HomeMy WebLinkAbout19970524 Ver 1_Complete File_19970708State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
9'1Ds�4
CEIVED
p E H N R
Y: t! D
Ul 1
June 10, 1997
TO: Mr. A. Preston Howard, P.E., Director
Division of Water Quality
FROM: John R. Parker, Jr.
Major Permits Processing Coordinator
IQSC /�N °FS
1 In
JUN 12 ;9197
IJ
D! v :sj()r\i GE
COASTAL MA[gAGEMENT
SUBJECT: CAMA /DREDGE & FELL Permit Application Review
Applicant: The Bluffs Homeowners Association, Inc.
The Bluffs Marina
Project Location: Carteret County, in Morehead City, at South Shore Dr.
�u tt
west of Peletier Creek, on Bogue Sound
Proposed Project: The applicants propose to excavate an approximate 1601
x 130' "basin" area around an existing dock, reconfigure
the 25 existing slips, and add dockage for 8 personal
water craft.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by July
19 1997. If you have any questions regarding the proposed project, please contact Ted Tyndall at (919) 808-
2808. When appropriate, in -depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED C-1 Cc-_ DATE ' j J I ��
�.II.%
Hestron Plaza II, 151 B, Highway 24, Morehead City NC 28557 NC � An Equal Opportunity / Affirmative Action Employer
Voice 919- 808 -2808 FAX 919 - 247 -3330 Courier 11 -12- 09 50% recycled/ 10% post - consumer paper
1.
2.
3.
4.
5.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: The Bluffs Homeowners Association, Inc.
PROJECT NAME: The Bluffs Marina
LOCATION OF PROJECT SITE: Carteret County, in Morehead City, at South Shore Dr. just west
of Peletier Creek, on Bogue Sound
Photo Index - 1995: 41 -515 (indexed by I -15 & 16) 1989: 3 154 29 (indexed by F -10 & 11)
State Plane Coordinates - X: 2,665,250 Y: 362,000 Mansfield Quad "UR"
INVESTIGATION TYPE: CAMA/D &F
INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8/2/96 and 6/6/97
Was Applicant Present - Yes on 8/2/96; No on 6/6/97
PROCESSING PROCEDURE: Application Received Complete - May 22, 1997
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Morehead City
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: Yes
(D) Intended Use: Private Residential
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Pier with 25 slips
Planned - Reconfigured 25 slips
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED
RECEIVED
JUN j_ 1 1997
COASTAL MANAGEMENT
,6 .
(A) Vegetated Wetlands
(B) Non - Vegetated Wetlands
Shallow waters of Bogue Sound
20,200 ft2
PTA usurpation
of 6,088 ft'
(C) Other
(D) Total Area Disturbed: 20,968 ft2 (20,200 ft' for dredging and 768 ft2 additional usurpation)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicants propose to excavate an approximate 160' X 130' "basin"
area around an existing dock, reconfigure the 25 existing slips, and add dockage for 8 personal water
craft.
FIELD INVESTIGATION REPORT:
THE BLUFFS HOMEOWNERS ASSOCIATION, INC. /CARTERET COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION:
Project Setting
The Bluffs is a 44 -unit townhouse /condominium complex located off Highway 70
and South Shore Drive, in the Mansfield area, of Morehead City, in Carteret County.
The specific project site is located at the waterward end of an existing pier on Bogue
Sound, just west of Peletier Creek and east of the red daymarker #8 on the AIWW.
The existing pier is approximately 573' long X 6' wide and includes a "T "-
shaped platform that measures 65' long X 23' wide. A 16' X 16' gazebo is located on
the east end of the platform. The entire pier structure was recently reconstructed
following destruction by Hurricanes Bertha and Fran. Also authorized for
reconstruction (but not rebuilt pending the outcome of this application) was an "L "-
shaped finger dock on the east side of the main pier that measured about 110' in length
and provided for sixteen boat slips. In addition, on the west side of the main pier a
65' dock was authorized for reconstruction (but was also not rebuilt pending the
outcome of this application) and provided for another 5 slips. Finally two, smaller -
finger docks located on the west side of the main pier were also authorized for
reconstruction (but again not rebuilt pending the outcome of this application) and
provided dockage for 4 additional boats. Overall, 25 slips have been authorized for
reconstruction.
