HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120801�0
c
AN
if
NCDENR
North Carolina Department of Environment and Natura
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E
Governor Director
July 26 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Resou�o�,�,
Seeman
"' ft Lary
H
Subject Inspection US Highway 221
DWQ Project 08 1809
Individual Certification No 3784
TIP Nos R 2233AA and AB Sections
Rutherford County
Dear Mr Swain
On July 9 and 24 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB
Sections in Rutherford County Construction continues along most of the project with heavy grading bridge
construction culvert construction pipe installation and roadbed preparation
Please ensure that all sediment and erosion control structures are mamtamed and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
0,,,4Xz 14- 6k.L-
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US Highway 221July 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 45001 FAX 828 299 7043 One
Intemet www ncwaterguality or9 NorthCarollna
An Equal Opportunity r Affirmative Action Employer ;Vatura!!tf
Wetland Inspection Report
Protect Num
20081809 Version 1
Project Name
NCDOT US 221 (R 2233a)
County
Rutherford
Location
NCDOT US 221 (R 2233a)
Latitude
+35 1221
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 07/09/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status n Compliant
Program Area 401 (includes isolated /non 404)
Question Areas
N Permit (401 WQC)
Inspection Summary
Title
Status Issued
Project Type Road /Highway Widening
Region Central
Longitude 81 5018
M Not Compliant
Phone
Phone 828 296 4500
Reviewed project on July 9 2012
Checks and waddles near Stations 233 +00 to 236 +00 in the middle of the roadway should be cleaned
The other parts of the project appear to be in good condition
Reviewed project on July 24 2012 Recent heavy rains have resulted in the loss of sediment into Long Branch downstream of the
culvert and offsite near the culvert Station near Station 536 +00
Sediment should be removed from the stream and from any areas that are off the DOT right of way
Seed and mulch any bare areas
Continue to maintain sediment and erosion control devices
Page 1
Project Num 20081809 Owner NC DOT PDEA
Inspection Date 07/09/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ■ n n n
Are the culverts and /or filled areas installed properly? ■ Cl n Cl
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? n ■ n n
Comment Sediment was lost Into Long Branch and offsite near the culvert at Long
Branch
Page 2