Loading...
HomeMy WebLinkAbout19980260 Ver 6_R-2247EB losses_20210902 Wanucha, Dave From:Euliss, Amy Sent:Thursday, September 2, 2021 3:40 PM To:Wanucha, Dave Cc:Jones, Scott A; Librandi, Nicholas C; Marciniak, Katherine J Subject:R-2247EB losses Dave, We have a few losses to report on R-2247EB following the 1.23” rain event yesterday (Hurricane remanents). Thankfully, we have had a much better response this time from our contractor. Cleanup is underway. The losses include: Site 4 had a loss of about 8 CY, and the lost material will be removed from the streambed. Site 10H-VV had a loss of about 3 CY. There was no visible direct loss, rather the material was likely within the pipe system. It appears that the pipe is now clean. This area had some 57 stone mix in with the natural stream material, so it won’t all be 100% removed. We will remove what we can that causes minimum stream bed disturbance. Site 13A-DDD had a loss of about 4 CY, and the lost material will be removed from the streambed. Let me know if you have questions or need additional information. Thanks. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1