The water depths in the area are very shallow and vary from -1.5' below MLW
to -2.5' below MLW. According to the applicant's, workplat, controlling water depths
waterward of the existing pier are -4.3' or greater. Again, according to the applicants'
plats, the leading edge of the AIWW channel is approximately 155' from the location
of the "existing" or authorized mooring pilings. The waters of Bogue Sound at the
project site are "SA" and closed to shellfishing (the closure line appears to be in the
immediate vicinity). Some SAVs were noted close to shore during my field visit, but
the water was too turbid near the end of the dock to confirm/deny any presence in the
proposed dredge area. The bottom is mostly sand with some mud.
A copy of the pier 'rules and regulations enforced by the Homeowners
Association is included as part of the application package. And rules #3 and #7
confirm why few boats are ever noticed at the existing pier at any one time. These
two rules disallow overnight, live - aboard conditions at the marina, as well as long -term
mooring of the boats when homeowners are not at the condominium.
FIELD INVESTIGATION REPORT:
THE BLUFFS HOMEOWNERS ASSOCIATION, INC. /CARTERET COUNTY
PAGE #3
Project Description
The applicants propose to use a clamshell on a barge and excavate an
approximate 160' X 120' X -4' "basin" area adjacent their existing dock. Calculations
taken from the plat indicate an area of impact around 20,200 ft. The applicants also
propose to reconfigure the existing 25 slips. This would be accomplished by
constructing a 4' X 125' finger dock off the west side of the main pier where ten 11'
to 12' -wide slips would be located. Then at the end of the main pier platform, a 6' X
96' finger dock would be constructed where thirteen 12' to 14' -wide slips would be
located. The final two slips would be located inside the west side of the existing
platform. Consequently, the applicants will have create a marina "basin" area as
defined by the two large finger docks. Also, the applicants propose to install 7
additional mooring pilings adjacent the east side of the existing pier to tie up personal
water craft/jet skis, essentially creating eight small 8' slips.
Anticipated Impacts
Approximately 20,200 ft' of shallow water habitat would be altered as a result of
the dredging of the "basin" area and approximately 1,500 yds3 of sandy material would
be removed. Excavated material would .be placed off site on an approved high ground
site. Short-term and localized increases in turbidity would also be expected to occur.
The reconfiguration of the 25 slips would result in the increase in usurpation of Public
Trust Areas (PTA) of approximately 5,320 ft. Essentially the "existing" or authorized
docks /slips would usurp approximately 9,840 ft' of PTA and the new configuration
would usurp 15,160 ft2 of PTA. The 8 new personal watercraft slips would usurp
another 768 ft2 of PTA. A slight increase in the amount of shallow water bottom that
would be shaded would also occur.
The applicants in the past have demonstrated the ability to control and restrict
unfavorable use of the docks. Their pier rules and regulations are thorough and very
restrictive.
M. Ted Tyndall - Morehead City - June 9, 1997
Form DCM -MP -1
APPLICATION
(To be completed by all applicants)
I. APPLICANT
a. Landowner:
Name The Bluffs Homeowners Assoc., Inc '
Address 4801 S. Shore Dr. #A -1
City Morehead City State NC
Zip 28557 Day Phone 919 726 -7705
Fax 919 726 -9220
b. Authorized Agent:
Name Michael V. Heath
Address 4801 S. Shore Dr. #A -1
City Morehead City, NC 21tata e NC
Zip 28557 Day Phone 919 726 -7705
Fax 919 726 -9220
C. Project name (if any) The Bluffs Marina
NOTE. Penvdt will be issued in name of landowner(s), and /or
project name.
2. LOCATION OF PROPOSED
PROJECT
b. City, town, community or landmark
Morehead City
c. Street address or secondary road number
4801 S Shore Drive
d. Is proposed work within city limits or planning
jurisdiction? x Yes No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) _ Bogue Sound (AICWW )
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and /or filling activities.
