Loading...
HomeMy WebLinkAbout19970175 Ver 4_Pre-Filing Meeting Request_20210406DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 19970157 Version * 4 Asheville Regional Office - (828) 296-4500 Amy Annino Pre -Filing Meeting Request submitted 4/6/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Richard Harmon richard.harmon@woodplc.com Cliffside Unit 5 Switchyard Storm Drain Replacement Duke Energy Carolinas, LLC Rutherford Street Address 573 Duke Power Road Address Line 2 City State / Rovince / Region Mooresboro NC Fbstal / Zip Code Country 28114 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information. * Duke Energy wishes to re-route a storm drain around a switchyard at the Cliffside Station. The current stormwater pipe lies under the switchyard and has several breaks in the pipe. There the need to re- route the stormwater drain pipe around the switchyard, Please give a couple of dates you are available for a meeting. 5/6/2021 Please attach the documentation you would like to have the meeting about. 3.26.2021 - 6226200051 - Cliffside Unit 5 11.02 MB Switchyard Storm Drain Replacement (002).pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/6/2021 CLIFFSIDE UNIT 5 SWITCHYARD STORM DRAIN REPLACEMENT RUTHERFORD COUNTY MOORESBORO, NC SURVEY: PREPARED BY: PATTERSON & DEWAR ENGINEERS 850 CENTER WAY NORCROSS, GA 30071 MASER CONSULTING 5275 PARKWAY PLAZA BLVD., SUITE 100 CHARLOTTE, NC 28217 PARCEL DATA: OWNER: DUKE ENERGY CAROLINAS, LLC 400 SOUTH TRYON STREET CHARLOTTE, NC 28201 PIN NUMBER: TAX MAP NUMBER: TOTAL AREA: PARCEL ZONING: 1574262434 1617219 155.6 ACRES INDUSTRIAL PROPERTY ADDRESS: SITE DATA: TOTAL PROPOSED SITE AREA: TOTAL DISTURBED AREA: PARCEL ZONING: DEVELOPMENT TIER: EXISTING IMPERVIOUS AREA: RIVER BASIN: ROGERS ENERGY COMPLEX - 573 DUKE POWER ROAD, MOORESBORO, CLIFFSIDE STEAM STATION: RUTHERFORD COUNTY, NC 8.9 ACRES 0.40 ACRES INDUSTRIAL 8.41 ACRES BROAD RIVER PROPERTY MAP SEAL: R u the rfr rd to n CAROLINA CAROLINA Bo Ring Sp rims Valley Falls LEGEND: SpIndi!e Forest Cdy 1 .Alexander .` Mills - 1 Chesnee PROPERTY LINES ROAD R/W LIMITS PROPOSED DISTRIBUTION LINE EXISTING LINE R/W LIMITS EXISTING DISTRIBUTION LINE EXISTING TRANSMISSION LINE STATION FENCE X X ' Casar Ellenboro I hMooresboro t per_ y y1961xr.n,d— - Shelby Lao, rolale -I, Fielwood Lattimore Boiling Springs CLIFFSIDE STEAM STATION Co"vpere VICINITY MAP Gaffney PRELIMINARY 30% - NOT FOR CONSTRUCTION TIII V DRAWING OP, DILL OF IIATERI-1L I ('OVFTDTLV7UA it \ D MY \TOT HP LOA :L'A, REPRODLCEL) 014 COPAL, IITIIIR IIIOLLY OP IN PART, OP, 11,1 DF, PUBLIC F\4 I \Y 1, 1 \TVFP, JVTTNOT T THE I4RITTL' Co vsLT T OF LC KI ENERGY (00/0P.TTOa. DESCRIPTION ❑ PRELIMINARY ❑ AS BUILT Contract: Company: Phone: Date: SSUED FOR CLIENT REVIEW REVISION HISTORY ISSUE TYPE TITLE: W180161 East Gaffney Patterson Springs Blacksburg COVER SHEET STORM DRAIN REPLACEMENT 3/26/2021 LOCATI°N: CLIFFSIDE UNIT 5 SWITCHYARD CITY: MOORESBORO COUNTY: RUTHERFORD STATE: NC SHEET SIZE: ARCH D REGION: NCSC STATION NUMBER: 3403 DRAWING NUMBER: #######C-01 REV: 0 SHEET 1 FILENAME: #######C-Ol COVER SHEET DWG GENERAL NOTES PROJECT DESCRIPTION THE WORK AT THE 115KV YARD AT THE CLIFFSIDE UNIT 5 SUBSTATION CONSISTS OF ABANDONING IN PLACE