HomeMy WebLinkAbout19980260 Ver 6_Nov NPDES inspections_EB_DEF_20211117 Wetland Inspection Report
Project Num: 19980260 Version: 7 Status: Issued
Project Name: NC DOT-Winston-Salem Northern Beltway Phase Project Type: New Road/Highway
County: Forsyth (R-2247/U-2579) Region: Winston-Salem
Location: NC DOT-Winston-Salem Northern Beltway Phase 2(R-2247/U-2579)
Latitude: +360 10'49" Longitude: -80' 16'23"
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 11/16/2021
Reason for Inspection: Routine
Inspection Type: Records/File Review(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: NPDES SW-Roadway(DOT)
Question Areas:
Operation and Maintenance
Inspection Summary:
page 1
Site Number: 19980260 Owner: Thorpe,Greizory
Inspection Date: 11/16/2021 Inspection Type: Records/File Review(DOT) Reason for Visit: Routine
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑
Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑
Comment: I met with DIv 9 Roadside,DEO and field project staff to review randomly selected NPDES records at
two separate projects related to the overall W_S Northern Outerloop project ,Sections EB &DEFL
The intersection project(EB)records(34 weeks reviewed)were in good shape with weekly inspections,
notations of losses and maintenance of measures all documented. Precip is monitored via MPE
electronic system. Records at the DEF Section were in excellent shape and included all emails related
to communications between field staff and DOT Div 9 DEO. We reviewed 22 weeks of inspections of
which were randomly selected.
page 2