May 1, 1997 D C 171-1�D
MEMORANDUM: MAY 0 51997
DIVISI� .. JF
TO: Mr. A. Preston Howard, P.E., Director COASTAL MA14AGEMENT
Division of Environmental Management
FROM: John R. Parker, Jr.
Major Permits Processing Coordinator 41
SUBJECT: CAMA/DREDGE & FILL Permit Application Review �0 9
ti,4�sc /->
Applicant: S. D. & Linda Freeman
Project Location: 1033 Cedar Point Boulevard, adjacent AIWW, Cedar Point
Proposed Project: Construct 10 commercial boat slips
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by May 22, 1997. If you have any questions regarding the proposed project, please
contact M. Ted Tyndall at (919) 808 -2808. When appropriate, in -depth comments with
supporting data is requested.
sirYfy-7
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
r�X . comments.
b
W, ;ICS
SIGNED DATE
W. Hestron Plaza II, 151 B, Highway 24, Morehead City NC 28557 NZEWC An Equal Opportunity / Affirmative Action Employer
Voice 919 - 808 -2808 FAX 919 - 247 -3330 Courier 11 -12- 09 50% recycled/ 10% post - consumer paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: S.D. & Linda Freeman
�. LOCATION OF PROJECT SITE: Carteret County, Town of Cedar Point, at 1033 Cedar Point
Blvd., adjacent the Intracoastal Waterway
Photo Index - 1995: 39 -472 (indexed by E,F -12) 1989: 4 165 14 (indexed by S -5)
State Plane Coordinates - X: 2,571,100 Y: 342,700
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - April 10, 1997
Was Applicant Present - No .�
5. PROCESSING PROCEDURE: Application Received - April 1, 1997 MAY _ WT
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Carteret County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: EW, PTA, ES
(C) Water Dependent: Yes
(D) Intended Use: Commercial slips
(E) Wastewater Treatment: Existing - Septic system
Planned - None
(F) Type of Structures: Existing - House, concrete bulkhead, two piers
Planned - 10 commercial slips, boathouse
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non - Vegetated Wetlands
Usurpation of
Estuarine Waters /Public Trust
3,864 ft';
Areas
(432 ft2) shaded
(C) Other
Disturbance
High Ground
2,875 ft2
(D) Total Area Disturbed: 6,739 ft2
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicants propose to construct 10 commercial slips, a boathouse and
gravel /pave the associated parking area.
FIELD INVESTIGATION REPORT:
S.D. & LINDA FREEMAN /CARTERET COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION:
Project Setting
The applicants own a 30,000 ft' high ground lot off NC 24 /Cedar Point
Boulevard in Cedar Point, adjacent the Atlantic Intracoastal Waterway (AIWW), in
Carteret County. The lot to the west is a public boating access area controlled by the
NC Wildlife Resources Commission. The adjacent lot to the east is used for overflow
parking from the public boating access site. A one story frame building is situated on
the site. Also on the site are /were two short piers (54' and 44' in length) opposite
each side of a 12' -wide concrete boat ramp. Hurricane Fran destroyed the shorter pier
and damaged an 8' section at the end of the longer one. The applicant has already
been authorized to reconstruct the piers as a result of Hurricane Fran. Likewise, the
applicants have already reconstructed the :existing bulkhead and boat ramp, both of
which suffered damage from Fran.
There are no jurisdictional wetlands on the site, and no SAVs were noted during
the site visit. According to the applicant, the AIWW channel is 230' from shore.
Several lots to the east, an existing dock at the Waterway Inn establishes the pier head
alignment. Water depths at the end of the proposed slips is approximately -6' below
MHW. Bottom substrate at the site is sandy. The AIWW is SA waters but is closed
to shellfishing.
