Loading...
HomeMy WebLinkAbout19970414 Ver 1_Complete File_19970516State of North Carolina Department of Environment, Al G Health and Natural Resources &MW • • AM Division of Coastal Management J ames B. Hunt, Jr., Governor p E H N R Jonathan B. Howes, Secretary Roger N. Schecter, Director May 1, 1997 D C 171-1�D MEMORANDUM: MAY 0 51997 DIVISI� .. JF TO: Mr. A. Preston Howard, P.E., Director COASTAL MA14AGEMENT Division of Environmental Management FROM: John R. Parker, Jr. Major Permits Processing Coordinator 41 SUBJECT: CAMA/DREDGE & FILL Permit Application Review �0 9 ti,4�sc /-> Applicant: S. D. & Linda Freeman Project Location: 1033 Cedar Point Boulevard, adjacent AIWW, Cedar Point Proposed Project: Construct 10 commercial boat slips Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 22, 1997. If you have any questions regarding the proposed project, please contact M. Ted Tyndall at (919) 808 -2808. When appropriate, in -depth comments with supporting data is requested. sirYfy-7 REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached r�X . comments. b W, ;ICS SIGNED DATE W. Hestron Plaza II, 151 B, Highway 24, Morehead City NC 28557 NZEWC An Equal Opportunity / Affirmative Action Employer Voice 919 - 808 -2808 FAX 919 - 247 -3330 Courier 11 -12- 09 50% recycled/ 10% post - consumer paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: S.D. & Linda Freeman �. LOCATION OF PROJECT SITE: Carteret County, Town of Cedar Point, at 1033 Cedar Point Blvd., adjacent the Intracoastal Waterway Photo Index - 1995: 39 -472 (indexed by E,F -12) 1989: 4 165 14 (indexed by S -5) State Plane Coordinates - X: 2,571,100 Y: 342,700 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - April 10, 1997 Was Applicant Present - No .� 5. PROCESSING PROCEDURE: Application Received - April 1, 1997 MAY _ WT Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County Land Classification From LUP - Conservation (B) AEC(s) Involved: EW, PTA, ES (C) Water Dependent: Yes (D) Intended Use: Commercial slips (E) Wastewater Treatment: Existing - Septic system Planned - None (F) Type of Structures: Existing - House, concrete bulkhead, two piers Planned - 10 commercial slips, boathouse (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non - Vegetated Wetlands Usurpation of Estuarine Waters /Public Trust 3,864 ft'; Areas (432 ft2) shaded (C) Other Disturbance High Ground 2,875 ft2 (D) Total Area Disturbed: 6,739 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicants propose to construct 10 commercial slips, a boathouse and gravel /pave the associated parking area. FIELD INVESTIGATION REPORT: S.D. & LINDA FREEMAN /CARTERET COUNTY PAGE #2 9. NARRATIVE DESCRIPTION: Project Setting The applicants own a 30,000 ft' high ground lot off NC 24 /Cedar Point Boulevard in Cedar Point, adjacent the Atlantic Intracoastal Waterway (AIWW), in Carteret County. The lot to the west is a public boating access area controlled by the NC Wildlife Resources Commission. The adjacent lot to the east is used for overflow parking from the public boating access site. A one story frame building is situated on the site. Also on the site are /were two short piers (54' and 44' in length) opposite each side of a 12' -wide concrete boat ramp. Hurricane Fran destroyed the shorter pier and damaged an 8' section at the end of the longer one. The applicant has already been authorized to reconstruct the piers as a result of Hurricane Fran. Likewise, the applicants have already reconstructed the :existing bulkhead and boat ramp, both of which suffered damage from Fran. There are no jurisdictional wetlands on the site, and no SAVs were noted during the site visit. According to the applicant, the AIWW channel is 230' from shore. Several lots to the east, an existing dock at the Waterway Inn