Loading...
HomeMy WebLinkAbout20100747 Ver 1_10252012-401_20121030Wetland Inspection Report Project Num: 20100747 Project Name: NCDOT- U.S 29 (U -3326) County: Rockingham Location: NCDOT- U.S 29 (U -3326) Latitude: SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 10/25/2012 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Amy C Euliss Secondary Inspector(s): Facility compliance Status: M Compliant Program Area: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Road /Highway Widening Region: Winston -Salem Title: Longitude: n Not Compliant Phone: Phone: Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? fl fl fl Are the culverts and /or filled areas installed properly? fl fl fl Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 0 0 Comment: See email dated 10/26/2012 in project file for inspection notes Page: 1