Excavate -for Boat Basin and re- position
b. Is the proposed activity maintenance of an existing
project, new work, or both? Both
c. Will the project be for public, private or commercial
use ?, Private
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If' more space is needed, please attach
additional pagesPursuant to damage following
hurricanes of 1996, re- construct Pier
and Marina for private use of residents.
Construction and excavation by Licensed
contractors.No services provided.All mat's
a. County Carteret . n,
rPAPR2 4 1997
Revised 03/95
�wsspas ss � wwwassaill�
to he ^Tw with gel -,r steal bolts p r attac:
plans. The slips will be moved from old
position to be on the west side of the pie.
to allow dredgingin a smaller area.
Form DCM -MP -1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 3.643 acres ( land)
b. Size of individual lot(s) 19' x 60'
c. Approximate elevation of tract above NEW -or
N'V;L 10' - 24' above NWL
d. Soil type(s) and texture(s) of tract
Coarse to fine sandy loam
e. Vegetation on tract mature mixed trees, shrubs,
grassed lawn areas.
f. Man-made features now on tract 44 townhouses,
swimming pool & tennis courts
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the loot land use plan.)
Conservation Transitional
xx Developed Community
Rural Other
h. How is the tract zoned by local government?
Multi- Family Residential
i. Is the proposed project consistent with the applicable
zoning? x Yes No
(Attach Zoning compliance certificate, if applicable)
Has a professional archaeological assessment been
done for the tract? Yes x No
If yes, by whom?
k. Is the" project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes x No
1. Are there wetlands on the site? Yes x No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Attach documentation, if available)
Revised 03/95
m. Describe existing wastewater treatment facilities
Community -owned & Maintained
wastewater plant to be removed after
community is connected to Morehead City
Sewer system in 1997
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial /commercial effluent, "wash
down" and residential discharges.)
Surface runoff
o. Describe existing drinking water supply source.
Town of Morehead City
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy 'of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross - sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the . U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Form DCM -MP -1
site. Include highway or secondary road (SR)
numbers, landmarks, and the like.
• A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name
Address
Phone
Warren S. Perry
PO Box 1475
Kinston, NC 28501
Name Town of Morehead City (Manager)
Address PO Drawer M
Phone Morehead City, NC 28557
Name William Scott
Address 412 Virginia Av
Phone Morehead City, NC. 28557
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
Not known
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the . N.C.
Environmental Policy Act (N.C.G.S. 113A 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
Revised 03/95
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow -up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
/ p4,
This is the day of &1 , 199
Print Name The Bluffs omeowners Assoc., Inc.
Signature L_11J U r Qi::,
Landowner or Authorized Agent
Please indicate attachments pertaining to your proposed
project.
X DCM MP -2
Excavation and Fill Information
DCM MP -3
Upland Development
X DCM MP-4
Structures Information
DCM MP -5
Bridges and Culverts
X DCM MP-ti
Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
U r.
,qJ APR 2 4 1997 1!
::aasaasswta,
Form DCM -MP -2
EXCAVATION
AND FILL
(Except bridges and culverts)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM -MP -1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Access
channel
(MLW) or (NWL)
Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Excluding
shoreline
stabilization)
Revised 03/95
Average Final
Existing Project
Length • Width Depth Depth
1. EXCAVATION
a. Amount of material to be excavated from below
MHW or NWL in cubic yards 1500
b. Type of material to be excavated muck
and sandy bottom
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? Yes x No
d. Highground excavation in cubic yards none
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area Monroe Johnson Const.
Co, Yard, Core Creek, Hwy 101, Core Cr Rd
Beaufort, NC
b. Dimensions of disposal area 300'x300'
c. Do you claim title to disposal area?
Yes x No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? x Yes No
If yes, where? -same as "a" above
i a
APR 2 4 1997
150
120'
2'
4'
bottom
cut
160'
130'
+- �,:' �';., /.:,•'
"`;fir .::..... 3:
�ii
�x::.J.: :•: 4'
:
1. EXCAVATION
a. Amount of material to be excavated from below
MHW or NWL in cubic yards 1500
b. Type of material to be excavated muck
and sandy bottom
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? Yes x No
d. Highground excavation in cubic yards none
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area Monroe Johnson Const.