Project Description
The applicants propose to construct 10 commercial slips perpendicular to a
bulkheaded shoreline adjacent their property on the AIWW. All of the slips except for
the end slip adjacent the public boating access area would be 32' in length. That
particular slip would be 16' in length. Five of the slips would be 12.5' wide, three
would be 10.5' wide, one would be 10' wide, and the end slip adjacent the access area
would be 8.5' wide. Five 2' -wide finger piers define the 10 4lips. According to the
application, a 16' floating section (3' wide) would be added at the end of the main pier
(either as an extension or as a "finger pier "). And after discussions with the
applicants, they wish to proceed with the addition as a "finger pier". The applicants
have also designed the slips so that uncovered boat lifts could be installed if a renter
preferred to do so. In addition, the first slip adjacent the dock would be covered with
a 10' X 16' -roof /platform (to serve as an "observation deck "), essentially creating a
boathouse with no sides.
The applicants also propose to grade and marl approximately 1,650 ft2 of high
ground within the 75' Estuarine Shoreline (ES) and fill and area measuring
approximately 1,225 ft' with topsoil. Much of the area to be marled would serve as an
access drive to the boat ramp. In addition, the applicant would place rock marl on an
area measuring approximately 130' X 100' outside the ES to be used for parking.
FIELD INVESTIGATION REPORT:
S.D. & LINDA FREEMAN /CARTERET COUNTY
PAGE #3
Anticipated Impacts
The installation of the 10 slips would result in approximately 3,864 ft2 of Public
Trust usurpation. And of that amount, approximately 432 ft2 of Estuarine
Waters /bottom would be shaded due to the addition of the platform, docks and finger
piers. Since existing water depths are fairly deep, any effects due to shading should be
minimal. There should be no adverse impacts to boat traffic along the AIWW,
however there does exist the potential for problems to boaters using the public boating
access to the west (i.e. heavy currents) as a result of the last slip's location.
NCWRC's initial response to the structure encroaching within the 15' setback was "no
objection" to the pilings being placed 8' from the property line. They did reserve final
comment until the formal review process. Obviously, final approval is needed from
NCWRC before the 101 slip could be formalized via placement of the three end tie
poles.
The high ground activities should not have any significant impact to the adjacent
water quality. The percent impervious coverage is just under 30% most of that
percentage is taken up by the boat ramp and apron, and the 4' -wide concrete walkway.
M. Ted Tyndall - Morehead City - April 30, 1997
'4
Form DCM -MP -1
APPLICATION
1. APPLICANT
a. Landowner:
Name S.D. & Linda Freeman
Address 1224 Greenway Ct.
City Jacksonville
(To be completed by all applicants)
State NC
Zip 28546 Day Phone (910) 330 -1650
Fax (910) 353 -1330
b. Authorized Agent:
Name n/a
Address
City _
Zip _
Fax
Day Phone
c. Project name (if any)
State
NOTE: Permit will be issued in name of landowner(s), and /or
project name.
2. LOCATION OF PROPOSED
PROJECT
a. County Carteret
Revised 03/95
b. City, town, community or landmark
Cedar Point
c. Street address or secondary road number
10-13 C'pdar Pni ni- Rlvc9
d. Is proposed work within city limits or planning
jurisdiction? x Yes No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) Intracoastal waterway
DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and /or filling activities.
10 boat slips, 5 two ft finqer piers.
Filling and placing rock on parking as
and riveways. Installing boat lifts
in slips
b. Is the proposed activity maintenance of an existing
project, new work, or both? new work
C.
d.
Will the project be for public, private or commercial
use? commercial
-4
Give a brief description of purpose, use, methods of
construction and daily . operations .. of proposed
project. If more space is needed, please attach
additional pages. see attached page
wl!_TAil_._ii111t•,ir-A 0
»■ [V V �'� WE R-1
Form DCM -MP -1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract -069 acres (30, 056.85 SF)
b. Size of individual lot(s) combined
c. Approximate elevation of tract above MHW or
NWL three (3) feet
d. Soil type(s) and texture(s) of tract
coarse topsoil
e. Vegetation on tract St Augustine grass
m. Describe existing wastewater treatment facilities.
septic tank
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial /commercial effluent, "wash
down" and residential discharges.)
limited surface runoff
o. Describe existing drinking water supply source.
county water system
f. Man-made features now on tract concrete
bulkhead piers, house with porch 5. ADDITIONAL INFORMATION
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the iocat kind use plan.)
