00" Area (acl CN Description 1.200 98 20.000 48 Brush, Good, HSG B 25.200 55 Woods. Good. HSG B 46.400 53 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 37.1 1,300 0.0476 0.6 LaglCN Method, Reach 1 Da: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth = 0.00" for 1 "/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min • Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 2,507.85 cfs Inlet Invert= 222.00', Outlet Invert= 214.00' 10.00' x 6.00' deep channel, n= 0.070 Sluggish weedy reaches w/pools Side Slope Z-value= 10.0 '/' Top Width= 130.00' Length= 480.0' Slope= 0.0167 '/' Reach 1 Db: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth = 0.00" for 1"/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 1,944.06 cfs Inlet Invert= 214.00', Outlet Invert= 206.00' • 10.00' x 4.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 10.0 'P Top Width= 90.00' Length= 440.0' Slope= 0.0182 '/' Shotwell Pre-Development Rev 3 Type 1/24hr 1'%hour Rainfall=1.00" Prepared by G.N. Richardson and Associates, Inc. Page 4 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 1 Dc: Existing Ditch Inflow Area = 43.000 ac, Inflow Depth = 0.00" for 1 "/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 2,708.59 cfs Inlet Invert= 206.00', Outlet Invert= 200.00' 10.00' x 4.00' deep channel, n= 0.035 Side Slope Z-value= 10.0 'P Top Width= 90.00' Length= 170.0' Slope= 0.0353 '/' Reach 2D: Existing Ditch Inflow Area = 28.100 ac, Inflow Depth = 0.00" for 1 "/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min • Routing by Stor--Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 965.22 cfs Inlet Invert= 236.00', Outlet Invert= 233.00' 2.00' x 4.00' deep channel, n= 0.030 Side Slope Z-value= 5.0 '/' Top Width= 42.00' Length= 160.0' Slope= 0.0188 'P Reach 3D: Existing Ditch Inflow Area = 11.500 ac, Inflow Depth = 0.00" for 1 "/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor--Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 12,439.41 cfs Inlet Invert= 226.00', Outlet Invert= 220.00' • 2.00' x 10.00' deep channel, n= 0.030 Side Slope Z-value= 5.0 '/' Top Width= 102.00' Length= 220.0' Slope= 0.0273 '/' Shotwell Pre-Development Rev 3 Type 1124hr 1'%hour Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 5 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4Dc: Existingn Ditch Inflow Area = 46.400 ac, Inflow Depth = 0.00" for 1"/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 3.00 hrs Capacity at bank full= 18,200.57 cfs Inlet Invert= 250.00', Outlet Invert= 206.00' 10.00' x 10.00' deep channel, n= 0.030 Side Slope Z-value= 5.0 '/' Top Width= 110.00' Length= 1,100.0' Slope= 0.0400 '/' Pond 1 P: Farm Pond • Inflow Area = 19.390 ac, Inflow Depth = 0.00" for 1 "/hour event Inflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 3.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Primary = 0.00 cfs @ 3.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 3.00-19.96 hrs, dt= 0.08 hrs Peak Elev= 234.00' @ 3.00 hrs Surf.Area= 0.500 ac Storage= 0.000 of Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 234.00' 1.200 of Custom Stage Data (Prismatic) Listed below Elevation SurF.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 234.00 0.500 0.000 0.000 236.00 0.700 1.200 1.200 Device Routing Invert Outlet Devices #1 Primary 236.00' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 3.00 hrs HW=234.00' (Free Discharge) L1=Broad-Crested Rectangular Weir (Controls 0.00 cfs) Hydro-CAD Calculations For Post-Developed Conditions • 25-year - 24 hour Storm Event • 10-year - 24 hour Storm Event • 1 "/ hour Storm Event • 25-Year 24-Hour Storm Event U • • i ~ --- ---- --- - - --- - -- ---- - 6 6gg I _ _~ __ _ @@ ~f \ 1 ~ / /' ` ' \~ ~ -' ~ / ~ ~ ~ gg ~ ~ ~'/ ~ . -~ ~ IE~rm ~ $ \ \ f \ oxesw Nnw lx4 xowaA ~ / i _,_____ t \ \ ~ \ o~x~ -__- ~ireauj nux ~ m ~~ ` ~ ~ \~\ ~ ~- / ~~ \. _ / ndernne~m unuaxta mcs xmmax~n0@I MIgRp) .~ C'7w 7~ - , }~~ // 1b5 ~. f ~ ~. 7S ,}+//yyy+~// ¢OCID bl ifE ew®41QatlASl ~1f.Hd,`5~~ xnH U ~~ \ ~.` ,~~~ i i ' ~`~~----~J ` .- l . J D~afi ge.Area ~G `' ., r gym ~a,7 n p _--_ mr AOUm mn.m awu rroaan.ee uM f ~ ~ - ` t ii ` 1 ~ /~ s:.L rSy, ,~xlantletl dry tletenll n ~ ~ _- ~\; ~ \ x ~~age ,Nea- ~•.- -~ N o~nxaeaMC ni r , ~' ~ asseamix / ~~ ~ CP ~~ ~ ~ ~ ~R ~ ^~' -- '-' ~ x"~~~~„ 5~ ~ ~.,~~~ /. • ~rsvs sen rn xa.msrmn .\.._ /. ~". 1.t `~I, I i ~ I"... ~- ~2S ~ 135-~ ~ ,- ~~~~~~87 ~ x . pw~ow¢Yanus leeoa'aa ` ~? .-~ , __ _ __ +, _ ___ i xexe aw ~ Ort xs~x A ~ I ~ ~ ~ ~f ~ - ~~ ~~ >~~ ~ t i G . rrpP ~ mod{`'' ~--- ~ ~v - ~-~ 3A Qh ~ ,, ~ 0 ~ - : ~\' ~ ~~ 2A ~~ d ed d t m(d ra" ~ / n ` ~ ~~ ¢ 7 .~, , ' 18 __ n e ry g < ~~ 2B / :% 4R e ~, \ c i ~ ~ ` \ ~ I Edaf~i ~ 1 atrdrySeleTt a~ -basin-s : '~ 71 R ,~1 _ _ ~ t _-' - 81 . - - / 83 / ~ ~ ~ ~ ~ 1 J i ` ~`\ O ui ~ ~ ` / ~ I T ~ ~~ ~ xlaud¢d dry Bela nllon basin-I ~ ~ EMlend B2 ' d dryd n4fon ~ baxln~ ~ ~1 ~ ~ J '~ . 1 ~ i - ~ ~~11 --'~'~C` Bras; sunule- --~---~~--- , _____ ntlstl tlry Oelsnllon ,- _ ~ J ~ t' W ~ ' J ~ r ~ J ~ J _ ~a ~-- ~¢ ~ e a ' ~- ~ I 1 r/- o j, Z ~ ~ ~~ 0 200' 400' 800' ...,,, ,~ ~ -,~~ / ® FIG 3 Subcat '.Reach Ponds Link • No wetland Impacts.Rev-7 for EEDB Type I! 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N. Richardson and Associates, Inc. Page 1 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor--Ind method Subcatchment 1A: Drainage Area-1A Runoff Area=7.500 ac Runoff Depth>2.89" Flow Length=750' Tc=6.5 min CN=69 Runoff=40.53 cfs 1.808 of Subcatchment 1 B: Drainage Area-16 Runoff Area=5.180 ac Runoff Depth>2.99" Flow Length=720' Tc=5.8 min CN=70 Runoff=2921 cfs 1.290 of Subcatchment 1 S: Drainage Area-7C Runoff Area=0.920 ac Runoff Depth>4.20" Tc=5.0 min CN=82 Runoff=7.18 cfs 0.322 of Subcatchment 2A: Drainage Area-2A Runoff Area=6.510 ac Runoff Depth>2.89" Tc=5.0 min CN=69 Runoff=36.91 cfs 1.570 of Subcatchment 2B: Drainage Area-26 Runoff Area=7.160 ac Runoff Depth>2.99" Tc=5.0 min CN=70 Runoff=41.83 cfs 1.784 of Subcatchment 2S: Drainage Area-6 Runoff Area=12.930 ac Runoff Depth>2.99" Flow Length=750' Tc=6.9 min CN=70 Runofr=71.22 cfs 3.219 of • Subcatchment 3A: Drainage Area-3A Runoff Area=8.110 ac Runoff Depth>2.99" Flow Length=640' Tc=5.3 min CN=70 Runoff=46.74 cfs 2.020 of Subcatchment 5S: Drainage Area-7A Runoff Area=6.760 ac Runoff Depth>2.89" Tc=5.0 min CN=69 Runoff=38.33 cfs 1.630 of Subcatchment 7S: Drainage Area-7B Runoff Area=8.680 ac Runoff Depth>1.70" Flow Length=1,000' Tc=43.0 min CN=56 Runoff=1020 cfs 1.231 of Subcatchment 9S: Drainage Area-4 Runoff Area=2.890 ac Runoff Depth>4.63" Tc=5.0 min CN=86 Runoff=24.19 cfs 1.115 of Subcatchment 13S: Drainage Area-5A Runoff Area=15.580 ac Runoff Depth>2.89" Flow Length=550' Tc=4.9 min CN=69 Runoff=88.74 cfs 3.758 of Subcatchment 16S: Drainage Area~B Runoff Area=4.340 ac Runoff Depth>2.25" Tc=5.0 min CN=62 Runoff=19.30 cfs 0.814 of Reach 1R: Grass Swale -7 Peak Depth=0.65' Max Vet=5.8 fps Inflow=38.33 cfs 1.630 of n=0.030 L=400.0' S=0.0325 '/' Capacity=306.32 cfs Outflow=36.08 cfs 1.626 of Reach 2R: grass Swale-2 Peak Depth=0.87' Max Vet=5.4 fps Inflow=36.91 cfs 1.570 of n=0.030 L=220.0' S=0.0227 '/' Capacity=190.28 cfs Outflow=35.44 cfs 1.568 of • Reach 3R: GraSS Swale-6 Peak Depth=0.79' Max Vet=8.1 fps Inflow=71.22 cfs 3.219 of n=0.030 L=1,250.0' S=0.0496 '/' Capacity=378.41 cfs Outflow=65.74 cfs 3.201 of No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 2 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4R: Grass Swale-3 Peak Depth=0.71' Max Vet=6.3 fps Inflow=46.74 cfs 2.020 of n=0.030 L=530.0' S=0.0340 '/' Capacity=313.13 cfs Outflow=43.74 cfs 2.014 of Reach 11 R: Grass Swale-1 Peak Depth=0.76' Max Vet=5.0 fps Inflow=40.53 cfs 1.808 of n=0.030 L=500.0' S=0.0200 '/' Capacity=240.29 cfs Outflow=37.48 cfs 1.801 of Reach 14R: Grass Swale-5 Peak Depth=1.34' Max Vet=52 fps Inflow=88.74 cfs 3.758 of n=0.030 L=700.0' S=0.0114 '/' Capacity=181.64 cfs Outflow=80.02 cfs 3.740 of Pond B1: Extended dry detention basin-1 Peak Elev=218.28' Storage=63,607 cf Inflow=64.02 cfs 3.091 of Primary=19.05 cfs 1.908 of Secondary=0.00 cfs 0.000 of Outflow=19.05 cfs 1.908 of Pond B2: Extended dry detention basin-2 Peak Elev=231.31' Storage=62,747 cf Inflow=7625 cfs 3.352 of Primary=20.07 cfs 2.180 of Secondary=13.02 cfs 0.127 of Outflow=33.09 cfs 2.307 of Pond B3: Extended dry detention basin-3 Peak EIev=245.51' Storage=42,929 cf Inflow=43.74 cfs 2.014 of Primary=10.38 cfs 1.197 of Secondary=0.00 cfs 0.000 of Outflow=10.38 cfs 1.197 of Pond 64: Extended dry detention basing Peak EIev=252.01' Storage=24,947 cf Inflow=24.19 cfs 1.115 of Primary=7.91 cfs 0.669 of Secondary=0.00 cfs 0.000 of Outflow=7.91 cfs 0.669 of Pond B5: Extended dry detention basing Peak Elev=276.38' Storage=116,536 cf Inflow=95.76 cfs 4.553 of Primary=7.12 cfs 2.101 of Secondary=0.00 cfs 0.000 of Outflow=7.12 cfs 2.101 • Pond B6: Extended dry detention basin-6 Peak EIev=209.85' Storage=63,006 cf Inflow=65.74 cfs 3201 of Primary=10.25 cfs 1.902 of Secondary=15.26 cfs 0.278 of Outflow=25.51 cfs 2.180 of Pond B7: Basin-7 Peak EIev=264.42' Storage=70,641 cf Inflow=44.08 cfs 3.179 of Primary=6.70 cfs 1.866 of Secondary=0.00 cfs 0.000 of Outflow=6.70 cfs 1.866 of Total Runoff Area = 86.560 ac Runoff Volume = 20.561 of Average Runoff Depth = 2.85" • . No wetland Impacts.Rev-7 for ~EDB Type 1124-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 3 HydroCAD® 7:10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 1A: Drainage Area-1A Runoff = 40.53 cfs cLD 11.98 hrs, Volume= 1.808 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 7.500 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 750 ^ 0.2830 1.9 Lag/CN Method, Subcatchment 1 B: Drainage Area-1 B Runoff = 29.21 cfs ~ 11.97 hrs, Volume= 1.290 af, Depth> 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 4.810 69 50-75% Grass cover, Fair, HSG B 0.370 82 Direct pond and surrounding area ^5.1.80 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.8 720 0.3130 2.1 Lag/CN Method, Subcatchment 1S: Drainage Area-7C Runoff = 7.18 cfs t~ 11.95 hrs, Volume= 0.322 af, Depth> 4.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 0.920 82 Direct pond Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, n LJ No wetland Impacts.Rev-7 for EEDB Type l/ 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 4 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 2A: Drainage Area-2A Runoff = 36.91 cfs ~ 11.96 hrs, Volume= 1.570 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 6.510 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2B: Drainage Area-2B Runoff = 41.83 cfs cLD 11.96 hrs, Volume= 1.784 af, Depth> 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall~.55" Area (ac) CN Description 6.780 69 50-75% Grass cover, Fair, HSG B 0.380 82 Direct Pond 7.160 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Drainage Area-6 Runoff = 71.22 cfs Ldi 11.98 hrs, Volume= 3.219 af, Depth> 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 12.400 69 50-75% Grass cover, Fair, HSG B 0.530 82 Direct pond 12.930 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.9 750 0.2400 1.8 Lag/CN Method, • • No wetland Impacts.Rev-7 for EEDB Type 1124hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 5 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 3A: Drainage Area-3A Runoff = 46.74 cfs t~ 11.96 hrs, Volume= 2.020 af, Depth> 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 7.730 69 50-75% Grass cover, Fair, HSG B 0.380 82 Direct pond 8.110 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 640 0.3125 2.0 L.ag/CN Method, Subcatchment 5S: Drainage Area-7A Runoff = 38.33 cfs ~ 11.96 hrs, Volume= 1.630 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs • Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) , CN Description 6.760 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Drainage Area-7B Runoff = 10.20 cfs t~ 12.45 hrs, Volume= 1.231 af, Depth> 1.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 8.680 56 Brush, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.0 1,000 0.0200 0.4 Lag/CN Method, • No wetland Impacts.Rev-7 for EEDB Type 1124hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 6 • H~droCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 9S: Drainage Area-4 Runoff = 24.19 cfs cLD 11.95 hrs, Volume= 1.115 af, Depth> 4.63" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 0.230 98 Paved parking & roofs 2.320 85 Gravel roads, HSG B 0.340 82 Direct pond and surrounding area 2.890 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: Drainage Area-5A Runoff = 88.74 cfs cLD 11.96 hrs, Volume= 3.758 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 15.580 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 550 0.3000 1.9 Lag/CN Method, Subcatchment 16S: Drainage Area-SB Runoff = 19.30 cfs ~ 11.96 hrs, Volume= 0.814 af, Depth> 2.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Area (ac) CN Description 3.290 55 Woods, Good, HSG B 1.050 82 Direct pond 4.340 62 Weighted Average -' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • . No wetland Impacts.Rev-7 for EEDB Type l/ 24hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N. Richardson and Associates, Inc. Page 7 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 1 R: Grass swale -7 Inflow Area = 6.760 ac, Inflow Depth > 2.89" for 25 Yr- 24 Hrs event Inflow - 38.33 cfs cLD 11.96 hrs, Volume= 1.630 of Outflow = 36.08 cfs cLD 11.99 hrs, Volume= 1.626 af, Atten= 6%, Lag= 2.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.8 fps, Min. Travel Time= 1.2 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 4.2 min Peak Depth= 0.65' ~ 11.98 hrs Capacity at bank full= 306.32 cfs Inlet Invert= 287.00', Outlet Invert= 274.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 400.0' Slope= 0.0325 '/' Reach 2R: grass swale-2 Inflow Area = 6.510 ac, Inflow Depth > 2.89" for 25 Yr- 24 Hrs event Inflow = 36.91 cfs @ 11.96 hrs, Volume= 1.570 of • Outflow = 35.44 cfs ~ 11.98 hrs, Volume= 1.568 af, Atten= 4%, Lag= 1.3 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.4 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 2.3 min Peak Depth= 0.87' ~ 11.97 hrs Capacity at bank full= 190.28 cfs Inlet Invert= 234.00', Outlet Invert= 229.00' 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 220.0' Slope= 0.0227 '/' Reach 3R: Grass swale-6 Inflow Area = 12.930 ac, Inflow Depth > 2.99" for 25 Yr- 24 Hrs event Inflow = 71.22 cfs ~ 11.98 hrs, Volume= 3.219 of Outflow = 65.74 cfs ~ 12.05 hrs, Volume= 3.201 af, Atten= 8%, Lag= 4.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.1 fps, Min. Travel Time= 2.6 min Avg. Velocity = 2.3 fps, Avg. Travel Time= 9.1 min Peak Depth= 0.79' ~ 12.01 hrs Capacity at bank full= 378.41 cfs Inlet Invert= 280.00', Outlet Invert= 218.00' • 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed 8 winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 1,250.0' Slope= 0.0496 '/' No wetland Impacts.Rev-7 for EEDB Type 1124hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 8 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4R: Grass swale-3 Inflow Area = 8.110 ac, Inflow Depth > 2.99" for 25 Yr- 24 Hrs event Inflow = 46.74 cfs Gm 11.96 hrs, Volume= 2.020 of Outflow = 43.74 cfs cLD 12.00 hrs, Volume= 2.014 af, Atten= 6%, Lag= 2.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.3 fps, Min. Travel Time= 1.4 min Avg. Velocity = 1.7 fps, Avg. Travel Time= 5.1 min Peak Depth= 0.71' ~ 11.98 hrs Capacity at bank full= 313.13 cfs Inlet Invert= 264.00', Outlet Invert= 246.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 530.0' Slope= 0.0340 '/' Reach 11 R: Grass Swale-1 Inflow Area = 7.500 ac, Inflow Depth > 2.89" for 25 Yr- 24 Hrs event Inflow = 40.53 cfs ~ 11.98 hrs, Volume= 1.808 of Outflow = 37.48 cfs cLD 12.03 hrs, Volume= 1.801 af, Atten= 8%, Lag= 2.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs • Max. Velocity= 5.0 fps, Min. Travel Time= 1.7 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 5.9 min Peak Depth= 0.76' ~ 12.00 hrs Capacity at bank full= 240.29 cfs Inlet Invert= 230.00', Outlet Invert= 220.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 500.0' Slope= 0.0200 'r Reach 14R: Grass swale-5 Inflow Area = 15.580 ac, Inflow Depth > 2.89" for 25 Yr- 24 Hrs event Inflow = 88.74 cfs ~ 11.96 hrs, Volume= 3.758 of Outflow = 80.02 cfs ctvD 12.02 hrs, Volume= 3.740 af, Atten= 10%, Lag= 3.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.2 fps, Min. Travel Time= 2.2 min Avg. Velocity = 1.5 fps, Avg. Travel Time= 7.6 min Peak Depth= 1.34' ~ 11.99 hrs Capacity at bank full= 181.64 cfs Inlet Invert= 288.00', Outlet Invert= 280.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed ~ winding Side Slope Z-value= 3.0 'P Top Width= 20.00' • Length= 700.0' Slope= 0.0114 '/' . No wetland Impacts.Rev-7 for EEDB Type 1124hr 25 Yr- 24 Hrs Rainfall=fi.55" Prepared by G.N. Richardson and Associates, Inc. Page 9 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Pond B1: Extended dry detention basin-1 Inflow Area = 12.680 ac, Inflow Depth > 2.93" for 25 Yr- 24 Hrs event Inflow = 64.02 cfs cLD 12.00 hrs, Volume= 3.091 of Outflow = 19.05 cfs ~ 12.17 hrs, Volume= 1.908 af, Atten= 70%, Lag= 10.7 min Primary = 19.05 cfs ~ 12.17 hrs, Volume= 1.908 of Secondary = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 218.28' ~ 12.17 hrs Surt.Area= 15,965 sf Storage= 63,607 cf Ptug-Flow detention time= 140. 4 min calculated for 1.903 of (62% of inflov~ Center-of-Mass det. time= 65.2 min (857.0 - 791.7 ) Volume Invert Avail.Storage Storage Description #1 212.00' 94 _ ,059 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubio-feet) (cubiGfeet) 212.00 5,106 0 0 214.00 7,891 12,997 12,997 216.00 11,443 19,334 32,331 218.00 15,371 26,814 59,145 220.00 19,543 34,914 94,059 Device Routing Invert Outlet Devices #1 Primary 212.00' 18.0" x 35.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 206.00' S= 0.1714 'P Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections . #2 Device 1 217.50' 30.0" Horiz. Top of the principal spillway Limited to weir flow C= 0.600 #3 Secondary 218.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 216.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=18.59 cfs ~ 12.17 hrs HW=218.27' (Free Discharge) t-1=Barrel (Passes 18.59 cfs of 19.99 cfs potential flow) 2=Top of the principal spillway (Weir Controls 17.24 cfs ~ 2.9 fps) =Orifice/Grate (Orifice Controls 1.34 cfs ~ 6.8 fps) $econdary OutFlow Max=0.00 cfs cLD 0.00 hrs HW=212.00' (Free Discharge) 3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B2: Extended dry detention basin-2 Inflow Area = 13.670 ac, Inflow Depth > 2.94" for 25 Yr- 24 Hrs event Inflow 76.25 cfs ~ 11.97 hrs, Volume= 3.352 of Outflow 33.09 cfs ~ 12.08 hrs, Volume= 2.307 af, Atten= 57%, Lag= 6.8 min Primary = 20.07 cfs cLD 12.08 hrs, Volume= 2.180 of Secondary = 13.02 cfs ~ 12.08 hrs, Volume= 0.127 of No wetland Impacts.Rev-7 for EEDB Type 1124hr25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 10 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Soltations LLC 7/27/007 Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 231.31' ~ 12.08 hrs Surt.Area= 15,538 sf Storage= 62,747 cf Plug-Flow detention time= 118.6 min calculated for 2.302 of (69% of inflow) Center-of-Mass det. time= 48.6 min (837.7 - 789.1 ) Volume Invert Avail.Stora a Storage Description #1 225.00' 73,864 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 225.00 4,600 0 0 230.00 13,000 44,000 44,000 232.00 16,864 29,864 73,864 Device Routing Invert Outlet Devices #1 Primary 225.00' 18.0" x 40.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 224.60' S= 0.0100 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 230.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 231.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 • Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Primary OutFlow Max=20.04 cfs ~ 12.08 hrs HW=231.30' (Free Discharge) Barrel (Inlet Controls 20.04 cfs ~ 11.3 fps) 2=Top of Principal Spillway (Passes 20.04 cfs of 26.92 cfs potential flow) Secondary OutFlow Max=12.08 cfs ~ 12.08 hrs HW=231.30' (Free Discharge) t-3=Broad-Crested Rectangular Weir(Weir Controls 12.08 cfs G 1.4 fps) Pond B3: Extended dry detention basin-3 Inflow Area = 8.110 ac, Inflow Depth > 2.98" for 25 Yr- 24 Hrs event Inflow = 43.74 cfs cLD 12.00 hrs, Volume= 2.014 of Outflow = 10.38 cfs ~ 12.19 hrs, Volume= 1.197 af, Atten= 76%, Lag= 11.1 min Primary = 10.38 cfs cLD 12.19 hrs, Volume= 1.197 of Secondary = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 245.51' ~ 12.19 hrs Surt.Area= 13,263 sf Storage= 42,929 cf Plug-Flow detention time= 150.4 min calculated for 1.194 of (59% of inflow) Center-of-Mass det. time= 74.2 min (865.4 - 791.2 ) Volume Invert Avail.Storage Storage Description #1 240.00' 82,738 cf Custom Stage Data (Prismatic)Listed below (Recalc) • No wetland Impacts.Rev-7 for EEDB Type 1l 24-hr,25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 11 HydroCAD® 7:10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) cubic-feet) 240.00 2,663 0 0 242.00 6,250 8,913 8,913 244.00 10,127 16,377 25,290 246.00 14,286 24,413 49,703 248.00 18,749 33,035 82,738 Device Routing Invert Outlet Devices #1 Primary 240.00' 18.0" x 210.