THE EXISTING 36" CMP CULVERT THAT RUNS UNDER THE SUBSTATION AND INSTALLING A NEW PIPE NETWORK THAT USES AN ALIGNMENT THAT RUNS AROUND THE OUTER EAST SIDE OF THE SUBSTATION. THE NEW PIPE NETWORK WILL CONVEY THE SAME DRAINAGE FROM THE EXISTING CULVERT INLET TO THE SAME OUTLET LOCATION. SILT FENCE AND COMPOST SOCK WILL BE USED DOWN GRADIENT OF EXCAVATIONS AND INLET PROTECTION WILL BE USED TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING THE EXISTING OR PROPOSED STORM DRAINAGE SYSTEM OR FROM LEAVING THE PROJECT SITE. THE TOTAL DISTURBED AREA FOR THIS PROJECT IS APPROXIMATELY 28.64 ACRES. EXISTING SITE CONDITIONS STORMWATER RUNOFF FROM THE SITE ULTIMATELY DISCHARGES TO THE BROAD RIVER WHICH IS LOCATED WITHIN THE SANTEE RIVER WATERSHED. SCHEDULE WORK IS PLANNED TO BEGIN IN THE FIRST QUARTER OF 2022. EROSION AND SEDIMENTATION CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE PLACEMENT OF A VARIETY OF EROSION AND SEDIMENT CONTROL DEVICES AT STRATEGIC LOCATIONS THROUGHOUT THE DEVELOPMENT. THESE MEASURES INCLUDE: 1. SILT FENCING 2. SILT FENCE OUTLETS 3. SILT FENCE J-HOOK 4. EROSION CONTROL MATTING 5. COMPOST SOCKS 6. INLET PROTECTION 7. ROCK PIPE INLET PROTECTION 8. TEMPORARY/PERMANENT SEEDING PERIMETER DEVICES AND INLET PROTECTION ARE TO BE INSTALLED PRIOR TO ANY LAND DISTURBANCE ACTIVITIES. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED UNTIL THE COMPLETION OF ALL WORK ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING WORK ACTIVITIES IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE WORK IS COMPLETE AND THE SITE IS STABILIZED. GENERAL NOTES 1. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING CONSTRUCTION UNTIL THE COMPLETION OF CONSTRUCTION ACTIVITIES AND DISTURBED AREAS HAVE BEEN STABILIZED. TEMPORARY EROSION CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 2. SEDIMENT AND EROSION CONTROL DEVICES AND PLANTED AREAS SHALL BE INSPECTED BY DUKE ENERGY OR THEIR REPRESENTATIVE EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH IN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 3. SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO THE SEEDING PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. SEEDED AREAS SHALL BE INSPECTED PERIODICALLY BY DUKE ENERGY UNTIL FINAL GROUND COVER HAS BEEN ESTABLISHED. 4. THE OWNER OR THEIR AGENT SHOULD ADHERE TO THE SELF -INSPECTION PROGRAM FOR EROSION AND SEDIMENT CONTROL (EFFECTIVE OCTOBER 1, 2010). DETAILS OF THE PROGRAM AND RECOMMENDED INSPECTION FORMS CAN BE FOUND AT THE FOLLOWING WEBSITE: HTTPS://DEQ. NC. GOV/ABOUT/DIVISIONS/EN ERGY-MI NERAL-LAND-RESOURCES/EROSI ON-SEDI MENT-CONTROL 5. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN ( 7) DAYS FOR PERIMETER AREAS AND SLOPES GREATER THAN 3H:1V AND NO MORE THAN FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. 6. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF, OR IMPROPER RELIANCE ON, THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS SHALL BE WITHOUT LIABILITY TO WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS. STANDARDS ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT OF 1973. CONSTRUCTION DETAILS AND SPECIFICATIONS WITHIN THIS PLAN WERE DERIVED FROM THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED MAY, 2013, PREPARED BY THE NORTH CAROLINA SEDIMENTATION CONTROL COMMISSION, NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND NORTH CAROLINA AGRICULTURAL EXTENSION SERVICE (NCAES). CONSTRUCTION SEQUENCE PHASE 1 - INSTALLATION OF PERIMETER CONTROLS 1. HOLD PRE -CONSTRUCTION MEETING WITH THE OWNER, ENGINEER OF RECORD, AND ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH LAND DISTURBANCE. PRE -CONSTRUCTION MEETING SHALL REVIEW OVERALL CONSTRUCTION SEQUENCE, ENVIRONMENTAL COORDINATION AND TESTING, AND ITEMS ON THE CRITICAL PATH PRIOR TO THE START OF CONSTRUCTION. 2. CONTRACTOR MOBILIZATION TO SITE. 3. THE CONTRACTOR SHALL LOCATE AND VERIFY ALL UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY UTILITIES, CABLES, PIPES, OR OTHER UNDERGROUND CONVEYANCES SCHEDULED TO REMAIN THAT ARE DESTROYED OR DAMAGED BY THE CONTRACTOR, INCLUDING ANY SUBCONTRACTORS, DURING THE PROJECT. UTILITIES WHICH HAVE BEEN ABANDONED WILL NOT BE REPAIRED/REPLACED. 4. THE CONTRACTOR SHALL CLEARLY DEMARCATE THE LIMITS OF DISTURBANCE. THE LIMITS SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS OR OTHER APPROPRIATE VISUAL MARKING DEVICES. THE LIMITS OF DISTURBANCE SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED LIMITS OF DISTURBANCE INDICATED ON THE DRAWINGS VVITHOUT APPROVAL BY THE OWNER. 5. INSTALL PERIMETER CONTROL MEASURES AS SHOWN ON THE PLAN PRIOR TO CLEARING AND GRUBBING, WHERE PRACTICAL. FIELD VERIFY AND INSTALL DOUBLE ROW SILT FENCE AND PROTECTIVE FENCE AROUND ENVIRONMENTALLY SENSITIVE AREAS INCLUDE BUT ARE NOT LIMITED TO STREAMS, WETLANDS, AND PONDS. WHEN CLEARING IS REQUIRED TO INSTALL PERIMETER MEASURES, CLEARING AND GRUBBING SHALL NOT OUTPACE THE INSTALLATION OF PERIMETER CONTROLS. 6. INSTALL SILT FENCE AND SILT FENCE OUTLETS AROUND THE PROPOSED STOCKPILE AREA. INSTALL COMPOST FILTER SOCK PYRAMID AS SHOWN ON THE PLANS TO PROVIDE VEHICLE ACCESS TO THE STOCKPILE AREA. 7. THE CONTRACTOR SHALL NOT PERFORM ANY CLEARING AND GRUBBING ACTIVITIES (EXCEPT THOSE NECESSARY FOR PERIMETER CONTROL INSTALLATION) NOR ANY DEMOLITION ACTIVITIES (SUCH AS REMOVAL OF SWITCHYARD FENCE AND ANY OTHER SWITCHYARD APPURTENANCES) UNTIL PERIMETER CONTROLS ARE INSTALLED AS SHOWN ON THE PLANS. PHASE 2 - PROPOSED PIPE INSTALLATION 1. CONTRACTOR TO BEGIN NEW PROPOSED PIPE NETWORK INSTALLATION. CONTRACTOR TO PHASE, SEQUENCE, AND CONDUCT LAND DISTURBING AND CONSTRUCTION ACTIVITIES IN A MANNER THAT MINIMIZE THE AMOUNT OF BARE SOIL EXPOSED AT A GIVEN TIME DURING THE PROJECT. CONTRACTOR TO DETERMINE THE NECESSARY SHORING REQUIREMENTS PER OSHA EXCAVATION STANDARD. 2. CONTRACTOR TO EVALUATE THE SHORING REQUIREMENTS FOR PIPE INSTALLATION AND DESIGN SHORING PER OSHA EXCAVATION STANDARD. SHORING DESIGN TO BE PROVIDED TO DUKE ENERGY AND THE ENGINEER FOR APPROVAL. 3. CONTRACTOR TO ENDEAVOR TO MAINTAIN EXISTING MAINTENANCE ACCESS DURING CONSTRUCTION THROUGH PHASING OF EXCAVATION AND PIPE INSTALLATION. 4. DURING PIPE INSTALLATION, STORMWATER COLLECTED WITHIN THE EXCAVATION SHALL BE PUMPED TO AN APPROPRIATE OUTFALL AND DISCHARGED THROUGH A SILT BAG. DIRECT DISCHARGE OF PUMPED STORMWATER IS NOT PERMITTED. PHASE 3 - FINAL CONDITIONS 1. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES THROUGHOUT ALL PHASES OF THE PROJECT. 