establishes the pier head alignment. Water depths at the end of the proposed slips is approximately -6' below MHW. Bottom substrate at the site is sandy. The AIWW is SA waters but is closed to shellfishing. Project Description The applicants propose to construct 10 commercial slips perpendicular to a bulkheaded shoreline adjacent their property on the AIWW. All of the slips except for the end slip adjacent the public boating access area would be 32' in length. That particular slip would be 16' in length. Five of the slips would be 12.5' wide, three would be 10.5' wide, one would be 10' wide, and the end slip adjacent the access area would be 8.5' wide. Five 2' -wide finger piers define the 10 4lips. According to the application, a 16' floating section (3' wide) would be added at the end of the main pier (either as an extension or as a "finger pier "). And after discussions with the applicants, they wish to proceed with the addition as a "finger pier". The applicants have also designed the slips so that uncovered boat lifts could be installed if a renter preferred to do so. In addition, the first slip adjacent the dock would be covered with a 10' X 16' -roof /platform (to serve as an "observation deck "), essentially creating a boathouse with no sides. The applicants also propose to grade and marl approximately 1,650 ft2 of high ground within the 75' Estuarine Shoreline (ES) and fill and area measuring approximately 1,225 ft' with topsoil. Much of the area to be marled would serve as an access drive to the boat ramp. In addition, the applicant would place rock marl on an area measuring approximately 130' X 100' outside the ES to be used for parking. FIELD INVESTIGATION REPORT: S.D. & LINDA FREEMAN /CARTERET COUNTY PAGE #3 Anticipated Impacts The installation of the 10 slips would result in approximately 3,864 ft2 of Public Trust usurpation. And of that amount, approximately 432 ft2 of Estuarine Waters /bottom would be shaded due to the addition of the platform, docks and finger piers. Since existing water depths are fairly deep, any effects due to shading should be minimal. There should be no adverse impacts to boat traffic along the AIWW, however there does exist the potential for problems to boaters using the public boating access to the west (i.e. heavy currents) as a result of the last slip's location. NCWRC's initial response to the structure encroaching within the 15' setback was "no objection" to the pilings being placed 8' from the property line. They did reserve final comment until the formal review process. Obviously, final approval is needed from NCWRC before the 101 slip could be formalized via placement of the three end tie poles. The high ground activities should not have any significant impact to the adjacent water quality. The percent impervious coverage is just under 30% most of that percentage is taken up by the boat ramp and apron, and the 4' -wide concrete walkway. M. Ted Tyndall - Morehead City - April 30, 1997 '4 Form DCM -MP -1 APPLICATION 1. APPLICANT a. Landowner: Name S.D. & Linda Freeman Address 1224 Greenway Ct. City Jacksonville (To be completed by all applicants) State NC Zip 28546 Day Phone (910) 330 -1650 Fax (910) 353 -1330 b. Authorized Agent: Name n/a Address City _ Zip _ Fax Day Phone c. Project name (if any) State NOTE: Permit will be issued in name of landowner(s), and /or project name. 2. LOCATION OF PROPOSED PROJECT a. County Carteret Revised 03/95 b. City, town, community or landmark Cedar Point c. Street address or secondary road number 10-13 C'pdar Pni ni- Rlvc9 d. Is proposed work within city limits or planning jurisdiction? x Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Intracoastal waterway DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and /or filling activities. 