Loading...
HomeMy WebLinkAboutAllen Steam Facility (11)Georgoulias, Bethan From: Georgoulias, Bethany Sent: Thursday, March 22, 2012 1041 AM To: 'Mc Gary, Mark E' Cc: 'Velte, John S', 'Everett, George T', 'Stowe, Allen%, Bennett, Bradley; Parker, Michael, Patterson, Robert; Lowther, Brian, Matthews, Matt; Karoly, Cyndi, Chernikov, Sergei Subject: RE- Revised Draft NPDES Stormwater Permits for Marshall, Allen, and Riverbend - Public Notice Update Hi Mark, We've been asked to hold off the, public inotice of these permits until(we have had a chance to meet`with you all. My e- mail yesterday indicated that these would begoing,out to notice in the next week, but those notices will be held for now. However, we Will have to re -notice the permit at some point soon because of the significant changes. I apologize for the confusion We look forward to an opportunity to,discuss these permits. Please let�us know some dates that would be,good for you to meet. Thanks, Bethany Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mad, Service,Center, Raleigh, NC 27699-1617 512 N Salisbury St, Raleigh, NC 27604 Phone (919) 807-6372 Fax (919) 807-6494 NEW'Website http //portal ncdenr org/web/wq/ws/su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Georgoulias, Bethany 'Sent: Wednesday, March 21, 2012 2:48 PM To: 'Mc Gary, Mark E' Cc: 'Vette, John S'; 'Everett, George T; 'Stowe, Allen'; Bennett; Bradley; Parker, Michael; Patterson, Robert; Lowther, Brian; Matthews, Matt; Karoly, Cyndi; Chernikov, Sergei Subject: Revised Draft NPDES Stormwater Permits for Marshall, Allen, and Riverbend Mark, We have revised the draft stormwater permits for these three plants (attached). Hard copies, along with the attached cover letter explaining the changes, are being mailed out to you. Because of the significant changes, we are re -running, the public notice for these draft permits That.notice,should be available on our website in the next few days ,(please check http.//Portal.ncdenr org/web/wq/ws)su/current-notices) and will' be published in the newspapers in the next week or so This will allow another 30 -day comment period and move the scheduled issuance date into May. If,you would like to,meet and discuss; please let us know. We would be happy to sit down with you all again and,go over any questions that you might have Regards, Bethany Georgoulias Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center,, Raleigh, NC,27699-1617 512 N Salisbury St, Raleigh, NO 27604 Phone (919) 807-6372 Fax (919) 807-6494 NEW -Website http //portal ncdenr org/web/wq/ws/su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Georgoulias, Bethany Sent: Friday, December 16, 2011 11:41 AM To: 'Mc Gary; Mark E' Cc: Velte, John S; Everett, George T; Stowe, Allen; Bennett, Bradley; Parker, Michael; Patterson, Robert; Lowther, Brian Subject: RE: Draft stormwater,permits for Marshall, Allen, and Riverbend Hi Mark, December schedules and logistics with the Green Square Building moves have delayed us more than I'd hoped for responding to you all on this I wanted to update you. We are scheduled to meet with our Section managers the middle of next week, and I hope to have something out to you all shortly after This means we probably won't be able to convene until,after the holidays in January, but I imagine several people there will be taking vacation over the next few weeks as well - Also, I've begun working on the, Buck CCTC review and permit development The staff report request needs to be completed and sent to the region for review I hope to:get through that step before the Christmas holidays, but I'll keep you posted on where I am with that Either way, it will be next month before we get to the public notice stage at the earliest. I .Just wanted to let you know°that was in,the development process. Please let me know if you have any questions or updates on the Buck CCTC facility completion schedule since the last time we discussed. Thanks, Bethany Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater,Permittmg Unit '1617 Mail Service Center, Raleigh, NC 27699-1617 512 N Salisbury St, Raleigh, NC 27604 Phone (919) 807-6372 Fax (919) 807-6494 NEW'Website http //portal ncdenr org/web/wq/ws/su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Mc Gary, Mark E [madto:Mark.McGary@duke-energy.com] Sent: Friday, November 18, 20119:30 AM To: Georgoulias, Bethany Cc: Velte, John S; Everett, George T; Stowe, Allen Subject: Draft stormwater permits for Marshall, Allen, and Riverbend Bethany Duke Energy reiterates the positions stated' in our comment letters to NCDENR-DWQ in, response to the draft stormwater permits for the Marshall, Riverbend and Allen Steam Stations We do not believe the requirements for inclusion of analytical sampling of,any benchmarks to be valid Stormwater runoff has been occurring at these facilities for decades with no indications of adverse impacts to the receiving water bodies DWQ has provided no.evidence of actual or potential adverse impacts that would warrant the inclusion sof sampling for these many benchmarks There should be a substantial water quality issue, such as a 303(d) listing, to justify the requirements for monitoring of any benchmark values in these permits Duke Energy maintains that many of,the requirements mandated by these draft permits are of little or marginal value'in terms, of environmental protection, and that these requirements place an unjustlfied'burden on our facilities As an alternative, Duke Energy proposes a stormwater permitting approach more in line with the requirements of other states general permits such as the South Carolina Industrial, Stormwater General'NPDES Permit SCR000000, Part,8 — Sector -Specific Requirements for Industrial Activity, Subpart O, Sector O —Steam ,Electric -Generating Facilities- In particular, we propose the following alternative requirements a Semi-annual quantitative sampling for,those outfalls discharging stormwater runoff,from areas that store coal This would' be limited to any stormwater runoff from the coal storage pile that discharges directly to'the receiving water body Samples would be analyzed for TSS and pH only, with effluent limits of 50 mg/I, for TSS, and60to9Osu forpH b Semi-annual quantitative sampling for any parameters