2. STABILIZE ANY DISTURBED AREAS WITH PERMANENT VEGETATION PER THE SEEDING SPECIFICATIONS. 3. UPON PERMANENT STABILIZATION OF DISTURBED AREAS, AN INSPECTION AND APPROVAL BY A REPRESENTATIVE OF THE NCDEQ LAND QUALITY SECTION IS REQUIRED PRIOR TO THE REMOVAL OF EROSION CONTROL MEASURES. 4. CLOSE EROSION AND SEDIMENT CONTROL PERMIT IN ACCORDANCE WITH NCDEQ REQUIREMENTS. 5. DECOMMISSION EROSION AND SEDIMENT CONTROL MEASURES. GENERAL NOTES FOR CONTRACTOR 1. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL COUNTY, STATE AND FEDERAL REGULATIONS AND CODES AND O.S.H.A. STANDARDS. 2. EXISTING TOPOGRAPHIC INFORMATION IS A BLEND OF TOPOGRAPHIC DATA FROM SURVEY COMPLETED BY PATTERSON & DEWAR ENGINEERS ON NOVEMBER 11, 2018, ADDITIONAL SURVEY COMPLETED BY MASER CONSULTING ON OCTOBER 30, 2020 AND LIDAR DATA FROM NC ONE MAP. 3. EXISTING PLANIMETRIC DATA PRODUCED FROM PHOTOGRAMMETRIC METHODS FROM AERIAL PHOTOGRAPHY COMPLETED BY PATTERSON & DEWAR ENGINEERS ON NOVEMBER 26, 2018 AND ADDITIONAL SURVEY COMPLETED BY MASER CONSULTING ON OCTOBER 30, 2020. 4. NOT ALL UTILITIES ARE SHOWN IN THESE PLANS AND THEREFORE THE CONTRACTOR SHALL NOT ASSUME COMPLETENESS OF THE PROVIDED EXISTING CONDITIONS PLAN. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION. 5. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ANY PROPERTY MARKERS DISTURBED DURING CONSTRUCTION. 6. PROPOSED GRADING AND GROUND DISTURBING ACTIVITIES SHOWN ON THIS PLAN IS ON DUKE ENERGY PROPERTY. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS IN WRITING. 7. CONTRACTOR AGREES TO REPAIR ANY DAMAGE TO THE PUBLIC RIGHT OF WAY IN ACCORDANCE WITH THE STANDARDS OF THE NCDOT. 8. ANY EXCAVATED MATERIAL SHALL BE STOCKPILED IN DESIGNATED AREAS AS SHOWN ON THE PLANS. STOCK PILES SHALL BE LOCATED UP -GRADIENT OF EROSION AND SEDIMENT CONTROL FEATURES. ADDITIONALLY, ALL STOCK PILES SHALL HAVE SILT FENCE OR DIVERSION BERMS INSTALLED ON THE DOWN -GRADIENT SIDE OF THE STOCK PILE. 9. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. EXCAVATED SOILS CONTAINING FLY ASH TO BE REMOVED AND DISPOSED OF IN SPECIFIED ON -SITE ASH DISPOSAL LOCATIONS. PRIOR TO HAULING ANY MATERIAL OFF -SITE, THE ENVIRONMENTAL REPRESENTATIVE SHALL COORDINATE MATERIAL TESTING FOR ANY CONTAMINANTS PER EPA/DUKE ENERGY PROCEDURES AND DISPOSE ACCORDINGLY. NON -HAZARDOUS AND CLEAN MATERIAL SHALL BE DISPOSED AT PERMITTED LANDFILLS OR SITES. 10. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND CIVIL ENGINEERING CONSULTANT ANY DISCREPANCIES FOUND BETWEEN THE ACTUAL FIELD CONDITIONS AND THE CONSTRUCTION DOCUMENTS AND SHALL HALT WORK IN THE AREA OF DISCREPANCY. CONTRACTOR IS ALLOWED TO CONTINUE WORK ON OTHER AREAS ON THE PROJECT SITE. 11. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS. 12. IT IS ANTICIPATED THAT THE PROPOSED WORK WILL REQUIRE AN EROSION CONTROL PERMIT FROM NCDEQ, A 401/404 NATIONWIDE PERMIT FROM THE USACE, AND A FLOODPLAIN DEVELOPMENT PERMIT FROM RUTHERFORD COUNTY. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY REMOVAL OF ALL CONSTRUCTION MATERIALS SPILLED ON PAVED STREETS, ONSITE AND OFFSITE. 14. THE CONTRACTOR SHALL PURSUE THE WORK IN A CONTINUOUS AND DILIGENT MANNER, CONFORMING TO ALL THE PERTINENT SAFETY REGULATIONS, TO INSURE A TIMELY COMPLETION OF THE PROJECT. 