10 boat slips, 5 two ft finqer piers. Filling and placing rock on parking as and riveways. Installing boat lifts in slips b. Is the proposed activity maintenance of an existing project, new work, or both? new work C. d. Will the project be for public, private or commercial use? commercial -4 Give a brief description of purpose, use, methods of construction and daily . operations .. of proposed project. If more space is needed, please attach additional pages. see attached page wl!_TAil_._ii111t•,ir-A 0 »■ [V V �'� WE R-1 Form DCM -MP -1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract -069 acres (30, 056.85 SF) b. Size of individual lot(s) combined c. Approximate elevation of tract above MHW or NWL three (3) feet d. Soil type(s) and texture(s) of tract coarse topsoil e. Vegetation on tract St Augustine grass m. Describe existing wastewater treatment facilities. septic tank n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial /commercial effluent, "wash down" and residential discharges.) limited surface runoff o. Describe existing drinking water supply source. county water system f. Man-made features now on tract concrete bulkhead piers, house with porch 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land classification of the site? (Consult the iocat kind use plan.) X Conservation Developed Rural Transitional Community Other h. How is the tract zoned by local government? "B1" Town of Cedar Point i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach Zoning compliance certificate, if appUcabk) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? k. Is the project located in a National Historic District or does it involve Register listed or eligible property? Yes F...:X _ ,,#, No 1. Are there wetlands on the site? Yes Coastal (marsh) Other If yes, has a delineation been conducted. -d` (Attach documentation; if avaitabk) upapd nzioc In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross- sectional drawings) drawn to scale in black ink on an 8 1/2'4by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Registered `Please note that original drawings are preferred and a National only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of X No Engineers regarding that agency's use. of .larger drawings.) A site or location map is a part of plat. requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Item 3d: Purpose and Use: We propose to install and maintain 10 boat slips to provide access to the Intracoastal Waterway for the person who wishes to rent same. We plan to construct the slips so the renter may install a lift for his convenience to store his equipment and have it protected and ready for use in the water. We also plan to construct an observation deck over the first slip for use by renters and guests. Construction: - -- Construction will be the use of pressure treated materials, galvanized bolts and pilings. I will do the construction personally. Daily Operation: The slips that are planned will be leased monthly and yearly. This will eliminate the need for an attendant to monitor daily. 4 Y1111V APR 0 11997 Mrpwr��rar � r rra���"►�"° Form DCM -MP -1 site. Include highway. or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners ,have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Don Tobaban Name N.C. Wildlife Commission AddressDiv of Boating and Inland Fishries Phone 512 North Salisbury St. Raleigh, N.C. 27604 -1188 Name (919) 733 -3633 Address Phone Name Town of Cedar Point Address Cedar Point, N.C. Phone (919) 393- • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Corps of Engineers Act #199605592 for hurricane repairs Carteret County# • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03195 6. CERTIFICATION AND PERNIISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 4lday of 44 , 19X Print Name S.D. / Freeman Signature 40- Z:c��_ Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. 