Loading...
HomeMy WebLinkAboutZebulon Water Main ReplacementsROY COOPER Governor ELVABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Municipal Waterline Project City of Raleigh NORTH CAROLINA Environmental Quality May 9t', 2022 Subject: Buffer Determination Letter NBRRO #22-128 Wake County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B .0714) ❑ Tar -Pamlico (15A NCAC 2B .0734) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Zebulon Water Main Replacements Address/Location: S Arendell Ave Stream(s): Little Creek North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 M1 ATH CAPOUNA '0 919.791.4200 �W � hpAN1Y11Crm, Ch Zebulon Water Main Replacements Wake County 5/9/2022 Page 2 of 3 Determination Date: 5/6/2022 Staff. Josh Brigham Stream Feature E/I/P(1> Not Subject(2) Subject Start@ Stop@ Soil Survey USGS To o Culvert at Off project approximately boundary 35.815697, -78.308942 SA X X X Culvert at approximately Off project 35.815700, boundary -78.308844 Culvert at SC X approximately Off project X X 35.819152, boundary -78.311881 SC1 X Feature SC Off project X boundary (1) E — Ephemeral, I — Intermittent, P = Perennial, NP = Not Present, NE = Not Evaluated (2) Refers to State riparian buffer rules only. Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements. Explanation: The stream(s)/pond(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each feature that is checked "Not Subject' has been determined to not be an intermittent stream, perennial stream, a pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer rules. There may be other streams located on the property that do not show up on the maps referenced above and are therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 02B and may be considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski; DWR — 401 & Buffer Permitting Unit; 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Paul Wojoski; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. Q North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CFROIINA _919.707.9000 Zebulon Water Main Replacements Wake County 5/9/2022 Page 3 of 3 If you have questions regarding this determination, please feel free to contact Josh Brigham at (919) 791-4251. Sincerely, AcottVinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office, Division of Water Resources, NCDEQ cc: Laserfiche Consultant via e-mail, Christopher Burkhardt, Falcon Engineering, burkhardtchris@hotmail.com D E Q � North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CAROIINA �" �/ 919.707.9000 DryNOtb11101 EmIIOMronftl IAIMXrr fy 1 _ d •. I I I I 1 - � -.' I ,�-, J - III T - I �'1 � I^•_ - ff� � r I J• �J.I��.e.'`1�;i��'r����_�1�I�y�'Y'rj-`■,1.'—��-��i ft1E��i•1�-. [�'� it 1•1��'r-fir ,''�1i x�CT_'. Imo.. I , I I '. - I �- - ICI � I � 1' J � - - - [. 4 _' , ► - I - 111 I .ir I � - •a _ I - 1 �. rA 11 � I I ' : it - I I- I •• i• = I I I 1� I � L I r� l V I I L I ' •� ' 1-■fin +�'. r I 1 � Y� I � =� '' ' ' •�• rt� a .- I - � �-I '�i}�_ � rye - * ' _+� � •� � L F? � , , r:..I I �. -L 1 I 1 L_■ I1 •Z ♦ �1 1Jr 1r � C - I �'•� �.1 _ � _ - � � I � - �1 I I _ - 1 I� " IL r i•, _ T' 1 L• F • �y' r _ , ■ r I I � r;'. �111 5,+`�-.F�,`.t �e 1 , � ��~ 1•I iff•. I 1 .•�'i 4 ♦� y, 'I.. _I• --.� i f j ---1; �.� Yrl ''' L. �•�, IT I 1 �+_'`~ . IN, +tl ' ''y'•' � f y �yfa'' ti y lL 1` d - � � .1. �� . �� Ilr �^�~�.-1 � - 1 -+ �'�{Y �- J;�'. �� ��..' �I ,I�.I • _ ..,. �-i}`�'�I' •f r� Imo„ , I i1 f 1_ f .�. �f ,. � .1. fig' �1i'��'i •I_- 1. �.y.IJ -.t ��}4'� •� � i ikr � II.sTf 1, 'y, ~y." L u ` La �7 i '■r ,, ,■ r =}, * _ �•_ 1 _ t ■ F.1 - _ -L IN, IL ■ 1� 7S A_ I C .�•a.y--_ J Ni i L � J 1 i■ i1= a`-'• ! 1■l 1 I .1,1 �� \ J■� L7 - ■ } 1 -I II I ` A, r �Jy+•L •�r Ian 31 1- Nit- - 1.1I-�� 1�'!�J•' '�J �1�1V d.�' - J�'II I11=J� 1I� 1 Jl4 ' IN JIll 'x ■� f- L 1 ' �� ■ , =ti. ' I•f 4�:;ice • *' =' - j�- n lu � r1� n s - � � �� 1 ■ t �-' �L-. 1 4; I� �i � - - ♦ - �� T � IN } •r 1 a 'F-' 1 rJ r •al, -� - , L �_ , _I' .F`I -,r Ai - I TS. --- 1�6 y _ �"T 1 �1 _ I ' 1 ;w - I _ . f �, 1 j - - ' y� ' - _: 1 ' '•_ - 1 J n ' . 1 I r� ■ , 1 II , 1 • . I - _ •1 ' ' J -k I ! I - I rp ., - '� ' } y I _ L. -'}.� R ■ ' I 1^0111• 1'� 11 } ■ 1 - J ~ L - OL `J L_ J 1_ 1 1 1 �' ;• Jrl :.I , 1 . ' 7 r IN I Pip .L 1�_ J i `_�.l 11 1 -I 1 10 JI _ * ~_ ' 'MI I IN 1- 1 m I`- w Il■I J •T - I+I--It_ L� I I I �.1 '-�1- �' 111'- �- 1 ' • I 1.'■" !�1�1 -" 1 '•.- -`,I' 1 _;1__I J_ 1 ,; IN - • .-L r` L I 'I Jam ` ' I . I •_ ■, _ . J ., I . � r =1 1 1 _♦ � 1- , { I Ilr -_ -.. ' JO I i 1 M 1.-, -= i 1 °'r' Y - I } Lv L ■,� - J� ► ." -+tip '+"�111� } ' 11 ILI _ � I I I r _ __ L I I I II .r �'IL'I 'r ~NJ _r` ~ _ ' - } -1 ' I y rL.V ■-• `I�J-� 1' ' .may -j N I• rI V INim -o;, " � I T ■ I L ' --r ii 1 'r i L = .- 1- 1 I - J ■ggqJJJJJJ1 1 I y IN J 1 F - ■ ' - -1- 1 7 L I I II - - ■y - ,' I-' _ 11�� . Zebulon Water Main Replacements Wake County, NC-DWR Project # 22-128 -� .- - A , I� qJL O ftO r ApB SC1, Subject SC, Subject DI 1` n i± C tr SA, Subject t49 AP82 « F ApB pI � A n '•Y^ 7 D u B Np E a _ ': • —8% NRCS Soil Survey Sheet 54 d44 ATEa Base Map provided by Falcon Wake Co., NC 1970 ,,7 n' Engineering Legend: :: Locations are approximate and are provided for refer- nn project boundary Q���� enceonly:. I`JA`1JI 0 r�s 2349 :y Zebulon Water Main Replacements Wake County, NC-DWR Project # 22-128 0 0 P , , 0 eo. �:; � &q f, am SC, Subject / I SA, Subject k USGS Topographical Map �,s A1Fa. Base Map provided by Falcon Zebulon Quadrangle 2019 Engineering g g Legend: _ Locations are approximate and are provided for refer- -Project boundary Q��, enceonly::