HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20130103WDENR
North Carolina Department of Environment and Natural
Division of Water Quality
Beverly Eaves Perdue Charles Waklld, P E
Governor Director
December 19, 2012
Mr J J Swam, Jr, P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Rdftg qe
Ir ,Dee Freeman
C�,. Secretary
,1
Subject Inspection -US Highway 221
DWQ Project 08 -1809
Individual Certification No 3784
TIP Nos R- 2233AA and AB Sections
Rutherford County
Dear Mr Swain
On December 10, 2012, I inspected the construction work on the US Highway 221 Project, R- 2233AA and AB
Sections, in Rutherford County Construction continues along most of the project with heavy grading, bridge
construction, culvert construction, pipe installation, roadbed preparation and paving
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also, please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions, please call me at 828 - 296 -4500
Sincerely,
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens, PE
Roger Bryan, Division 13, DEO
Ben DeWit, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
US Highway 221 December 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa,NC 28778 -8211
Phone 828 296-45001 FAX 828 299 7043 One
Internet www ncwaternuality org NorthCarohna
An Equal Opportunity 1 Affirmative Action Employer ;Vatura!!rf
Wetland Inspection Report
Project Num
20081809 Version 1
Project Name
NCDOT- US 221 (R- 2233a)
County
Rutherford
Location
NCDOT- US 221 (R- 2233a)
Latitude
+35 °12'21"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 12/10/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On -Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status ® Compliant
Program Area 401 (includes isolated /non -404)
Question Areas
® Permit (401 WQC)
Title
Status Issued
Project Type Road /Highway Widening
Region Central
Longitude -81 °50'18"
n Not Compliant
Phone
Phone 828 - 296 -4500
Inspection Summary
Inspected both AA and AB Sections from NC -SC State Line to end of project
Provide sediment controls for drainage pipes on northern side of Floyds Creek Bridge
Ensure that proper controls are in place to protect Floyds Creek during bridge removal and new bridge construction
Continue to maintain sediment and erosion control structures
Seed and mulch all bare areas as required
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment
Yes No NA NE
®nnn
■nnn
®nnn
Page 1