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 232.00' S= 0.0381 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 245.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 246.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.6 5 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 244.00' 6.0" Vert. 6" Orifice C= 0.600 Primary OutFlow Max=10.26 cfs cLD 12.19 hrs HW=245.50' (Free Discharge) L =Barrel (Passes 10.26 cfs of 18.55 cfs potential flow) • 2=Top of Principal Spillway (Weir Controls 9.20 cfs ~ 2.3 fps) =6" Orifice (Orifice Controls 1.06 cfs ~ 5.4 fps) $econdary OutFlow Max=0.00 cfs cLD 0.00 hrs HW=240.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond 64: Extended dry detention basin-4 Inflow Area = 2.890 ac, Inflow Depth > 4.63" for 25 Yr- 24 Hrs event Inflow = 24.19 cfs cQ 11.95 hrs, Volume= 1.115 of Outflow = 7.91 cfs ~ 12.08 hrs, Volume= 0.669 af, Atten= 67%, Lag= 7.8 min Primary = 7.91 cfs ~ 12.08 hrs, Volume= 0.669 of Secondary = 0:00 cfs cLD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 252.01' ~ 12.08 hrs Surt.Area= 8,374 sf Storage= 24,947 cf Plug-Flow detention time= 151.4 min calculated for 0.667 of (60% of inflow) Center-of-Mass det. time= 79.1 min (834.7 - 755.7 ) Volume Invert Avail.Storage Storage Description #1 248.00' 44,060 cf Custom Stage Data (Prismatic~Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 248.00 4,229 0 0 250.00 6,142 10,371 10,371 252.00 8,364 14,506 24,877 254.00 10,819 19,183 44,060 No wetland Impacts.Rev-7 for EEDB Type 1124-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 12 . HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Device Routing Invert Outlet Devices #1 Primary 248.00' 15.0" x 120.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 247.00' S= 0.0083 'P Cc= 0.900 n= 0.013 Concrete pipe, bends 8 connections #2 Device 1 251.50' 24.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 252.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=7.74 cfs @ 12.08 hrs HW=252.00' (Free Discharge) t-1=Barrel (Passes 7.74 cfs of 9.20 cfs potential flow) 2=Top of Principal Spillway (Vlleir Controls 7.27 cfs cLD 2.3 fps) =Orifice/Grate (Orifice Controls 0.47 cfs ~ 9.5 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HV1F=248.00' (Free Discharge) t3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B5: Extended dry detention basin-5 Inflow Area = 19.920 ac, Inflow Depth > 2.74" for 25 Yr- 24 Hrs event • Inflow = 95.76 cfs ~ 12.01 hrs, Volume= 4.553 of Outflow 7.12 cfs cLD 12.84 hrs, Volume= 2.101 af, Atten= 93%, Lag= 49.8 min Primary = 7.12 cfs ~ 12.84 hrs, Volume= 2.101 of Secondary = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 276.38' ~ 12.84 hrs Surt.Area= 33,051 sf Storage= 116,536 cf Plug-Flow detention time= 195.2 min calculated for 2.096 of (46% of inflow) Center-of-Mass det. time= 112.2 min (907.7 - 795.5 ) Volume Invert Avail.Stora a Stora a Description #1 272.00' 258,312 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 272.00 19,166 0 0 274.00 26,572 45,738 45,738 276.00 31,799 58,371 104,109 278.00 38,333 70,132 174,241 280.00 45,738 84,071 258,312 Device Routing Invert Outlet Devices #1 Pnmary 272.00' 18.0" x 100.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 264.00' S= 0.0800'/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 276.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 277.00' 30.0' long x 8.0' breadth Broad rested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 i No wetland Impacts.Rev-7 for EEDB Type 1124hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 13 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 275.00' 6.0" Vert. 6" orifice C= 0.600 Primary OutFlow Max=7.10 cfs ~ 12.84 hrs HV1r`276.38' (Free Discharge) 'L1=Barrel (Passes 7.10 cfs of 16.22 cfs potential flow) 2=Top of Principal Spillway (Weir Controls 6.09 cfs ~ 2.0 fps) =6" orifice (Orifice Controls 1.01 cfs ~ 5.1 fps) condary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=272.00' (Free Discharge) =Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B6: Extended dry detention basin-6 Inflow Area = 12.930 ac, Inflow Depth > 2.97" for 25 Yr- 24 Hrs event Inflow = 65.74 cfs ~ 12.05 hrs, Volume= 3.201 of Outflow = 25.51 cfs ~ 12.21 hrs, Volume= 2.180 af, Atten= 61 %, Lag= 9.6 min Primary = 10.25 cfs cLD 12.21 hrs, Volume= 1.902 of Secondary = 15.26 cfs ~ 12.21 hrs, Volume= 0.278 of • Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 209.85' cLD 12.21 hrs Surt.Area= 17,443 sf Storage= 63,006 cf Plug-Flow detention time= 135.8 min calculated for 2.180 of (68% of inflow) Center-of-Mass det. time= 65.3 min (860.3 - 795.0 ) Volume Invert Avail.Storage Storage Description #1 204.00' 106,330 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 204.00 4,650 0 0 208.00 12,865 35,030 35,030 212.00 . 22,785 71,300 106,330 Device Routing Invert Outlet Devices #1 Primary 204.00' 18.0" x 70.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 203.00' S= 0.0143'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 208.50' 24.0" Vert. Top of Principal Spillway C= 0.600 #3 Secondary 209.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 207.50' 6.0" Vert. 6" Orifice C= 0.600 • No wetland Impacts.Rev-7 for EEDB Type Il 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 14 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=10.09 cfs cLD 12.21 hrs HW=209.83' (Free Discharge) L1=Barrel (Passes 10.09 cfs of 19.18 cfs potential flow) 2=Top of Principal Spillway (Orifice Controls 8.72 cfs ~ 3.9 fps) =6" Orifice (Orifice Controls 1.36 cfs ~ 6.9 fps) Secondary OutFlow Max=14.32 cfs ~ 12.21 hrs HW=209.83' (Free Discharge) L3=Broad-Crested Rectangular Weir(Weir Controls 14.32 cfs @ 1.4 fps) Pond B7: Basin-7 Inflow Area = 16.360 ac, Inflow Depth > 2.33" for 25 Yr- 24 Hrs event Inflow = 44.08 cfs @ 11.99 hrs, Volume= 3.179 of Outflow = 6.70 cfs ~ 13.05 hrs, Volume= 1.866 af, Atten= 85%, Lag= 63.4 min Primary = 6.70 cfs @ 13.05 hrs, Volume= 1.866 of Secondary = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 264.42' cLD 13.05 hrs Surt.Area= 37,588 sf Storage= 70,641 cf Plug-Flow detention time= 170. 6 min calculated for 1.861 of (59% of inflow) Center-of-Mass det. time= 89.0 min (896.8 - 807.9 ) Volume Invert Avail.Storage Stora a Description • #1 258 00' 144 358 cf Custom Sta e Data Prismatic Li t d b l R l . , g ( ) s e e ow ( eca c) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 258.00 3,074 0 0 260.00 4,302 7,376 7,376 262.00 5,713 10,015 17,391 264.00 32,684 38,397 55,788 266.00 55,886 88,570 144,358 Device Routing Invert Outlet Devices #1 Primary 258.00' 15.0" x 600.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 256.00' S= 0.0033 'P Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 264.00' 36.0" Horiz. Riser Limited to weir flow C= 0.600 #3 Secondary 265.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 263.00' 6.0" Vert. 6" orifice C= 0.600 No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 25 Yr- 24 Hrs Rainfall=6.55" Prepared by G.N.Richardson and Associates, Inc. Page 15 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=6.70 cfs cLD 13.05 hrs HW=264.42' (Free Discharge) L =Barrel (Barrel Controls 6.70 cfs ~ 5.5 fps) Z=Riser (Passes < 8.47 cfs potential flow) =6" orifice (Passes < 1.02 cfs potential flow) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs H1IW258.00' (Free Discharge) 3=Broad-Crested Rectangular weir(Controls 0.00 cfs) • • 0-Year 24-Hour Storm Event • No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 1 HydroCAD®7 10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 1A: Drainage Area-1A Runoff = 29.93 cfs ~ 11.98 hrs, Volume= 1.325 af, Depth> 2.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 7.500 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 6.5 750 0.2830 1.9 Lag/CN Method, Subcatchment 1 B: Drainage Area-1 B Runoff = 21.68 cfs t~ 11.97 hrs, Volume= 0.951 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" • Area (ac) CN Description 4.810 69 50-75% Grass cover, Fair, HSG 6 0 370 82 Direct pond and surrounding area 5.180 70 Weighted Average Tc Length Slope Velocity Capacity Description _ (min) (feet) (ft/ft) (ft/sec) (cfs) 5.8 72p 0.3130 2.1 Lag/CN Method, Subcatchment 1S: Drainage Area-7C Runoff = 5.69 cfs t~ 11.95 hrs, Volume= 0.251 af, Depth> 3.28" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 0.920 82 Direct pond Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • No wetland impacts.Rev-7 for EEDB Type 11 24hr 70 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N. Richardson and Associates, Inc. Page 2 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 2A: Drainage Area-2A Runoff = 27.23 cfs cLD 11.96 hrs, Volume= 1.151 af, Depth> 2.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 6.510 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2B: Drainage Area-2B Runoff = 31.07 cfs cLD 11.96 hrs, Volume= 1.314 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 6.780 69 50-75% Grass cover, Fair, HSG B • 0.380 82 Direct Pond 7.160 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Drainage Area-6 Runoff = 52.90 cfs ~ 11.99 hrs, Volume= 2.372 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 12.400 69 50-75% Grass cover, Fair, HSG B 0.530 82 Direct pond 12.930 70 Weighted Average Tc Length Slope Velocity Capacity Description ___ (min) (feet) (ft/ft) (ft/sec) (cfs) 6.9 750 0.2400 1.8 Lag/CN Method, • • No wetland Impacts.Rev-7 for EEDB Type 1124-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 3 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 3A: Drainage Area-3A Runoff = 34.70 cfs ~ 11.96 hrs, Volume= 1.489 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" ___Area (ac) CN Description 7.730 69 50-75% Grass cover, Fair, HSG B 0.380 82 Direct pond 8.110 70 Weighted Average Tc Length Slope Velocity Capacity Description _~min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 640 0.3125 2.0 Lag/CN Method, Subcatchment 5S: Drainage Area-7A Runoff = 28.28 cfs ct/iD 11.96 hrs, Volume= 1.195 af, Depth> 2.12" • Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 10 Yr- 24 Hrs Rainfall=5.49" A_ _rea (ac) CN Description 6.760 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description __(min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Drainage Area-7B Runoff = 6.39 cfs ~ 12.46 hrs, Volume= 0.820 af, Depth> 1.13" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" A_ rea (ac) CN Description 8.680 56 Brush, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.0 1,000 0.0200 0.4 Lag/CN Method, • No wetland ImpactS.Rev-7 for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N. Richardson and Associates, Inc. Page 4 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 9S: Drainage Area-4 Runoff = 19.52 cfs @ 11.95 hrs, Volume= 0.885 af, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 0.230 98 Paved parking & roofs 2.320 85 Gravel roads, HSG B 0.340 82 Direct pond and surrounding area 2.890 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: Drainage Area-5A Runoff = 65.48 cfs cLD 11.96 hrs, Volume= 2.754 af, Depth> 2.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description _ 15.580 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 550 0.3000 1.9 Lag/CN Method, Subcatchment 16S: Drainage Area-5B Runoff = 13.48 cfs G 11.97 hrs, Volume= 0.571 af, Depth> 1.58" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Area (ac) CN Description 3.290 55 Woods, Good, HSG B 1.050 82 Direct pond 4.340 62 Weighted Average Tc Length Slope Velocity Capacity Description ___ (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • • • No wetland Impacts.Rev-T for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 5 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 1 R: Grass swale -7 Inflow Area = 6.760 ac, Inflow Depth > 2.12" for 10 Yr- 24 Hrs event Inflow = 28.28 cfs ~ 11.96 hrs, Volume= 1.195 of Outflow = 26.48 cfs ~ 12.00 hrs, Volume= 1.191 af, Atten= 6°!0, Lag= 2.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.2 fps, Min. Travel Time= 1.3 min Avg. Velocity = 1.5 fps, Avg. Travel Time= 4.5 min Peak Depth= 0.54' ~ 11.98 hrs Capacity at bank full= 306.32 cfs Inlet Invert= 287.00', Outlet Invert= 274.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed 8~ winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 400.0' Slope= 0.0325 '/' Reach 2R: grass swale-2 Inflow Area = 6.510 ac, Inflow Depth > 2.12" for 10 Yr- 24 Hrs event Inflow = 27.23 cfs cLU 11.96 hrs, Volume= 1.151 of • Outflow = 26.10 cfs ~ 11.98 hrs, Volume= 1.149 af, Atten= 4%, Lag= 1.4 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.0 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.5 fps, Avg. Travel Time= 2.4 min Peak Depth= 0.74' ~ 11.97 hrs Capacity at bank full= 190.28 cfs Inlet Invert= 234.00', Outlet Invert= 229.00' 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 220.0' Slope= 0.0227 '/' Reach 3R: Grass swale-6 Inflow Area = 12.930 ac, Inflow Depth > 2.20" for 10 Yr- 24 Hrs event Inflow = 52.90 cfs ~ 11.99 hrs, Volume= 2.372 of Outflow = 48.71 cfs ~ 12.06 hrs, Volume= 2.356 af, Atten= 8%, Lag= 4.5 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.3 fps, Min. Travel Time= 2.8 min Avg. Velocity = 2.1 fps, Avg. Travel Time= 9.8 min Peak Depth= 0.67' ~ 12.01 hrs Capacity at bank full= 378.41 cfs Inlet Invert= 280.00', Outlet Invert= 218.00' • 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed 8~ winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 1,250.0' Slope= 0.0496 '/' No wetland Impacts.Rev-7 for EEDB Type 1124-hr 10 Yr- 24 Hrs Rainfall=5.49" • Prepared by G.N.Richardson and Associates, Inc. Page 6 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4R: Grass swale-3 Inflow Area = 8.110 ac, Inflow Depth > 2.20" for 10 Yr- 24 Hrs event Inflow = 34.70 cfs cLD 11.96 hrs, Volume= 1.489 of Outflow = 32.25 cfs @ 12.01 hrs, Volume= 1.483 af, Atten= 7%, Lag= 2.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.7 fps, Min. Travel Time= 1.5 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 5.5 min Peak Depth= 0.60' ~ 11.98 hrs Capacity at bank full= 313.13 cfs Inlet Invert= 264.00', Outlet Invert= 246.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 530.0' Slope= 0.0340 '/' Reach 11 R: Grass Swale-1 Inflow Area = 7.500 ac, Inflow Depth > 2.12" for 10 Yr- 24 Hrs event Inflow = 29.93 cfs ~ 11.98 hrs, Volume= 1.325 of Outflow = 27.59 cfs cLD 12.03 hrs, Volume= 1.319 af, Atten= 8%, Lag= 3.0 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs • Max. Velocity= 4.6 fps, Min. Travel Time= 1.8 min Avg. Velocity = 1.3 fps, Avg. Travel Time= 6.4 min Peak Depth= 0.64' cLD 12.00 hrs Capacity at bank full= 240.29 cfs Inlet Invert= 230.00', Outlet Invert= 220.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 500.0' Slope= 0.0200 '/' Reach 14R: Grass swale-5 Inflow Area = 15.580 ac, Inflow Depth > 2.12" for 10 Yr- 24 Hrs event Inflow = 65.48 cfs ~ 11.96 hrs, Volume= 2.754 of Outflow = 59.46 cfs cLD 12.03 hrs, Volume= 2.738 af, Atten= 9%, Lag= 4.3 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.7 fps, Min. Travel Time= 2.5 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 8.2 min Peak Depth= 1.13' dLi 11.99 hrs Capacity at bank full= 181.64 cfs Inlet Invert= 288.00', Outlet Invert= 280.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 'P Top Width= 20.00' • Length= 700.0' Slope= 0.0114 '/' • No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N. Richardson and Associates, Inc. Page 7 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Pond 61: Extended dry detention basin-1 Inflow Area = 12.680 ac, Inflow Depth > 2.15" for 10 Yr- 24 Hrs event Inflow - 46.69 cfs ~ 12.00 hrs, Volume= 2.269 of Outflow = 4.29 cfs ~ 12.64 hrs, Volume= 1.119 af, Atten= 91 %, Lag= 38.5 min Primary = 4.29 cfs ~ 12.64 hrs, Volume= 1.119 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 217.75' ~ 12.64 hrs Surt.Area= 14,871 sf Storage= 55,292 cf Plug-Flow detention time= 192.0 min calculated for 1.116 of (49% of inflow) Center-of-Mass det. time= 108.6 min (907.0 - 798.4 ) Volume Invert Avail.Storage Storage Description #1 212.00' 94,059 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 212.00 5,106 0 0 214.00 7,891 12,997 12,997 216.00 11,443 19,334 32,331 218.00 15,371 26,814 59,145 • 220.00 19,543 34,914 94,059 Device Routing Invert Outlet Devices #1 Primary 212.00' 18.0" x 35.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 206.00' S= 0.1714 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 217.50' 30.0" Horiz. Top of the principal spillway Limited to weir flow C= 0.600 #3 Secondary 218.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 .2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 216.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=4.27 cfs ~ 12.64 hrs HW=217.74' (Free Discharge) L-1=Barrel (Passes 4.27 cfs of 19.02 cfs potential flow) 2=Top of the principal spillway (Weir Controls 3.11 cfs ~ 1.6 fps) =Orifice/Grate (Orifice Controls 1.16 cfs ~ 5.9 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HW'=212.00' (Free Discharge) L3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B2: Extended dry detention basin-2 Inflow Area = 13.670 ac, Inflow Depth > .2.16" for 10 Yr- 24 Hrs event . Inflow 56.24 cfs ~ 11.97 hrs, Volume= 2.463 of _ Outflow 10.66 cfs ~ 12.17 hrs, Volume= 1.424 af, Atten= 81 %, Lag= 12.0 min Primary = 10.66 cfs ~ 12.17 hrs, Volume= 1.424 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of No wetland ImpactS.Rev-7 for EEDB Type 1124hr 70 Yr- 24 Hrs Rainfall=5.49" • Prepared by G.N. Richardson and Associates, Inc. Page 8 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 230.56' Ld'i 12.17 hrs Surt.Area= 14,075 sf Storage= 51,530 cf Plug-Flow detention time= 151.6 min calculated for 1.420 of (58% of inflow) Center-of-Mass det. time= 71.6 min (867.2 - 795.6 ) Volume Invert Avail.Storage Storage Description #1 225.00' 73,864 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubio-feet) 225.00 4,600 0 0 230.00 13,000 44,000 44,000 232.00 16,864 29,864 73,864 Device Routing Invert Outlet Devices #1 Primary 225.00' 18.0" x 40.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 224.60' S= 0.0100 'P Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 230.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 231.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 • Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Primary OutFlow Max=10.45 cfs ~ 12.17 hrs HV1r230.55' (Free Discharge) Barrel (Passes 10.45 cfs of 18.64 cfs potential flow) 2=Top of Principal Spillway (Weir Controls 10.45 cfs ~ 2.4 fps) $econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=225.00' (Free Discharge) 3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B3: Extended dry detention basin-3 Inflow Area = 8.110 ac, Inflow Depth > 2.19" for 10 Yr- 24 Hrs event Inflow = 32.25 cfs ~ 12.01 hrs, Volume= 1.483 of Outflow = 2.21 cfs ~ 12.93 hrs, Volume= 0.698 af, Atten= 93%, Lag= 55.6 min Primary = 2.21 cfs cLD 12.93 hrs, Volume= 0.698 of Secondary = 0.00 cfs cLli 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 245.14' ~ 12.93 hrs Surf.Area= 12,490 sf Storage= 38,142 cf Plug-Flow detention time= 210.9 min calculated for 0.698 of (47% of inflow) Center-of-Mass det. time= 126.6 min (924.5 - 797.9 ) Volume Invert Avail.Storage Storage Description #1 240.00' 82,738 cf Custom Stage Data (Prismatic)Listed below (Recalc) No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 9 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 240.00 2,663 0 0 242.00 6,250 8,913 8,913 244.00 10,127 16,377 25,290 246.00 14,286 24,413 49,703 248.00 18,749 33,035 82,738 Device Routing Invert Outlet Devices #1 Primary 240.00' 18.0" x 210.0' long Barrel RCP, square .edge headwall, Ke= 0.500 Outlet Invert= 232.00' S= 0.0381 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 ~ Device 1 245.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 246.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 244.00' 6.0" Vert. 6" Orifice C= 0.600 Primary OutFlow Max=2.18 cfs ~ 12.93 hrs HW=245.14' (Free Discharge) • t-1=Barrel (Passes 2.18 cfs of 17.82 cfs potential flow) 2=Top of Principal Spillway (Weir Controls 1.29 cfs ~ 1.2 fps) =6" Orifice (Orifice Controls 0.89 cfs ~ 4.5 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HV1F=240.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B4: Extended dry detention basin-4 Inflow Area = 2.890 ac, Inflow Depth > 3.68" for 10 Yr- 24 Hrs event Inflow = 19.52 cfs !~ 11.95 hrs, Volume= 0.885 of Outflow = 1.98 cfs ~ 12.36 hrs, Volume= 0.460 af, Atten= 90%, Lag= 24.4 min Primary = 1.98 cfs C .12.36 hrs, Volume= 0.460 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 251.68' cLD 12.36 hrs Surt.Area= 8,005 sf Storage= 22,230 cf Plug-Flow detention time= 193.8 min calculated for 0.460 of (52% of inflow) Center-of-Mass det. time= 115.6 min (876.7 - 761.1 ) Volume Invert Avail.Storage Storage Description #1 248.00' 44,060 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 248.00 4,229 0 0 250.00 6,142 10,371 10,371 252.00 8,364 14,506 24,877 254.OQ 10,819 19,183 44,060 No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 70 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 10 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Device Routing Invert Outlet Devices #1 Primary 248.00' 15.0" x 120.