X Conservation
Developed
Rural
Transitional
Community
Other
h. How is the tract zoned by local government?
"B1" Town of Cedar Point
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(Attach Zoning compliance certificate, if appUcabk)
j. Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom?
k. Is the project located in a National
Historic District or does it involve
Register listed or eligible property?
Yes F...:X _ ,,#, No
1. Are there wetlands on the site? Yes
Coastal (marsh) Other
If yes, has a delineation been conducted.
-d` (Attach documentation; if avaitabk)
upapd nzioc
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross- sectional drawings) drawn to scale in black
ink on an 8 1/2'4by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Registered `Please note that original drawings are preferred and
a National only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
X No Engineers regarding that agency's use. of .larger
drawings.) A site or location map is a part of plat.
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Item 3d:
Purpose and Use:
We propose to install and maintain 10 boat slips to provide access
to the Intracoastal Waterway for the person who wishes to rent same.
We plan to construct the slips so the renter may install a lift for his
convenience to store his equipment and have it protected and ready for
use in the water. We also plan to construct an observation deck over the
first slip for use by renters and guests.
Construction: - --
Construction will be the use of pressure treated materials, galvanized
bolts and pilings. I will do the construction personally.
Daily Operation:
The slips that are planned will be leased monthly and yearly. This
will eliminate the need for an attendant to monitor daily.
4
Y1111V
APR 0 11997
Mrpwr��rar � r rra���"►�"°
Form DCM -MP -1
site. Include highway. or secondary road (SR)
numbers, landmarks, and the like.
• A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
,have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Don Tobaban
Name N.C. Wildlife Commission
AddressDiv of Boating and Inland Fishries
Phone 512 North Salisbury St.
Raleigh, N.C. 27604 -1188
Name (919) 733 -3633
Address
Phone
Name Town of Cedar Point
Address Cedar Point, N.C.
Phone (919) 393-
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
Corps of Engineers Act #199605592 for
hurricane repairs
Carteret County#
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
Revised 03195
6. CERTIFICATION AND PERNIISSION
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow -up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 4lday of 44 , 19X
Print Name S.D. / Freeman
Signature 40- Z:c��_
Landowner or Authorized Agent
Please indicate attachments pertaining to your proposed
project.
4
DCM MP -2
_7T
Excavation and Fill Information
DCM MP -3
Upland Development
X DCM MP-4
Structures Information
DCM MP -5
Bridges and Culverts
DCM MP-6
Marina Development
NOTE. Please sign and date each attachment in the
space provided at the bottom of each form.
-------------------------- .4
Form DCM -MP -3
UPLAND
DEVELOPMENT
(Construction and /or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM -MP -1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed
NoNE
b. Number of lots or parcels two combined
c. Density (give the number of residential units and the
units per acre) one
d. Size of area to be graded, filled or disturbed
including roads, ditches, etc. ass
_4L-0111- ES."' isedo Fd Z To4ct t
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
n/a least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? 'Yes No
If yes, date submitted
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces.
marl, asphalt and concrete
g. Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and /or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. 30%
Revised 03/95
'Tip,
AFR
11997 w
a�ew�siy ay «yN��yt�iitji�.
h. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
Yes X No
If yes, date submitted
i. Describe proposed method of sewage disposal.
septic tank (existing)
j. Have the facilities described in Item i. above
received state or local approval? existing
(Attach appropriate documentation)
k. Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial /commercial effluent,
"wash down" and residential discharges).
effluent is in leach field, surface
runoff will be directed to purvious
areas
1. Describe proposed drinking water supply source
(e.g. well, community, public system, etc.)
community water system Carteret Co
.4
m. Will water be impounded? Yes X No
If yes, how many acres?
n. If the project is a oceanfront development, when
was the lot(s) platted and recorded? n/a
S.D. Freeman
Applicant or Project Name
Signature
Date
Form DCM -MP4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM -MP -1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and /or Pier(s)
b.
