Loading...
HomeMy WebLinkAbout20101017 Ver 1_Site Inspection_20120924AIT"A NCDENR North Carolina Department of Environment and Natural Beverly Eaves Perdue Governor Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Dear Mr Swain Division of Water Quality Charles Wakild P E Director September 24 2012 Resources Subject Stormwater Inspection DWQ Project 1Q I DJ-7- TIP No U 2550B NC Highway 18 @ 140 Burke County eve 7 �( Dee Freeman Secretary On September 19 2012 I inspected the construction work on TIP Project No U 2550B NC Highway 18 at Interstate 40 in Burke County The inspection included compliance with the 401 Water Quality Certification and review of Construction Stormwater records Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection report for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office R 2550B NC Highway 18 @ 140 September 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296-45001 FAX 828 299 7043 One Internet www ncwatemualtty ora Nort:hCarohna An Equal Opportunity 1 Affirmative Action Employer Naturally Project Num Project Name County Location Latitude SW Plan Location Site Owner Name Inspection Date Wetland Inspection Report 20101017 NCDOT NC 18 (U 2550B) Burke NCDOT NC 18 (U 2550B) NC DOT PDEA 09/19/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person On Site Representative(s) J Primary Inspector Michael R Parker 11 Secondary Inspector(s) Facility compliance Status E Compliant Program Area Construction SW (NCG010000) Question Areas 0 NCG010000 Permit Inspection Summary Version 1 Status Issued Project Type Road maintenance /repair /improvements Region Asheville Title Longitude n Not Compliant Phone Phone 828 296 4500 Inspected project Project received 3 6 inches of rain from September 17 through September 18 Seed and mulch area adjacent to eastbound on ramp Temporary seed and mulch westbound off ramp The sediment basin on the southwest side of 1-40 needs to be cleaned It appears that material from the slope washed into one cell of the basin The sediment fence on the near the Mexican restaurant has faded and need to be repaired and basin may need to be cleaned Records and reports appear to be maintained properly and have appropriate information Page 1 Project Num 20101017 Owner NC DOT PDEA Inspection Date 09/19/2012 Inspection Type Site Inspection (DOT) NCG_O10000 Permit # Is this inspection related to a DLR/delegated program inspection? If Yes what was the DLR/delegated program inspection date? Is the site following its E &SC Plan as per DLR or delegated program? Is the site maintaining their E &SC measures as per DLR or delegated program? Is a copy of the approved E &SC plan on site? Is a rain gauge present on site or is WE in use for the site? Is rain gauge data or MPE data recorded? Are inspection records complete? Is the site compliant with other conditions of the NCG010000 permit? Comment Reason for Visit Routine Yes No NA NE 0000 ■000 ■nnn ■nnn ■nnn ■nnn ■nnn ■nnn Page 2 V