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 247.00' S= 0.0083 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 251.50' 24.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 252.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=1.97 cfs ~ 12.36 hrs HW`-251.68' (Free Discharge) L1=Barrel (Passes 1.97 cfs of 8.79 cfs potential flow) 2=Top of Principal Spillway (Weir Controls 1.52 cfs @ 1.4 fps) =Orifice/Grate (Orifice Controls 0.45 cfs ~ 9.1 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=248.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond 65: Extended dry detention basin-5 Inflow Area = 19.920 ac, Inflow Depth > 1.99" for 10 Yr- 24 Hrs event • Inflow = 69.17 cfs ~ 12.02 hrs, Volume= 3.309 of Outflow = 2.06 cfs ~ 15.58 hrs, Volume= 0.878 af, Atten= 97%, Lag= 213.7 min Primary = 2.06 cfs ~ 15.58 hrs, Volume= 0.878 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 276.12' cLD 15.58 hrs Surf.Area= 32,206 sf Storage= 108,093 cf Plug-Flow detention time= 286.5 min calculated for 0.878 of (27% of inflow) Center-of-Mass det. time= 193.7 min (996.2 - 802.5 ) Volume Invert Avail.Stora a Storage Description #1 272.00' 258,312 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 272.00 19,166 0 0 274.00 26,572 45,738 45,738 276.00 31,799 58, 371 104,109 278.00 38,333 70,132 174,241 280.00 45,738 84,071 258,312 Device Routing Invert Outlet Devices #1 Primary 272.00' 18.0" x 100.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 264.00' S= 0.0800 'P Cc= 0.900 n= 0.013 Concrete pipe, bends ~ connections #2 Device 1 276.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 277.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 11 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 275.00' 6.0" Vert. 6" orifice C= 0.600 Primary OutFlow Max=2.01 cfs ~ 15.58 hrs HW=276.12' (Free Discharge) L1=Barrel (Passes 2.01 cfs of 15.63 cfs potential flow) 2=Top of Principal Spillway (Weir Controls 1.13 cfs ~ 1.2 fps) =6" orifice (Orifice Controls 0.88 cfs ~ 4.5 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=272.00' (Free Discharge) L3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B6: Extended dry detention basin-6 Inflow Area = 12.930 ac, Inflow Depth > 2.19" for 10 Yr- 24 Hrs event Inflow = 48.71 cfs ~ 12.06 hrs, Volume= 2.356 of Outflow = 5.03 cfs ~ 12.64 hrs, Volume= 1.363 af, Atten= 90%, Lag= 34.9 min Primary = 5.03 cfs ~ 12.64 hrs, Volume= 1.363 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor-tnd method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 209.33' cLD 12.64 hrs Surt.Area= 16,168 sf Storage= 54,364 cf Plug-Flow detention time= 173.8 min calculated for 1.359 of (58% of inflow) Center-of-Mass det. time= 94.7 min (896.6 - 802.0 ) Volume Invert Avail.Storage Storage Description #1 204.00' 106,330 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 204.00 4,650 0 0 208.00 12,865 35,030 35,030 212.00 22,785 71,300 106,330 Device Routing Invert Outlet Devices #1 Primary 204.00' 18.0" x 70.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 203.00' S= 0.0143 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 208.50' 24.0" Vert. Top of Principal Spillway C= 0.600 #3 Secondary 209.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 207.50' 6.0" Vert. 6" Orifice C= 0.600 • No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 90 Yr- 24 Hrs Rainfall=5.49" Prepared by G. N. Richardson and Associates, Inc. Page 12 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=5.03 cfs ~ 12.64 hrs HW=209.33' (Free Discharge) L1=Barrel (Passes 5.03 cfs of 18.21 cfs potential flow) 2=Top of Principal Spillway (Orifice Controls 3.84 cfs @ 3.1 fps) =6" Orifice (Orifice Controls 1.19 cfs ~ 6.1 fps) Secondary OutFlow Max=0.00 cfs cLD 0.00 hrs HW`=204.00' (Free Discharge) t3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B7: Basin-7 Inflow Area = 16.360 ac, Inflow Depth > 1.66" for 10 Yr- 24 Hrs event Inflow = 32.22 cfs ~ 11.99 hrs, Volume= 2.263 of Outflow = 2.60 cfs ~ 13.84 hrs, Volume= 0.972 af, Atten= 92%, Lag= 110.7 min Primary = 2.60 cfs ~ 13.84 hrs, Volume= 0.972 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Ti me Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 264.14' cLD 13.84 hrs Surt.Area= 34,349 sf Storage= 60,597 cf Plug-Flow detention time= 231 .4 min calculated for 0.972 of (43% of inflow) Center-of-Mass det. time= 134 .7 min (948.5 - 813.8 ) Volume Invert Avail.Stora a Story a Description #1 258.00' 144,358 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 258.00 3,074 0 0 260.00 4,302 7,376 7,376 262.00 5,713 10,015 17,391 264.00 32,684 38,397 55,788 266.00 55,886 88,570 144,358 Device Routing Invert Outlet Devices #1 Primary 258.00' 15.0" x 600.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 256.00' S= 0.0033'/' Cc= 0.900 n= 0.013 Concrete pipe, bends ~ connections #2 Device 1 264.00' 36.0" Horiz. Riser Limited to weir flow C= 0.600 #3 Secondary 265.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 263.00' 6.0" Vert. 6" orifice C= 0.600 • No wetland Impacts.Rev-7 for EEDB Type 1/24hr 10 Yr- 24 Hrs Rainfall=5.49" Prepared by G.N.Richardson and Associates, Inc. Page 13 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=2.57 cfs cLD 13.84 hrs HW=264.14' (Free Discharge) t-~1=Barrel (Passes 2.57 cfs of 6.57 cfs potential flow) 2=Riser (Weir Controls 1.67 cfs ~ 1.2 fps) =6" orifice (Orifice Controls 0.89 cfs ~ 4.6 fps) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs H1Iw258.00' (Free Discharge) t--3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) • • 1 "/Hour Storm Event • a No wetland Impacts.Rev-7 for EEDB Type l/ 24-hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 1 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor--Ind method L_J • Subcatchment 1A: Drainage Area-1A Runoff Area=7.500 ac Runoff Depth=0.00" Flow Length=750' Tc=6.5 min CN=69 Runoff=0.07 cfs 0.001 of Subcatchment 1 B: Drainage Area-1 B Runoff Area=5.180 ac Runoff Depth=0.00" Flow Length=720' Tc=5.8 min CN=70 Runoff=0.08 cfs 0.002 of Subcatchment 1 S: Drainage Area-7C Runoff Area=0.920 ac Runoff Depth=0.11" Tc=5.0 min CN=82 Runoff=0.42 cfs 0.009 of Subcatchment 2A: Drainage Area-2A Runoff Area=6.510 ac Runoff Depth=0.00" Tc=5.0 min CN=69 Runoff=0.06 cfs 0.001 of Subcatchment 26: Drainage Area-2B Runoff Area=7.160 ac Runoff Depth=0.00" Tc=5.0 min CN=70 Runoff=0.11 cfs 0.003 of Subcatchment 2S: Drainage Areal Runoff Area=12.930 ac Runoff Depth=0.00" Flow Length=750' Tc=6.9 min CN=70 Runoff=0.19 cfs 0.005 of Subcatchment 3A: Drainage Area-3A Runoff Area=8.110 ac Runoff Depth=0.00" Flow Length=640' Tc=5.3 min CN=70 Runoff=0.13 cfs 0.003 of Subcatchment 5S: Drainage Area-7A Runoff Area=6.760 ac Runoff Depth=0.00" Tc=5.0 min CN=69 Runoff=0.07 cfs 0.001 of Subcatchment 7S: Drainage Area-7B Runoff Area=8.680 ac Runoff Depth=0.00" Flow Length=1,000' Tc=43.0 min CN=56 Runoff=0.00 cfs 0.000 of Subcatchment 9S: Drainage Area-4 Runoff Area=2.890 ac Runoff Depth=020" Tc=5.0 min CN=86 Runoff=2.94 cfs 0.048 of Subcatchment 13S: Drainage Area-6A Runoff Area=15.580 ac Runoff Depth=0.00" Flow Length=550' Tc=4.9 min CN=69 Runoff=0.16 cfs 0.003 of Subcatchment 16S: Drainage Area-6B Runoff Area=4.340 ac Runoff Depth=0.00" Tc=5.0 min CN=62 Runoff=0.00 cfs 0.000 of Reach 1R: GraSS Swale -7 Peak Depth=0.01' Max Vet=0.7 fps Inflow=0.07 cfs 0.001 of n=0.030 L=400.0' S=0.0325 '/' Capacity=306.32 cfs Outflow=0.04 cfs 0.001 of Reach 2R: gras5 Swale-2 Peak Depth=0.02' Max Vet=0.5 fps Inflow=0.06 cfs 0.001 of n=0.030 L=220.0' S=0.0227 '/' Capacity=19028 cfs Outflow=0.05 cfs 0.001 of Reach 3R: Grass swale-6 Peak Depth=0.01' Max Vet=0.8 fps Inflow=0.19 cfs 0.005 of n=0.030 L=1,250.0' S=0.0496 '/' Capacity=378.41 cfs Outflow=0.09 cfs 0.005 of No wetland Impacts.Rev-7 for EEDB Type 1124hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 2 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4R: Grass Swale-3 Peak Depth=0.02' Max Vet=0.7 fps Inflow=0.13 cfs 0.003 of n=0.030 L=530.0' S=0.0340 'P Capacity=313.13 cfs Outflow=0.08 cfs 0.003 of Reach 11R: Grass Swale-1 Peak Depth=0.01' Max Vet=0.5 fps Inflow=0.07 cfs 0.001 of n=0.030 L=500.0' S=0.0200 '/' Capacity=24029 cfs Outflow=0.04 cfs 0.001 of Reach 14R: Grass Swale-5 Peak Depth=0.02' Max Vet=0.4 fps Inflow=0.16 cfs 0.003 of n=0.030 L=700.0' S=0.0114 'P Capacity=181.64 cfs Outflow=0.05 cfs 0.003 of Pond B1: Extended dry detention basin-1 Peak EIev=212.03' Storage=147 cf Inflow=0.08 cfs 0.003 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond B2: Extended dry detention basin-2 Peak EIev=225.04' Storage=172 cf Inflow=0.13 cfs 0.004 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond B3: Extended dry detention basing Peak EIev=240.05' Storage=134 cf Inflow=0.08 cfs 0.003 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond B4: Extended dry detention basing Peak EIev=248.42' Storage=1,856 cf Inflow=2.94 cfs 0.048 of Primary=0.13 cfs 0.045 of Secondary=0.00 cfs 0.000 of Outflow=0.13 cfs 0.045 of Pond B5: Extended dry detention basin-5 Peak EIev=272.01' Storage=126 cf Inflow=0.05 cfs 0.003 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000• Pond B6: Extended dry detention basin-6 Peak EIev=204.05' Storage=215 cf Inflow=0.09 cfs 0.005 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond B7: Basin-7 Peak Elev=258.14' Storage=436 cf Inflow=0.42 cfs 0.010 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Total Runoff Area = 86.560 ac Runoff Volume = 0.076 of Average Runoff Depth = 0.01" • • No w®tland Impacts.Rev-7 for EEDB Type l/ 24-hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 3 HydroCAD®7 10 s!n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 1A: Drainage Area-1A Runoff = 0.07 cfs @ 1.02 hrs, Volume= 0.001 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1 "IHr Storm Rainfall=1.00" Area (ac) CN Description 7.500 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 750 0.2830 1.9 Lag/CN Method, Subcatchment 1 B: Drainage Area-1 B Runoff = 0.08 cfs ~ 0.99 hrs, Volume= 0.002 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" • Area (ac) CN Description 4.810 69 50-75% Grass cover, Fair, HSG B 0.370 82 Direct pond and surrounding area 5.180 70 Weighted Average Tc Length Slope Velocity Capacity Description _ (min) (feet) (ft/ft) (ft/sec) (cfs) 5.8 720 0.3130 2.1 L,ag/CN Method, Subcatchment 1S: Drainage Area-7C Runoff - 0.42 cfs cLD 0.59 hrs, Volume= 0.009 af, Depth= 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" Area (ac) CN Description 0.920 82 Direct pond Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N. Richardson and Associates, Inc. Page 4 • HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 2A: Drainage Area-2A Runoff = 0.06 cfs cLD 1.00 hrs, Volume= 0.001 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" Area (ac) CN Description 6.510 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 26: Drainage Area-2B Runoff = 0.11 cfs ~ 0.99 hrs, Volume= 0.003 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" Area (ac) CN Description 6.780 69 50-75% Grass cover, Fair, HSG B • 0.380 82 Direct Pond 7.160 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Drainage Area-6 Runoff = 0.19 cfs cLD 1.00 hrs, Volume= 0.005 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" Area (ac) CN Description 12.400 69 50-75% Grass cover, Fair, HSG B 0.530 82 Direct pond 12.930 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.9 750 0.2400 1.8 Lag/CN Method, • No wetland Impacts.Rev-7 for EEDB Type 1124hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 5 HydroCAD®7 10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 3A: Drainage Area-3A Runoff = 0.13 cfs ~ 0.99 hrs, Volume= 0.003 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1 "/Hr Storm Rainfall=1.00" Area (ac) CN Description 7.730 69 50-75% Grass cover, Fair, HSG B 0 380 82 Direct pond ^ 8.110 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 640 0.3125 2.0 Lag/CN Method, Subcatchment 5S: Drainage Area-TA Runoff = 0.07 cfs ~ 1.00 hrs, Volume= 0.001 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs • Type II 24-hr 1.00 hrs 1 "/Hr Storm Rainfall=1.00" Area (ac) CN Description 6.760 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Drainage Area-7B Runoff = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1 "/Hr Storm Rainfall=1.00" Area (ac) CN Description 8.680 56 Brush, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.0 1,000 0.0200 0.4 Lag/CN Method, ~J No wetland Impacts.Rev-7 for EEDB Type 1124hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 6 i HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Subcatchment 9S: Drainage Area-4 Runoff = 2.94 cfs cLD 0.57 hrs, Volume= 0.048 af, Depth= 0.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/HrStorrn Rainfall=1.00" Area (ac) CN Description 0.230 98 Paved parking & roofs 2.320 85 Gravel roads, HSG B _ 0.340 82 Direct pond and surroundin area 2.890 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Sulxatchment 13S: Drainage Area-5A Runoff = 0.16 cfs cLD 0.99 hrs, Volume= 0.003 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1 "/Hr Storm Rainfall=1.00" Area (ac) CN Description 15.580 69 50-75% Grass cover, Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 550 0.3000 1.9 Lag/CN Method, Subcatchment 16S: Drainage Area-5B Runoff = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1.00 hrs 1"/Hr Storm Rainfall=1.00" Area (ac) CN Description 3.290 55 Woods, Good, HSG B 1.050 82 Direct pond 4.340 62 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • No wetland Impacts.Rev-7 for EEDB Type l/ 24-hr 1.00 hrs 1'%Hr Stonn Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 7 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 1 R: Grass swale -7 Inflow Area = 6.760 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.07 cfs t~ 1.00 hrs, Volume= 0.001 of Outflow - 0.04 cfs ~ 1.24 hrs, Volume= 0.001 af, Atten= 38%, Lag= 14.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.7 fps, Min. Travel Time= 10.2 min Avg. Velocity = 0.7 fps, Avg. Travel Time= 10.2 min Peak Depth= 0.01' ~ 1.07 hrs Capacity at bank full= 306.32 cfs Inlet Invert= 287.00', Outlet Invert= 274.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 'P Top Width= 20.00' Length= 400.0' Slope= 0.0325 '/' Reach 2R: grass swale-2 Inflow Area = 6.510 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.06 cfs ~ 1.00 hrs, Volume= 0.001 of • Outflow = 0.05 cfs ~ 1.16 hrs, Volume= 0.001 af, Atten= 27%, Lag= 9.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.5 fps, Min. Travel Time= 6.7 min Avg. Velocity = 0.5 fps, Avg. Travel Time= 6.7 min Peak Depth= 0.02' ~ 1.05 hrs Capacity at bank full= 190.28 cfs Inlet Invert= 234.00', Outlet Invert= 229.00' 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed 8~ winding Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 220.0' Slope= 0.0227 '/' Reach 3R: Grass swale-6 Inflow Area = 12.930 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.19 cfs cL'D 1.00 hrs, Volume= 0.005 of Outflow = 0.09 cfs cLD 1.55 hrs, Volume= 0.005 af, Atten= 55%, Lag= 32.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.8 fps, Min. Travel Time= 25.8 min Avg. Velocity = 0.8 fps, Avg. Travel Time= 25.8 min Peak Depth= 0.01' ~ 1.11 hrs Capacity at bank full= 378.41 cfs Inlet Invert= 280.00', Outlet Invert= 218.00' • 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed 8~ winding Side Slope Z-value= 3.0 'P Top Width= 20.00' Length= 1,250.0' Slope= 0.0496 '/' No wetland Impacts.Rev-7 for EEDB Type /l 24hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" • Prepared by G.N. Richardson and Associates, Inc. Page 8 HYdroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Reach 4R: Grass swale-3 Inflow Area = 8.110 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.13 cfs @ 0.99 hrs, Volume= 0.003 of Outflow = 0.08 cfs ~ 1.28 hrs, Volume= 0.003 af, Atten= 36%, Lag= 17.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.7 fps, Min. Travel Time= 13.2 min Avg. Velocity = 0.7 fps, Avg. Travel Time= 13.2 min Peak Depth= 0.02' cLD 1.06 hrs Capacity at bank full= 313.13 cfs Inlet Invert= 264.00', Outlet Invert= 246.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 530.0' Slope= 0.0340 'P Reach 11 R: Grass Swale-1 Inflow Area = 7.500 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.07 cfs @ 1.02 hrs, Volume= 0.001 of Outflow = 0.04 cfs ~ 1.38 hrs, Volume= 0.001 af, Atten= 50%, Lag= 21.5 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs • Max. Velocity= 0.5 fps, Min. Travel Time= 16.2 min Avg. Velocity = 0.5 fps, Avg. Travel Time= 16.2 min Peak Depth= 0.01' cLD 1.10 hrs Capacity at bank full= 240.29 cfs Inlet Invert= 230.00', Outlet Invert= 220.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed ~ winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' Length= 500.0' Slope= 0.0200 '/' Reach 14R: Grass swale-5 Inflow Area = 15.580 ac, Inflow Depth = 0.00" for 1"/Hr Storm event Inflow = 0.16 cfs ~ 0.99 hrs, Volume= 0.003 of Outflow = 0.05 cfs ~ 1.60 hrs, Volume= 0.003 af, Atten= 67%, Lag= 36.5 min Routing by Stor--Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.4 fps, Min. Travel Time= 30.1 min Avg. Velocity = 0.4 fps, Avg. Travel Time= 30.1 min Peak Depth= 0.02' ~ 1.10 hrs Capacity at bank full= 181.64 cfs Inlet Invert= 288.00', Outlet Invert= 280.00' 8.00' x 2.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 20.00' • Length= 700.0' Slope= 0.0114 '/' • No wetland Impacts.Rev-7 for EEDB Type 1124hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 9 HydroCAD®7 10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Pond B1: Extended dry detention basin-1 Inflow Area = 12.680 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.08 cfs ~ 0.99 hrs, Volume= 0.003 of Outflow = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ctvD 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 212.03' ~ 8.95 hrs Surt.Area= 5,146 sf Storage= 147 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 212.00' 94,059 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 212.00 5,106 0 0 214.00 7,891 12,997 12,997 216.00 11,443 19,334 32,331 218.00 15,371 26,814 59,145 220.00 19,543 34,914 94,059 Device Routing Invert Outlet Devices #1 Primary 212.00' 18.0" x 35.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 206.00' S= 0.1714'/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 217.50' 30.0" Horiz. Top of the principal spillway Limited to weir flow C= 0.600 #3 Secondary 218.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 .0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 216.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=212.00' (Free Discharge) t-1=Barrel (Controls 0.00 cfs) 2=Top of the principal spillway (Controls 0.00 cfs) =OrificelGrate (Controls 0.00 cfs) $econdary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=212.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B2: Extended dry detention basin-2 Inflow Area = 13.670 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.13 cfs cii 1.00 hrs, Volume= 0.004 of • Outflow = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs (.c0 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of No wetland Impacts.Rev-7 for EEDB Type It 24hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" • Prepared by G.N.Richardson and Associates, Inc. Page 10 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 225.04' ~ 4.15 hrs Surt.Area= 4,662 sf Storage= 172 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storag e Description #1 225.00' 73,864 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 225.00 4,600 0 0 230.00 13,000 44,000 44,000 232.00 16,864 29,864 73,864 Device Routing Invert Outlet Devices #1 Primary 225.00' 18.0" x 40.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 224.60' S= 0.0100 'P Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 230.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 231.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Primary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=225.00' (Free Discharge) L1=Barrel (Controls 0.00 cfs) t-2=Top of Principal Spillway (Controls 0.00 cfs) $econdary OutFlow Max=0.00 cfs cLD 0.00 hrs HW=225.00' (Free Discharge) 3=Broad-Crested Rectangularweir(Gontrols 0.00 cfs) Pond B3: Extended dry detention basin-3 Inflow Area = 8.110 ac, Inflow Depth = 0.00" for 1"/Hr Storm event Inflow = 0.08 cfs @ 1.28 hrs, Volume= 0.003 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 240.05' cLD 7.60 hrs Surt.Area= 2,752 sf Storage= 134 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) V_ olume Invert Avail.Storage Storage Description #1 240.00' 82,738 cf Custom Stage Data (Prismatic)Listed below (Recalc) • No wetland Impacts.Rev-7 for EEDB Type Il 24hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 11 HYdroCAD®7 10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubio-feet) (cubic-feet) 240.00 2,663 0 0 242.00 6,250 8,913 8,913 244.00 10,127 16,377 25,290 246.00 14,286 24,413 49,703 248.00 18,749 33,035 82,738 Device Routing Invert Outlet Devices #1 Primary 240.00' 18.0" x 210.