Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120821 jorA ,/;?,/?, 0 NCDENR sip f North Carolina Department of Environment and Natural Resources 2 4 2012� �rygr Division of Water Quality 0/1-7L4 ,os Sq,E Beverly Eaves Perdue Charles ild P E oRaoU�Governor Director F Freeman 8/creri ta ry September 18 2012 Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Subject Inspection US Highway 221 DWQ Project 08 1809 Individual Certification No 3784 TIP Nos R 2233AA and AB Sections Rutherford County Dear Mr Swain On September 10 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB Sections in Rutherford County Construction continues along most of the project with heavy grading bridge construction culvert construction pipe installation roadbed preparation and paving Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection reports for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office US Highway 221 September 2012 Inspection Letter SURFACE WATER PROTECTION SECTION—Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 4500\FAX 828 299 7043 One Internet www ncwaterquality orq North'C/arr/yo/h/na An Equal Opportunity Affirmative Action Employer Naturally f 1 Wetland Inspection Report ( Project Num 20081809 Version 1 Status Issued I 1 Project Name NCDOT US 221 (R 2233a) Project Type Road/Highway Widening It I County Rutherford Region Central Location NCDOT US 221 (R 2233a) Latitude +351221 Longitude 81 5018 Ii SW Plan Location Site Owner Name NC DOT PDEA ' Inspection Date 09/10/2012 Reason for Inspection Routine It Inspection Type Site Inspection(DOT) I Inspection Contact Person Title Phone i1 On Site Representative(s) I Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status u Compliant n Not Compliant Program Area 401 (includes isolated/non 404) 1 Question Areas NI Permit(401 WQC) Inspection Summary I Inspected the length of the project Clean traps and waddles in the median from Floyds Creek south to the Harris Henretta Road 11 Clean basins at Stations 146 and 226 Remove debris and lumber from under the Broad River bridge Seed and mulch all bare areas Permit(401 WQC) Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit's ■ n n n Are the culverts and/or filled areas installed properly' ■ n n n i I Is the site compliant with additional conditions of the 401 WQC or non 404 permit? . 0 o 0 Comment Page 1