Co, Yard, Core Creek, Hwy 101, Core Cr Rd
Beaufort, NC
b. Dimensions of disposal area 300'x300'
c. Do you claim title to disposal area?
Yes x No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? x Yes No
If yes, where? -same as "a" above
i a
APR 2 4 1997
Form DCM -MP -2
e. Does the disposal area include any coastal wetlands
(marsh), SAVs or other wetlands?
Yes m x No
L Does the disposal include any area in the water?
Yes x No
3. SHORELINE STABILIZATION n / a
a. Type of shoreline stabilization
Bulkhead Riprap
b. Length
c. Average distance waterward of MHW or NWL
If yes,
(1) Amount of material to be placed in the
water
(2) Dimensions of fill area
(3) Purpose of fill
b. Will fill material be placed in coastal wetlands
(marsh), SAVs or other wetlands?
Yes No
If yes,
(1) Dimensions of fill area
(2) Purpose of fill
5. GENERAL
d. Maximum distance waterward of MHW or NWL
e. Shoreline erosion during preceding 12 months
(Source of information)
f. Type of bulkhead or riprap material
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap
(2) Bulkhead backfill
h. Type of fill material
i. Source of fill material
4. OTHER FILL ACTIVITIES n/a
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
Yes No
Revised 03/95
a. How will excavated or fill material be kept on site
and erosion controlled? n /a
b. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
Clamshell
c. Will wetlands be cr:,ssed in transporting equipment
to project site? Yes x No
If yes, explain steps that will be taken to lessen
environmental impacts.
The Bluffs Marina
The Bluffs Homeowners Assoc., Inc.
Date
°s
'Form DCM -MP4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form. DCM -MP -1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and /or Pier(s)
(1) _ Commercial _Community x Private
(2) Number One - Existing
(3) Length 572'
(4) Width 6
(5) Finger Piers X Yes No
(i) Number 13
(ii) Length 161
(iii) Width 3' & 4'
(6) Platform(s) x Yes No
(i) Number 1 - existing
(ii) Length 64"
(iii) Width 24'
(7) Number of slips proposed 25
(8) Proximity of structure to adjacent riparian
property lines 4 ,qn' cnuth 301 Pact
(9) Width of water bodyn 1800' - one mile
(10) Water depth at waterward end of pier at
MLW or NWL 21 MLw
b. Boathouse (including covered lifts) None
(1)
Commercial Private
(2)
Length
(3)
Width
c. Groin (e.g. wood, sheetpile, etc.) None
(1)
Number
(2)
Length(s)
d. Breakwater (e.g. wood, sheetpile, etc.) None
(1)
Length
(2)
Average distance from MHW, NWL or
wetlands
(3)
Maximum distance beyond MHW, NWL or
wetlands
Revised 03/95
e. Mooring buoys None
(1) _ Commercial _Community _ Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
(4)
Width of water body
(5)
Distance buoy(s) to be placed beyond
shoreline
f. Mooring structure (boatlift, moorin pilin s etc.)
(1)
_ Commercial _Community -X - Private
(2)
Number 18 + 7 ( see g. )
(3)
Length 20'
(4)
Width I ;� -. I `I
g. Other (Give complete description)
7 add'l mooringpilinas on the east side
of the pier for personal watercraft
The Bluffs Marina, The Bluffs Homeonwers
A licanT kil-, , ject Na A oc., Inc.
1.
Si gns p t
0 I
Date
UU APR 2 A- 199"7 ,"
AO�Beiran"a a aesea+�ns��
Form DCM -MP -6
MARINA
DEVELOPMENT
(Required for the mooring of more than 10 vessels)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM -MP -1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
I. MARINA CHARACTERISTICS
a. Check below the type of marina proposed.
Commercial Public x Residential
b. Will the marina be open to the general public?
Yes x No
c. If there is residential development associated with
the marina, how many units or lots are planned and
how many are currently developed?
Yes- 44 townhouses
d. Check all of the types of services to be provided.