(1) X Commercial _Community _ Private
(2) Number extension of existing pier
(3) Length -W 16
(4) Width 3'
(5) Finger Piers X Yes No
(i) Number 5
(ii) Length 22'
(iii) Width 2'
(6) Platform(s) Yes No
(i) Number
(ii) Length
(iii) Width
(7) Number of slips proposed 10
(8) Proximity of structure to adjacent riparian
property lines 10'
(9) Width of water body 120 vds approx
(10) Water depth at waterward end of pier at
MLW or NWL 8 ' MLW
Boathouse (including covered lifts)
(1) 1 Commercial _
(2) Length 16'
(3) Width 10'
c. Groin (e.g. wood, sheetpile, etc.)
(1) Number n/a
(2) Length(s)
Private
d. Breakwater (e.g. wood, sheetpile, etc.)
(1) Length n/a
(2) Average distance from MHW, NWL or
wetlands
(3) Maximum distance beyond MHW, NWL or
wetlands
Revised 03/95
e. Mooring buoys n/a
(1) _ Commercial _Community _ Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
(4)
(5)
Width of water body _
Distance buoy(s) to
shoreline
be placed beyond
f. Mooring structure (boatlift, mooring pilings, etc.)
(1) X Commercial _Community _ Private
(2) Number 10
(3) Length 30'
(4) Width 5@ 12'/4@ 1017-1@ 8 1
to be installed in each
g. Other (Give complete description)
Item a, 1 thru 4 proposed extension
of existing pier
S.D. Freeman
Applicant o j t Name
Signature
Date
O)LDELUD.&I
APR 0 11997
i3 aranT — u Yeatesvule•+ 4S yF ., ! eMaf ,
n.►c•.
44A P, I T 6 Y 3 9 10 fi 2 +�� � Land' g Gbb n:
r Wintervdle II ChotowinitY 6 R Sidney -� �:� Scranton - J 6 iddlatown -•'
ounee 81ack N o° sr. vk 92 Bath ead >•
6
• rn /, Sladesvrlle ebr s a
sury Oi Aden I1 ne
helmerd S r od 1 `� 17 New Holland
rw Hill r Too i { rgeYv+e ns o- + \45 2
poker Vsv' ! 1 2 0 8 'FREE +': �' �J..,.. + Gull Rock WVsockr II Bap: \
t
,r +`i II + Swan Quarter s
323 2 Calico Core ."FERRY, Rrup-
1 �' Wilmar Poo 7 Pambea BeacR�"l Rose BoV 1
\ Sonn n
Griffon 7
43 l0 17 "cos Crossr NUfE R E
#fount reek \ � A11 W11D
9 11 \ SOU - �GIIEAiI abN n�i ; ?;.1 F7'i� �i;.F -•'s.
lawson ngars' S5 k Edward 3 Geek r •- \ r' \\ -3
t� Vanceboro \ ►aer n' - , k
s For nwell z urora Royal 12 's'Y'\ ''"' \r¢ i :. •y. ��G
. :ka stun 1• 0 = Ernul �r HO
Caxton
, \
.♦
war
2 Mesic 3
70 • /
YVYSe R 9 Askin Hall vdle °v / \ \
es0er E II (Cash ,ornerl 5
�Ifork \' -•NS ore City
SS l Gr + Ms ibe 7 a of.