for,which a 303(d) listing exists for the subject section of the receiving water body Sampling would be performed for the listed constituent,at all defined representative outfalls Sampling for the listed constituent -would be discontinued following two consecutive non -detect results c Semrannual qualitative sampling at'all defined representative outfalls Samplias,would be characterized by color, odor, clarity, presence offloating solids, settled solids, suspended solids, foam, oil sheen, or other indications of stormwater pollution d Qualitative�and quantitative monitoring will be limited to defined representative outfalls only, Presently, those outfalls are'identified as I Marshall Steam Station SWO03 and SWO07 u' Riverbend Steam Station SW002, SW003, SWO07 and,SW008 III Allen Steam Station SW005, SW008, SW011 and SW015 IV, Buck Steam Station SW,002, SWO05 and SW073 e- Development of stormwater pollution prevention plans as stated in the draft permits We would welcome another opportunity to meet with you and others in the Stormwater Permitting Unit to further explain our concerns and work toward resolution Thanks Mark McGary, P E Duke, Energy EHS From: Georgoulias, Bethany[mailto:bethany.georgoulias@ncdenr.gov] Sent: Monday, November 14, 2011 1:45 PM To: Mc Gary, Mark E Cc: Bennett, Bradley Subject: RE: Meeting on draft stormwater permits -for Marshall, Allen, and Riverbend Hi Mark, I was just following up with you to see if the end of November was a good timeframe for you all? Thanks, Bethany Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater Permittmg'Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N Salisbury St, Raleigh, NO 27604 Phone (919) 807-6372 Fax (919) 807-6494 NEW Website http //portal ncdenr org/web/wq/ws/su E-mail correspondence to -and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Georgoulias, Bethany Sent: Monday, November 07, 20112:18 PM To: 'Mc Gary, Mark E'; 'Velte,'John S' Cc: Bennett, Bradley; Patterson, Robert; Lowther, Brian; Parker, Michael; 'Stowe, Allen'; 'Everett, George T Subject: RE: Meeting on ,draft stormwater permits for'Marshall, Allen, and Riverbend Gentlemen, Thanks so much for meeting,with us last,week about the INPDES stormwater permits for these'three Duke Energy plants We appreciate your taking the time to come to Raleigh and discuss several of the issues that have come up during the draft permit phase We hope we explained,some,aspects about,our stormwater permits and program that were confusing or not so,clear before We realize'we may not have answered all of your questions or concerns, but we hope we conveyed how important we value the dialogue as we move forward to`finalize these permits We look forward to corning back together with idea`s from both sides about alternatives and clarifications we can consider integrating into the permits. Some of these ideas include. (1) alternative monitoring schemes that serve both purposes of: characterizing stormwater discharges based on potential pollutants from the activities here, and serving as a tool for the permittee's Stormwater Pollution Prevention Plan/BMP assessment; (2) proposals for a period of time after -which monitoring for some parameters can be discontinued and why (for example, to identify the most likely constituents present); (3) proposals for,alternative qua_ Irtative monitoring requirements to accommodate the, large number of outfalls and accessibility concerns, (4) proposals for alternative storm events that should be measured (e g., "measureable storm event" based on discharge potential"instead of "representative,"' based on the,0.1" rainfall criterion). Our goal is to progress towards,finalizing something by the end of the year. I know we're moving,into the holiday'season soon, and so we'd like to propose having these ideas ready by November 30`h Please let us know'if thattimeframe, works for you all Thanks again, Bethany Georgoulias Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N Salisbury St, Raleigh, NC 27604 Phone (919) 807-6372 'Fax (919) 807-6494 NEW Website http //portal ncdenr org/web/wo/ws/su `E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Georgoulias, Bethany Sent: Monday, October 24, 20113-42 PM To: 'Mc Gary, Mark E'; Velte, John S; Everett, George T; Stowe, Allen Cc: Bennett, Bradley; Patterson, Robert; Lowther, Brian; Parker, Michael Subject: RE: Meeting on draft stormwater permits for Marshall, Allen, and Riverbend Mark, We are all set for a meeting on Wednesday, November 2nd at 10:30 AM I have reserved the large conference room (#3) on,the 14th Floor of,the Archdale Building at the NC DENR offices here in Raleigh. If you,need to find us earlier that morning, our Unit is located on the 91h floor. You have been down here severa'I times and are probably aware of the parkin&options (and challenges!,), but please let me know if you need more information. Several of the DENR Divisions will be moving over to the new Green Square building that week, so I'm not sure what to expect up there that day, but it's a great meeting space Since we are discussing three plants and the permits in,general, I think it would help for me to put•an agenda together I'll draft up something and get it out in the next week. I think it would help to talk about items common to all of the permits first=and then get into site-specific details We'll use the comments you all submitted as a guide. If you would like me to include anything else, let me know Welook forward to speaking with you. If you have,any questions in the meantime, please don't hesitate to contact me Thanks, Bethany Bethany Georgoulias Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N Salisbury St, Raleigh, NC 27604 Phone (919) 807-6372 Fax -'(91'9) 807-6494 NEW Website http //portal ncdenr oro/web/wq/ws/su E-mail correspondence'to and from this °address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From:, Mc Gary, Mark E Imailto:Mark. McGa[y(Muke-energy.com1 Sent: Monday, October 24, 20112:04 PM To: Georgoulias, Bethany Cc: Velte, John S; Everett, George T; Stowe, Allen Subject: RE: Meeting on draft stormwater permits for Marshall, Allen, and Riverbend Bethany. Looks like Wed, Nov 2 is best for,us. Please send a meeting notice to those,copied on this email. See you then Mark