15. THE WORK INCLUDES ALL WORK SHOWN ON THESE DRAWINGS OR REASONABLY IMPLIED. 16. THE CONTRACTOR SHALL AT ALL TIMES DURING CONSTRUCTION, PROTECT FROM DAMAGE EXISTING IMPROVEMENTS ON AND AROUND THE SITE, INCLUDING, BUT NOT LIMITED TO, ASPHALT PAVEMENTS, SIGNAGE, SANITARY SEWERS, WATER MAINS, OVERHEAD POWER LINES AND OTHER UTILITIES WITHIN THE PROJECT AREA. CONTRACTOR SHALL AVOID GOING OUTSIDE THE CONSTRUCTION LIMITS SO AS TO MINIMIZE DISTURBANCE OF EXISTING VEGETATION. 17. THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ANY IMPROVEMENTS (EXISTING OR PROPOSED) DAMAGED THROUGHOUT THE COURSE OF CONSTRUCTION. REPAIRS SHALL BE MADE WITH CLOSE COORDINATION WITH DUKE ENERGY PROJECT MANAGER. 18. THE CONTRACTOR SHALL, UPON COMPLETION OF THE PROJECT, PREPARE AND SUBMIT TO THE ENGINEER, AS -BUILT RED -LINES INDICATING BY DIMENSION AND DESCRIPTION ANY FACILITY CONSTRUCTED CONTRARY TO THAT SHOWN ON THESE PLANS. 19. ALL QUANTITIES SHOWN HEREIN ARE APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR. CONTRACTOR SHALL DETERMINE THE QUANTITIES THAT HE DEEMS NECESSARY TO MEET THE MINIMUM REQUIREMENTS SHOWN HEREON THE PLANS. 20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION SIGNING, BARRICADING, MAINTENANCE OF TRAFFIC AND TRAFFIC DELINEATION AND SHALL CONFORM TO ALL STATE AND FEDERAL REGULATIONS. 21. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH NCDEQ REGULATIONS. 22. ATTENTION IS DRAWN TO THE FACT THAT THE SCALE OF THESE DRAWINGS MAY HAVE BEEN DISTORTED DURING THE REPRODUCTION PROCESS. GRADING AND DRAINAGE NOTES 1. EXISTING AND PROPOSED GRADE CONTOUR INTERVAL IS 1 FOOT. 2. THE INCLUDED REFERENCES TO NCDEQ E&SC MEASURES AND DETAILS ARE FOR BEST MANAGEMENT PRACTICES AND AS AN AID TO CONSTRUCTION. THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE GENERAL NORTH CAROLINA N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 3. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION TO EXISTING GRADE. 4. ALL NON -STOCKPILE FILL SHALL BE COMPACTED TO 95% STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-D698) OR PER THE ON -SITE GEOTECHNICAL ENGINEER'S DIRECTION. UNSUITABLE MATERIAL SHALL BE DISPOSED OF AT THE OWNER'S DISCRETION. PRIOR TO HAULING ANY MATERIAL OFF -SITE, THE ENVIRONMENTAL REPRESENTATIVE SHALL COORDINATE MATERIAL TESTING FOR ANY CONTAMINANTS PER EPA/DUKE PROCEDURES AND DISPOSE ACCORDINGLY. NON -HAZARDOUS AND CLEAN MATERIAL SHALL BE DISPOSED AT PERMITTED LANDFILLS OR SITES. 5. CONTRACTOR TO DETERMINE OPTIMAL EXCAVATION METHOD FOR PIPE INSTALLATION (I.E. OSHA COMPATIBLE SLOPED EXCAVATION OR VERTICAL EXCAVATION WITH SHEET/SHORING). THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING, AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET O.S.H.A., FEDERAL, STATE, AND LOCAL REGULATION PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) AND OR INSTALLATION OF SAID ITEMS. 6. EXCAVATION PLAN SHALL BE DISCUSSED DURING PRE -CONSTRUCTION MEETING AND ANY ENGINEERING SOLUTIONS FOR SHORING SYSTEM SHALL BE SUBMITTED TO DUKE ENERGY FOR REVIEW/RECORD PURPOSE. 7. GRADES, ELEVATIONS, AND LOCATIONS SHOWN ARE APPROXIMATE, AND MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS, AS DIRECTED BY THE CIVIL ENGINEER . 