Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120801�0 c AN if NCDENR North Carolina Department of Environment and Natura Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director July 26 2012 Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Resou�o�,�, Seeman "' ft Lary H Subject Inspection US Highway 221 DWQ Project 08 1809 Individual Certification No 3784 TIP Nos R 2233AA and AB Sections Rutherford County Dear Mr Swain On July 9 and 24 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB Sections in Rutherford County Construction continues along most of the project with heavy grading bridge construction culvert construction pipe installation and roadbed preparation Please ensure that all sediment and erosion control structures are mamtamed and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection reports for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely 0,,,4Xz 14- 6k.L- Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office US Highway 221July 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 45001 FAX 828 299 7043 One Intemet www ncwaterguality or9 NorthCarollna An Equal Opportunity r Affirmative Action Employer ;Vatura!!tf Wetland Inspection Report Protect Num 20081809 Version 1 Project Name NCDOT US 221 (R 2233a) County Rutherford Location NCDOT US 221 (R 2233a) Latitude +35 1221 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 07/09/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Facility compliance Status n Compliant Program Area 401 (includes isolated /non 404) Question Areas N Permit (401 WQC) Inspection Summary Title Status Issued Project Type Road /Highway Widening Region Central Longitude 81 5018 M Not Compliant Phone Phone 828 296 4500 Reviewed project on July 9 2012 Checks and waddles near Stations 233 +00 to 236 +00 in the middle of the roadway should be cleaned The other parts of the project appear to be in good condition Reviewed project on July 24 2012 Recent heavy rains have resulted in the loss of sediment into Long Branch downstream of the culvert and offsite near the culvert Station near Station 536 +00 Sediment should be removed from the stream and from any areas that are off the DOT right of way Seed and mulch any bare areas Continue to maintain sediment and erosion control devices Page 1 Project Num 20081809 Owner NC DOT PDEA Inspection Date 07/09/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ■ n n n Are the culverts and /or filled areas installed properly? ■ Cl n Cl Is the site compliant with additional conditions of the 401 WQC or non 404 permit? n ■ n n Comment Sediment was lost Into Long Branch and offsite near the culvert at Long Branch Page 2