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 232.00' S= 0.0381 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 245.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 246.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 244.00' 6.0" Vert. 6" Orifice C= 0.600 Primary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=240.00' (Free Discharge) 'L =Barrel (Controls 0.00 cfs) • 2=Top of Principal Spillway (Controls 0.00 cfs) =6" Orifice (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HV1r240.00' (Free Discharge) 3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B4: Extended dry detention basin-4 Inflow Area = 2.890 ac, Inflow Depth = 0.20" for 1"/Hr Storm event Inflow = 2.94 cfs ~ 0.57 hrs, Volume= 0.048 of Outflow = 0.13 cfs ~ 1.10 hrs, Volume= 0.045 af, Atten= 96%, Lag= 31.6 min Primary = 0.13 cfs ~ 1.10 hrs, Volume= 0.045 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 248.42' @ 1.10 hrs Surt.Area= 4,630 sf Storage= 1,856 cf Plug-Flow detention time= 224.9 min calculated for 0.045 of (95% of inflow) Center-of-Mass det. time= 223.8 min (265.3 - 41.5 ) Volume Invert Avail.Storage Storag e Description #1 248.00' 44,060 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 248.00 4,229 0 0 . 250.00 252.00 6,142 8,364 10,371 14,506 10,371 24,877 254.00 10,819 19,183 44,060 No wetland Impacts.Rev-7 for EEDB Type 1l 24hr 9.00 hrs 1'%Hr Storm Rainfall=9.00" Prepared by G.N.Richardson and Associates, Inc. Page 12 HydroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Device Routing Invert Outlet Devices #1 Primary 248.00' 15.0" x 120.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 247.00' S= 0.0083 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends 8~ connections #2 Device 1 251.50' 24.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 252.50' 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.13 cfs ~ 1.10 hrs HV1r248.42' (Free Discharge) t-1=Barrel (Passes 0.13 cfs of 0.76 cfs potential flow) 2=Top of Principal Spillway (Controls 0.00 cfs) =Orifice/Grate (Orifice Controls 0.13 cfs ~ 2.6 fps) Secondary OutFlow Max=0.00 cfs cLD 0.00 hrs HW=248.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B5: Extended dry detention basin-5 Inflow Area = 19.920 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.05 cfs ~ • 1.60 hrs, Volume= 0.003 of Outflow = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.01' ~ 14.60 hrs Surf.Area= 19,190 sf Storage= 126 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Stora a Stora a Description #1 272.00' 258,312 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 272.00 19,166 0 0 274.00 26,572 45,738 45,738 276.00 31,799 58,371 104,109 . 278.00 38,333 70,132 174,241 280.00 45,738 84,071 258,312 Device Routin Invert Outlet Devices #1 Primary 272.00' 18.0" x 100.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 264.00' S= 0.0800'/' Cc= 0.900 n= 0.013 Concrete pipe, bends ~ connections #2 Device 1 276.00' 30.0" Horiz. Top of Principal Spillway Limited to weir flow C= 0.600 #3 Secondary 277.00' • 30.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 No wetland Impacts.Rev-7 for EEDB Type 11 24-hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 13 HVdroCAD® 7.10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 275.00' 6.0" Vert. 6" orifice C= 0.600 Primary OutFlow Max=0.00 ci's ~ 0.00 hrs H1IW272.00' (Free Discharge) t-1=Barrel (Controls 0.00 cfs) 2=Top of Principal Spillway (Controls 0.00 cfs) =6" orifice (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs H1/1f=272.00' (Free Discharge) 3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) Pond B6: Extended dry detention basin-6 Inflow Area = 12.930 ac, Inflow Depth = 0.00" for 1 "/Hr Storm event Inflow = 0.09 cfs ~ 1.55 hrs, Volume= 0.005 of Outflow = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 204.05' ~ 14.15 hrs Surf.Area= 4,744 sf Storage= 215 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 204.00' 106,330 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 204.00 4,650 0 0 208.00 12,865 35,030 35,030 212.00 22,785 71,300 106,330 Device Routing Invert Outlet Devices #1 Primary 204.00' 18.0" x 70.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 203.00' S= 0.0143 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends ~ connections #2 Device 1 208.50' 24.0" Vert. Top of Principal Spillway C= 0.600 #3 Secondary 209.50' 30.0' long x13.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 207.50' 6.0" Vert. 6" Orifice C= 0.600 • No wetland Impacts.Rev-7 for EEDB Type /l 24-hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N. Richardson and Associates, Inc. Page 14 HYdroCAD® 7.10 s/n 001426 ©2005 HYdroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=204.00' (Free Discharge) L'1=Barrel (Controls 0.00 cfs) 2=Top of Principal Spillway (Controls 0.00 cfs) =6" Orifice (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HV1F=204.00' (Free Discharge) t--3=Broad-Crested Rectangular weir(Controls 0.00 cfs) Pond B7: Basin-7 Inflow Area = 16.360 ac, Inflow Depth = 0.01" for 1 "/Hr Storm event Inflow = 0.42 cfs ~ 0.59 hrs, Volume= 0.010 of Outflow = 0.00 cfs cLD 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs ~ 0.00 hrs, Volume= 0.000 of Routing by Stor--Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 258.14' ~ 5.80 hrs Surt.Area= 3,160 sf Storage= 436 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 258.00' • 144,358 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surt.Area Inc.Store Cum.Store (feet) (sq-ft) (cubicfeet) (cubic-feet) 258.00 3,074 0 0 260.00 4,302 7,376 7,376 262.00 5,713 10,015 17,391 264.00 32,684 38,397 55,788 266.00 55,886 88,570 144,358 Device Routing Invert Outlet Devices #1 Primary 258.00' 15.0" x 600.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 256.00' S= 0.0033 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 264.00' 36.0" Horiz. Riser Limited to weir flow C= 0.600 #3 Secondary 265.00' 30.0' long x 8.0' breadth Broad-Crested Rectangular weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 263.00' 6.0" Vert. 6" orifice C= 0.600 • No wetland Impacts.Rev-7 for EEDB Type 1124hr 1.00 hrs 1'%Hr Storm Rainfall=1.00" Prepared by G.N.Richardson and Associates, Inc. Page 15 HydroCAD®7 10 s/n 001426 ©2005 HydroCAD Software Solutions LLC 7/27/2007 Primary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=258.00' (Free Discharge) L-1=Barrel (Controls 0.00 cfs) 2=Riser (Controls 0.00 cfs) =6" orifice (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs ~ 0.00 hrs HW=258.00' (Free Discharge) L3=Broad-Crested Rectangular Weir(Controls 0.00 cfs) C • • Impervious Area for Pre-developed Condition • • Z O Q J U J Q V Q w a O W a ~ p ~ v U ~ d p Y ~ CO N O 0 0 •` N H p = W M ~ ~ ~ M ~ ~ ~ v U ~ U = u~ ~ a U U ~ p ` Z M a a 0 0 c ~ ~ U ~- o o .~ ~ ~ p W ... = ~ N ~ m s ~ d p Y cn `- a a ' t0 o0 N N ~ C ap ap C = ~ U O N .~ ,r, ~ p x W ~ ~ p Y ~ ~ ~ d p .Y cg co a Q v ~t 0 r N , ~ O W ~ ~ ~a ~ `r° N ~ r c .~'.. C Rf ,,, ~ ~0,, ~p ~ ~ =+ .-. V ip ~ ~ C O ~ 1C i N N 7 p H w ~ ~ ~ ~ ~ ~ c w v~ v~ a 'Z Z Q o ' • Z , d ~ d ~ ~ ~ a ~ .~ ~ c 0 d 0 ~ 0 ~ ° ~ x o w a v d ~ U U U U U U Q Q d a a a a a a ~ O O O O O O N - N C ` ~ p M l9 ~ U U U U U U U U ~ ~ a o a 0 a 0 a 0 a 0 a 0 a 0 a 0 c .~ p N ~ ¢ rn Q Q Q ~ Q M O N O .- O ~ O N N .` p r V ~ U U U U U U U U d ~ a o a 0 a 0 a 0 a 0 a 0 a 0 a 0 c .~ p d ~ ~ C uJ ~ C Y (Q ~ ~ N _ ~ ~ ~ ~ ~ ~ ~ ~ , , O a~ ~ cn O ~ ~ D ~ O w O .. o !- • Extended Dry Detention Basin Worksheets c: • Basin Calculations • TSS Removal Efficiency Calculations • Sediment Storage Calculations Extended Dry Detention Basin-1 • Project No. DWQ • DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name: Shal'wel. cr~~ Zc~nd~j) 7r~ Contact Person: S-lziceu Sim;~ ~ rvu~l shu ~ Phone Number: (ql9) - 82S - OS ~ ~- For projects with multiple basins, specify which basin this worksheet applies to:_ Ejcfend ed, ~a~ ~e~en~m~ Basin - ~- Drainage Area:~acres Percent Impervious Area: o II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials ass Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or K capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain <<~a~ Kam- The basin length to width ratio is greater than 3:1. kgs The basin side slopes are no steeper than 3:1. ~Rt A small permanent pool at outlet orifice is provided to reduce clogging. k ~s An emergency drain to completely empty the basin is provided. ~~ Vegetation plan prepared is specified on plans. ~~~ - Basin to be stabilized within 14 days of construction is specified. ~cP~ Sediment storage (20% of detention volume) in addition to detention volume is provided. ~~g _ Inlet and outlet erosion control measures to prevent scour are provided. k~s Additional treatment to meet the 85% TSS removal efficiency is provided. ~~~. Access for clean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. ~<~ Forebay is provided to capture sediment and minimize clean-out problems. ~.; Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. i~ ~ ~ Seasonal high water table is at least 1 foot below bottom of basin. ,~a,~._ If used as a temporary sediment basin, plans indicate clean-out prior to final operation. ~_~.- A site specific operation and maintenance plan with the following provisions is provided. ,~, The 0&M agreement is signed by the responsible party and notarized. • • ~/~, Richardson Smith Gardner & Associates, InC. SHEET: ~, ,^r) Engirteerin9 and Geobgical seMces Job tt: shotweu oSz ~~ 14 N. Boylan Avenue TN: 819-828-0577 DATE: 727N7 Raleigh, NC 27603 Fax: 919828-3888 BY: ICES CHKD BY: /' ~~ Shotwell C$~D Landfill, Inc. ~T Extended Dry Detention Basin Analysis Basin No.: EDDB-1 DESIGN TEMPORARY WATER QUALITY POOL: Areas Draining Into Basin & %Imoervious: Area Drainage Area (acres) % Impervious AL OlherAreas 12.7. 0 Total = 12.7 Aces Avg. % Impervious = 0 Required Volume of Temoorarv Water llualHv Pool (Maximum V elue Controlsl: Water qua6N Reairemerds - Rlxwff from Design Rainfall: Rv(iMn)= 0.05 Design Rainfap (in) = 1.0 Required Vokme (acre-feet) = 0.05 Required Water quality VoNane (ft') = 2,301 Land quality Reaurements - Reaered Storaae/Acre: Required Storege Capadty (fl3/Ac.) = 1.800 Required Sediment Storage Vohane (ft~) = 22,824 Required Water quality Volume (ft~) = 22,824 Land Quality Requirements Control Riclmrdson SrriTh Gardner S Associates, Inc. EDDB-1 CopyofBASIhFEDDB-1 Rev2ads • Determine StageSYora ae Function: ~ _ Cordour Area Area Incremental CirrxAetive Sage h S h Z Zest (ftZ) (acres) Voume (ft') Vokme (ft') (ft) 212 5,106 0.12 0 0 214 7,891 0.18 12,997 12,997 2 9.47 0.69 2.00 216 11,443 0.26 19,334 32,331 4 10.38 1.39 4.00 218 15,371 0.35 26,814 59,145 6 10.99 1.79 6.00 220 19,543 0.45 34,914 94,059 8 11.45 2.08 8.00 Linear Reareasion Constants: Ks = 4,728 Storage = 4726 i"1.42 b= 1.42 `CAUTK)N: CHECK INPUT FOR REGRESSION ANALYSIS! • zz1 220 21B 218 . 217 t= °$ 218 B 215 214 213 212 211 0 StageSurtace Area Relationship Baaln Design Elevations: • Elev. of Rotten or Basin = Regd. Storage Vokrtne at Temp. Water QuaMty Pod (tt3) Min. Elev. of Temporary Water dueity Pod = Selected Elev. of Temporary Water duaFty Pod = Actual Storage Vdume at Terrgr. Water Queity Pod (tt3) _ Basin Cleanout Voluna (ft) _ Basin geanout E1eva9on = n1 z2o 218 218 217 K °~ 216 ~ 215 214 213 212 211 StageStorage Relationship 0 20,000 40,000 60,000 80,000 100,000 Storage IMI 212.0 27,389 Req'd. Volume of Temp. Water duality Pool x 1.2 (to Acct for Additional Sediment Storage) 215.4 216.0 O.K. 33,859 16,930 a 50% of Temp. Water duality Pool Storage Volume 214.5 Richardson Srtdfh Gfrdner 6 Assodatas, hrs. EDD&1 CopyoR3ASIN-EDDB-1 ReJ2.~ds 3uixe Area (~) • Dewaterina of Temoorarv Water Quality Pool: Average Head (ft) _ Surface Area at Tenporery Water Quality Pool (ftr) _ Caef. of Contraction = Min. Drawdown Period (hrs) _ Max. Drewdown Period (Ira) _ Max. Area of Dewatering Hole (ftr) _ Max. Diameter of Dewatering Hole (in) _ Min. Area of Dewatering Hole (ftr) _ Min. Diameter of Dewaterirg Hole (in) _ Selected Diamet« of Dewalering Hole(s) (in) _ Number of Dewatering Holes = Ac1ua1 Area of Dewatering Hole(s) (itz) _ Actual Drewdown Period (trs) _ ODlion: Feirdoth Skimmer Storage Vdume (tP) _ Required Orifice Diameter (in) _ Basin Drain Calculations: • Average Head (tt) = 2.0 Surface Area at Temp«ery Water Quatlly Pod (TtZ) = 12,021 Coef. of Contracton = '::-0.6 Desired Drawdown Period (hrs) = 24 Min. Area Of Dewaterirg Hole (itZ) = 0.08 Based on Max. Detention Time Min. Diameter of Dewatering Hole (in) = 3.9 Selected Dlameter of Dewaterfng Hole (In) _ 6 Actual Area of Dewatering Hole (ft~) = 0.20 Actual Drawdown Period (trs) = 10 O.K Forebav Calculations: Required Votlrne of Forebay(s) (ft') = 5,478 ~ 20%of Required Temporary Water Quality Pool Stooge Volume Forebay: tN-Notch Contour Area Area Incremental Glnrxtlative Stage h S h Z Zest (ft') (acres) Vokme (ft') Vdume (fl) (ft) 212 318 0.01 0 0 214 1,223. 0.03 1,541 1,541 2 7.34 0.69 2.00 216 2,780 0.06 4,003 5,544 4 8.62 1.39 4.00 Linear Regression Constarrts: Ks = 428 Slaage = 4728 z^1.42 b= 1.85 FJev. of Bottom of F«ebay = 2120. Tap Elevetlon of Forebay= 216.0 Forebay Storage (ft') = 5,544 O.K Forebay Cleanout Vohane (ff') = 2,772 = 50X of Forebay Storege Volunre Forebay Cieanout Elevation = 214.7 2.0 12,021 0.6 48 120 0.04 Based on Min. Detention Time 2.7 0.02 Based on Max. Detention Time 1.7 2.0 1 0.02 90 O.K. 33,859 3,0 Fran Design Chek Based on 2 to 5 Day Drawdown Basin Shaoe: Length of Basin (ft) _ '230 Measured at Temporary Water Quality Pool Elevation Width of Basin (ft) _ ` 75 Measured at Temporery Water Quality Pool Elevation Desired Length to Widtli RaSo (Xt) _ 3 Actual Length to VYidtlr Ratio (X:1) = 3.1 O.K. • Rkhardson Smith Gardner & Assodates, Inc. EDD&1 CopyorBASIN-EDD&1 ReYl.>Os .] 1/ 1I u • SHEET: / ROUTE DESIGN STORM: Use HydroCAD or Other Method. JOB #: Shotwetl 05-2 DATE: 787/07 Design Parameters: BY: KBS Design Storm: 2SYr; 24Hr CHKD BY: ~~ Design Storm Rainfatl (in) = 6:55 ~ Reinratl Dislritxfion: Tjlpe II Rurx>Tf Method: SCS TR-20 Results: Ma>amum Pool Elevation = 216.3 Surtace Area at Ma>amum Pod (ftz) = 14,100 From HydroCAD Analysis Peak Discharge (cfs)= 15:8 Check Settling E~ciencv: Particle Data: Diam. (microns) _ 40 Spec GYavtty = 2.7 Setl6rg Vebc. (ft/s) = 0.004265 Reynolds No. (~0.5) = 0.045626 O.K. Effidencv Data: Desired Eftiderxy (°6) = 80 No. oT Effective Ceis = 2 Setlirg Eftidency (%) = 88 O.K. DESIGN OUTLET STRUCTURES: Decfgn Riser/Barrel Structuros: Riser Design: Type of Riser. Cwicls/e-Clradar Riser Base Elevation = 212.0 Riser Top Elevation = 217.5 Riser Heig'rt (ft) = 5.5 Outlets: Outlet No. 1 (fw Deviatering TWO Pod): Size 2' Diem. OAflce .From Above - Dewatering of TWO Pool Irrvert Elevation 212.0 May Vary For Mukipla Holes Outlet No. 2: Size: 6•:DIAm.ONtlce Invert Elevation: 216.0 Outlet No. 3 (Prirxipal Spitlway): Size; 30' piam. Horiz. Ottfice (Top of Riser) Invert Elevation: 217.5: Concrete Riser WaA Thidgress (in) _ 2:75 Riser Inside Diameter (ft) _ 2:5 Approx Circ. Riser Interior Vokme (d) = 27 Approx. Circ. Conwete Riser Voh.ime of Concrete (cf) = 11 Barrel Design: Type of Bartel Concrete Diameter (in) = 18 Irrv. In Elevation = .212:0 Irrv. Out Elevation = 206.0 LerxJlh (ft) _ 100:0. Slope (tt/ft) _ 0.060 Richardson Sm+lh Gardner 3 Assodates, Inc. EDD61 CopyoIBASIN-EDD&1 ReJ1.ds C~ Riser Base Calculations: D_ esian Uo6ft Force: Fedor of Safety = F (urtedjusted) (bs) _ Approx. Circ. Concrete Riser Buoyant WL (~s) _ Buoyant Wf. of Riser Top (fbs) _ Buoyant Wt. of Surrounding Soil Acting on Ext. Base (bs) _ Sliding Resistance of Surrounditg Shc (bs) _ F (adjusted) (Ibs) _ Concrete Base: Required VoNxne of Concrete (ft') _ Length (ft) _ Width (ft) TNdmess (ft) _ Actual VoNmie of Concrete (ft) _ Anti-SeeoaaeCollarCalculetions• (Akematively-DesianFiher Diauhreaml Slope of Upstream En~anlonent (zH:t V) _ - 3. Sbpe of Outlet Pipe (ftlft) = 0.060 Ls (ft) = 51 Number of Copars: 2 Length of Each Co9ar (ft) _ 525. From Design Chart Based on Ls and No. of Collars Width of Each Co1ar (ft) _ 5.25. From Design Chart Based on Ls and No. of Collars Cotlar Projectlon, P (ft) = 1.875 Spaang of Subsequent MMIi-Seep Co6ars (ft) = 26 =14P Ememencv Spillway Calculations: • • Crest Elev. (ft) _ Required Freeboard (ft) _ Top of Benn Elev. (ft) Requited Capaaty (ds) _ Driving Heed {ft) _ weir CceffideM = Length of Crest (ft) _ Design Crest Length (ft) _ SUMMARY DATA: Basin No.: EDDB-1 Elev. of Bottom of Basin = Cleanout Elev. (ft) _ Elev. of Temporary Water Qua6ly Pod = Ertavgency Spitlway Ehn'- (tt) _ Top of Berm Elev. (ft) _ Top of Berm Width (ft) _ Barrel Diameter (in) _ Barrel Slope (%) _ 1.25. 2,106 757 Factore in 80°~ of the Weight of the Concrete Riser to Account for Outlets. 0 D 0 0 0 0 1,349 15.4 3.0 3.0 2.0 18.0 O.K 218.5 1:5 220.0 15:8 From HydroCAD - 25-Yr, 24-Hr. Storm D:5 3.0: 14.9 Determine by Weir Equat{on` • Length = 20 ft minimum. 212.0 214.5 216.0 See Above for Ricer end Other Design Information, 218.5 220.0 10 18 6.0 Riduvdson SrniN Cdvdnsr 8 Associates, Inc. EDD&1 CopyolBAStl~EDDB-1 Rev2~ds Extended Dry Detention Basin-2 • • Project No. DWQ • DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name Contact Person: Phone Number: (919) - 828 - c~5~ For projects with multiple basins, specify which basin this worksheet applies to:_ t:x tevlded ~~ ~e-~tYlt-~~m ~'~ - 2- Drainage Area: r3•~acres Percent Impervious Area: 6 REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials K~ Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or ~ capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain ~~~ kt? ~~ The basin length to width ratio is greater than 3:1. ~~, The basin side slopes are no steeper than 3:1. k~ ~ _ A small permanent pool at outlet orifice is provided to reduce clogging. ,mac - An emergency drain to completely empty the basin is provided. k~-e Vegetation plan prepared is specified on plans. ~~ Basin to be stabilized within 14 days of construction is specified. ~ Sediment storage (20% of detention volume) in addition to detention volume is provided. i-~~ Inlet and outlet erosion control measures to prevent scour are provided. ~, Additional treatment to meet the 85% TSS removal efficiency is provided. ,C Access for clean-out and maintenance is provided. ~k ,ti_ Inlet plunge pool or other energy dissipation is provided. r~,a Forebay is provided to capture sediment and minimize clean-out problems. k.€~ Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. k~~i Seasonal high water table is at least 1 foot below bottom of basin. tc~, If used as a temporary sediment basin, plans indicate clean-out prior to final operation. ~.~ A site specific operation and maintenance plan with the fol-owing provisions is provided. ~; The 0&M agreement is signed by the responsible party and notarized. • • Richardson Smith Gardner & Associates, Inc. Engneering and Geological Servkes ~ 14 N. Boylan Avenue Tel: 919-828-0577 Raleigh, NC 27603 Fax: 919-82&3899 Shotwell C&D Landfill, Inc. F~tended Dry Detention Basin Analysis Basin No.: EElDB-2 DESIGN TEMPORARY WATER QUALITY POOL Areas Draining Into Basin & N Impervious• Area Dreinane Area (acres) % Impervious At.OUterAreas 13.7 0 k! Total = 13.7 Aces Avg. % Irtpervious = 0 • Reauired Volume of Temoorerv Water Quality Pool (Maxim um Value CoMrolsl• Water QuaBty Reauiremerds -Runoff tram Design Rai Mal~ Rv(inlin)= 0.05 Design Rainfap (in) = 1.0 Requred Vokme (acre-feet) = 0.06 Required Water OuaNty Volme (ft') = 2,477 Land QuakN Reouiremelds -Reauired Sloreae/Aae~ Regldred Storage Capacity (ff'/AC.) = 1,800 Requred Sediment Storege Volme (ff') = 24,570 Required Water QuaNly VoWme (ft3) = 24,570 Land Qualil Requirements Control SHEET: / JOB #: ShotweN 05-2 DATE: 7!27/07 BY: KBS CHKDBY: ~~ ^^ Richardson SmiM Gardner d Assodates, Ina. CopyoBASIN-EDD&2Rev2.bs • petermine StegeStoraaa Function• l Contour Area Area Incremerdal Cum~6etive Stage In S kr Z Zest (ft') (saes) VoWrrre (ft') Volume (ft°) (ft) 225 asoo o.n 0 0 230. 