8. EXISTING DRAINAGE STRUCTURES TO BE REBUILT AS NEEDED TO ACCOMMODATE PROPOSED IMPROVEMENTS. REFERENCES 1. EXISTING TOPOGRAPHIC AND PLANIMETRIC DATA FROM "TOPOGRAPHIC SURVEY OF CLIFFSIDE SWITCHYARD #5" COMPLETED BY PATTERSON & DEWAR ENGINEERS ON NOVEMBER 11, 2018. 2. EXISTING TOPOGRAPHIC AND PLANIMETRIC DATA FROM SURVEY COMPLETED BY MASER CONSULTING ON NOVEMBER 5, 2020 AND UPDATED ON MARCH 2, 2021. 3. CONTOUR DATA OUTSIDE OF SURVEY BOUNDARY WAS OBTAINED FROM NC ONE MAP AND HAS NOT BEEN FIELD VERIFIED. 4. HORIZONTAL AND VERTICAL DATUM IS NAD 83 AND NAVD 88 RESPECTIVELY. SEEDING SPECIFICATIONS DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH SEED. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SPECIFICATIONS SEEDBED REQUIREMENTS ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER TO 1 INCH OF SOIL). • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS, SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. WHEN SOIL TEST RESULTS ARE NOT AVAILABLE FOR TEMPORARY SEEDBED PREPARATION FOLLOW RATES SUGGESTED IN THE SEEDING SPECIFICATIONS SHOWN AT RIGHT. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES: GROUND AGRICULTURAL LIMESTONE: LIGHT -TEXTURED, SANDY SOILS: 1 TO 1-1/2 TONS/ACRE, HEAVY -TEXTURED, CLAYEY SOILS: 2-3 TONS/ACRE • FERTILIZER: 700-1000 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. ROUGHEN SURFACES PRIOR TO SEEDING. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDI NG SEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS ARE DESIGNATED AS "BEST" OR "POSSIBLE." SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE THIS INTO ACCOUNT IN SCHEDULING LAND -DISTURBING ACTIVITIES. LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1 INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. HYDRO SEEDING SURFACE ROUGHENING IS PARTICULARLY IMPORTANT WHEN HYDRO SEEDING, AS A ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS, STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHALL BE 1,000 - 2,000 LB/ACRE. APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING INOCULANT TO A HYDRO SEEDER SLURRY. IF A MACHINERY BREAKDOWN OF 1/2 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM. MAI NTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL IT HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE IS RESPONSIBLE. FERTILIZATION --ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. TEMPORARY SEEDING SPECIFICATIONS SEEDING MIXTURE (FALL) SPECI ESQ RYE GRAIN (SECALE CEREALE) RATE (LB/ACRE) 120 SEEDING MIXTURE (LATE WINTER EARLY SPRING) SPECIES* RATE (LB/ACRE) RYE GRAIN (SECALE CEREALE) 120 SEEDING MIXTURE (SUMMER) SPECIES* RATE (LB/ACRE) GERMAN MILLET (SETARIA ITALICA) 40 SEEDING DATES (PIEDMONT) FALL: LATE WINTER (EARLY SPRING): SUMMER: AUG. 15 - DEC. 30 JAN. 1 - MAY 1 LATE MAY 1 - AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAI NTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, 3H:1V OR GREATER SLOPES LEFT EXPOSED WILL, WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. *REF: 6.10 A,B AND C, NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 2013. PERMANENT SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES* RATE (LB/ACRE) TALL FESCUE (FESTUCA ARUNDINACEA) (GRASS LINED CHANNELS) 200 TALL FESCUE (FESTUCA ARUNDINACEA) (OTHER