1 / •a1
�:. -1 , ._. 8 3/ 3'.:
01 yon is nr r 2BaYDOro F e VOpaeok
Y sbO o
Ili juscaraa k isd o wa I :� \
i Ii 70 ni)geton ti s �?r?°`.al4k'isYr --a'n
i8 41 \ ,� Bern r .. P °lay P A ta" { 4 �--t>ERa -r
\ 1 ar 's Cot Mr4r [it tt tonsvill
Rivera -
Pleasant Hill s °� a ton+ hems 6 I / 8 i 55 fi Pr. o� ROMan w ' t� P,or OD a
entay�Bap,r
0 oek y¢_yjy .s t West Bab Q y, R
C osksvNl / - ¢clan Islam �'�
Rwerdal : -\ �q )an
CROA`TAN Coo FFfFq mMSOtL `�, ih River
tan yr
I � FMAN - � 11 +;
CattishQ
P urg J Q;f Lake L nJJ J1 CA 1 a r ah Al ,L, (� .,.
4 icMa aysvdkNATION L- PLilrl r-..5 53 anD `
REST R de iC Par ''`•' QLa a oft h 5 - ¢ate
Catherine r - _ WINK _ r'°�° ` 70
untam
10 Lake �� ake v Stac
a L — Elfi, Sfmon Harlowt 10 Day
ine Lake 1 K u r+ ��FY 5 4
0 tN 258 5 0� 10 ewport `Q0 76 00
A �`c, E tway h ton O r
uhns L, .. r ��G0,91
+ lacksonvl �� Silverdale I a FOREST Q dR a D it yrna
Routes & Scher
J j' Peletier A
16 ~" Midws Par M ert 4 -•" n • O ea (or G tears ` efg
x Iii meM O �
Haws 17 neY een J eJ U *; ou d SB . , Ilan i ; -� FOft -Hark Ft`
Run '�$ " a,. Swan ro 7 •� / _ m Con 8 1 .�
Verona ti.�'' SatterBaach e°- stand
'� cAMlttcrEDNE , entd ndlan rtth Remewa
5 �- 'AiRlNEa45E r° °�� { 1s) , Beae11 r._af`i'•1,t/'ryte?orp,
't ;{ t•E��1 ea�ev+°rae°kt�a tMi
�e.ekk��kk «r ,' 11GH2NO05E k
'�j. r f! J U%T OOKOU2 - L„
Dixon
1
+ 1 w.r. to +'C"'S •� ,l 's c �r J �•:.. -•-i, ; '-`- sL �./
SG 1 .'f. !f�, r -: 4w,k�w,AJ'rr.n +,�, 1 i. ..*•' er l£. 'Gb t + r < ,,
.\ k Sn a. AI .q�k K' �` ' Y"�fJ f�,Y LF Y � y �j'• S' � ; \ Y
+ olkston Fer 'iyeifi.f,�i)ed;� a _ '" yv rL ;i�i. 1 '"t A �:. Y '.•t'
lolly Ridge CaUj 1 800 BY FERRY
1 V1°tE. q ,i. each" �r ak z
ut tt � forInformailon an d:Reservat►ons
a.Yr.� -'irsf• rc Mssy .�,�r _
IJ l sr'� -�D j t"t.;• r e�rr{.•`.s .. �i � �`R�i ';
Nor1hkCarolina
q
�Wiii r4 j s
-the state-operated ferry
pr {y_s stem:has; rovided.valu
able ,
I � Y , p connections
5 ;r r� between; prloint . on North Carolina's coast
1t i*
�r
isltOrs:and tourists enjoy usingthe ferry to
�xplore du� Outer Banks and coastaCcom
c L
1.
Ymunifies��utfo(.many;toastalNorth
? � 'Carolina r'sidents, the ferries are a way f
�,'a �, Y .
,. k �t;iife They ptovlde access to and from work
school and shopping
`'�Reserv�tions are recommended for the
x " j ,,'Cedar. Island 7.Ocracoke and Swan Quarter
sr� say Ocracoke,F'ernes fhe ma be made in
gs�
ti ;� „� �I't� �t��persort,8t e ferry termrnal or by telephone.