13,000 0.30 44,OOD 44,000 5 10.69 1.61 5.00 232 16,864 0.39 29,864 73,864 7 11.21 1.95 7.00 Linear Regression Constants: Ks = 3,692 Storage = 3692 z^1.54 b = 1.54 *CAUTION: CHECK INPUT FOR REGRESSK)N ANALYSISt • 233 232 231 230 ~, Z28 a ~0 228 227 228 225 224 0 StageSurface Area Relationship Basin Design Elevations: c: FJev. of Bottom of Basin = Req'd. Storage VoNane at Terre. Water Quatty Pod (tt) _ Min. Elev. of Temporary Water Quality Pod = Selected Elev. oT Temporary Water Quaflty Pod = Actual Storage Vohxne at Temp. Water Quepty Pod (ft) _ Basin Ckanout Vopane (ft') _ Basin Clearaul Elevation = 233 232 231 230 ~ 229 ~ 228 227 226 225 224 StageStorage Relationship 0 10.000 ZO,000 30.000 40,000 50.000 60.000 70,000 80,000 storage (~) 225A 29,484 Req'd. Volume of Temp. Water Quality Pool x 1.2 (to Acct. for Additional Sediment Storage) 228.9 229A O.K. 31,207 15,603 = 50% of Temp. Water Quality Pool Storage Volume 227.5 Ridnrdson SrMlh Gardner 8 Assodates, Inc. CopyotBASIN-EDD&2ReJL.ds 5,000 10,000 15,000 20,000 surface Area (sfl • peweterina of Temoororv Water Quality Poal: Average Head (ft) _ Surface Area at Temporary Water Quality Pod (tt') _ Coef. of Contraction = Min. Drowdown Period (fvs) _ Max. Drowdown Period (frs) _ Max. Area of Dewaterirg Hole (fP) _ Max. Diameter of Dewaterirg Hole (in) _ Min. Area of Dewatering Hole (fP) _ Min. Diameter of Dewatering Hole (in) _ Selected Diameter of Dewaterirg Hole(s) (in) _ Number of Dewatering Holes = Actual Area of Dewatering Hole(s) (ftZ) _ AcUral Drowdown Period (fxs) Option: Faircbtl~ Skimmer Storage VoWrne (ft') _ Required Orifice Diameter (in) _ 2.0 12,012 0.6 46 120 0.04 Based on Min. Detention Time 2.7 0.02 Based on Max. Detention Time 1.7 2.0 1 0.02 90 O.K. 31,207 3.0 From Design Chart Based on 2 to 5 Dar Drowdown Basin Drain Calculations: / 1 Average Head (ft) _ Surface Area at Temporary Water Quality Pod (ttZ) _ Coef. of Contraction = Desired Drewdown Period (hrs) _ Min. Area of Dewatering Hole (ft~) _ Min. Diameter of Dewaterirg Hde (in) _ Selected Diameter of Dewatering Hole (In) _ Actual Area of Dewaterirg Hale (fP) _ Actual Crowdown Period (hs) _ Forebav Calculations: Required VoNrne of Farebay(s) (tt') _ 2.0 12,012 t).B 24 0.08 Based on Max Detention Time 3.9 6 0.20 10 O.K 5,897 = 20 ~ of Required Temporary Water Quality Pool Storage Volume Forebay: K1-North Contour Area Area Incremerrtal Curndative Stage h S h Z Zest (iF) (acres) Voume (ft3) VaWme (Tt3) (tt) 225 600 0.01 0 0 226 1,050 0.02 825 825 1 6.72 0.00 1.00 ?28" 1,950 0.04 3,000 3,825 3 8.25 1.10 3.00 229 2,500 0.06 2,225 6,050 4 8.71 1.39 4.00 LinearRearesaion Constants: Ks = 820 Storage = 3692 z^1.54 b = 1.43 Elev. of Bottom of Forebay = 225.D Top Elevation of Forebay = 229.0 Forebay Storage (tt') = 5,922 O.K Forebay Cleanart Volme (tt') = 2,961 = 50'/. of Forebay Storage Volume Forebay Cleanout Elevation = 227.5 Basin Shaoe: Lergtir of Basin (ft) _ 200 Measu red at Temporary Water QualKy Pool Elevation Width of Basin (tt) = 50 Measu red at Temporary Water Quality Pool Elevation DesiredLerglhtoVNdtitRatio(X:1)= 3 Actual Lerglh to Width Ratio (X 1) = 4.0 O.K • Ridnnlson SmNh Gardner 6 Assodalea, Inc. Copyo1BA51N-EDD&2RaYlads ROUTE DESIGN STORM Use HydroCAD or Other Method. Design Parameters Design Storm: 10-Yr, 24Hr Design Stone RainfaA (in) = 5.49 RaiMaA Distribution: Type II Runoff Method: SCS TR-ZO Resu Maximum Pod Elevation = 230.5 Surface Area at Ma>amum Pod (ft~) = 14,278 Peak Discharge(ds)= 9.3 Check Settling Efficiency: Partide Date: DESIGN OUTLET STRUCTURES Design Riser/Barcel Structures Riser Destan: • • Dlam. (microns) _ 40 Spedfic Gravity = - 2,t35 Settlirg Vebc. (fUs) = 0.004140 Reynolds No. (<0.5) = 0.044284 O.K. Desired Effidency (%) _ I!0 No. of Effective Cetls = 2 Use of Foretiay(s) JustNies Velua of 2 Settling Effidenry (9G) = 94.3 O.K. type of Riser. Conttela - Riser Base Elevation = 225.0 Riser Top FJevatlon = 230.0 Riser Height (ft) = 5.0 Outlets: Outlet No. 1 (for Dewetertrg TWQ Pod): Size: 2' {71am. OrIQCe From Above - Dewetering of TWQ Pool Invert Elevation: 225.0 MayVary For Mukiple Holes Outlet No. 2: Size: ti Diem. Ver1ip1011frce Invert Elevation: 229.0:. Outlet No. 3 (Principal SplAway): Size: 30' pam. Hain, OrMce (Tap of Riser) Invert Elevation: :...23(1.0 Corwrete Riser WaN TMdaress (in) _ 275 Riser Inside Diameter (ft) _ .25 Approx. Circ. Riser kHerfor Vokme (d') = 25 Approx. qrc. Concrete Riser Vdume of Concrete (d) = 10 Barrel Desiarc Type a Barrel: Concrete Diameter(In)= 18. Irn. In Elevation = 225.0: Irn. Out Elevation = 224.5 Length (tt) = 40.0 5~ (~) = 0.010 Ridwrdson SrrYlh Qardnsr 8 Assodstes, Inc. Copyol8ASI1~FED0&2ReJ2.rtls AntiSeeoaaeCollarCalculations• (AlternetiveW DesianFikerDieoh n Sbpe oT Upstream EmbarlloneM (zH:1V) = 3 Sbpe of Outlet Plpe (fMt) = 0.010 Ls (ft) = 36 Number oT Copars: 2 Length of Each Copar (ft) = 4.5 From Design Chart Based on Ls and No. of Collars Widtlt of Eech Copar (ft) _ 4.5 From Design Chart Based on Ls and No. of Collars Copar Projection, P (ft) = 1.5 spacing of SubseweM Anti-Seep Capers (tt) = 21 =14P use Calculations Design Uopft Force Factor of Safety = F (unadjusted) (Ibs) _ Approx. Circ. Concrete Riser Buoyant Wt. (bs) _ Buoyant Wt of Riser Top (Ibs) _ Buoyant Wt. of Surounding Shc Acting on Ext Base (Ibs) _ Sliding Resistance of Surrounding Soil (Yx) _ F (adjusted) (Ws) _ Concrete Base Required Vokane of Concrete (ft') _ LergUr (ft) warn (tt> ThiGaless (tt) _ Actual Vohane of Concrete (tt') _ 1.25 ~_ 1,914 688 Fedora in BOY of the Weight of the Concrete Riser to Account for Outlets. 0 0 0 0 0 0 1,226 14.0 3.0 3.0 2.0 18.0 O,K. rE noroencv Soillwav Celculations• crest Elev. (n) _ Required Freeboard (ft) _ Top of Berm Elev. (ft) _ Rewired CapaGly (ds) _ Weir Coefficient = 231.0 1.0 232.0 32.4 From HydroCAD • ZSNr, 24.Hc Storm 3.0 Lengtlt of Crest (ft) _ Design Crest Length (tt) _ TA Basin No.: EDDB-2 FJev. of Bottom of Basin = Clearqut Elev. (tt) _ Elev. oT Temporary Water Oueply Pod = Flnergency SplNaay Elev. (fq = Top of Berm Elev. (tt) _ Top of Berm Width (ft) _ Bamel Diameter (in) _ BarelSbpe(%)= 30 Determine by Weir Equation' 30 ' Length = 20 tt minimum 225.0 227.5 229.0 See Above for Riser and Other Design Infomration. 231.0 232.0 10 18 to Riehardson SnYth Qard~er li Associates. Inc. CapyofBASIN-EDD&2Rev2.rds C: Extended Dry Detention Basin-3 • • Project No. DWQ DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name: Sti~fweLl ca9 L4'ncj~il~ 7mc - Contact Person: ~~~P_u Sync ~; ; ~ I ~~_ Phone Number: (yig) _ g28 _ c~ ~ ~. For projects with multiple basins, specify which basin this worksheet applies to:_ ~Fck~ ~1 ed ~~ ~ekn#i~ 'Bc~sln - 3 Drainage Area: 8_i acres Percent Impervious Area: O REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials ~~~~ Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or -~:~' capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain r~~`r ~'' The basin length to width ratio is greater than 3:1. ~ The basin side slopes are no steeper than 3:1. <.~~-- A small permanent pool at outlet orifice is provided to reduce clogging. An emergency drain to completely empty the basin is provided. .~,~ ~ Vegetation plan prepared is specified on plans. k~-, Basin to be stabilized within 14 days of construction is specified. ::4~r Sediment storage (20% of detention volume) in addition to detention volume is provided. ~~~ Inlet and outlet erosion control measures to prevent scour are provided. <~~ Additional treatment to meet the 85% TSS removal efficiency is provided. R, ~!_ Access for clean-out and maintenance is provided. ~.~`- Inlet plunge pool or other energy dissipation is provided. ~~c, Forebay is provided to capture sediment and minimize clean-out problems. k,~ s - Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. _ . ~;~ . Seasonal high water table is at least 1 foot below bottom of basin. ~~r;~. If used as a temporary sediment basin, plans indicate clean-out prior to final operation. <+: ' A site specific operation and maintenance plan with the following provisions is provided. t; The 0&M agreement is signed by the responsible party and notarized. • • Raleigh, NC 27603 Fax: 919-62&3999 Shotwell C&D Landfill, Inc. Extended Dry Detention Basin Analysis easfn No.: EDDB3 Richardson Smith Gardner & Associates, Inc. Er~rlaering and Geological Services ~ 14 N. Boylan Avenue Tel: 91 B-828-0577 DESIGN TEMPORARY WATER QUALITY POOL• Areas Dralnlng Into Basin t4 Y knoervious~ Area Drainage Area (saes) °6lmpervtous A1. OUter Areas 8.1 0. Total= 8.1 Acres Avg. % Impervious = 0 1~ u • Required Volume of Temooran Water Qualiri Pool (Maximu m Value CoMrolsl• Water quality ReauiremeMs - Runoff from Deslan Rainf stl~ Rv(iMn)= 0.05 Design Reinlatl (in) = 1.0 Required Vohane (sae-feet) = 0.03 Required Water Quatlty Vohme (ft') = 1,472 Land Quality Requirements Required SloreaelACrn~ Required Storage Capadty (ft'/AC.) = 1,800 Regired Sediment Storage Volume (R') = 14,598 Required Water quality Vokane (ft~) = 14,598 Land Quality Requirements Control SHEET: JOB #: DATE: BV: CHKD BY: f Shotwetl 05-2 7rz1ro7 KBS GGM Ridwrdson S1NIh Gardner 8 Assodates, Ina. Copyof BASIN•EDDB-3ReN2.las r1 U Determine StaaeStore ee function ~ - _ -. Contour Area Area Incremental Cumulative Stage h S h Z Z esl (flZ) (acres) Vokxne (ft') Vokxne (ft') (ft) 240 2,663 0.44 0 D 242 6;250 0.61 8,913 8,913 2 9.10 0.69 2.00 244 10,121 0.61 16,377 25,290 4 10.14 1.39 4.00 248 14,286 0.61 24,413 49,703 6 10.81 179 6.00 248 18,749 1.05 74,997 83,910 8 11.34 2.08 8.00 Linear Regression Conatanta: Ks = 2,845 Storage = 2845 z^ 1.61 b= 1.61 'CAUTION: CHECK INPUT FOR REGRESSION ANALYSISI 249 248 247 246 . 245 C e~ 244 ~ 243 242 241 240 239 0 StageSurface Area Relatonship Basin Deaian Elevations: I 1I J Elev. of Bottom of Basin = Req'd. Storage Voume at Temp. Water (xemy Pod (ri') Mln. Elev. oT Temporary Water QuaAty Pod = Selected Elev. of Temporary Water Ouefly Paol = Acfimi Storage Volume at Tengr. water Quaity Pool (ft') _ Basin Cleanout Voume (tt') _ Basin Clearxxrt Elevation = 248 248 247 248 245 K °a 244 a ~ 243 242 241 240 239 StageStorage Relationship 0 20,000 40,000 60,000 80,000 100,000 SYorays (cf) 240.0 17,518 Req'd. Volume of Temp. Water Quality Pool x 1.2 (to Acct for Additional Sediment Stoage) 243.1 244.0 O.K. 26,454 13,227 ~ 509e of Temp. Water Quality Pool Storage Volume 242.6 Ridrerdson SmBh Gardner 6 Assodatea, Ins. CopyofBASMFEDDB-3RM~de ,uw ~V,WU IO,000 20.009 Surface Aroa (sf) • Dewaterina of Temoorarv Water Quality Pool Average Head (ft) _ Surface Area at Temporary Water OuaAty Pod (fP) _ Coef. of Contraction = Min. Drewdown Period (trs) _ Max. Drewdown Period (trs) _ Max. Area of Dewatering Hole (fP) _ Max. Diameter of Dewetering Hde (In) _ Min. Area of Dewatering Hole (ftz) _ Min. Diameter of Dewaterirg Hde (in) _ Selected Diameter of Dewatering Hale(s) (in) _ Number of Dewaterirg Hdes = Actual Area of Deaatering Hole(s) (ft~) _ Actual Drewdown Period (hrs) _ Option: Fairdotli Sidmmer Storage VoNme (ft') _ Required Orifice Diameter (in) _ 2.0 10,637 0.6 48 120 0.04 Based on Min. Detention Time 2.6 0.01 Based on Max. Detention Time 1.6 2.0 1 0.02 80 O.K 26,454 3.0 From Design Chart Bassd on 2 to 5 Day Drewdown Basin Drein Celculetiona: • Average Heed(tt)= Surtace Area at Temporary Water Oualily Pod (ft') Coat. of Corrtadlon = Desired Drewdown Period (trs) _ Min. Area of Dewaterirg Hole (ft') _ Min. Diameter of Dewaterirg Hde (In) _ Selected Diameter of Dewaterlrg Hale (In) Actual Area of Dewaterirg Hale (ttZ) _ Actual Orawdown Period (irs) _ Forebay Calculations: Required VoMle of Forebey(s) (ft') _ 2.0 10,637 0.6' 24 0.07 Based on Max. Detention Time 3.6 6 020 9 O.K 3,504 .20Y, of Required Temporary Water Quality Pool Storage Volume Forebay: M1-North Contour Area Area Incremental Cumulative Stage ht S hr Z Z esl (it') (saes) VoNmte (ft) VoMrrre (tl') (ft) 240 365. 0.01 0 0 242 1,150 0.03 1.515 1,515 2 7.32 0.69 2.00 244 2,082 0.05 3,232 4,747 4 8.47 1.39 4.00 Linear Rearesalon Constants: Ks = 484 Storage = 2845 z^1.61 b= 1.65 FJev. of Rotten of Forebay = 240.0 Top Elevation of Forebay = 244.0 ForabaY Storage (ft') = 4,747 O.K Forebay Cleanoul Vohme (ft') = 2,374 ~ SOX of Forebay 9torege Volume Forebay Cleanout Elevation = 242.6 Basin Shane: LengCr oT Basin (ft) = 270 Measured at Temporary Water Quality Pool Elevation Widlh of Basin (ft) _ 40 Measured at Temporary Water Quality Rool Elevation Desired Lengttl to Width Ratio (X:1) = 3. Actual Length to Width Ratio (X:t) = 6.8 O.K. • Richardson SmiUr (iardrer 6 Assodates, Inc. CapyotflASlt!-EDO&3ReY2.ds • ROUTE DESIGN STORM: Use HydroCAD or Other Method. Desfgn Parameters: Design Storm: 25-Yr, 24Hr Design Stonn Rainfal (in) = 6.55 RaiMaN Disdibuion: Typed Rurroff Method: SCS TR-20 Res Mapmum Pod Elevation = 245.5 Surface Area at Me:dnaxn Pod (ftZ) = 12,925 Peak Disdlarge (ds) = 10.4 Check Settling Efficiency: Partide Data: '~~ u • Diam. (microns) = 40 Spedfic GraNry = 2.65 Settling Vebc. (ff/s) = 0.004140 Reynolds No. (<0.5) = 0.044284 O.K. Effidencv Data: Desired Effidency (%) = 80 No. of Effedive Ceis = 2 Up of Forvbay(s) Justifies Value of 2 Setting Effidericy (%) = 92.2 O.K. DESIGN OUTLET STRUCTURES: D~slgn RiseNBerrel Structures: Riser Design: Type of Riser. Cortaete - Gralar Riser Base Elevatlon = 240.0 Riser Top FJevaUon = 245.0 Riser Heigh (ff) = 5.0 Outlets: Outlet No. 1 (far Dewatenng T WO Pool): Size: 2 Diem. OrMce From Abova - Dewatering of TWQ Pool Invert Elevation: 240.0 May Very For Mufliple Hotes Outlet No. 2: Size: 6' Dtam:Orifice Invert Elevation: 244:0 Outlet No. 3 (Prirx:ipal Spiiway): Size: 30' Dtem: Horiz. Orifice (Tap o1 Risef} Invert Elevation: F45.0 Concrete Riser Wal TFrdgiess (in) _ 2.75 Riser inside Diameter (ft) _ 2.5 Approx Grc. Riser Interior Vokene (d) = 25 Approx. Grc. Concrete Riser Vokme of Coriaete (d) = 10 Barrel Design: Type of Barrei: Concrete Diameter (in) = 18 Irrv. In Elevation = 240.0 Irn. Out Elevation = 232.0 Length (n) _ 210,0 (ftRt) = i).o3a Richardson smear Gardner & Associates, inc. CopyoBASIFFEDD&3Rev2ads • Riser Base Calculatione• Design Udkt Force: Factor of Safety = F (unadjusted) (bs) _ Approx. Circ. Concrete Riser Burryeant Wt. (Ibs) _ Buoyant Wt. of Riser Top (Ds) _ Buoyant Wt. of Surroundirg Soil AcNirg on Fxt. Bese (tbs) _ SYdirg Resis4nce of Surrourxling Shc (ms) _ F (adjusted) (Ibs) Concrete Base: Required Vokane of Concrete (ft') _ Lerglh (ft) vaath (n> _ Thidmess (ft) _ Actual Vohrrle of Concrete (ft') _ AntiSeaoaas Collar Calculations: (Akarnativeh- Daayn Fiker Diaohroaml Slope of Upstream Embarllonent (zH:1 V) = 3 Slope of Outlet Pipe (ft/lt) = 0.038 Ls (tt) = 4t Number of Collars: 2 Lergtlr of Each Cotlar (tt) = 4:5 From Design Chart Based on Ls and No. of Collars WidMl of Eech Color (ft) = 4.5 From Design Chart Based on Le and No. of Collars Cellar Projection, P (tt) = t.5 Sparing of Subsequent Anti-Seep Colors (ft) = 21 ~ 14P Emeraencv Boillwav Calculations: \. Crest Elev. (ft) _ Required Freelx~ard (tt) _ Top of Berm Elev. (tt) _ Required Capacity (ds) _ Driving Head (ft) _ Weir Coeffident = Lerglh of Crest (ft) _ Design Crest Length (ft) _ UMMAR Begin No.: EDD83 Elev. of Bottom of Basin = Cleanout Elev. (ft) _ Elev. of Temporary Water Quaity Pod = Enwrgency SpltMay Elev. (tt) _ Top of Berth F~ev. (tt) _ Top of Berm Wldlh (tt) _ Barrel Diameter (in) BarelSbpe(X)= 1.25 ~_ 1,914 688 Factors in BOX of the Weight of the Concrete Riser to Account for Outlets. 0 0 0 0 0 0 t,z2s 14.0 $.0 3.0 2.0 18.0 O.K 246.0 2.0 248.0 70:4 From tfydroCJ1D - 25-Yr, ?A-Hr. Storm 0:5 3.0 9.8 Determine by Weir Equation' 30 240.0 242.6 ' Length = 20 N minimum. 244.0 See Above for Riser and Other Design Information. 246.0 248.0 f0 18 3.8 RldvMson Smlth Oartrrer a Assodates, Inc. CopyolBASIPFEDD&3RaJ1.>ds • Extended Dry Detention Basin-4 Project No. DWQ . DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: At a minimum, a complete Stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name : ShO~LJe-l-t c~.~ ~'rid~il) , Inc . Contact Person: S-frr ~P~ Sm~l~h ~ kth:G.t Shuh Phone Number: (qiy) 828 - p-S ~- ~ For projects with multiple basins, specify which basin this worksheet applies to:_ ~F kYi cj ed .~ ~e~en. H ~ 'Baste - ~i Drainage Area:~acres Percent Impervious Area:~% II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials k~ Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or cP.~. capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr, event or volume from 1 inch rain ~ ~~- ~~`. The basin length to width ratio is greater than 3:1. ~~;_ The basin side slopes are no steeper than 3:1. A small permanent pool at outlet orifice is provided to reduce clogging. ~<~L An emergency drain to completely empty the basin is provided. r;~- Vegetation plan prepared is specified on plans. ~~Basin to be stabilized within 14 days of construction is specified. {<c~~ Sediment storage (20% of detention volume) in addition to detention volume is provided. k>33 Inlet and outlet erosion control measures to prevent scour are provided. kF~t Additional treatment to meet the 85% TSS removal efficiency is provided, e~: Access for clean-out and maintenance is provided. ~~ Inlet plunge pool or other energy dissipation is provided. ,~~ Forebay is provided to capture sediment and minimize clean-out problems. ~~a~ Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. a ~.: Seasonal high water table is at least 1 foot below bottom of basin. ~'_ If used as a temporary sediment basin, plans indicate clean-out prior to final operation. F._,_~ _- A site specific operation and maintenance plan with the following provisions is provided. ~. ~ ~ The 0&M agreement is signed by the responsible party and notarized. ,~ Richardson Smith Gardner & Associates, Inc. <. EngineeriRg and Geobgical Servkes 14 N. Boylan Avenue Tel: 91 &828-0577 Raleigh, NC 27603 Fax: 818-82&3899 Shotwell C8D Landfill, Inc. Extended Dry Detention Basin Analysis Basin No.: EDDB-4 SHEET: JOB #: DATE: BY: CHKD BY: ShotweA 05-2 7mro7 ICES CS ~-M DESIGN TEMPORARY WATER QUALITY POOL: Areas Draining Into Basin $ % Impervious: Area Drainage Area (saes) %Inq~ervious A1.09terAreas 29 70 Total = 2.9 Acres Avg. % ImperNous = 70 • • $eyuired Volume of Temoorarv Water Quality Pool (Maximum Value Controls): Water QuapN Realiremerds - Rurroff from Design Rainfall: Rv (into) = 0.68 Design Rainfap (in) = 1.0 Required Vokxne (aaeieet) = 0.16 Required Water Quapty VoMmre (ft') = 7,134 Land Ouatity Reaurements -Repaired Sloraae/Acre: Required Storage Capacity (ft'/Ac J = 1.800 Required Sediment Storage Vopxne (tt) = 5,202 Required Water Ouaptll Vopxne (ttr) = 7,134 Water Quality Requirements Control RieMrdaon SmNh Gardner d A9apdate9, Inc. Copyo18A51N-EDDB4Rev2.~ds • Determine StaaeSYorage Function: Contour Area Area Incremental Cumulative Stage h S h Z Z esf (ft') (acres) Voume (ft) Voume (ft) ({t) 248 4,229 0.10 0 0 250 6,742 0.14 10,371 10,371 2 9.25 0.69 2.00 252 8,364 0.19 14,506 24,877 4 10.12 1.39 4.00 254 10,819 0.25 19,183 44,060 6 10.69 1.79 6.00 Linear Rearesaion Constants: Ks = 4,143 Storege = 4143 z" 1,31 b= 1.31 'CAUTK)N: CHECK INPUT FOR REGRESSION ANALYSISI • StageSurface Area Relationship 0 2,000 4,000 8,000 8,000 10,000 12,000 Surface Area (sit t3asin Design Elevations: • zss zss 253 252 K $ 251 ZK 250 249 248 247 Elev. of Bottom of Benin = Req'd. Storage Vohrme at Tenp. Water QuaRly Pod (tt') _ Min. Elev. of Temporary Water Quality Pod = Selected Elev. of Temporary Water Quality Pod = Actual Storage VoAane at temp. water Quality Pod (tt') _ Basin Cleanout VoMne (fP) _ Basin Clearaut Elevation = zss 2s4 253 252 +r 251 250 249 248 247 StageStorage Relationship 0 10,000 20,000 30,000 40,000 50,000 Storage Ictl 248.0 6,560 Raq'd. Volume of Temp. Water Quality Pool x 1.2 (to Acct. for Additional Sediment Storage) 250 250. O.K. 10,277 5,139 ~ 50y of Temp. Water Quality Pooi Storage Volume 249.2 Rldiardson SmMh Gardner 8 Assodatas, inc. Copyol6ASIN-EDDB-4ReJl.bs Dewaterina of Temoorerv Water Quality Pool: Averege Head (tt) _ Surface Area at Tenporery Water Quality Pod (fP) _ coat. of Contraction = Min. Drewdown Period (hrs) _ Max. Drawdovm Period (Ms) _ Max. Area of Dewaterirg Hde (ft) _ Max. Diameter oT Devietering Hole (in) _ Min. Area of Dewatering Hde (tt') _ Min. Diameter of Dewatering Hole (in) _ Selected Diameter of Dewatering Hole(s) (in) _ Number of Dewatering Hdes = Actual Area of Dewatering Hole(s) (fP) _ Actual Drawdovm Period (tys) _ Option: Fairclolh Sldnxner Storage Vokune (ft') _ Required Orifice Diameter (in) _ 1.0 6,736 o.s 48 120 0.02 Based on Min. Detention Time 1.7 0.01 Based on Max. Detention Time 1.1 2 1 0.01 63 O.K. 10,277 2.0 From Design Chart Based on 2 to S Day Drewdown Basin Drein Calculations: ,I u Averege Head (tt) _ Surface Area at Temporary Water (warty Pod (ft) _ Coef. of Contraction = Desired Drevrdown Period (trs) _ Min. Area oT Dewaterirg Hole (tt') _ Min. Diameter of Dewaterirg Hole (in) Selected Diameter of Deviaterirg Hde (in) _ AcWel Area of Deviaterirg Hale (TF) _ Actual Drewdown Period (trs) Required VoWme of Forebay(s) (ft') _ Forebay: #1 -North CanFwa Area Area Incremerrtal Crmulatrve Stage h 5 In Z Zest (ttZ) (saes) VoWme (tt') Vokxne (tt') (tt) 248 568 0.01 0 0 .249 850 0.02 709 709 1 6.56 0.00 1.00 250 1,242 0.03 1,046 1,755 2 7.47 0.69 2.00 1,712 = 20% of Required Temporary Wafer Qualify Pool Storage Volume • Linear Regression Constants: Ks = 709 b= 1.31 FJev. of Bottom of Forebay = Tap Elevation of Forebay = Forebay Storage (tt') _ Forebay Clearwut VoWnre (tt') _ Forebay Clearaut levaton = 1.0 6,736 0.6 24 0.03 Based on Max. Detention Time 2.4 3 0.05 16 O.K. Storage = 4143 z"1.31 248.0 250:0 1,755 O.K 878 a 50% of Forebey Stoage Volume 249.2 Rkhardson Srrith Oar6rer 6 Assodates, Inc. Copyo18AS1r~FEDD64Re~2.bs • Basin Shags: Lengtlr of Basin (ft) = 90 Measured at Temporery Weler Quality Pool Elevation Widlh of Basin (ft) = 30 Measured at Temporery Water Quality Pool Elevation Desired Lerxllh to Vvidlh Ratio (X:1) _ 3 Actual Lenglh to Widlh Ratio (X:1) = 3.0 O.K. RQUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters' Design Storm: Q5-Yr, 24Hr Design Stonn Rainlal (in) = 6.55 Rainfal DistribWan: Typo II Runoff Metllod: SC5 TR-20 Results: Maximum Pod Elevatlon = 252:0 Surface Area at Ma>amum Pod (fP) = 8,362 Peak Disdmrge (ds) _ J.9 Check Settling Efficiency: Particle Data: • • Diam.