AREAS) 100 NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET (SETARIA ITALICA) OR 15 LB/ACRE SUDAN GRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 40 LB/ACRE RYE GRAIN (SECALE CEREALE). SEEDING DATES FALL: LATE WINTER: BEST AUG. 25 - SEPT. 15 FEB. 15 - MAR. 21 POSSIBLE AUG. 20 - OCT. 25 FEB. 1 -APR. 15 SOIL AMENDMENTS A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER TESTS TAKEN PRIOR TO, DURING AND AFTER CONSTRUCTION. MULCH APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAI NTENANCE RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS. *REF: 6.11 NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 2013. #######C-02 0 REV PRELIMINARY 30% - NOT FOR CONSTRUCTION ISSUED FOR CLIENT REVIEW W180161 DESCRIPTION ISSUE TYPE DPN CNB DFT KPF CHK RLH ENG 3/26/2021 DATE REVISION HISTORY SEAL: TIiI DRAWING OR BILL OF VATERIAL I ('OVFTDPVVI4T, l\D IFIY \TOT HP LOAVL'D, REPRODLCED OR COINED, LITTLER IIIIOLLY OR IN PART. OP, i ADP PUBLIC IN I\Y V \VVPP WITHOUT THE 14RI17L'\ COVSL'VT OF DUKE ENERGY coPPOPAT/O. ❑ PRELIMINARY ❑ AS BUILT Contract: Company: Phone: Date: TITLE: LOCATION: GENERAL NOTES STORM DRAIN REPLACEMENT CLIFFSIDE UNIT 5 SWITCHYARD CITY: MOORESBORO COUNTY: RUTHERFORD STATE: NC SHEET SIZE: REGION: STATION NUMBER: DRAWING NUMBER: REV: ARCH D NCSC 3403 # # # # # # #C-02 0 SHEET 1 FILENAME: GENERAL NOTES.DWG SECTION A: SELF -INSPECTION business hours in accordance with the table below. When adverse of the inspection personnel to be in jeopardy, the inspection which it is safe to perform the inspection. In addition, when occurs outside of normal business hours, the self -inspection next business day. Any time when inspections were delayed a shall shall Self -inspections weather may be storm be performed be noted NOTE: are required during normal or site conditions would cause the safety delayed until the next business day on event of equal to or greater than 1.0 inch upon the commencement of the in the Inspection Record. Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. The rain inspection resets the required 7 calendar day inspection requirement. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3 Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. SECTION B: RECORDKEEPING shall be kept on the site. The approved E&SC plan must permit. The following items pertaining to the E&SC plan 1. E&SC The be shall 2. Additional In and Division requirement (a) (b) (c) Plan Documentation approved E&SC plan as well as any approved deviation kept up-to-date throughout the coverage under this be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Documentation addition to the E&SC Plan documents above, the following items shall be kept on the site available for agency inspectors at all times during normal business hours, unless the provides a site -specific exemption based on unique site conditions that make this not practical: This general permit as well as the certificate of coverage, after it is received. Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. SANDBAGS (TYP.) OR STAPLES SILT FENCE CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN ) PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FILTRATION SOIL BERM 10 MIL PLASTIC SANDBAGS (TYP.) LINING OR STAPLES SECTION A -A NOTES 1 ACTUAL LOCATION DETERMINED IN FIELD 2 THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3 CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE AA AA / 0 ov�v/0>-r 0> <0> _ 0> <0> 0vov V v onoQ ^ SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN ) PLAN 10 MIL PLASTIC LINING 1 SIDE SLOPE (PIP ) SECTION B-B SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM NOTES 1 ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3 CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE SECTION C: REPORTING following occurrences: in a stream or wetland. more, gallons but cannot be cleaned up within 24 hours, surface waters (regardless of volume), or of surface waters (regardless of volume). in excess of reportable quantities under Section 311 of the Clean Water Act 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. unanticipated bypasses. conditions of this permit that may endanger health or the environment. Other Requirements aware of an occurrence that must be reported, he shall contact the appropriate Division and in accordance with the other requirements listed below. Occurrences may also be reported to the Division's Emergency Response personnel at (800) (919) 733-3300. 1. Occurrences Permittees (a) (b) (a) (b) (c) 2. Reporting After regional outside 662-7956, that must be reported shall report the Visible sediment deposition Oil spills if: • They are 25 gallons or • They are less than 25 • They cause sheen on • They are within 100 feet Releases of hazardous substances (Ref: 40 CFR 110.3 and Anticipated bypasses and Noncompliance with the Timeframes and a permittee becomes office within the timeframes normal business hours (800) 858-0368 or Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7calendardays, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Site Area Description Stabilize within this many calendar days after ceasing land disturbance Timeframe variations (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water (HQW) Zones 7 None (c) Slopes steeper than 3:1 7 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d) Slopes 3:1 to 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes flatter than 4:1 14 -/ days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION the soil. Use one of the techniques in the table Stabilize below: the ground sufficiently so that rain will not dislodge Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. EFFECTIVE: 04/01/19 #######C-03 0 REV PRELIMINARY 30% - NOT FOR CONSTRUCTION ISSUED FOR CLIENT REVIEW W180161 DESCRIPTION ISSUE TYPE DPN CNB DFT KPF CHK RLH ENG 3/26/2021 DATE REVISION HISTORY SEAL: T711 BRAN/LW; OR BILL OF MATERIAL I ('OVFITPVTI41- , 111Y VOT HP LOAVL'D, REPRODLCLD OR COPIED, EITHER II`IIOLLY OR IN PART: OP, 11AOP PUBLIC TV 1\Y 1/ 1\I\PP, J.1TNOIT THE 11 REND' COVSLVT OF DIKE ENERGY coPP0PAT/O. ❑ PRELIMINARY ❑ AS BUILT Contract: Company: Phone: Date: TITLE: LOCATION: NCGO1 NOTES STORM DRAIN REPLACEMENT CLIFFSIDE UNIT 5 SWITCHYARD CITY: MOORESBORO COUNTY: RUTHERFORD STATE: NC SHEET SIZE: REGION: STATION NUMBER: DRAWING NUMBER: REV: ARCH D NCSC 3403 #######C-03 0 SHEET 1 FILENAME: GENERAL NOTES.DWG Existing Conditions Plans plan Plan Profile Details 1 Details 2 Details 3