4 DCM MP -2 _7T Excavation and Fill Information DCM MP -3 Upland Development X DCM MP-4 Structures Information DCM MP -5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. -------------------------- .4 Form DCM -MP -3 UPLAND DEVELOPMENT (Construction and /or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM -MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed NoNE b. Number of lots or parcels two combined c. Density (give the number of residential units and the units per acre) one d. Size of area to be graded, filled or disturbed including roads, ditches, etc. ass _4L-0111- ES."' isedo Fd Z To4ct t e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at n/a least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? 'Yes No If yes, date submitted f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. marl, asphalt and concrete g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and /or built -upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. 30% Revised 03/95 'Tip, AFR 11997 w a�ew�siy ay «yN��yt�iitji�. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted i. Describe proposed method of sewage disposal. septic tank (existing) j. Have the facilities described in Item i. above received state or local approval? existing (Attach appropriate documentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial /commercial effluent, "wash down" and residential discharges). effluent is in leach field, surface runoff will be directed to purvious areas 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) community water system Carteret Co .4 m. Will water be impounded? Yes X No If yes, how many acres? n. If the project is a oceanfront development, when was the lot(s) platted and recorded? n/a S.D. Freeman Applicant or Project Name Signature Date Form DCM -MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM -MP -1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and /or Pier(s) b. (1) X Commercial _Community _ Private (2) Number extension of existing pier (3) Length -W 16 (4) Width 3' (5) Finger Piers X Yes No (i) Number 5 (ii) Length 22' (iii) Width 2' (6) Platform(s) Yes No (i) Number (ii) Length (iii) Width (7) Number of slips proposed 10 (8) Proximity of structure to adjacent riparian property lines 10' (9) Width of water body 120 vds approx (10) Water depth at waterward end of pier at MLW or NWL 8 ' MLW Boathouse (including covered lifts) (1) 1 Commercial _ (2) Length 16' (3) Width 10' c. Groin (e.g. wood, sheetpile, etc.) (1) Number n/a (2) Length(s) Private d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length n/a (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03/95 e. Mooring buoys n/a (1) _ Commercial _Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) (5) Width of water body _ Distance buoy(s) to shoreline be placed beyond f. Mooring structure (boatlift, mooring pilings, etc.) (1) X Commercial _Community _ Private (2) Number 10 (3) Length 30' (4) Width 5@ 12'/4@ 1017-1@ 8 1 to be installed in each g. Other (Give complete description) Item a, 1 thru 4 proposed extension of existing pier S.D. Freeman Applicant o j t Name Signature Date O)LDELUD.&I APR 0 11997 i3 aranT — u Yeatesvule•+ 4S yF ., ! eMaf , n.►c•. 44A P, I T 6 Y 3 9 10 fi 2 +�� � Land' g Gbb n: r Wintervdle II ChotowinitY 6 R Sidney -� �:� Scranton - J 6 iddlatown -•' ounee 81ack N o° sr. vk 92 Bath ead >• 6 • rn /, Sladesvrlle ebr s a sury Oi Aden I1 ne helmerd S r od 1 `� 17 New Holland rw Hill r Too i { rgeYv+e ns o- + \45 2 poker Vsv' ! 