Loading...
HomeMy WebLinkAbout19970009 Ver 2_Approval Letter_20220128DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Bluewater Point, LLC Attn: Todd Isenhour 3411 Healy Drive, Suite A Winston-Salem, NC 27103 NORTH CAROLINA Environmental Quality January 28, 2022 DWR # 19970009v2 Brunswick County Subject: Approval of Individual 401 Water Quality Certification Bluewater Marina — 5710 57t" Place West, Oak Island — Montgomery Slough - SA;HQW USACE Action ID. No. SAW-1997-04601 Dear Mr. Isenhour: Attached hereto is a copy of Certification No. WQC004620 issued to Todd Isenhour and Bluewater Point, LLC, dated January 28, 2022. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Water Quality Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)]. This Water Quality Certification does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This Water Quality Certification neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Water Quality Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and does not create any prescriptive right or any right of priority regarding any usage of water. This Water Quality Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Water Quality Certification to possess any prescriptive or other right of priority with respect to any other consumptive user. Upon the presentation of proper credentials, the Division may inspect the property. This Water Quality Certification shall expire on the same day as the expiration date of the corresponding Section 404 Permit. The conditions shall remain in effect for the life of the project, regardless of the expiration date of this Water Quality Certification. North Carolina Department of Environmental Quality j Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTHGAROL]NA i` _' "�+ -1-1 m II ; � 919.707.9000 DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 2 of 7 Non-compliance with or violation of the conditions herein set forth may result in revocation of this Water Quality Certification for the project and may also result in criminal and/or civil penalties. If you are unable to comply with any of the conditions of this Water Quality Certification you must notify the Wilmington Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Wilmington Regional Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the permittee became aware of the non-compliance circumstances. This approval and its conditions are final and binding unless contested [G.S. 143-215.5]. This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the Division's review under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Holley Snider at 910-796-7303 or holley.snider@ncdenr.eov if you have any questions or concerns. Sincerely, 1DocuSigned by: tuµ 'f1n� i� �cOA, for 7F141E73B6F3456... Morella Sanchez -King Regional Supervisor DWR Wilmington Regional Office cc: Dana Lutheran(via email) Greg Currey, USACE Wilmington Regulatory Field Office (via email) DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 3 of 7 Todd Bowers, EPA, (via email) DWR 401 & Buffer Permitting Branch Electronic file Filename: 19970009v2 Bluewater Point LLC IC BrunsCo Jan.22.docx DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 4 of 7 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004620 is issued in conformity with the requirements of Section 401, Public Laws 92- 500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500 and 15A NCAC 02B .0200, to Todd Isenhour and Bluewater Point, LLC, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on December 2, 2021, and by Public Notice issued by the Division of Coastal Management on December 8, 2021. The State of North Carolina certifies that this activity will comply with water quality requirements and the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b)] Type of Impact Amount Approved (units) Amount Approved (units) Permanent Temporary Open Waters 50- slip Marina N/A N/A *see project narrative and *0.19 acres of sheet 1 & 2* incorporated impact* This approval requires you to follow the conditions listed in the certification below. CONDITIONS OF CERTIFICATION [15A NCAC 02H .0507(c)]: 1. The docking facility is permitted as daytime and transient only dockage. Dockage of vessels other than the permitted for daytime and transient slips will require re-evaluation by DWR of the use of the dockage facility. Handrails or other devices, including signage, should be used to discourage use of any dock space other than the designated slips. Citation: 15A NCAC 07H .0208 2. The docking facility is permitted for 50 slips. Dockage of vessels other than the permitted slips will require re-evaluation by DWR of the use of the dockage facility. Handrails or other devices, including signage, should be used to discourage use of any dock space other than the 50 designated slips. Citation: 15A NCAC 07H .0208 3. You will comply with any moratoriums per the INC Division of Marine Fisheries and the INC Wildlife Resources Commission. Dredging moratoriums shall be observed as required by the NC Division of Marine Fisheries, NC Wildlife Resources, US Fish and Wildlife and National Marine Fisheries. If such activities should take place during periods of high biological activity (e.g. anadromous species and DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 5 of 7 shorebirds), biological monitoring may be required at the request of other state and federal agencies and coordinated with these dredging activities. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 048.0125 4. The Permittee shall adhere specially to 15A NCAC 02B .0221 Tidal Salt Water Quality for Class SA Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. Citation: 15A NCAC 02B .0221 5. The permittee shall report to the DWR Wilmington Regional Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the permittee became aware of the non- compliance circumstances. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the approved impacts (including temporary impacts). Citation: 15A NCAC 02H .0506, 15A NCAC 02H .0507(c) 7. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North Caroline Department of Transportation Sediment and Erosion Control Manual. All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor -owned or leased borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and implementation shall comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 6 of 7 If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS-I, WS- II, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the sedimentation and erosion control designs shall comply with the requirements set forth in 15A NCAC 04B .0124, Design Standards in Sensitive Watersheds. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCACO28 .0200; 15A NCAC 028.0231 8. Sediment and erosion control measures shall not be installed in wetland or waters except within the footprint of temporary or permanent impacts otherwise authorized by this Certification. If placed within authorized impact areas, then placement of such measures shall not be conducted in a manner that results in dis-equilibrium of any wetlands, streambeds, or streambanks. Any silt fence installed within wetlands shall be removed from wetlands and the natural grade restored within two (2) months of the date that DEMLR or locally delegated program has released the specific area within the project to ensure wetland standards are maintained upon completion of the project. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200; 15A NCAC 028 .0231 9. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 10. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200; 15A NCAC 028.0231 11. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200, 15A NCAC 02B .0231 12. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200; 15A NCAC 028 .0231 13. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils. DocuSign Envelope ID: 93E66518-6283-40C8-A2F9-BBAC5DF371AB Bluewater Point, LLC DWR# 19970009v2 Individual Certification #WQC004620 Page 7 of 7 Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0200, 15A NCAC 028.0231 14. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance and compaction. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028.0231 15. In accordance with 143-215.85(b), the permittee shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. Citation: 15A NCAC 02H .0507(c); N.C.G.S 143-215.85(b) 16. The permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 17. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this Water Quality Certification. A copy of this Water Quality Certification shall be available at the project site during the construction and maintenance of this project. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(c)] This, the 28th day of January 2022 1DocuSigned by: tuµ 'f1n� i� �cOA, for 7F141E73B6F3456... Morella Sanchez -King Regional Supervisor DWR Wilmington Regional Office MSK/hs