Loading...
HomeMy WebLinkAbout19970175 Ver 4_PreFiling 30-Day Clock Reached Email_20210507Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, May 7, 2021 12:00 AM To: richard.harmon@woodplc.com Cc: Annino, Amy M Subject: Pre -Filing Time Clock has been reached for Cliffside Unit 5 Switchyard Storm Drain Replacement - 19970157 Ver 4 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cliffside Unit 5 Switchyard Storm Drain Replacement that you submitted on 4/6/2021. The ID number for that project is 19970157, Version 4. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 19970157 Version * 4 Asheville Regional Office - (828) 296-4500 Amy Annino Pre -Filing Meeting Request submitted 4/6/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Richard Harmon richard.harmon@woodplc.com Cliffside Unit 5 Switchyard Storm Drain Replacement Duke Energy Carolinas, LLC Rutherford Street Address 573 Duke Power Road Address Line 2 City State / Rovince / Region Mooresboro NC Fbstal / Zip Code Country 28114 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information. * Duke Energy wishes to re-route a storm drain around a switchyard at the Cliffside Station. The current stormwater pipe lies under the switchyard and has several breaks in the pipe. There the need to re- route the stormwater drain pipe around the switchyard, Please give a couple of dates you are available for a meeting. 5/6/2021 Please attach the documentation you would like to have the meeting about. 3.26.2021 - 6226200051 - Cliffside Unit 5 11.02 MB Switchyard Storm Drain Replacement (002).pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/6/2021