(miaors)= q0 Specfic Cxavily = 2:65 Settling Vebc. (tt/s) = 0.004140 Reynolds No. (<0.5) = 0.044284 O.K ETflctencv Data Desired Efficency (%) _ 80 No. of Effective Cell = 1 Setllrg Emderrcy (%) = 81.4 O.K DESIGN OUTLET STRUCTURES: Deaian RiaedBertel Structures: Riser Desion Type of Riser. GOrlcrele-grgiler Riser Base Elevation = 252.0 Riser Top Elevatlon = 255':5 Riser Height (ft) = 3.5 Outlets: Outlet No. 1 (for Devratering T WQ Pod): Size: 2' Oialn,Ortflce From Above - Dewatering of TWO Pool Invert Elevation: 248.0 May Vary For Multiple Holes Outlet NO.2: Size:3`gam.VeNdtlOri0ce. Invert Elevation:.... 2$0.0 Outlet No. 3 (Principal SpMvay): Size: 24`Dlam. Hartz. Ori0ce (Top of Riser) Invert Elevation: .251.5 Concrete Riser Wal Thidgless (in) _ 2.75 Riser Inside Diameter (ft) = 2A Approx. qrc. Riser Inferior Vdune (d) = 11 Approx Circ. Conaete Riser Vakane of Concrete (ct) = 6 Barrel Design: Type of Barrel: Corxxete Diameter (in) _ '. 15 Irrv. In EJevetlon = 248.0 Inv. Out Elevatlon = .247.0 Lerglh (ft) _ 80.0 Slope (ftJft) _ 0.011 Richardson Smlth Gardner & Assodates, Inc. CopyafBA,SIN-EDDB-4Re~2.~ds • AntiSeeoage Collar Calculations: (AhematlveH -Design Fitter Diaohream) Slope of Upstream Embanloraxtl (zH:1V) = 3 Skpe of Outlet Pipe (ffrtt) = 0.01 t Ls (ft) = 26 Number of Colors: 2 Leng7~ of Each Color (ft) = 3.5 From Design Chart Based on Ls and No. of Collars VNdtl~ of Each Color (ft) = 3.5 From Design Chart Based on Ls end No. of Collars Color Projection, P (n) = 1.125 ~edtg of Subsequent Artti-Seep Colors (ft) = 16 =14P Riser Base Calculations: Design Uppft Force: Factor of Safety = F (unadjusted) (bs) Approx. Circ. Concrete Riser Buoyant Wt. (ttu) _ Buoyant WL of Riser Top (bs) _ Buoyant Wt. of Surrounding Sal Acting on Fact. Base (bs) _ Spring Resistance of Surroundng Soil (bs) _ F (adjusted) (bs) _ Concrete Base: Required Volume of Concrete (fl3) _ Length (n) _ uwdth (ft) _ TtticWtess (ft) Actual Volume of Concrete (ft') _ 1.25 858 394 Factors in 80%of the Weight of the Concrete Riser to Account for Outlets. 0 0 0 0 0 0 464 5.3 3.0 3.0 z.o 18.0 O.K Emareencv Soillwav Calculations: • Crest Elev. (ft) _ Requred Freeboard (ft) _ Top of Berm Elev. (ft) _ Requred Cepadty (ds) _ Driving Head (ft) Weir Coeffident = 252.5. 1.5 254.0 7.9 FromHydroCAD-25-Yr,?.4-Hr.9tomi Ob 3.0 Length of crest (n) _ Design Crest Lerx,)1h (ft) _ * Length = 20 ft minimum SUMMARY DATA: • Basin No.: EDDB4 Elev. of Bottom of Basin = CleanoutElev.(ft)= Elev. of Temporary Water Quapty Poa = Emergency SpiMray Elev. (ft) _ Top of Berm FJev. (ft) _ rop of Berm Wdlh (n> _ Barrel Diameter (in) _ Barrel Sbpe (%) _ 7.5 Determine by Weir Equation' 30 248.0 249.2 250.0 See Above for Riser and Other Design Information. 252.5 254.0 10 15 1.1 Richardson Smith Gardnx & Associates, hcc. CopyoIBASIt~FEDDB-4Rev2.rds i Extended Dry Detention Basin-5 i Project No. DWQ DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name : t~eU C2i, (,~ c}{ill ~Y1C . Contact Person: S'yn' u Phone Number: (may ) -- R2Fs - DSa ~ For projects with multiple basins, specify which basin this worksheet applies to:_ ~}-~.~c)ed ~a~, ~~~~~+uYl ~Strl - 5 Drainage Area: l4•q acres Percent Impervious Area: o II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. ~plicants Initials cB~ Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain ~~ „_ !<~~ . The basin length to width ratio is greater than 3:1. ~ :~:.<, The basin side slopes are no steeper than 3:1. ~~ = A small permanent pool at outlet orifice is provided to reduce clogging. ~=: An emergency drain to completely empty the basin is provided. r ~.' Vegetation plan prepared is specified on plans. ~,r>. Basin to be stabilized within 14 days of construction is specified. Sediment storage (20% of detention volume) in addition to detention volume is provided. eTInlet and outlet erosion control measures to prevent scour are provided. r~•_ Additional treatment to meet the 85% TSS removal efficiency is provided. ~~ ~: Access for clean-out and maintenance is provided. k u',.~ Inlet plunge pool or other energy dissipation is provided. ~ ~~ Forebay is provided to capture sediment and minimize clean-out problems. k:Fs^ Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. ~~;Seasonal high water table is at least 1 foot below bottom of basin. ~~~~, If used as a temporary sediment basin, plans indicate clean-out prior to final operation. i« ~. A site specific operation and maintenance plan with the following provisions is provided. f` ~. ~, The 0&M agreement is signed by the responsible party and notarized. • ,] Richardson Smith Gardner & Associates, Inc. Engineering and Gttological Services \ 14 N. BoyWn Avenue Tel: 919-828-0577 Raleigh, NC 27693 Fax: 919-82B-3899 SHEET: JOB #: DATE: BY: CHKD BY: Shotwe1105-2 727107 KBS G~ ~ Shotwell CSD Landfill, inc. Extended Dry Detention Basin Analysis Basin No.: EDDB~B DESIGN TEMPORARY WATER QUALITY POOL: Areas Draining Into Basin R Y. Nnoervious: Area DreinaceAr~ (acres) %Impervious At. (7tllerAreas 19:9.. 0 Total = 19.9 Aces Avg. % Impervious = 0 11 J • Required Volume of Temoonrv Water Quality Pool (Maximum Valua Controls): Water Quality ReayremerRs -Runoff from Desiar RainfeA : Rv (inAn) = 0.05 Design Rainlal (in) _ 1.0. Requred Vokane (sae-feet) = 0.08 Required Water Quakty Vogxne (ff) = 3,615 Lera1 Quaity Reouirenlerrts - Regured Storaae/Acre: Required Storage Capedty (ft'/ACJ = 1,800 Required Sediment Storage Volume (ft) = 35,856 Required Water Quality Vohmle (ft3) = 35,856 Land Quality Requirements Control Richardson Smith Gardner & Assodates, Inc. CopyoIBASIN-EDD83Rev2ads Determine Stage-Storage Function: Contour Area Area Inaemenlal Cumulative Slage In S k1 Z Zest (ftZ) (acres) Voklme (ft') Volume (ft) (ft) 272 19;166 0.44 0 0 274 26;572 0.61 45,738 45,738 2 10.73 0.69 2.00 276 31,789 0.73 58,370 104,108 4 11.55 1.39 4.00 278 38,333 0.88 70,132 174,240 6 12.07 1.79 6.00 280 45,738 1.05 84,071 258,311 8 12.46 2.08 8.00 Linear Regression Conatanta: Ks = 19,035 Storage = 19035 z"1.24 b= 1.24 • 'CAUTION: CHECK INPUT FOR REGRESSK)N ANALYSIS! StageSurface Area Relationship 0 10,000 20,000 30,000 40,OOD 50,000 Surface Area (s0 Basin Design Elevations: • 281 280 279 z7a ^, 277 a ®z7s ~ z7s 274 273 272 271 Bev. of Bottom of Basin = Req'd. Storm Vdune et Term. Water Quaky Pod (ft') _ Min. Bev. of Temporary Water Quaky Pod = Selected Elev. of Temporary Water QuaFty Pool = Actual Storage Volume at Temp. Water Quatily Pod (ft') _ Basin Cleanout Vokme (ft') _ Basin Cleanout Elevation = 281 280 279 z7a _~ a S ns ~ 275 274 273 272 271 StageStorage Relatlonship 0 60,000 100.000 150.000 200,000 250.000 900.000 Storage (ct) 272:0 43,027 Req'd. Volume of Temp. Water Qualify Pool x 1.2 (to Acct for Additional Sediment Storage) 273.9 275.0 O.K. 74,596 37,298 •50Ya of Temp. Water Gualily Pool Storage Volume 273.7 Richardson Smith Gartner & Assodates, Inc. CopyoIBASII~FEDO&5Re~2.x15 r: Dewaterina of Temporary Water Quality Pool: Averege Head (ft) _ Surface Area at Temporary Water Quality Pod (tt') _ Coat. oT Conlrecflon = Min. Drawdown Period (hrs) _ Max Orewdown Period (hrs) _ Mex. Area of Dewatering Hole (ft') _ Max. Diameter of Dewaterirg Hok (In) _ Min. Area of Dewatering Hole (tt') _ Min. Diameter of Dewaterirg Hole (in) _ Selected Diameter of Dewatering Hole(s) (in) _ Number of Dewatering Holes = AcWai Nee of Dewatering Hole(s) (fP) _ Acbial Drewdown Period (Ivs) _ Oplion: Falydotti Sidmmer Storage VoNxne (ft) Required Orifice Diameter (in) _ 1.5 30,912 0.6 48 120 0.09 Based on Min. Detention Time 4.1 0.04 Based on Mau. Detention Time 2.6 2.0 2 0.04 100 O.K 74,596 3.0 From Design Chart Based on 2 to 5 Dey Drewdown Basin Drain Calculations: • Average Heed (ft) _ Surface Area at Temporary Water Quaity Pod (ftZ) _ Coat. of Contractlon = Desired Drewdown Period (hs) _ Min. Area of Dewatering Hole (ttZ) _ Min. Diameter of Dewatering Hole (in) _ Selected Diameter or Dewaterirg Hak (in) _ Actual Area of Dewaterirg Hole (ttZ) _ Actual DrawdoNn Period (trs) Forebay Calculations: Required Vokme of Forebay(s) (tt') _ 1.5 30,912 os 34 0.18 Basal on Max. Detention Time 5.8 6 0.20 22 O.K 8,605 ~ 20X of Required Temporary Water Quality Pool Storage Volume Forebay: M1-PIoRh Contour Nee Area Incrertrerdal Cumalalive Stage In S h Z Zest (ttZ) (acres) Volume (ft') VoMane (tt') (ft) 272 3,425- 0.08 0 0 274 4,500 0.10 7,925 7,925 2 8.98 0.69 2.00 275 5,084 0.12 4,792 12,717 3 9.45 1.10 3.00 Linear Rearessfon Constants: Ks = 3,531 b= 1.17 Elev. of Bottom oT Forebay = Top Elevation of Forebay = Forebay Storege (ft') _ Forebay Cleanart Vohane (ft') _ Forebay Clearaut Elevation = Basin Shaoe: Storage = 19035 z^1.24 272:0 275:0 12,717 O.K 6,359 a 50% of Forebay Storage Volume 273.7 Length of Basin (ft) = 200 Measurod at Temporary Water QualFty Pool Elevation Widlh of Basin (tt) _ 50 Measured at Temporary Water Quality Pool Elevation Desired Length to Widlh Ratio (X:1) _ - 3 Actual Lenglh to V~idlh Ratio (X1) = 4.0 p.K Richardson SMIh Oardnar 8 Assodates, Inc. CopyoIBASMFEDDB-SRNt.~ds • • • ROUTE DESIGN STORM: Use FtydroCAD or Other Method. JOB #: Sht DATE: Desim Parameters: BV: Design Sfonn: 25-Yr, 24Hr CHKD BY: ~ Design Storm Rainfatl (in) = 6.55 Rainfai Distiilxtim: Type II Ruoff Method: SCS TR-20 Results: Marimun Pod Elevetim = 776.38 Sutace Area at MapnMm Pod (ftZ) = 33,892 Peak Discharge (ds) _ 7.12 Check Settling ERiciencv: Partide Data: Diam.(micrms)= 40 SpeaBc Gravity = 2.65 Selling Vebc. (tUs) = 0.004140 Reynolds No. (<0.5) = 0.044284 O.K. Effiden<.w Data: Desired Efidency (%) = 80 No. of Effective Ceis = 2 Setting Eitidency (%) = 99.2 O.K DESIGN OUTLET STRUCTURES: Deaian Rised8arrel Structures: Riser Desim: Type of Riser Conv'e!e- CircWar Riser Base Elevatim = 272.0 Riser Tap Elewatim = 276.0 Riser Height (ft) = 4.0 Outlets: Outlet No. 1 (for Dewaterkg TWQ Pod): Size: 7 Diam:.OriBce. From Above - Dewatering of TWC Pool Irrvert Elevetim: 272.0' May Very For Multiple Holes Outlet No. 2: Size: S"lltem~ Orifice Invert Elevation. 275.0 Cutlet No. 3 (Principal SpiMay): Size: 30" Diem.lioriz. Orifice (Top ofRiser) Invert Elevaatm: 276.0 Concrete Riser WaN TNdoless (in) _ 2:75 Riser Inside Diameter (ft) _ 2:5.. Approx Circ. Riser Interior Voilne (ci) = 20 Approx. Circ. Concrete Riser Voixne of Concrete (cn = 8 Barrel Desim: Type of eerrd: Concrete Diameter (in) = 18 Urv. In Elevation = 272.0 Irw. Out Elevation = 264.0 Length (ft) _ 100.0 Slope (itRt) = 0.080 Richardson Smith Gardner & Assoaates, Inc. Capyo18N51N-EDD&5Rev2.xls Concrete Base: Regrtred Vaume of Concrete (fl3) = 11.2 Ttliclaless (ft) = 2;0 Actual Vaume of concrete (tP) = t8.0 O.K Riser Base Calculations: Design Uaift Force: Factor of Safety = F (unadjusted) (bs) _ Approx Grc. Concrete Riser Buoyant Wt. (bs) _ Buoyant Wt. of Riser Top (bs) _ Buoyant Wt. of Surroundirg Soil Acting on EM. Base (Ibs) _ Sliding Resistance of Surrou~rg Soil (6s) _ F (adjusted) (Es) _ t25 i 1,532 551 Factors in 80%of the Weight of the Concrete Riser to Account for Outlets. 0 0 0 0 0 0 981 Anti-Seeaaaa Collar Calculations: (AttemativeW - Deslan Filter Dianhraaml Slope of Upstream Embatllarlent (zH:1 V) _ 3 Slope of Outlet Pipe (tuft) = 0.080 Ls(tt)= 41 Number of Colars: 2 Lerglh of Each Cotlar (tt) _ 4.5 From Design Chart Based on Ls and No. of Collars WidM of Each Cotlar (ft) _ 4:5 From Design Chart Based on Ls and No. of Collars CoAar Pro)ectioR P (tt) _ 1..5 Spacing of Subsequent Mti-Seep Colars (ft) = 21 =14P • Emereenw SDiliwav Calculations: Crest Elev. (ft) _ Required Freeboard (rt) _ Top of eenn Elev. (tt) _ Required CaPaaAl (ds) _ DriNng Head (it) _ Weir Coeftldent = LengM of Crest (tt) _ Design Crest LergM (ft) _ 277.0 1.5 278.5 7a D_5 3:0 6.7 Determine by Weir Equation* 30 * Length = 20 ft minimum. SUMMARY DATA: • Basin No.: EDDBa Elev. of Bottom of Basin = Clearqut oev. (ft) _ Elev. of Temporary Water (1UBtl(y Pod EmergerMy ~~Y ~- (ft) Top of Berm Elev. (ft) _ Top of Berm vu1dM (tt) _ Barrel Diameter (in) _ Barrel Sbpe (*k) _ 272.0 273.7 275.0 See Abova for Riser and Other Design Information 277.0 278.5 10 1s 8.0 Richardson SmiM Gardner & Associates, Inc. CopyolBASIN•EDD83ReJlads • Extended Dry Detention Basin-6 ;~ Project No. DWQ • DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete Stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name : SIB o~-ryeU C 8.D ~sYl ~-"~ )) ~c Contact Person: c~ ceu S•rn~~~Kinia~ Sh4h Phone Number: (9 ~4) - S'28 ~ 05 ~ ~ For projects with multiple basins, specify which basin this worksheet applies to:_ F'c {-C.yld~ ~~ ~ E~2YL~i ur7 13 ca~iN - ~ Drainage Area:~gacres Percent Impervious Area: o II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials ~_ Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or r~3 <, _ capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain ~"G;_ ~,- The basin length to width ratio is greater than 3:1. ~: ~~~ The basin side slopes are no steeper than 3:1. "> A small permanent pool at outlet orifice is provided to reduce clogging. :r>-~ An emergency drain to completely empty the basin is provided. k e> : Vegetation plan prepared is specified on plans. Basin to be stabilized within 14 days of construction is specified. ors; Sediment storage (20% of detention volume) in addition to detention volume is provided. >; Inlet and outlet erosion control measures to prevent scour are provided. ~. Additional treatment to meet the 85% TSS removal efficiency is provided. ~F;i Access for clean-out and maintenance is provided. ~~~ Inlet plunge pool or other energy dissipation is provided. rE~.. Forebay is provided to capture sediment and minimize clean-out problems. x'f.` Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. ~~ri_ Seasonal high water table is at least 1 foot below bottom of basin. !:: f " If used as a temporary sediment basin, plans indicate clean-out prior to final operation. ~Y;, A site specific operation and maintenance plan with the following provisions is provided. r' The 0&M agreement is signed by the responsible party and notarized. LJ .] `~ Rfchardson Smith Gardner & Associates, Inc. Etglneeling and (3eobgical SeMces ~~ 14 N. Boylan Avenue Tel: 919-828-0577 Raleigh, NC 27603 Fax: 91982&3899 SHEET: JO8 #: DATE: BY: CHKD BY: ! ShotweN O~a2 721/07 (/~~, I/t./B,,S~/~ V v Ir 1 Shotwell C8D Landfill, Inc. Extended Dry Detention Basln Analysts Basln No.: EDD&6 DESIGN TEMPORARY WATER QUALITY POOL: Areaa Draining Into Basin 8~'/e 4noervious: Area Drainage Area (acres) % Inpervious A1.OtltarArees 12:9 0 Total = 12.9 Acres Avg. % IRpervious = 0 • 1/ I, J Required Volume of Temoorerv Water Quality Pool (Maximu m Yalue Controls): Water QuaNN Reguiremens -Runoff from Design RaiM at: Rv (irJin) = 0.05 Design Rairdat (in) = 1.0 Required Voliane (age-feet) = 0.05 Required Water Quatity Vokme (ft') = 2,347 Land Quaity Requirements -Land Reauiremelds Realired~aelAae: Required Storege CepaGly (fh'lAc.) = t,800 Required Sedimerd Storage VoAane (ff) = 23,274 Required Water Quality Vohltrle (ft~) = 23,274 Land Quality Requirements Control Ridwdson Snits Gardner 8 Associates, Inc. CopyoIBASIN-EDDB-BReYt.xiS • Determine StaaeSYoraae Function: I Contour Area Area Incremental Cumulative Stage h S kr Z Zest (tF) (acres) Vdtane (ft) VoWme (TP) (ft) 204 4,65D 0.44 0 0 208 12,865 0.61 35,030 35,030 4 10.46 1.39 4.00 212 22,785 1.05 71,3D0 106,330 8 11.57 2.08 8.00 Linear Regression Constants: Ks = 3,802 Storage =3802 z"1.6 p = 1.60 •CAUTKIN: CHECK INPUT FOR REGRESSK)N ANALYSISI • 213 212 211 210 ,~ 209 4: 208 ~ 207 208 ZOS 204 203 0 StageSurtace Area Relationship Basin Dealgn Elevations: • Elev. of Bottom of Basin = Req'd. Storage Vohime at Temp. Water Quality Pool (1t7) _ Min. Elev. of Temporary Water au®lity Pod = Selected Elev. of Temporery Water QuaGly Pod = AcWal Storege Vohime at Temp. Water Quatly Pod (ft) = Basin Cleanaut Vopxne (ft) _ Basin Cleanout EleveSon = 213 212 211 210 ,_, 208 4= 208 ~ 207 208 205 204 203 StageStarage Relationship 0 20,000 40.000 80.000 80,000 700,000 120.000 Storage (~) 204.0: 27.929 Req'd. Volume of Temp. Water Quality Pool x 1.2 (to Acct. for Additional Sediment Storage) 207.5 207.5' O.K. 28,284 14,142 = 50'~ of Temp. Water Quality Pool Storage Volume 206.3 Ridardeon Smith GaMna d Auedat», Int. Cepyo1BA51r~EDDB~Rev2ads 5,000 10,000 15,000 20,000 25,000 Surface Arsa (~) • Basin Drofn Calculations: ~waterina of Temoorarv Water Quality Pool: Average Head (ft) _ Surtace Area at Temporary Water Quality Poa (fP) _ Ccef. of Contraation = Min. Drowdown Period (hrs) Max. Drawdown Period (trs) _ Max. Mee of Dewatering Hole (ft') _ Max. Diameter of Deweterirg Hole (in) _ Min. Mea of Dewatering Hole (ftZ) _ Min. Diameter of Dewaterirg Hole (in) _ Selectetl Diameter of Dewatering Hole(s) (in) _ Number of Dewaterirg Holes = Actual urea of Dewatering Hoe(s) (ft) _ Actual Drowdown Period (Fxs) ODtion: Faircbth Sommer Storage VoWme (fP) _ Required Orifice Diameter (in) _ Average Head (ft) _ Surface Area at Temporary Water Ouaity Pod {iP) _ Coef. of Contraction = Desired Drowdown Period (hrs) Min. Area oT Dewaterirg Hole (itZ) _ Min. Diameter of Dewaterirg Hole (In) _ Selected Diameter of Dewatering Hole (in) _ Actual Mea of Deweterir~ Hole (fF) _ Actual Drowdown Penod (hrs) _ 1.8 12,945 0.6 48 120 0.04 Based on Min. Detention Time 2.7 0.02 Based on Max. Detention Time 1.7 2.D 1 o.oz 91 O.K. 28,284 3.0 From Deslgn Chart Based on 2 to 5 Day Dravrdown 1.8 12,945 0.6 24 0.08 Based on Max. Detention Time 3.9 6 0.20 10 O.K. Forebav Calculations: • Requiretl Votime of Forebay(s) (ft) _ 5,586 a 20% of Required Temporary Water Quality Pool 9toroge Volume Forobay: k1 -North Comour Area Mea Increrrx3ntal Cumulative Stage h S In Z Z es! (fF) (acres) Votixne (ft') Votrxne (fl3) (ft) 204 409 0.01 0 0 206 1,237.. 0.03 1,646 1,646 2 7.41 0.69 2.00 208 3,766 0.06 4,003 5,649 4 8.64 t.39 4.00 Linear Resression Constants: Ks = 480 Storage = 3802 2^7.6 b= 1.78 Elev. of Bottom of Forobay = 204A Top Elevation oT Forobay = ...208.0 Forobay Storage (fP) = 5,649 O.K. Forobay Clearrout Vogarle (Tt') = 2.825 = 50°~ of Forobay Storage Volume Forobay Cleanout Elevation = 206.7 Basin Shaae: Lengtl~ of Basin (ft) _ 240 Measured at Temporary Water Quality Pool Elevation Widtil of Basin (ft) _ 6D Measured at Temporary Water Quality Pool Elevation Desired Lerglh to Widtl~ Ratio (X:1) _ 3 Actual Length to Width Ratio (X:1) = 3.0 O.K. • Richardson Smith Gardner 74 Assoaates, Inc. CopyoBASIN-EDDR-aRev2.xis • ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters: Design Skim: 25•Yr, 24Hr Design Storm Rainfall (in) = 6.55 RainfaY Distribution: Type IF Ruwft Mettad: SCSTR-20 Results: Ma>amum Pod Elevation = 209.9 Surface Area at Mapmum Pod (fP) = 17,635 Peak Discharge (cis)= 25.7: Check ttling Efficiency: Partide Data: Diem. {microns) _ 40 Speafic Gravity = 2:65 SeBfirg Vebc. (fUs) = 0.004740 Reynolds No. (c0.5) = 0.044284 O.K Eftidencv Data: Desired ETfidenq (%) _ No. of Efteclive Cols = Settling Effidency (%) _ 80 2 Uw of Forehay(e)JustHiea Value of 2 83.0 O.K. DESIGN OUTLET STRUCTURES: Design Riserl8arre19truduros: Riser Design: • Type of Riser. Concete.-C(rct/tV Riser Base Elevation = 204.0 Riser Top Elevation = 208.5 Riser Height (tt) = 4.5 Outlets: Outlet No. 1 (for Dewaterirg TWO Pod): Size: 2' gain. Uifice From Abova - Dewatering of TWQ Pool Irrvert Elevaton: 204.0 - May Vary For Muhiple Holes Outlet No. 2: S@e: 6' Dlam. Oitfice krvert Elevation: 207.5 Outlet No. 3 (Prindpal Spillway): Size: -30' Diam. Flaiz. Orifice (TOpof Riser) Invert Elevation: . 208.5 Concrete Riser Wal Thidaress (in) _ 2:75. Riser Inside Diameter (ft) _ 2b Approx. Circ. Riser Interior Vohme (d) _ 22 Approx. Circ. Concrete Riser Vop~me of Carxxete (cf) = 9 Barrel Design: Type of Barrel: GorxYSte Diameter (in) = t8 Irn. In Elevation = -. 204.0 Inv. Out Elevation = 203.0 Lenglti (ft) _ 70.0 Slope (ftrft) = 0.014 • 18drardson Smlth Gar6rer 8 Anodates, Inc. CopyoIBASIN~EDDB-eRe~2.xls Risar Base Calculations: Design Uofitt Force: Factor of Safety = F (unadjusted) (ros) _ Approx. Circ. Corxrete Riser Buoyant Wt. (ros) _ Buoyant WL of Riser Top (ros) _ Buoyant Wt. of Surrounding Soil Acting on Ext. Base (ros) _ S4ding Resistance of Surrounding Soil (ros) _ F (adjusted) (ros) _ Concrete Base: Required Vopm~e of Concrete (ft') _ Length (ft) _ Widh (ft) _ Ttidmess (ft) _ Actual Vdume of Concrete (ft') _ 1.25 ~_ 1,723 620 Factors in SOY. of the Weigh of the Concrete Riser to Account for Oulleta. 0 0 0 0 0 0 1.103 12.6 3.0 3.0 2.0 18.0 O.K. Anti-SeeoaaeCollarCalculations• (Akarnatively-DasianFilterDieohraarr~ Slope of Upstream Embardanenf (zH:1 V) _ 3 Slope of Outlet Pipe (tt/ft) = 0.014 Ls (ft) = 33 Number of Cellars: 2 Length of Each Cotlar (ft) _ 4.5 From Design Chart Based on Ls and No. of Collars Width of Each Cotlar (ft) = 4:5 From Design Chart Based on Ls end No. of Collars CoNar Projection, P (ft) = 1:5 Sparing of Subsequent MU-Seep Copars (f[) = 21 =14P • Emeraenw Soillwav Calculations: Crest Elev. (ft) _ Requred Freeboard (ft) _ Top of Benn Elev. (ft) _ Required Cepedty (cfs) _ Driving Head (ft) _ Weir Coefficient = Lengtlr of Crest (ft) _ Design Crest length (ft) _ SUMMARY DATA: Basin No.: EDDB~ Elev. of Bottom of Basin = Clearwut Elev. (ft) _ Elev. of Temporary Water Quaity Pod = Emergency Spitlway Elev. (ft) _ Top of Berm Elev. (ft) _ Top of Berm 1Mdlh (ft) Barrel Diameter (in) _ Barrel Slope (%) _ 209.5 2:5 212.0 25:7 From HydroCAD- 2b-Yr, 24-Hr. Stotm 0.5 3.0 24.2 Determine by Weir Equetion• • Length = 20 ft minimum. 