Loading...
HomeMy WebLinkAbout20100312 Ver 1_Application_20100609C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Z Wetlands ❑ Streams - tributaries Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2& 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary (T) W1 nPnT Yes ❑ No ❑ Corps ❑ DWQ 0 Sq. Ft. W2 E]PE]T ❑ Yes ❑ No ❑ Corps ❑ DWQ 0 Sq. Ft W3 EIPEIT ❑ Yes ❑ No [:1 Corps [--] DWQ OSq. Ft. W4 nPnT ❑ Yes ❑ Corps [-] No ❑ DWQ W5nPnT ❑ Yes ❑ Corps [:1 No [-] DWQ W6 ❑ P f-1 T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0 Sq- Ft. 2h. Comments: No 404 Wetland Impacts 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent D - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ZPnT Fill Un-Named Tributary of Brice's PER El INT 0 Corps 0 DWQ 12" 36' Creek S2 E]PnT ❑ PER ❑ Corps [:1 INT ❑ DWQ S3 nPnT [:1 PER F1 Corps ❑ INT [:] DWQ S4 [:] P ❑ T [-] PER ❑ Corps ❑ INT ❑ DWQ S5 [:1 P ❑ T ❑ PER f-1 Corps El INT [:1 DWQ S6 E]PnT ❑ PER ❑ INT 3h. Total stream and tributary impacts 36 LF 3i. Comments: 36 Linear Feet of Stream Impacts Page 4 of 10 -VU-