Loading...
HomeMy WebLinkAbout19980260 Ver 6_R-2247EB sediment losses_Sept_20210923 Wanucha, Dave From:Euliss, Amy Sent:Thursday, September 23, 2021 4:36 PM To:Wanucha, Dave Cc:Librandi, Nicholas C; Jones, Scott A; Marciniak, Katherine J Subject:R-2247EB sediment losses_Sept Hi Dave. We have a couple losses to report from the rains on Tuesday and Wednesday. Our contractor and DOT inspectors started the walk thru yesterday, and finished up today. Due to the rain the project was partially inaccessible by vehicle which meant they had to do a lot of the inspection on foot. This is why it took a couple days. The losses are detailed by our Assistant Resident, Nick Librandi, below: From Nick: Site 10H-VV had a loss of predominantly 57 stone mixed with some earthen material. The inlet dome was moved about 1 foot by the material coming down the ditch line allowing the surrounding 57 stone and dirt to get into the drop inlet and exit through the pipe in the culvert headwall. This was the loss found yesterday and approximately 2 CY of stone and dirt was lost and clean up was completed by noon today. Site 7-LLL had the silt fence knocked over and material lost into the rip rap and stream. Approximately 6 CY of material is lost and clean up efforts are ongoing. -Amy Get Outlook for iOS Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1