Loading...
HomeMy WebLinkAboutKit Creek Tap LineMarch 18,2013 Kevin S. Johnson, PE Duke Energy Substation Engineering 526 S Church St Mail Code: EC08Q Charlotte, NC 28202 Subject: Surface Water Determination Letter JBRRO#13-033 Wake/Durham County Determination Type: Buffer Call Isolated or Ell' Call F-1 Neuse (15A NCAC 2B.0233) F-1 Tar-Pamlico (1 5A NCAC 213 0259) El Ephemeralfl nterm ittent/Pere nnial Determination R Isolated Wetland Determination Z Jordan (15A NCAC 2B.0267) Project Name, Duke Energy - Kit Creek Tap Line Location/Directions: Project is a electrical power substation-type area with transmission lines extending north from Kit Creek Rd to Hopson Rd approximately, east side of Hwy 55 Subject Stream: UT to and Long Creek Date of Determination: March 18, 2013 - No site visit conducted Feature VIM* Not Subject Subject Start* Stop @� Soil Survey ri, A E X Flag AI Flag A2 X B E X Flag B1 Flag B3 X B I X Flag B3 Flag 134 l=ong --f X Throughout X X C I P X ag C2 onc aw NPC a a)�; Nt U'r North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919)791 -4200 Customer Service Internet www.nmaterguality,org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 57.1-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper Duke Energy — Kit Creek Tap Line Wake and Durham County March 18, 2013 Page 2 of 2 Explanation: The feature(s) listed above has or have been located on the Soil, Survey of Wake and Durham Counties, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on-site determination shall expire rive (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWQ WeBSCaPe Unit, 1650 Mail Service Center, Raleigh, NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. Respectfully, Martin Ric and Environin al Specialist CC. RRO/SWP File Copy 1=4 A