204.0 206.3 207.5 See Above for Riser and Other Design Information 209.5 212.0 10 18 1.4 • RICIIird5011 Snlittl IiirdllM $ ASSOC18te5, Inc. Copyo18AS11~4EDDS-aRe~2.~ds • Extended Dry Detention Basin-7 Project No. DIVISION OF WATER QUALITY • 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name : S}~ ofcv 2dt C $ D Lurl c~ll ~ ~n c . Contact Person: .S'tr~ceu ,~mt-tfi it~iG~l Sha Phone Number: (ql t 1 -$28 - os~-~- For projects with multiple basins, specify which basin this worksheet applies to:_ .(~ 1-eYld e cl ~ .~ ~ e~ent~arl (3c~siYt - ~- Drainage Area:~cres Percent Impervious Area: O % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials ~S Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or < capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain ~~` i~ss. The basin length to width ratio is greater than 3:1. Fit The basin side slopes are no steeper than 3:1. ties. A small permanent pool at outlet orifice is provided to reduce clogging. K~ An emergency drain to completely empty the basin is provided. r ~c_ Vegetation plan prepared is specified on plans. k r~; Basin to be stabilized within 14 days of construction is specified. ~_r~_. Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. kr~_ Additional treatment to meet the 85% TSS removal efficiency is provided. ..mss- Access for clean-out and maintenance is provided. ?c~~ Inlet plunge pool or other energy dissipation is provided. ~~i_. Forebay is provided to capture sediment and minimize clean-out problems. !:~~; Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. ~_ If used as a temporary sediment basin, plans indicate clean-out prior to final operation. <,.~. A site specific operation and maintenance plan with the following provisions is provided. r=~ ~ The 0&M agreement is signed by the responsible party and notarized. • • ~ Richardson Smith Gardner di Associates, Inc. t Engir~eri~ pfM Geological SeMCes ~ 14 N. Boylan Avem~e Tel: 81&828-0577 Raktiyh, NC 27603 Fax: 815828-3899 SHEET: JOB #: DATE: BV: CHKD BY: i Stxriwell 05-2 721Po7 KBS G ~Nl Shotwell C8D Landfill, Inc. Extended Dry Detention Basin Analysis Basin No.: EDDB-7 DESIGN TEMPORARY WATER QUALITY POOL: Areas Draining Into Basin &%Imoervlous: Area Drainage Area (aces) %Impervious A7. OplerAreas 16.4. 0 Total = 16.4 Acres Avg. % Impervious = 0 C7 • Reaufred Volume of Temoorarv Water lluslity Pool (Maximu m Value Controlal: yyater QuaRN Requirements - Runoff frwn Design Reinf aR: Rv (inNn) = 0.05 Design Rairdal (in) = 1.0 Required Vokme (acrafeet) = 0.07 Requred Water Quetily Volme (R3) = 2,969 Lend OuaRN Rewiremerlts -Rewired Staraae/Acre: Required Storage Cepeaty (R'fAc.) _ 1,800 Required Sedknent Storage Volme (ff') = 29.448 Required Water OueRty Vopmle (its) = 29,448 Land Quality Requirements Control Riotavdson SmMh Gardner 8 Aaeodales, Inc. CopyoIBASMFEDD&7Rev2.xk • Determine StaaeStoreae Function: ) Contour Area Area Incremental laxrnYatlve Stage In S fi Z Zest (flz) (acres) Volume (fP) Vokime (ft) (ft) 258 3,074 0.44 0 0 260 4,302 0.61 7,376 7,376 2 8.91 0.69 2.00 262 5,713 0.61 10,015 17,397 4 9.76 1.39 4.00 284 32,684 0.61 73,972 81,348 6 11.31 1.79 6.00 266 55,886 0.61 88,570 169,918 8 12.04 2.08 8.00 Linear Regression Constants: Ks = 1,182 Storage = 1182 z"2.31 b = 2.31 'CAUTION: CHECK INPUT FOR REGRESSION ANALYSISt • 267 288 285 264 283 K °~ 262 a ~ 281 260 259 258 257 0 StageSUrtace Area Relationship Basin Design Elevations: Elev. of Bottom of Basin = Regd. Storage Vohane at Temp. Water Quafdy Pod (ft) _ Min. Elev. of Temporary Water Quefty Pool = Selected Elev. of Temporary Water Quaity Pod = Actual Storege Volume at Temp. Water QuaNty Pod (tt') _ Basin Clearwut Voume (ft) _ Basin Cleanout Elevation = 287 280 285 284 .-. 283 C eo 282 e ~ 281 280 259 258 257 StageStorage Relationship 0 50,000 100,000 150,000 200,000 Srorege (cf) 258:0 35,338 Req'd. Volume of Temp. Water Quality Pool x 1.2 (to Acct for Additional Sediment Storage) 262.4 263.0 O.K. 48,318 24,159 a 50%. of Temp. Water Quality Pool Stoage Volume 261.7 Richardson Snilh Gardner 8 Assoaates, Inc. CopyolBASlf!-EDDB-7RevZ.~ds 10,000 20,000 30,000 40,000 50,000 60,000 Surface Area (sQ r1 Deweterina of Temoorerv Water QualHv Pool: Average Head (tt) _ Surface Area at Temporary Water Quality Pooi (ftz) _ Coef. 0f Contraction = Min. Drawdown Period (hrs) _ Max. Drewdown Period (hrs) _ Max. Area of Dewatering Hole (fP) _ Max. Diameter of Dewatering Hole (in) _ Min. Area of Dewaterirg Hole (flr) _ Min. Diameter of Dewaterirg Hole (in) _ Selected Diameter of Dewatering Hole(s) (in) _ Number of Dewatering Holes = Actual Area of Dewaterirg Hole(s) (it') _ Actual Drawdown Period (hrs) _ Ootion: Fairdoth Skimmer Storage VoNxne (tt') _ Required Orifice Diameter (in) _ 2.5 22,278 0.6 48 12D 0.08 Based on Min. Detention Time 3.9 0.03 Based on Max. Detention Time 2.5 3.0 1 0.05 83 O.K. 48,318 2:0 :From Design Chart Based on 2 to 5 Day Dtavrdown Basin Drain Calculations: • Average Head (ft) _ Surface Area at Temporary Water Quality Pod (ftZ) _ Coef. o(Contraction = Desired Drewdown Period (frs) _ Min. Area of Dewetering Hole (tt') _ Min. Diameter of Devratering Hole (In) Selected Diameter W Dewatering Hole (in) _ Acdml Area or Dewetering Hole (Tt2) _ Actiml Drewdown Periotl (hrs) _ Forebav Calculations: Required Vohme of Forebay(s) (fl3) _ Forebay. #1 . North Contour Area Area Incremenlai Cumilative Stage In S N Z Zest (fly) (acres) VoNnne (ft') VoNrme (ft') (ft) 258 737 0.02 0 0 260 t.o39 0.02 1,77s t,ns 2 zaa os9 2.00 262 1;389 0.03 2,428 4,204 4 8.34 1.39 4.00 263 4,648 0.11 8,531 10,307 5 9.24 1.61 5.00 Linear Regression Constants: Ks = 490 b= 1.76 Elev. of Bottom of Forebay = Top Elevation of Forebay = Forebay Storage (tt') _ Forebay Geanout Vohrne (fP) _ Forebay Geanout Elevation = 2.5 22,278 bs 24 0.17 Based on Max. Detention Time 5.6 6 0.20 21 O.K. 7,068 = 20% of Required Temporary Water Quality Pool Storage Volume Storage = 1182 z^2.31 258.fl 263:0 6,294 O.K. 4,147 = 50% of Forebay Storage Volume 261.4 Basin Shaoe: Lergth of Basin (ft) _ ..170_ Maasured at Tomporery Water Quality Pool Elavetion Width of Basin (tt) _ 70 Measured at Temporary Water Quality Pool Elevation Desired Length to Width Ratio (X:1) = 3 Actual Length to Width Ratio (X:1) = 2.4 No Good. Revise Shape or Add BaRles. • Richardson S1NtFr Gardner & Associates, Inc. CopyoIBASN.FEDD&7ReJlads SHEET: / ROUTE DESIGN STORM: Use Hydrol:AO or Other Method. JOB It Sfrotvrep 05-2 DATE: 721N7 Design Parameters: BY: KBS Design Stonn: 25-Yr, 24Hr ~+ CHKD BY: /Y~ Desi~ Storm Rainfall (in) = 6.65 VV Rainfal DistrilxNon: Type II Rrawif Me1Fwd: SCS TR-20 Results: Mabmum Pcol Elevation = 264.4 Surface Area at Maximtm Pool (ft') = 30,937 Peak Discharge(cfs)= 6.62 Check Settling Efficiency: Partite Data: Diam.(miaoru)= 40 Spedfic Qavity = 2.fi5 Set7rg Vebc. (ft/s) = 0.004140 Reynolds No. (<0.5) = 0.044284 O.K Efficiency Data: Desired Efliderrry (%) = 80 Ng. of Effective Cell = 1 Setling Effiaenry (%) = 95.1 O.K DESIGN OUTLET STRUCTURF~S: Design Riser/Barrel Structures: Riser Design: TypeoiRiser: Cenaete-.Clralar.- Riser Base Elevatlon = 258:0 Riser Top Elevation = 264.0 Riser Height (ft) = 6.0 Outlets: Outlet No. 1 (for Devratering TWO Pod): Size. 3" qam. Orttice From Above - Dewatering of TWQ Pool Invert Elevatign: 258.0' May Very For MuRiple Holes Outlet No. 2: Size: 6' Diam. Orifice Invert Elevation: 263.0 Outlet No. 3 (Prtrxapal Sglway): Size: 36' Diam. Haiz. O[tfice (Top of Riser) Invert Elevation:. 264.0> Corx:rete Riser Watl THdg>ess (in) _ 2.75 Riser Inside Diameter (ft) = 2.5 Approx. Circ. Riser Interior Volrme (d) _ 29 Approx. Circ. Concrete Riser Vokxne of Concrete (ci) = 12 Barrel Design: Type of Barrel: Corxxete Diameter (in) _ 1S Irn. In Elevation = - 258.0 Irn. Out Ekwation = 256.0 Lerglh (ft) _ 600.0 Skrpe (ftlR) _ 0.003 RicMNeon SrrYth Gardner 8 Assodates, Mc. CopyofBA61N•EODB-7Rev2.~ds Riser Base Calculations: Design Uofft Force: Factor of Safety = F (unadjusted) (ibs) _ Approx. Circ. Concrete Riser Buoyant WL (~s) _ Buoyant WL of Riser Top (tlrs) _ Buoyant Wt. of Surrounding Soil Adirg on Ext. Base (Ibs) _ Spding Resistance of Surrounding Soil (Ibs) _ F (adjusted) (bs) _ Concrete Base: Required VoNune of Concrete (ft') _ Lergtlt (ft) _ W idlh (ft) _ Thidoress (ft) _ Actual Vatrme of Concrete (ft') _ AntiSeeoaaeCollarCelculations: tAkernatively-DesianFikerDiaohraeml Slope of Upstream ErrrbarYarrent (tH:tV) = 3 Slope of Outlet Pipe (f Mt) = 0.003 Ls (ft) = 43 Number of Calars: 2 Lerglh of Each CoMat (ft) _ 4.5 From Design Chart Based on Ls and No. of Collars Widdt of Each Cotlar (ft) = 4.5 From Design Chart Based on La and No. of Collars Colar Projection, P (ft) = 1:5 Spadng of Subsequent Md--Seep CoAars (ft) = 21 =14P Emeraencv Sofllwav Calculations: .7 Crest Elev. (ft) _ Requred Freeboard(ft)= Top of Bens Elev. (ft) _ Requred Capedty (ds) Driving Head (ft) _ Weir CoeffldeM = Length of Crest (ft) _ Design Crest Length (ft) _ MMARY DA Basin No.: EDDB-7 Elev. of Bottom of Basin = Cleanoul Elev. (ft) _ Elev. of Temporary Water QuaAly Pool = Emergency sd~+ay ~. (ft) _ Top of Berm Elev. (ft) _ Tap of Berrrl Widdt (k) _ Barrel Diameter (in) _ Barrel Slops (9G) _ 1.25 2.297 826 Factors in 80K of the Weight of the Concrete Riser to Account for Outlets. 0 0 0 0 0 0 1,471 16.8 3.0 3.0 2.0 18.0 O.K. 265:0 1.0 266.0 6.6 From HydroCAD - 25-Yr, 2t~tr. Storm 0:5 3:0 6.2 Determine by Weir Equation' 30 258.0 261.7 • Length = 20 ft minimum. 263.0 See Above for Riser and Other Designlnfonnation. 265.0 266.0 10 "l il' 0.3 wavraswr smith t~ardner & Assoaates, inc. cor,yweASIN~EDDBaRe,rz,aa ~1 ~J TSS Removal Efficiency Calculations n U • PROJECT Shott,~.lt LF SHEET OF ` JOB N0. -Shr~~~ os-z DATE ~ o ~iyl a~ SUBJECT Cal cu.lah' cm s - TSs ~2em~oy- ~- COMPUTED BY h-r3S ____ E~icienc~,. CHECKED BY ~;~~ Atm -fo C4.tc:,1c~-C, TSS ~emaUc~C ~{-{-iciCnc~ . R~ftn~nce = ~~~I~I-ed dz~~t rnc~>7t~c~9. ~ S'bhrnc~c.~.~ ~ ~ ~~,~ ~-~~~~ ~~c.-cis' c~ 6~ N c D c-~i I + ~ eT /10 (,~ i ~ 2 ~c Ti7 a ClY1 c l.~ \~ ~ V-}- ~ Cl C eYYt r, i'YL~1 CVO off- ~~ ins s az; e.~ i~ 1S c ~-rn ~~ ~ ~. d c~ s ~ul~~s T E -- ~~. .~.. ~_ C A x Q ~~ • G _ fie ~ro ~ ~~'Ci ca'tc y Ci ~» ~ ~ ~ ~4z.s ~- ~~ ~PS'I'Zreu;YYl.. r3 m ~{~,cieYJc~ ab- _ ~ ~ec0'~c~ e~ _ o c..~ns ~ aYp _ B n11-' _ -1 ,_ arn~ _~ _v ._ ,. ~- ~Je~n~hcm b~~i 5d aka ~ Tss ~^ema e~,'c~~m ~.. ;. ... . _. ~ T461~ ~:~z BmP B __ - -- ;_ G.N.. RiCHARDSON & ~SSOCI~TES, INC. 425 N. Boylan Avenue Raleigh, North Carolina 1919)-828-0577 Fax~9191-828-3899 www.gnra.com • SHEET Z OF ~' PROJECT S~o~'~{.l L~ JOB N0. sho~ft.~.r,U. o S-~ SUBJECT ~S R moues ~ ~ DATE /o~ly~n6 '~~~ ---- COMPUTED BY ~~~ CHECKED BY `~" ~C,r Le v~ s~~ e~~ e~ -~s /o - ~~rnun~l~ P~un~d y~-u.ss o~ 1e~4m~ 3'0 % - Pairnc'J''~~ 1471kr~ ~~~ ~~'v1'1 U },,L ~ _ i rn o: t ~ 4,,, 1u.0 G. L~ • _ G.N.. RICHARDSON & ASSaCIATES, INC. .. _ __ 425 N. 8o~lan Avenue Raleigh, North Carolina 19191-828-0577 Fax~9191-828-3899 www.gnra.com • Sediment Storage Calculations • • • • • SHEET ~-- OF -3 PROJECT 5~1 ~-~-r ~ JOB NO. S ~0•~1. lJ s - 2 DATE in ~i ~lo~ SUBJECT se r~YY~-2-lt~ S ?t [xaSL • CO~,~1pUTFD COY f ~ r3 S CHECKED BY' ~~ C C O ~ c~+ "fl~ ~f'u ~ ~ Q ~ S' e c~. ~'Yrie-YLL S i~£1~ c~c~r~- •2 ~ C Yl T7 UYl \/ 0 ~ Ll'h'LQ, --F' •2 ~ /~ ~ d L' ~'~ (Jl'1 V U ~ (tiY}tiQ, . ~ Ch e ~ -{roh; a-U 13 c..bi rS T3 us i~ -~ c~e~4-r.~n ~~ ~'1 F2e 4~~ e~ _ ~b lu1'>1.e• -= 23~__Z,.~ ~F C ~ z •93 Rcv~e.d X !_. /$~~ rz~y4;?~ec1 s~nv~e.. - ~3~ z~ -r C~- 2~, Cz3~ z~~ ' ~ ~s~n 5 _. _ a , _ _ t a . . ~.el{ ~{i.1L4{,~ t1L'~ ~ ~7Y~-Q. - `~lSc~ttitC~-~, u ~nQ.4 ~ ~ 5IUD ; ~ _. _. _ _ _ ~ ~- ; j _ . __ ;... r.. 1~ eyuJ~. ~ _ S-~-a l~ c~-c~2, f~ z~ ~ 3 0 ' ~- i C o 2-r3~ ~4 ~ `~~ ~ _. . _ ___ __ Y ~ t ~~6 ~_ ~ __ c~ ° _._ l _ _... _.._ _ __ _. _.. _ _... ~. G. N. RICHARDSON &~SSOCIATES Engineering & Geological Services 14 N. Boylan Avenue, Raleigh, NC 27603 Telephone (919) 828-0577 • SHEET 2- OF 3 PROJECT ~~ p-~t-~-~JA L ~ JOB NO. ~'~.~ -t~~ at .- 2 DATE 1~~1~'~D6 SUBJECT COMPUTED BY /ef3-S CHECKED BY: ~(!% ~S,t~ __-_~ , 12eyw ~e ~ d e~~, ~~ ~ vo 1 umQ., _ 'J~~~a-~ ar~.ec~ x l ~o = 2' ~ g9 X I g E1'n •' G. N. RICHARDSON &,~SSOCIATES Engineering & Geological Services 14 N. Boylan Avenue, Raleigh, NC 27603 Telephone (919) 828=0577 • PROJECT ~ ~ o-}-u,-e~1 L.~ SHEET ~ _ OF 3 JOB NO. s o-~-~.,~U ns-- ~-- SUBJECT _S~d,,'~y,w~tt~ S~12c,~u ~ DATE ~ d I IS 1 0 ~ COMPUTED BY Lr~~_~ _. ~' CHECKED BY 5~~=- ~- ' ~ ~+.5 lyt ~ 2 ~ E 4 ~ ~ ; ~ d e ~ ~ ~~ ~rn U ~ I a rne.. = c~ ~u~n c~c~-e ~u~2~-t K / 8 - r3•Ss J~ I gam (2~~~ ~1 ~'n~- _ ~4~ s ~-a -r ~o • 2o~ X24 , s ~~ 2~/ 4 g ~ c~ ~~ (~ bI2 -~hu- _ ~-3~ ~ 64 c F -. a1c B ~s'i - _ ~ • • G.N.. RICH~rRDSON & ASSOCIATES, INC. 425 N. Boylan Avenue .Raleigh, North Carolina 1919)-828-0577 Fax~1919)-828-3699 www.gnra.com • Level Spreader Worksheets & Digital Photos of Existing Buffer conditions DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET (112007) • I. PROJECT INFORMATION (please complete the following information): Project Name : shn+WeU c2~~ Lanai; II Z~~ Contact Person: s-Friceu .~ni~F, Phone Number: (gfg) sz$ - os ~-~ Level Spreader ID: ~ Level Spreader Length ~3 ft. (perpendicular to flow) Drainage Area .2• ~ ac. (on-site and off-site drainage to the level spreader) Impervious Area ~~ ac. (on-site and off-site drainage to the level spreader) Forebay Area N H cu ft. (0.2% of the contributing impervious surface area) Maximum Filter StriplBuffer Slope 6' % (6% for forested/leaf littler cover, 8% for grass/thick cover) Max. Discharge from 1 "/Hr Storm o • os cfs Max. Discharge to Level Spreader o • cm cfs Filter Stripl Zone 1 Buffer Vegetation ~,~_esl-~ Filter Stripl Zone 1 Buffer Width 3o ft. Filter Strip/ Zone 2 Buffer Vegetation t^n12 esl-e a Filter Stripl Zone 2 Buffer Width !QO ft. (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) C ~+r5f, -f1 ow SyP~sS ~-a°"'de~ czf'h e~2Enc~ Bypass Method Used NA Please include a worksheet for this. ~;C~;~~~vh~ ~ II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet • structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials .ice Project Site was visited prior to designing level spreader system. ~,~ Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. K~_ Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the buffer/filter strip). kr~ All ground cover types and their widths have been labeled on the construction plans. Rte.- All contours have been depicted on the construction plans. k~3-- No structures are located in protected buffers (must meet no practical alternatives criteria). I<~- No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. ~~ Construction details for the level spreader have been provided. K~ The operation and maintenance agreement signed and notarized by the responsible party is provided. ry A No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: tom`-- Bypass conveyance method is specified and construction details and calculations are provided. ~_ Alternative design option is specified and plan details and calculations are provided. ~c r-~,,, Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the • bypass discharge, i~~..-- Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET (112007) • I. PROJECT INFORMATION (please complete the following information): Project Name : Shotu~eU cB~ L4n dr;~l Zhu Contact Person: s-Iz~~.~ S'~m•,ifi Phone Number: (~j) S2R' - os~-~ Level Spreader ID. 2 Level Spreader Length Drainage Area Impervious Area Forebay Area Maximum Filter StriplBuffer Slope 13 ft. i3.~- ac. o ac. wfl cu ft. Max. Discharge from 1 "/Hr Storm o• 13 cfs Max. Discharge to Level Spreader ~. a~ cfs Filter Strip/ Zone 1 Buffer Vegetation ~n~~~-ed Filter Stripl Zone 1 Buffer Width 3n ft. Filter Stripl Zone 2 Buffer Vegetation f=i,r,,~{•e-o~~ Filter Stripl Zone 2 Buffer Width SSo ft. Ct+~~h Bypass Method Used (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (0.2% of the contributing impervious surface area) (6% for forested/leaf littler cover, 8% for grass/thick cover) (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) -f~ouo h~~ucs p~ptl~d.ect ~~~? ~nP~~j ~ -~'~~si,= ~x#~9~~ Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet • structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~~s_ Project Site was visited prior to designing level spreader system. k~s _ Date of the Site visit. Please attach time•dated digital photos of existing buffer conditions. Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the bufferlfilter strip). k~ All ground cover types and their widths have been labeled on the construction plans. ~as_ All contours have been depicted on the construction plans. ~~s_ No structures are located in protected buffers (must meet no practical alternatives criteria). K,~~ No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. ~r;s _ Construction details for the level spreader have been provided. K&s The operation and maintenance agreement signed and notarized by the responsible party is provided. kB-4_ No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: K~~-- Bypass conveyance method is specified and construction details and calcu-ations are provided. n~F` Alternative design option is specified and plan details and calculations are provided. ~~r~--- Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the • bypass discharge. ~~- Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET (112007) • I. PROJECT INFORMATION (please complete the following information): Project Name : Sho~r~e1.1 c~D ILn dill Contact Person: sfaceu S~;+h Phone Number: ~yiy) R2R' - c~~~-~. Level Spreader ID: ~ Level Spreader Length 13 ft. (perpendicular to flow) Drainage Area B• I~ ac. (on-site and off-site drainage to the level spreader) Impervious Area o ac. (on-site and off-site drainage to the level spreader) Forebay Area 1v A cu ft. (0.2% of the contributing impervious surface area) Maximum Filter Strip/Buffer Slope $ % (6% for forested/leaf littler cover, 8% for grass/thick cover) Max. Discharge from 1"/Hr Storm a • 0 8 cfs Max. Discharge to Level Spreader o cs~ cfs Filter Stripl Zone 1 Buffer Vegetation ;va Filter Stripl Zone 1 Buffer Width ~ A ft, Filter Stripl Zone 2 Buffer Vegetation -fh~d~ aa,~~nd coVelL Filter Strip/ Zone 2 Buffer Width ~o ft. C H7511f1o~ (Discharge rate from extended detention wetland or pond) (GrasslThick ground cover or Forested) b~p~ss ~aov~dQC4 t;-~;+~ cnen5_y d~ss;~ ak'D~~ Bypass Method Used k N Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet • structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~C~ Project Site was visited prior to designing level spreader system. ~~ Date of the Site visit. Please attach time•dated digital photos of existing buffer conditions. ~t s Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the bufferlfilter strip). kr~ All ground cover types and their widths have been labeled on the construction plans. ,~ All contours have been depicted on the construction plans. ~<~ _ No structures are located in protected buffers (must meet no practical alternatives criteria). _~ ~_ No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. ~aS _ Construction details for the level spreader have been provided. +~~.- The operation and maintenance agreement signed and notarized by the responsible party is provided. kB.~ _ No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: kRS, Bypass conveyance method is specified and construction details and calculations are provided. a~ Alternative design option is specified and plan details and calculations are provided. ~a~--- Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. ~~-- Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET (112007) • I. PROJECT INFORMATION (please complete the following information): Project Name : __Shotcyc~lt cr3~ l4nd-ill , 1~~ . Contact Person: s~ce~ sm~Ffi Phone Number: 1919) 828 - o5~~- Level Spreader ID: 4 Level Spreader Length is ft. Drainage Area 2 •q ac. Impervious Area ~• o ac. Forebay Area i ~4 cu ft. Maximum Filter Strip/Buffer Slope 6" Max. Discharge from 1 "/Hr Storm p .13 cfs Max. Discharge to Level Spreader o cfs Filter Stripl Zone 1 Buffer Vegetation .F,~~1-.mod Filter Stripl Zone 1 Buffer Width ao ft. Filter Strip/ Zone 2 Buffer Vegetation ~n.~~-cd Filter Stripl Zone 2 Buffer Width I~~ ft. Ct~9h ~'lo~ (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (0.2% of the contributing impervious surface area) (6% for forested/leaf littler cover, 8% for grass/thick cover) (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) by p ass pzrovi de d ci, ~t e n ~~g~ d~ ss ~ f u~ h Bypass Method Used ~t0 Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet • structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~s~ Project Site was visited prior to designing level spreader system. ~c~~ Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. key Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the buffer/filter strip). ~n~ _ All ground cover types and their widths have been labeled on the construction plans. !