HomeMy WebLinkAbout19970175 Ver 4_PreFiling 30-Day Clock Reached Email_20210507Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, May 7, 2021 12:00 AM
To: richard.harmon@woodplc.com
Cc: Annino, Amy M
Subject: Pre -Filing Time Clock has been reached for Cliffside Unit 5 Switchyard Storm Drain
Replacement - 19970157 Ver 4
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cliffside Unit 5
Switchyard Storm Drain Replacement that you submitted on 4/6/2021. The ID number for that project is 19970157,
Version 4.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
19970157
Version *
4
Asheville Regional Office - (828) 296-4500
Amy Annino
Pre -Filing Meeting Request submitted 4/6/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Richard Harmon
richard.harmon@woodplc.com
Cliffside Unit 5 Switchyard Storm Drain Replacement
Duke Energy Carolinas, LLC
Rutherford
Street Address
573 Duke Power Road
Address Line 2
City State / Rovince / Region
Mooresboro NC
Fbstal / Zip Code Country
28114 United States
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below and include location information. *
Duke Energy wishes to re-route a storm drain around a switchyard at
the Cliffside Station. The current stormwater pipe lies under the
switchyard and has several breaks in the pipe. There the need to re-
route the stormwater drain pipe around the switchyard,
Please give a couple of dates you are available for a meeting.
5/6/2021
Please attach the documentation you would like to have the meeting about.
3.26.2021 - 6226200051 - Cliffside Unit 5
11.02 MB
Switchyard Storm Drain Replacement (002).pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/6/2021