HomeMy WebLinkAboutBearpond Solar CenterA&4
®
off
NC®ENR
,North Carolina Department of Environment and Natural Resources
Division of"Water °Resou"rces
Water Quality Programs
Pat McCrory Thomas k Reeder
Governor Director
December 9,,2013
Carolyn P. Adcock
'26 t'2 Trifle Lane
Wake, Forest; NC' 27587
John .E. Skvarla, III
Secretary
Subject: Surface Water, Determination Letter
NBRRO# 13 -332
Vance County
Determination Type• .
Buffer Call
Isolated.or Ell? Call
❑ �Neuse (.15A NCAC 2B .0233)
Stak*
'®
El Ephemeraliintermittent7Perennial Determination,
Tar - Pamlico (1'5A.NCAC.2B� '0259)
- A - -
❑ Isolated "Wetland `Determinatio_n
❑ Jordan�(1'5A NCAC 2B,.0267)
Project-Name: Bearpond Solar'Center
L'ocation/Direcfibns: Located,at_ 1689 Bear Pond'Road, �in Henderson;, Vance County
Subject Stream- Mart'in'Creek,
Deter-mination'Date:, October, 29; 2013 Staff: Cheng Zhang
Feature
E/UP *-
NoBubject
Subject
Stak*
Sio_p@
iil o
rve
USGS�
To o°
- A - -
.X
X
*EMP = Ephemeral /Intermittent /Perennidl
Explanation_ The�feature(s) listed above has.or have been 16cated,6n the S'oi1 Survey of °Wake County, North
Carolina.or ttielmost recent copy-of`the`USGS Topographic map�at;a,1:2'_4;000~ §cale: Each feature, that is°checked
"Not,Subject" has been deterrn"ined,not to be a stream or is,,not present on,the property. Features,that,are checked
"Subject" °have °been' located`on'the;propertyFand possess,cheracteri`stics,that qualify it,to be a,Mfeam- There rriay,be-
other, streams locate-d,on your property that do not�show, up on°themiaps referenced above; but, still maybe
' One
No Carolina
&rail&
North�Caroliha Divi §ion of Water Resources 1628 Mad Service Center Raleigh, NC 27699- 1628iPhone (919)791-4200
-,Internet- www ncwatercivalitD or Location- 3800?Barrett,Drive Raleigh,,NC 27609 Fax (919)'788 -7159
,An Equal'OpportunitylAffnnative Acbon!Employer= 50 %o Recycled110 %Post Consumer Papet
13earpond ,Solar Center
Vance - County
December {9;,2013
Page `2 of 2,
considered, jurisdictional, accordirig, to'the US,Ahny Corps of Eng`ineers7and%or to the'Divisibh�df Water-Resources
(DWR)., -
'This!,on= sitead`etermination ,shall OCOire five�(5) years from the d'ate,of this letter. Landowners or affected `parties that
`dispute a- determination made by the DWR or;Delegated Local Authority may "request a determination by the
Directoe.,, mappeal request &muA be'.made within sixty (60) days of'date of this lettee orifrom the date" the affected
party (incl'uding,downstream and/or adjacent owners) isjnotified of'this letter. A tequest•for,a determination,by the,
D rector,shall be referred to the DirectoHiv writing c% Karen,Higgins, DWR',WeBSCaPe,Unit,1650,Mai1 {Service
'Cener NM k% 7
This,determ_inati"on is final and binding,u less,,as,detailedt above, you,askTdt,a,hearing or appeal within,siziy (60)
days:
The owner/future owwners,, should notify, the.Division of Water Resourees, (including anyother Local,, State, ,,and
Federal.Agencies) of'this,decision concerning,any future correspondences regarding,the subject property (stated
above). This project may require it Section 464'/401 Permit -,for the proposed activity:, Any inquiries; should be
directed to the Division,of Water Resource"_s (Central Office) ati(919)- 807=6300, and the US Army, Corp,of Engineers.
(Raleigh Regulatory,Field,Officeyat (919)- 5544884:
If.you have questions regarding this determination, please feel free to cointact;Cheng `Zjidnf at (919) 7,'91 -4200.
°R&Js ectfully,
Dar►riy Sm' `'
Regional upervisor-
M. RRO /,SWP File Copy
Jesse Rufener
GPD , GROUP'
520,South,Main Street, Suite.253I'
Almon, ,OH 44111,
i
p C')
cc
W N �
tc9
N D
v D
ai
00
'f C� ono
• � C N
V J °°
c ID
As
W O
c '
`r.►" • �, A.0
t
cr
Tt
zr
: D
.. 4 ',(� � "S :`i5a- y -fir ``i � '` � •` ' '
y
1 :1
a
3
m
th
cam, •
AA
Zt
LANDive
tj
lor
J
� •J
•
- �--- -'
I r
• tiA • • ;
It
IP
co
dp
i
w �
o �