1 2 0 8 'FREE +': �' �J..,.. + Gull Rock WVsockr II Bap: \ t ,r +`i II + Swan Quarter s 323 2 Calico Core ."FERRY, Rrup- 1 �' Wilmar Poo 7 Pambea BeacR�"l Rose BoV 1 \ Sonn n Griffon 7 43 l0 17 "cos Crossr NUfE R E #fount reek \ � A11 W11D 9 11 \ SOU - �GIIEAiI abN n�i ; ?;.1 F7'i� �i;.F -•'s. lawson ngars' S5 k Edward 3 Geek r •- \ r' \\ -3 t� Vanceboro \ ►aer n' - , k s For nwell z urora Royal 12 's'Y'\ ''"' \r¢ i :. •y. ��G . :ka stun 1• 0 = Ernul �r HO Caxton , \ .♦ war 2 Mesic 3 70 • / YVYSe R 9 Askin Hall vdle °v / \ \ es0er E II (Cash ,ornerl 5 �Ifork \' -•NS ore City SS l Gr + Ms ibe 7 a of. 1 / •a1 �:. -1 , ._. 8 3/ 3'.: 01 yon is nr r 2BaYDOro F e VOpaeok Y sbO o Ili juscaraa k isd o wa I :� \ i Ii 70 ni)geton ti s �?r?°`.al4k'isYr --a'n i8 41 \ ,� Bern r .. P °lay P A ta" { 4 �--t>ERa -r \ 1 ar 's Cot Mr4r [it tt tonsvill Rivera - Pleasant Hill s °� a ton+ hems 6 I / 8 i 55 fi Pr. o� ROMan w ' t� P,or OD a entay�Bap,r 0 oek y¢_yjy .s t West Bab Q y, R C osksvNl / - ¢clan Islam �'� Rwerdal : -\ �q )an CROA`TAN Coo FFfFq mMSOtL `�, ih River tan yr I � FMAN - � 11 +; CattishQ P urg J Q;f Lake L nJJ J1 CA 1 a r ah Al ,L, (� .,. 4 icMa aysvdkNATION L- PLilrl r-..5 53 anD ` REST R de iC Par ''`•' QLa a oft h 5 - ¢ate Catherine r - _ WINK _ r'°�° ` 70 untam 10 Lake �� ake v Stac a L — Elfi, Sfmon Harlowt 10 Day ine Lake 1 K u r+ ��FY 5 4 0 tN 258 5 0� 10 ewport `Q0 76 00 A �`c, E tway h ton O r uhns L, .. r ��G0,91 + lacksonvl �� Silverdale I a FOREST Q dR a D it yrna Routes & Scher J j' Peletier A 16 ~" Midws Par M ert 4 -•" n • O ea (or G tears ` efg x Iii meM O � Haws 17 neY een J eJ U *; ou d SB . , Ilan i ; -� FOft -Hark Ft` Run '�$ " a,. Swan ro 7 •� / _ m Con 8 1 .� Verona ti.�'' SatterBaach e°- stand '� cAMlttcrEDNE , entd ndlan rtth Remewa 5 �- 'AiRlNEa45E r° °�� { 1s) , Beae11 r._af`i'•1,t/'ryte?orp, 't ;{ t•E��1 ea�ev+°rae°kt�a tMi �e.ekk��kk «r ,' 11GH2NO05E k '�j. r f! J U%T OOKOU2 - L„ Dixon 1 + 1 w.r. to +'C"'S •� ,l 's c �r J �•:.. -•-i, ; '-`- sL �./ SG 1 .'f. !f�, r -: 4w,k�w,AJ'rr.n +,�, 1 i. ..*•' er l£. 'Gb t + r < ,, .\ k Sn a. AI .q�k K' �` ' Y"�fJ f�,Y LF Y � y �j'• S' � ; \ Y + olkston Fer 'iyeifi.f,�i)ed;� a _ '" yv rL ;i�i. 1 '"t A �:. Y '.•t' lolly Ridge CaUj 1 800 BY FERRY 1 V1°tE. q ,i. each" �r ak z ut tt � forInformailon an d:Reservat►ons a.Yr.� -'irsf• rc Mssy .�,�r _ IJ l sr'� -�D j t"t.;• r e�rr{.•`.s .. �i � �`R�i '; Nor1hkCarolina q �Wiii r4 j s -the state-operated ferry pr {y_s stem:has; rovided.valu able , I � Y , p connections 5 ;r r� between; prloint . on North Carolina's coast 1t i* �r isltOrs:and tourists enjoy usingthe ferry to �xplore du� Outer Banks and coastaCcom c L 1. Ymunifies��utfo(.many;toastalNorth ? � 'Carolina r'sidents, the ferries are a way f �,'a �, Y . ,. k �t;iife They ptovlde access to and from work school and shopping `'�Reserv�tions are recommended for the x " j ,,'Cedar. Island 7.Ocracoke and Swan Quarter sr� say Ocracoke,F'ernes fhe ma be made in gs� ti ;� „� �I't� �t��persort,8t e ferry termrnal or by telephone. Reservations must be claimed at least minute poor to departure time � Ocracoke �erminal ; (919) 928 -3841 zr Cedar Island Term ( inal 919 ) 225 3551 i�L Swan Quarter Terminal (919) 926 -1111 - 6 m -- • 6:50 1115 1115 CapFacity:w 18 �.? k r 1145 -1145 m Pon, r 1215 12.15 - 940 1030 1:15 1 15 71:20 12ao 145 ' -1.45 t:oo - ts0 215 .• -2:15 - 2:40 3:30 2:45 '• 2:45 4:20 5:10 3:15 3:15 3:45 3:45 _ 415.415 Crossing -30 Minutes 445' -445 Capacity 20 cars 5:15 5:1 - Fare (one Way) 545 545 _'are„ A, Pedestrian . 50E '6-1 3 Bicycle Rider 51.00 645 71 7:45 8.15 .. Motorcycles .. $3.00 845 915 ; Vehicle and7,'• $3.00 9,45 •' 10:15 or combination - 10.45 ,17. 