Reservations must be claimed at least
minute poor to departure time
� Ocracoke �erminal ; (919) 928 -3841
zr Cedar Island Term (
inal 919 ) 225 3551
i�L Swan Quarter Terminal (919) 926 -1111
- 6 m -- • 6:50 1115 1115 CapFacity:w 18 �.?
k r 1145 -1145
m Pon, r
1215 12.15
- 940 1030
1:15 1 15
71:20 12ao 145 ' -1.45
t:oo - ts0 215 .• -2:15 -
2:40 3:30
2:45 '• 2:45
4:20 5:10
3:15 3:15
3:45 3:45
_ 415.415
Crossing -30 Minutes 445' -445
Capacity 20 cars 5:15 5:1
- Fare (one Way) 545 545 _'are„ A,
Pedestrian . 50E '6-1 3
Bicycle Rider 51.00 645 71
7:45 8.15 ..
Motorcycles .. $3.00 845 915 ;
Vehicle and7,'• $3.00 9,45 •' 10:15
or combination - 10.45 ,17. 15 1230 4 m
less than 20' 11:45 --12:15
Vehicle and/ , $6.00 72 45 1.15 Crossing 2112 Hours
orcornbination Capacity 28ars '
up to 55' ossi"g -2 � Fare Same as
PaOtY- 20 cars Cedar Bland
Fare Free
Seasons:
Cedar bland - Ocracoke & Ocracoke - Hatteras. "Summer:
SCHEDULES AND FEES AU S[TMCT TO Southport - Fort Fisher. Summer.. Apd 1- October 31, Win
T ' Trucker's Note: For information on size limitations. contact the N.C. De CHANGE WITHOUT NOTCE. Street, Morehead City, N.C. 28557 or call 919) 72 &64
�
77 0o Map inquiries and suggested revisions should be submitted to A. Poe Cox, N.C. Depart
,��i �i� �,.i�'4�+tn�'t3,t'' k•''s `�" a r r 'v„;c a
p
k•r. n
n D
Depart D
Depart
Sam 8
850 a
am "
" am " `
`1230 `
` 7
-- 8.50 9
940 -
-- 545 =
.•6.15 '
='615
9:40` -
-10:30 6
615 .
'830 '
'-'915 "
- 10:30 1
11:20 6
6.45 -
- 6:45 1
1015 1
11:00-
11:20 -
- 12:10 7
7.15 °
° 7:15 N
Noon f —
—1:00
- 12:10'- -
- 1.00 7
7:45 -
-7.45 '
'200 -
- 315��'
1:50 8
8:15 '- 8
8.15 - -
-"4.45 '
'5,301-
2:40 8
8 4S '
'- 8.45 .
.11 6:15 ^
^- 7:00 --
320 -
- 9:15 9
9:15 8
8:30 •
• -9 15 -
3.30 4
4:20 9
9:45 -
- 9:45 l
lo pm i
it Pin
5:10 - 1
10:15:'- °
° -10:15 -
- •-
570 6
6 m -
- -1045 ' 1
1045 C
Seasons:
Cedar bland - Ocracoke & Ocracoke - Hatteras. "Summer:
SCHEDULES AND FEES AU S[TMCT TO Southport - Fort Fisher. Summer.. Apd 1- October 31, Win
T ' Trucker's Note: For information on size limitations. contact the N.C. De CHANGE WITHOUT NOTCE. Street, Morehead City, N.C. 28557 or call 919) 72 &64
�
77 0o Map inquiries and suggested revisions should be submitted to A. Poe Cox, N.C. Depart
,��i �i� �,.i�'4�+tn�'t3,t'' k•''s `�" a r r 'v„;c a
`\ X • 3o = 3�' 87• S�
U �
W
APR 0 1 1997
e0�k °0 *
°tr
N/F
STATE OF
NORTH CAROLINA
DB 509, PG 412
R/R IR
Al
EIP
A-%
MIA °� rs• `.
LOT 18
i
A o
TOTAL AREA
4, t4 30,056.85 S.F.
0.69 ACRES
a \ �,
ON X-11
Cy \+A \ <
r\ lz' 1
•`,
r ° . / C.'MevrW / 1
c �
n
rd t.