Full service, including travel lift and /or rail
Dockage, fuel, and marine supplies
X- Dockage ( "wet slips ") only
Number of slips 25
Dry storage
Number of boats
Boat ramp(s)
Other (describe)
e. Check below the proposed type of siting.
Land cut and access channel
x Open water with dredging for basin and /or
channel
Open water, no dredging required
Other (describe)
f.
g. Typical boat length 22'
h. - Maximum boat length 32'
i. Are any floating structures planned? .,n
If so, describe
2. MARINA OPERATIONS .
Check each of the following sanitary facilities that
will be included in the proposed project..
0 Office toilets
0 Toilets for patrons
Number
Location
o Showers
Boat holding tank pumpout
Type and location
b. Describe treatment type and disposal location for all
sanitary wastewater. n/a
c. Describe the disposal of solid waste, fish offal and
trash disposal. see attached rules for
pier usage
d. How will overboard discharge of sewage from boats
be controlled? no sewage discharge allowed
Describe the typical boats to be serf .. ;(for
open runabout, charter boats, >,:,1riixed
types). open runabout e
1997
Give the location and number of "No Sewage
Discharge" signs proposed. 1 on pier
Form DCM -MP -6
f. Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
sandblasting waste and petroleum products.
none is allowed. See attached
rules for use of the pier
g. Where will residue from vessel maintenance be
disposed of ? see attached ru 1,-,; for
use of the pier
h. Give the number of channel markers and "No
Wake" signs proposed. non P
L Give the location of fuel- handling facilities, -and
describe the safety measures planned to protect area
water quality. none
j. Describe design measures that promote boat basin
flushing or circulation and that reduce water quality
impacts. open water basin
k. What will be the marina policy on overnight and
live -board dockage? see attached rules
for use of the pier
1. Is the proposed marina located near any shellfish
leases? Yes X No
If yes, give the name and address of the leaseholder.
m. If this project is an expansion of an existing marina,
what types of services are currently provided?
Yes -wYes ipdockaae only
n. How many slips are now available? 25
o. Is the marina proposed within a primary or
secondary nursery area? Yes X' No
p. Is the marina proposed within an area open to
shellfish harvesting? Yes X No
q. Give the location and number of "Pumpout
Available" signs proposed. none
The Bluffs Marina
The Bluffs Homeowners Assoc., Inc.
AIWH=! or Dame
s;gwtiuy€1 A _
Tate
XtAt61T A
Al 19199
i
hod-- CoK -c4vucW o-s
6-P CIC14- 61r or I; ct41611.
�, A, �ol r
Pfd' P�
0 0' o 0 0 0
� I
I -. -4 . o'
_,
dI
Ui
t= +
o�
to
I �
U
z
,
tv�
T-
it
4
i
t
+ -2,00
H W o, 00
I
1�
jI
_
`�W[vNc
IA" CONDITIONS ��... �.
FS TOWNMOMES
01 !s;zq
� �xl•r�► -�A -J
SIN
z
H
a
!N�
W
0
a
E
.o -. £
. � W �3 � F p3�D-�Zi N�ao
E
CV z
-1 09 A HX
a m, x. W
�O - �xaov� � o, coCA� "O� W
tl a NNR SaoW
N W 'd WNW NN Woz 00mJEW
:a
m�
(�7 N
■ a
La
tl1N Ix
UHE
33a�
EC�OWOI
co f
N a �il�I
W
Ek1�i15�T 1>
w
�o00
W� Oxw
� pox
�za
o �W
w
w E-�
H
1
Ha
��
3a
Ca
• �
H
N
z
ORi
oD
�
H
0 a
E
P.
a°,�'a
co W
a' V a
�o
N cn
o i� C
N N to
:a
m�
(�7 N
■ a
La
tl1N Ix
UHE
33a�
EC�OWOI
co f
N a �il�I
W
Ek1�i15�T 1>
w
�o00
W� Oxw
� pox
�za
o �W
w
w E-�
H
1
The Bluffs - Pier Rules and Regulations
April 18,1997
Use of Dock %W
1. The dock area is for the use and enjoyment of The Bluffs' resident
boatownersl their families and guests.
2. The use of the dock is for pleasure and recreation onlyt and no
commercial ventures of any kind shall be undertaken.