15 1230 4 m less than 20' 11:45 --12:15 Vehicle and/ , $6.00 72 45 1.15 Crossing 2112 Hours orcornbination Capacity 28ars ' up to 55' ossi"g -2 � Fare Same as PaOtY- 20 cars Cedar Bland Fare Free Seasons: Cedar bland - Ocracoke & Ocracoke - Hatteras. "Summer: SCHEDULES AND FEES AU S[TMCT TO Southport - Fort Fisher. Summer.. Apd 1- October 31, Win T ' Trucker's Note: For information on size limitations. contact the N.C. De CHANGE WITHOUT NOTCE. Street, Morehead City, N.C. 28557 or call 919) 72 &64 � 77 0o Map inquiries and suggested revisions should be submitted to A. Poe Cox, N.C. Depart ,��i �i� �,.i�'4�+tn�'t3,t'' k•''s `�" a r r 'v„;c a p k•r. n n D Depart D Depart Sam 8 850 a am " " am " ` `1230 ` ` 7 -- 8.50 9 940 - -- 545 = .•6.15 ' ='615 9:40` - -10:30 6 615 . '830 ' '-'915 " - 10:30 1 11:20 6 6.45 - - 6:45 1 1015 1 11:00- 11:20 - - 12:10 7 7.15 ° ° 7:15 N Noon f­ — —1:00 - 12:10'- - - 1.00 7 7:45 - -7.45 ' '200 - - 315��' 1:50 8 8:15 '- 8 8.15 - - -"4.45 ' '5,301- 2:40 8 8 4S ' '- 8.45 . .11 6:15 ^ ^- 7:00 -- 320 - - 9:15 9 9:15 8 8:30 • • -9 15 - 3.30 4 4:20 9 9:45 - - 9:45 l lo pm i it Pin 5:10 - 1 10:15:'- ° ° -10:15 - - •- 570 6 6 m - - -1045 ' 1 1045 C Seasons: Cedar bland - Ocracoke & Ocracoke - Hatteras. "Summer: SCHEDULES AND FEES AU S[TMCT TO Southport - Fort Fisher. Summer.. Apd 1- October 31, Win T ' Trucker's Note: For information on size limitations. contact the N.C. De CHANGE WITHOUT NOTCE. Street, Morehead City, N.C. 28557 or call 919) 72 &64 � 77 0o Map inquiries and suggested revisions should be submitted to A. Poe Cox, N.C. Depart ,��i �i� �,.i�'4�+tn�'t3,t'' k•''s `�" a r r 'v„;c a `\ X • 3o = 3�' 87• S� U � W APR 0 1 1997 e0�k °0 * °tr N/F STATE OF NORTH CAROLINA DB 509, PG 412 R/R IR Al EIP A-% MIA °� rs• `. LOT 18 i A o TOTAL AREA 4, t4 30,056.85 S.F. 0.69 ACRES a \ �, ON X-11 Cy \+A \ < r\ lz' 1 •`, r ° . / C.'MevrW / 1 c � n rd t. Y�• YC cr N, •�O Z4 Xa CHARLES A. RAWLS, REGISTERED AND SURVEYOR duo hereby certify hat I have surveyed the propert, s shown hereon in accordance ith THE STANDARDS OF PRACTICE OR LAND STpVT M4,. IN NORTH AROLINA. A. 1 ' G K/ 1ttUN LO IV Q \ G W. 7 S �' NIF STATE OF �rrUsS NORTH CAROLINA ar �140yu C �orc re f� IRON \ SURVEY FOR J u 'T. REFERENCE: MB 1, PG 113 DB 718, PG 131 CARTERET CO. REGISTRY LOTS 18 & 19 JOHN S. JONES SUBDIVISION WHITE OAK TOWNSHIP Charles A. Rawls and Associates P.O. Box 1126, Swansboro, N.C. 28584 TELEPHONE (910)326 -1408 • CA.h PL9NMNG MAPPING SURYMG z APR 0 1 1097 O �o \ \ Ae �Y �o \ •� Y \ 40 o�P \\ QO\ \ ' \ EIP \, \ NIF STATE OF s \ NORTH CAROLINA �� \ DB 509, PG 412 LOT 18 TOTAL AREA / 30,056.85 S.F. // R/ IRON 0.69 ACRES // LOT o \\ \\ R/R IRON \ 22!0 15% •,�� . 7. o O/ D� N/F / STATE OF NORTH CAROLINA j► S � jar /' N• 48 �j�,?i •1 R/R IRON \ \, REFERENCE: MB 1, PG 113 DB 718, PG 131 CARTERET CO. REGISTRY ' CHARLES A. RAWLS, REGISTERED awn SURVEY FOR�p LAND SURVEYOR dog hereby certify J 0444 V 9T . that .I have surveyed the property o eo e as shown . hereon in accordance revis e LOTS 18 19 .with THE STANDARDS OF PRACTICE sg a JOHN S. JONES SUBDIVISION OR LAND SiiR4N IN NORTH ' =50' CAROLINA. ��Q�N�CAR 0'�'�i4 pro . no WHITE OAK TOWNSHIP O %% SST .,LL QaOLINA a = _ Charles A. Rawls ��L- 49 Z � and Ass "ociates CAR ''�'Sq� I R�Pv1 `` P.O. Box 1126, Swansboro, N.C. 28584 PLANNING TELEPHONE (910)326 -1408 .MAPPING FAX (91MnP- r, -14nn SURVEnwo � M, � � 0 It A -C 5 L fit Ze. ddb I M 0 ! m I Ell I 104M 1 immol EL I.. l...l 6 ri. s RQ RE I i i I .I- ' - - -- -- `k : I JI i Q j -- -- 1 r : : �J - I I I - wi: r , J V ✓1 y- -- : r r i l I I I I 1 : �i . 1 r I IN I I �• I I -- - -- - - -- - - -1 -- l- i I, I i I I I, I I �j r � I, , r I I , 1 I r , - -- r I r r r � i j �_ __� ►► I I I � 1 1 l i i l l j i l __,_ -_ � - I I i -- : i I - ; I I — I I I�I ; I I : I I j I j I i i �•� -- -- -- - -- -- —�— —) i a o I i JC4 I 1T>< i I I I IL i I- j I i - - - -- - __ ' I I - -- - - - -- - I I I 1 1 r- , �-- I I J T-4 V Vi _ft V .. MMMM � I , - -- M' • 7 I I , I I I I t _I j I• : _I I I I i i I L i i II - - - - -- -- - -- ... - -- - - - -- j I j j r