Y�• YC
cr
N,
•�O
Z4 Xa
CHARLES A. RAWLS, REGISTERED
AND SURVEYOR duo hereby certify
hat I have surveyed the propert,
s shown hereon in accordance
ith THE STANDARDS OF PRACTICE
OR LAND STpVT M4,. IN NORTH
AROLINA.
A.
1
' G K/ 1ttUN
LO
IV Q \
G W.
7 S
�' NIF
STATE OF �rrUsS
NORTH CAROLINA ar �140yu
C �orc re f�
IRON
\
SURVEY FOR
J u 'T.
REFERENCE:
MB 1, PG 113
DB 718, PG 131
CARTERET CO. REGISTRY
LOTS 18 & 19
JOHN S. JONES SUBDIVISION
WHITE OAK TOWNSHIP
Charles A. Rawls
and Associates
P.O. Box 1126, Swansboro, N.C. 28584
TELEPHONE (910)326 -1408
•
CA.h
PL9NMNG
MAPPING
SURYMG
z
APR 0 1 1097
O �o \ \
Ae �Y �o \ •� Y \
40 o�P \\ QO\ \
' \
EIP \, \
NIF
STATE OF s \
NORTH CAROLINA �� \
DB 509, PG 412
LOT 18
TOTAL AREA /
30,056.85 S.F. // R/ IRON
0.69 ACRES // LOT o \\
\\ R/R IRON
\ 22!0 15% •,�� .
7.
o
O/
D�
N/F
/ STATE OF
NORTH CAROLINA
j► S � jar
/' N• 48
�j�,?i •1 R/R IRON
\ \, REFERENCE:
MB 1, PG 113
DB 718, PG 131
CARTERET CO. REGISTRY
'
CHARLES A. RAWLS, REGISTERED awn SURVEY FOR�p
LAND SURVEYOR dog hereby certify J 0444 V 9T .
that .I have surveyed the property o eo e
as shown . hereon in accordance revis e LOTS 18 19
.with THE STANDARDS OF PRACTICE sg a JOHN S. JONES SUBDIVISION
OR LAND SiiR4N IN NORTH ' =50'
CAROLINA. ��Q�N�CAR 0'�'�i4 pro . no WHITE OAK TOWNSHIP
O %% SST .,LL QaOLINA
a = _ Charles A. Rawls
��L- 49 Z � and Ass "ociates CAR
''�'Sq� I R�Pv1 `` P.O. Box 1126, Swansboro, N.C. 28584 PLANNING
TELEPHONE (910)326 -1408 .MAPPING
FAX (91MnP- r, -14nn SURVEnwo
� M, �
� 0 It A
-C
5 L fit Ze.
ddb
I M 0
! m
I Ell I
104M 1
immol
EL I.. l...l
6
ri. s
RQ
RE
I i
i
I
.I-
'
-
-
--
--
`k
:
I JI i
Q j
--
--
1
r :
:
�J
-
I I I
-
wi:
r ,
J
V ✓1
y- --
: r r
i
l I I I I
1
: �i
. 1
r
I
IN
I I
�•
I
I
--
- --
- - --
- - -1
--
l-
i I, I i I I I, I I �j
r �
I,
, r
I I
,
1
I r ,
- --
r I
r r r
�
i j �_ __� ►► I I I � 1 1 l i i l l j i l
__,_ -_
�
-
I I i
--
:
i
I
-
; I
I —
I I
I�I ; I I
: I
I j I j I i i
�•�
--
-- --
- -- --
—�—
—)
i a o I i
JC4
I
1T><
i I I I IL i
I-
j
I
i
-
- - --
-
__
'
I
I
- --
-
- - --
-
I
I
I
1
1
r-
,
�--
I
I
J
T-4
V
Vi
_ft
V
..
MMMM �
I ,
- -- M' • 7
I
I ,
I
I
I
I
t
_I j I• :
_I
I
I I
i
i I
L i
i
II - - - - -- -- - -- ... - -- - - - --
j
I
j
j
r