HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120821 jorA ,/;?,/?, 0
NCDENR sip f
North Carolina Department of Environment and Natural Resources 2 4 2012� �rygr Division of Water Quality 0/1-7L4 ,os Sq,E
Beverly Eaves Perdue Charles ild P E oRaoU�Governor Director F Freeman
8/creri ta
ry
September 18 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Inspection US Highway 221
DWQ Project 08 1809
Individual Certification No 3784
TIP Nos R 2233AA and AB Sections
Rutherford County
Dear Mr Swain
On September 10 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and
AB Sections in Rutherford County Construction continues along most of the project with heavy grading
bridge construction culvert construction pipe installation roadbed preparation and paving
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US Highway 221 September 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION—Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500\FAX 828 299 7043 One
Internet www ncwaterquality orq North'C/arr/yo/h/na
An Equal Opportunity Affirmative Action Employer Naturally f
1 Wetland Inspection Report
( Project Num 20081809 Version 1 Status Issued
I 1 Project Name NCDOT US 221 (R 2233a) Project Type Road/Highway Widening
It I County Rutherford Region Central
Location NCDOT US 221 (R 2233a)
Latitude +351221 Longitude 81 5018
Ii
SW Plan Location
Site Owner Name NC DOT PDEA '
Inspection Date 09/10/2012
Reason for Inspection Routine
It
Inspection Type Site Inspection(DOT)
I
Inspection Contact Person Title Phone
i1
On Site Representative(s)
I
Primary Inspector Michael R Parker Phone 828 296 4500
Secondary Inspector(s)
Facility compliance Status u Compliant n Not Compliant
Program Area 401 (includes isolated/non 404)
1
Question Areas
NI Permit(401 WQC)
Inspection Summary
I Inspected the length of the project
Clean traps and waddles in the median from Floyds Creek south to the Harris Henretta Road
11 Clean basins at Stations 146 and 226
Remove debris and lumber from under the Broad River bridge
Seed and mulch all bare areas
Permit(401 WQC) Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit's ■ n n n
Are the culverts and/or filled areas installed properly' ■ n n n
i I Is the site compliant with additional conditions of the 401 WQC or non 404 permit? . 0 o 0
Comment
Page 1