~- All contours have been depicted on the construction plans. No structures are located in protected buffers (must meet no practical alternatives criteria). ~, No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. Construction details for the level spreader have been provided. ~ The operation and maintenance agreement signed and notarized by the responsible party is provided. try No practical alternatives explanation + Variance request. (Level Spreaders in Series only). _::_-- Bypass method used: k'r=~,-- Bypass conveyance method is specified and construction details and calculations are provided. N~ Alternative design option is specified and plan details and calculations are provided. k~t~..-- Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the • bypass discharge. ~~r;.-- Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET (112007) • I. PROJECT INFORMATION (please complete the following information): Project Name : shn~c~~U c~ ~ Lund tall Contact Person: s-I-r~cn ~ Sm1~F, Phone Number: (41y) - gZg - DS~~ Level Spreader ID: ~ Level Spreader Length i3 ft. (perpendicular to flow) Drainage Area l9.9 ac. (on-site and off-site drainage to the level spreader) Impervious Area o ac. (on-site and off-site drainage to the level spreader) Forebay Area N A cu ft. (0.2% of the contributing impervious surface area) Maximum Filter Strip/Buffer Slope ~z % (6% for forested/leaf littler cover, 8% for grass/thick cover) • • Max. Discharge from 1"/Hr Storm nos cfs Max. Discharge to Level Spreader o cfs Filter Strip/ Zone 1 Buffer Vegetation t;,1ud1-~. Filter Stripl Zone 1 Buffer Width 3 o ft. Filter Strip/ Zone 2 Buffer Vegetation ~ ,fL. Filter Strip/ Zone 2 Buffer Width t ~v ft. CFhyh ~loc~ Bypass Method Used NR (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) b~~R~s ~a~v~dc~d c.~i-f"h e~ena~ d,'ss;r~i-~9> `; Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials -~ Project Site was visited prior to designing level spreader system. ~~ Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. K~ Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- ~- foot canopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the buffer/filter strip). ~~ All ground cover types and their widths have been labeled on the construction plans. k~ All contours have been depicted on the construction plans. ~~_ No structures are located in protected buffers (must meet no practical alternatives criteria). ~_ No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. K~_ Construction details for the level spreader have been provided. k~ The operation and maintenance agreement signed and notarized by the responsible party is provided. kris No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: ~~° Bypass conveyance method is specified and construction details and calculations are provided. ~A Alternative design option is specified and plan details and calculations are provided. ~..~-- Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. Imo-- Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET (112007) I. PROJECT INFORMATION (please complete the following information): Project Name : Sh n>j-c~QU c?~ l.4nd~ill Contact Person: SdCico~ Sm,~f, Phone Number: j419) R28 - 65~~- Level Spreader ID: r Level Spreader Length Drainage Area Impervious Area Forebay Area Maximum Filter Strip/Buffer Slope ~ 3 ft. (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (0.2% of the contributing impervious surface area) (6% for forested/leaf littler cover, 8% for grass/thick cover) 12.43 ac. o ac. NR CU ft. Max. Discharge from 1 "/Hr Storm ~ . og cfs Max. Discharge to Level Spreader o cfs Filter Stripl Zone 1 Buffer Vegetation ~ h¢ok~ Filter Strip/ Zone 1 Buffer Width ~ ft. Filter Stripl Zone 2 Buffer Vegetation ~,~ Filter Stripl Zone 2 Buffer Width `~-a ft. ~'{-h~ 9 h Bypass Method Used N ~ (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) -f1o~ b`y~asc me~od p~avided~ ~~ c~e~~ Please include a worksheet for this. c~~'ss~~G-~'~ ~ II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet . structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~~~ _ Project Site was visited prior to designing level spreader system. ~c~~_ Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. ~ Level spreader length is at least: 13 ft. per cfs for thick ground cover /grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the bufferlfilter strip). kr3~ _ All ground cover types and their widths have been labeled on the construction plans. k= All contours have been depicted on the construction plans. No structures are located in protected buffers (must meet no practical alternatives criteria). No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. ~_ Construction details for the level spreader have been provided. ~ The operation and maintenance agreement signed and notarized by the responsible party is provided. ~ No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: k~~-- Bypass conveyance method is specified and construction details and calculations are provided. n7A Alternative design option is specified and plan details and calculations are provided. ~'~{~- Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. ~' Construction details for the bypass and outlets are provided. DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET (112007) I. PROJECT INFORMATION (please complete the following information): Project Name : Sho+c~pL( c8 ~ ~snd$U Znc Contact Person: s~f-a~eu S'rY,~~h Phone Number: j919 ) g28 - ~tS~-a- Level Spreader ID: ~- Level Spreader Length i3 ft. (perpendicular to flow) Drainage Area 16.36 ac. (on-site and off-site drainage to the level spreader) Impervious Area o ac. (on-site and off-site drainage to the level spreader) Forebay Area i~ +~ cu ft. (0.2% of the contributing impervious surface area) Maximum Filter Strip/Buffer Slope 3 ~ 3 % (6% for forested/leaf littler cover, 8% for grass/thick cover) Max. Discharge from 1"/Hr Storm o -42. cfs Max. Discharge to Level Spreader • ~ cf; Filter Strip/ Zone 1 Buffer Vegetation Filter Strip/ Zone 1 Buffer Width ~ b ft. Filter Strip/ Zone 2 Buffer Vegetation ~ hes{-ec~ Filter Strip/ Zone 2 Buffer Width I ~ ft. C~~y h Bypass Method Used Ivl~ (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) -f''Io~ b~ pass p~ov~de~! c~r~'h ~nenc~ dissi~ atv~ ~~1 Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a requesf for additional information and will substantially delay final review and approval of the project. Applicants Initials kB~ Project Site was visited prior to designing level spreader system. kr~ Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. kRs Level spreader length is at least:13 ft. per cfs for thick ground cover I grass; OR 65 ft per cfs for 50- footcanopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the buffer/filter strip). I:F~ All ground cover types and their widths have been labeled on the construction plans. r«r~ All contours have been depicted on the construction plans. kr~ No structures are located in protected buffers (must meet no practical alternatives criteria). ,ITT No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. ~s Construction details for the level spreader have been provided. ~ The operation and maintenance agreement signed and notarized by the responsible party is provided. t<r~s No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: k~'~~---- Bypass conveyance method is specified and construction details and calculations are provided. Alternative design option is specified and plan details and calculations are provided. i;~~--~ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the • bypass discharge. ~Q'•-P' Construction details for the bypass and outlets are provided. i• • • Figure 2: Level Spreader at the end of Basin-2 • r~ L_J I Basin-3 ,' ` t r '~ Y , M " ~ s - h ~ ~ 1 ~~~ PP ;. x r .• x' to '.~ B~ ~ ~ ~ c; ~ a,rt_ ar ` ` ~ ~ Y~ ~ .. ~ ern ~ %b °' _ ~ ~'~. R y . ",' +w . K ! 4' F {fig 4 ~ ~+ . __!S ~ = ~ v a .f-1'~ a' r~ 1~ 9 ~ C f,., ~ R S f- ~rY~bSeS, .~,~ ~ ~ ~ JF ' a t ~ ~ ~- -' ~ ',~Ar.. 1 ~ p. jj i ~ ~; . ^~ „4. ~ ;~~ ~$ ~ ~' Y `. i ~ 'C ~ =•1` is ~,. +w ., _. ,; + t - ~- _ ' .X M E ~ t .'k~+ -., ~~ {~, Z. r f.. • • • ~` + "l lj ~ ~" r C3~ •+~~ ~ ~ 4 ~a~+ ~i ,~ , ~ , ~ ~ 1~1!! ~ ~ ~14, ~'~' lr~, k~ iI ~~ nt,~.rJ ~ ' 'flit ,~ i i? • , ~~P ~ ~ r:i+ x , j- ~, ~ . o. ~~ s 4 '.~ 6 ~ e 7". ?! v ~ ~,: ~#M' 6y -. r il'k` ~,~ 5 4~yi# rk~°~`w,:. ~" as _ r ~ ,a i' .,C!"eF a ~1 5.,`. ~, ItlC~ ~,, s a~ '7F1' ~•v°'!- ~~~ ~ .iii ~. y~ '~ _ - .. ~ °~ ~ ~, ~ y{' ., ~ r. y~ dx ` Si, ~t a•' .4'..1.4 '; '1 r..fJ~?A of Basin-5. Y ~~ ' ~6~r 4 t • ,~ ~sda ~ ,~ s s F 11 ` ;~' '~ ~'~`~ ~ ~. ` ~ ~ 1 x Y:- ~' ~ ,~y~_, -:fit ,,tt > ._ ~ ~,e ~y }~ ~C r` . i ~S'. 3N: i t... ~~'y Xz~~ t a,~,. aj~~ '_,~' ° R ~6 } r+ ~'~ ; ~ k{~ 3 ., C ~ ~ 5~ ~ ~ ~ r fi ~ F { 1. x ,~ ~~ "¢. 3`'X'- ': a '~ .: ~~~ ..9 i Y'A'W ~ ,dn 'z"~ Y • w A x ~ti i~ 9 .% esri S w~ ~ ~ pit E~ ~ a* y, ter ~~, .~ Y~~,: u~~ '+k i ~} a~ t~ ,~ i i s 7 r Fr r yv tr. ~p''~y 1 ~ * ry' ~ r ~'"a' ~ v„~ ~' ~~ Y"'c' t ~ Cr) '~Ci{ ~ + ~_ J t '; ~~s ? t r - '~,~yie~ ! - Y 1 ~' _; G ' _ +~ a. ~., i~. ~ ~ ~ Fiqure 7: Level Spreader at the end of Basin-7 (Same at Basin-4) • r~ u High Flow Bypass Structure Design n U • • ,~ ^ RICHARDSON SMITH GARDNER & ASSOCIATES 14 N. Boylan Avenue Tel: 919-828-0577 Raleigh, NC 27603 Fax: 919-828-3899 Shotwell Landfill, Inc. High Flow Bypass Structure Design Balance the flow at an overflow bypass junction box, to set flow to a BMP and bypass flow Calculations are valid for all level spreaders at the Shotwell Landfill. c: • EL Bottom of Bypass 0 ft (user entry) Diameter of Orifce 6 inches (user entry) >tal Number of Orifice Holes 2 (count) (user entry) EL Weir 6.33 inches (user entry) Weir Len th 4 ft user ent area of orifice EL Weir 0.196 0.53 ft2 ft Cd 0.6 orifce discha a co Cw 3.3 weir dischar a coe T EL„,,,,, ELw„~ Heado,~~e Head„,,;, inches ft ft ft 6.33 0.53 0.28 0.00 :onclusion: The weir elevation can be set at 6.33 inches above the bottom of the high flow bypass box, and equal to the level spreader lip elevation. When the water elevation in the bypass structure reaches the crest of the weir, approx. 1 CFS of Flow will be directed to the level spreader. Any add8ional flow will bypass the level spreader. (calculated value) (calculated value) efficient (ca~ulated value) fficient (ca~ulated value) Flowo,;~, Fbww,a CFS CFS 1.00 0.00 SHEET. JOB #: Shotwell 05-2 DATE: 7130/2007 BY: G. Mills CHKD BY: Total Flow CFS 1.00 elevation of weir Richardson Smith Gardner 8 Associates 7/30/2007 Bypass Flow Design.xls r ~J B FROM IN1E1S UPSTREAM A • 1 (K) OF RAMP INED BY DESIGN TREATMENT VOLUME SECTION A-A • BYPASS STRUCTURE SCHED ULE POND A B C D E f G N J K L BASIN 1 5' 4' 4' S' 18'r 18'r 2 6" 2' 6.33' 205.47 BASN12 5' 4' 4' S' 18'r 18"r 2 6" Z' 6.33' 224.1' BASIN 3 5' 4' 4' S' 18'1 18"r ? 6~ 2 6.33' 231.47 BASW 4 5' 4' 4' S' 15"r 15'/ ._ _ 2 ___ 6" __ __ 2' .. 6.33" .._ 246.47' BASMI5 5' 4' 4' S' 18'0 18'r 2 6' 2' 6.33' 263.47 BAS6i 6 5 4' 4' S' 18"I 18"I 2 6' 2' 6.33' 20247 BASIN 7 5' 4' 4' S' 15'r 15"1 2 6' 7 6.33' 255.47 2 N N O } 1~ y~~ 3 ~i A ~ V O h O h ~ •' vi lu N r OI Y^ N~ .- ro o of ~ 10 n M A I M I~ r ~ m o ~ o c o o S p#p~mm Q 2 O ~ J[ N V m ~ ~ a0 Q N } N ~ N ~ t0 ~ N ~ n ~ ~~~ ~ N N O ((O)) p J C ~ M 9b T N C V O W O ~- ~ ~ f') h >` N ~~ O ap O O .- 00 O OI N p J pO N r 0 0 I A A I ip ~ - C ~ m O ~ O ~ ' ~ R x x v m ~ O ~ C') 1~ N }` ^ O N OI O Ol m J O O I S O I O 1~ UU O S N = < m ~ ,y N y` 2 C U o °° O' ~ M ~ ~ N Q ~ m °~ p N o ~ OI ~~ 3 J ~ Iq r O O t` r I I~" ~ ~ ~ m p N 0 p N YI 5 V A a = r m d x` ~ ~_ 14 C N ~T U O ~ ~ fM ~ N } N 10 ~ ^ ~ p N ~ O ~ I N ~ N ~ ~ ~ m Q: p M M OQ p N N th J ~- ~ I N N N Q N ~. a ~ I N ~ _ r ~ N ~ • U y O N apq ~ app ~ ~ d~ d~ C y •- >` Q ~ m °' __ ~ T G d M~ O r ~ O M~ IA N N O~ M H N V M N ~ N t7 h ~ O> ~ h ~ ~O ~ N ^y LL S' F ~ Q m ~ ~ ' ~~ ~ c~j J O ~ ' N C C v. J C p ~ i t U b ~ ~ , _ i 'S N V O Qj :+ II II II II ' II II II 11 :' II II II II Z .~~ $ 4~ p « n ~ ~ 6 ~ ~ ry OI ~ D N ~ 7 ~ Y .n0 0 ~ p ~ E C X m ~ $ ~ ~/.Alel .f- ~ (/J O O ` N d ~ L 0I U ~~.. N $qp~ ~~ C U yNN lI O > Y Z ~ N O O LJ p ; LL ~ LL « ~ m J V 6 ~ ~ LL ~ K ~ ~ ; o K ~ tq LL ~ Q Q F L S O 3 c o r '' c U U Eo d ~ 10 I- R ti 2 F m Z O U O tt a w O a U e a° ro c7 N E K Appendices ~#± c t b7~n ~- p. ~,`~-cart a~- ~ ~ ~cc ~~5'lc cEc~n ~ ~n' 7~ r3~i. si n - ~.. c2 6 • ~O~ ~ t .sl 3Qo ~ l~sl =Rot 2( • 1( C Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter; . • a~ _N Q (>3 i a 0 . TS t C" QU Rev. 11A3 8.Of~.3 ,~ ~25 ~ "~ 3 iuu 200 500 1.100 ,1~ - '/R sb~m -~ Discharge (ft /sec) Q t.~t1 e~ ~a-o ~-~ c h crn a.,t` 8chsi~- - ~ ~ ~- • 2 6f • 1 _N rn a (Lf _d O r 7-3s N N _. -- .,~ iuu 200 500 1 ~)0 6 12'(-- -~ z5 -YR -~ g cis • Discharge (ft3/sec) ~~m Curves may not be extrapolated. F(gure 8.06a Design of outlet protection protection from a round pipe (lowing full, miriimum tailwater condition (Tw < 0.5 diameter' • 8y _ P ~S sou-c~~ ~~ APPen ;'ices Rev. 12N3 8.0~ .3 t ~ • s' 3Qo ~ 1 S Appen :ices 0 t.~tl ~~ p ~o }-ecli ~'- ~-~' 8 Y - P ~ s .sic r~-wtQ. ~' yZ. t~.,s .n - '~ ~ s • 3Qo ~ (~~ I 6tt ~ - } 1 2( • 1C 6~ C Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter' • a~ _N a R7 a 0 g N V -S 6 4 R: PauP Rev. 1?~93 8.0~ .3 ~~ iuu 200 500 1 ~~)0 fo CfS y iQc~sed aYt Discharge (ft3/sec) L5 - Yf~ sh~hm Appen `ices ~t.~kl c~ ~~-cc~-7m ~ ~ - P~ ~ st-rt.~ ~I-un.e.. ~~ (3~~y1 - z fi I S ~ rt 3Qo ~T ~ 1 4 2C 10 0 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter; .7 m ~ N Q t0 i a tr -v ~ 2~ 1 R~ !~P• Rev. 12N3 8.0+ .3 ""' ~~v JvV 1 ~'JU 25 -yR S ~n Discharge (ft3/sec) • Appendix B • Revegetation Plan • SECTION 02930 REVEGETATION Revegetation: Revegetation includes permanent Revegetation of all site areas disturbed by the Contractor whether inside the Contract Limits or not. A. DESCRIPTION General: The Contractor shall furnish all labor, material, and equipment to complete Revegetation in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section • Embankment 02223 Vegetative Soil Layer 02258 Erosion and Sedimentation Control 02270 Rolled Erosion Control Products 02275 Warrantv: The Contractor shall be responsible for the satisfactory establishment and growth of a permanent stand of vegetation for a period of one year following the final seeding as judged by the Engineer. During this period, the Contractor shall be responsible for the maintenance items described in Paragraph D.4 (Maintenance) of this Specification. B. MATERIALS Limestone: Unless otherwise defined by specific soil tests, supply agricultural grade ground limestone conforming to the current "Rules, Regulations, and Standards of the Fertilizer Board of Control." 2. Fertilizer: Unless otherwise defined by specific soil tests, supply commercial fertilizer of 10-20-10 analysis, meeting applicable requirements of State and Federal law. Do not • use cyanamic compounds of hydrated lime. Deliver fertilizer in original containers labeled with content analysis. Shotwell - C&D Landfill Specifications July 2007 REVEGETATION Page 02930-1 • 3. Grass Seed: Supply fresh, clean, new-crop seed as specified in Table 1 of this section. Do not use seed which is wet, moldy, or otherwise damaged. Deliver seed in standard sealed containers labeled with producer's name and seed analysis, and in accord with US Department of Agriculture Rules and Regulations under Federal Seed Act. 4. Mulch: Supply clean, seed-free, threshed straw of oats, wheat, barley, rye, beans, or other locally available mulch material. a. Do not use mulch containing a quantity of matured, noxious weed seeds or other species that will be detrimental to seeding, or provide a menace to surrounding land. b. Do not use mulch material which is fresh or excessively brittle, or which is decomposed and will smother or retard growth of grass. 5. Binder: Supply emulsified asphalt or synthetic binder. 6. Water: Supply potable, free of substances harmful to growth. C. SUBMITTALS • The Contractor shall submit the following to the Engineer: Results of soil tests performed and proposed modifications, if any, to the specified requirements. 2. Certificates for each grass seed mixture, stating botanical and common name, percentage by weight, and percentages of purity, germination, and weed seed. Certify that each container of seed delivered is fully labeled in accordance with Federal Seed Act and equals or exceeds specification requirements. Copies of invoices for fertilizer, showing grade furnished and total quantity applied. D. CONSTRUCTION The Contractor shall establish a smooth, healthy, uniform, close stand of grass from the specified seed. Prior to Revegetation, the Contractor shall adequately test the soils to be revegetated to ensure the adequacy of the specified requirements. Any modifications to these requirements deemed necessary after the review of soil test results, shall be at the Contractor's sole expense. The Engineer will perform the observations to determine when successful Revegetation is achieved. • Shotwell - C&D Landfill Specifications July 2007 REVEGETATION Page 02930-2 • 2. Soil Preparation: a. Limit preparation to areas which will be planted soon after preparation. b. Loosen surface to minimum depth of four (4) inches. c. Remove stones, sticks, roots, rubbish and other extraneous matter over three (3) inches in any dimension. d. Spread lime uniformly over designated areas at the rate specified in Table 1 of this section. e. After application of lime, prior to applying fertilizer, loosen areas to be seeded with double disc or other suitable device if soil has become hard or compacted. Correct any surface irregularities in order to prevent pocket or low areas which will allow water to stand. f. Distribute fertilizer uniformly over areas to be seeded at the rate specified in Table 1 of this section. • (1) Use suitable distributor. (2) Incorporate fertilizer into soil to depth of a least two (2) inches. (3) Remove stones or other substances which will interfere with turf development or subsequent mowing. g. Grade seeded areas to smooth, even surface with loose, uniformly fine texture. (1) (2) 3. Seeding: Roll and rake, remove ridges and fill depressions, as required to meet finish grades. Fine grade just prior to planting. a. Use approved mechanical power driven drills or seeders, mechanical hand seeders, or other approved equipment. b. Distribute seed evenly over entire area at the rate specified in Table 1 of this section. Shotwell - C&D Landfill July 2007 Specifications REVEGETATION Page 02930-3 • c. Stop work when work extends beyond most favorable planting season for species designated, or when satisfactory results cannot be obtained because of . drought, high winds, excessive moisture, or other factors. d. Resume work only when favorable condition develops, or as directed by the Engineer. e. Lightly rake seed into soil followed by light rolling or cultipacking. f. Immediately protect seeded areas against erosion by mulching or placing Rolled Erosion Control Products in accordance with Section 02275 of these Specifications, where applicable. (1) Spread mulch in a continuous blanket at the rate specified in Table 1 of this section. (2) Immediately following spreading mulch, secure with evenly distributed binder at the rate specified in Table 1 of this section. 4. Maintenance: • The Contractor shall be responsible for maintaining all seeded areas through the end of his warranty period. The Contractor shall provide, at his expense, protection of all seeded areas against damage at all times until acceptance of the work. Maintenance shall include, but not be limited to, the following items: a. Regrade and revegetate all eroded areas until adequately stabilized by grass. b. Remulch with new mulch in areas where mulch has been disturbed by wind or maintenance operations sufficiently to nullify its purpose. Anchor as required to prevent displacement. c. Replant bare areas using same materials specified. • Shotwell - C&D Landfill Specifications July 2007 REVEGETATION Page 02930-4 • TABLE l: SEEDING SCHEDULE MATERIAL SEED TYPE APPLICATION RATEI Lime ----- 4,000 lbs/acre Fertilizer ----- 1,000 lbs/acre Seed Permanent: Kentucky 31 Tall Fescue 80 lbs/acre Pensacola Bahiagrass SO lbs/acre Sericea Lespedeza3 301bs/acre Kobe Lespedeza 10 lbs/acre Seasonal Nurse Crop2 See Note 2 Temporary: Seasonal Nurse Crop2 See Note 2 Mulch ----- 4,000 - 5,000 lbs/acre Binder ----- 150 gallons/acre Notes: Application rates and/or chemical analysis shall be confirmed or established by a soil test. 2. Use seasonal nurse crop in accordance with seeding dates as stated below: April 15 -August 15 l O lbs/acre German Millet or 15 lbs/acre Sudangass August 16 -April 14 25 lbs/acre Rye (grain). 3. From September 1 -March 1, use unscarified Sericea seed. END OF SECTION • Shotwell - C&D Landfill July 2007 Specifications REVEGETATION Page 02930-5