HomeMy WebLinkAbout201 Hein Dr., GarnerFIFAJ
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A. Reeder John E. Skvarla, III
Governor Director Secretary
August 6, 2013
Tom Speight
Bateman Civil Survey Company
200 N. Main Street
Holly Springs, NC 27540
Subject: Surface Water Determination Letter
NBRRO# 13 -185
Wake County
Determination Type
Buffer Call
Isolated or EIP Call
® Neuse (15A NCAC 2B 0233)
Start@
Stop@
❑ Ephemeral /Intermlttent/Perennlal Determination
F-1 Tar-Pamlico (15A NCAC 2B 0259)
❑ Isolated Wetland Determination
❑ Jordan (15A NCAC 2B 0267)
Project Name:
201 Hein Drive
Location/Directions: Subject property is a private lot; the owner is planning to construct a
building.
Subject Stream: Walnut Creek
Determination Date: July 31, 2013 Staff: Cheng Zhang
Feature
E /1/P*
Not Subject
Subject
Start@
Stop@
Soil
USGS
Survey
To o
A
I
X
DWQ Flag (Int.
DWQ Flag (Int.
X
start)
Stop)
*E /I /P = Ephemeral /Intermittent /Perennial
Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North
Carolina or the most recent copy of the USGS Topographic map at a 1.24,000 scale. Each feature that is checked
1617 Mail Service Center, Raleigh, North Carolina 27699 -1617
Location 512 N Salisbury St Raleigh, North Carolina 27604
Phone 919 -807 -63001 Fax 919 - 807 -6492
Internet www ncwaterguality mg
An Equal Opportu itylAffirmative Action Employer
201 Hein Drive, Garner, NC
Wake County
July31, 2013
Page 2 of 2
"Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked
"Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be
other streams located on your property that do not show up on the maps referenced above but, still may be
considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources
(DWR).
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that
dispute a determination made by the DWR or Delegated Local Authority may request a determination by the
Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected
party (including downstream and /or adjacent owners) is notified of this letter. A request for a determination by the
Director shall be referred to the Director in writing c/o Karen Higgins, DWR WeBSCaPe Unit, 1650 Mail Service
Center, Raleigh, NC 27699.
This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60)
days.
The owner /future owners should notify the Division of Water Resources (including any other Local, State, and
Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated
above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the Division of Water Resources (Central Office) at (919)- 807 -6300, and the US Army Corp of Engineers
(Raleigh Regulatory Field Office) at (919) -554 -4884.
If you have questions regarding this determination, please feel free to contact Cheng Zhang at (919) 791 -4200.
Resp ctfully,
I
d/7
1pernvisor
Danny Sm
Regional
cc: RRO /SWP File Copy
z
D
m.
n
O
C
Z
Z
O
C7
D
O
_r
Z
D
cn
2
m
m
z
C
rn
00
00
0
oTa
3,
IC
-%-wnpmmlw
41
- A
i 4.,w
P"!
14