3. Boats may be docked at the pier only when the townhouse is occupied,
and the owner can make a daily check of the boat.
C. All boats must be moored within a designated boat slip.
5. Boatowners shall insure that their boat is safely moored with lines
adequate for any weather condition, and they are solely responsible
-for moving the boat to safe harbor when necessary.
6. All rowboats, canoesp small sailboats and dinghies should be stored
ashore at night.
7. A boat berthed at the dock shall not be used as a residence, and the
boat shall not be occupied for more than two nights in succession.
8. only ordinary, light maintenance shall be permitted on the boat at
the dock. Spray painting, welding and burning are strictly prohibited.
9. Boatowners shall keep the pier area clean and litter free, and nothing
should be stored on the dock without prior permission from the Homeowners
- Association.
10. Fishing from the dock is permitted, however, all bait should be cut on
a cutting board and not on the pier. Be sure that all fishing residue
is fully washed off from the pier before leaving the dock area.
11. No charcoaling or fires of any kind are permitted on the dock.
12. The Association reserves the right to remove any person or boat not
authorized to bk on the pier or dock, . or anyone creating a nuisance
or disturbance:((
APR 2 4 1997
MgrMNww..w.. K
av$
of
....... ......
. ...... ...
........ ....
..................
...... ....
140' M10'
�I
1�
14d woo. 141
LA
I
i! rm: . - .. _
FxRjt,rr c
121�,j
A4
mrmo a Fu mcK
7nL DLU73 MKI NA
M012-��O'm2
AKAT 15, 1-9414P
r PT
LM FDN�Nl WAKE HAM Ala
A
CoIr- r�� I
I�J'WtMN 'lb-47e-wx
!/,,.rz& SF Pl�fJ
tw PINT
n I
I AF
Plan View Showing
Dock and View to be
Excavated for
The Bluffs Marina
3/7/97
AIW �Y Channel x- R 16 (t— P)
If -7 117
K► 1W�INy�INEa GI'iM#•I�L
+l
0
Access from the ICW is 4' or more
h
4_3..
Area to be dredged
.iV}Jrn!(n,,,.('•C,4 r
to a 4 depth at MLW
personal
watercraft
dockage
3.g..
3'2"
I I 1.6..
Water Depths
Take at 130 pm
3!7/97 MLW
0'9"
o_o" Water Depths
taken every
50 ft. from
o_o" high water
mark
o_o"
IT'
F EBB / FLOW —>
o N•u
. v m
One inch =100 feet
7-: �' APR 2 4 19-97
ra
�aiiisaaaoiiAailwlt�Mt.' e
*wm Wa
MH W -
Vacant Lot Mansfield Park
Warren I I + (Town of Morehead City)
Perry I � � j iE-- (•1�P�1C7Y L1h{E
I I
The Bluffs
rr-orwclt LjHr= +/- 611 ft. of Shoreline from Property Line to Property Line
MONROE JOHNSON CONSTRUCTION, INC.
P. 0 Box 628 Morehead City, NC 28557 -0628
(919) 728 -7872 (FAX) 728 -1908
April 17, 1997
Michael Heath
The Bluffs Marina
Mansfield Parkway
Morehead City, NC 28557
Dear Michael,
Pursuant to our contract with The Bluffs to reconstruct your pier following the
damage from the Hurricanes in 1996 and dredge the boat basin, we hereby grant
you permission to dispose of dredge spoils on our property located at Highway
101, Core Creek Road, Beaufort, NC.
Sincerel
lev ��l 7 97
Tom Zachary, V -P MJC, Inc.
�1
APR G 10 -07
-IN1O1
tip' d ...,.._... _... _...
i
t
i
1
1
1
{
r
�t
ol
• L1
r
1
f � r
t �
MAN
S
'�7�t�i eta
7
r[M
Y
a
S '
T
�h
ji XE j
q auoUd
3uobd - 3deQJ.00
0, y�J9 Y)70 of
4� uioij x� rlsoe
n 9 N d .i - -- .�u�u�r117W W-D(a WO�d
c
eti:vti zF6ti— �ti —ranl