HomeMy WebLinkAboutR-2247EB sediment loss
Wanucha, Dave
From:Euliss, Amy
Sent:Tuesday, January 4, 2022 3:12 PM
To:Chapman, Amy
Cc:Librandi, Nicholas C; Marciniak, Katherine J; Jones, Scott A; Wanucha, Dave
Subject:R-2247EB sediment loss
We had a sediment loss at permit site 6 on R-2247EB. At Site 6 we had a slope drain get clogged and cause the area
around the drain fail leading to a loss. It was approximately 6, 5 gal buckets of material. Rainfall was 2.92” and occurred
between Sunday and Monday. The silt has already been removed, and they expect to repair the slope today.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1